Following area/equipment division is proposed. Date: 06.10.

2018

Sh. V.Rajkumar, Sr.Manager Sh. Hariom, Sr.Manager Sh. Karri Ramu, Sr.Manager Sh.J.V.S. Rangaiah, General shift engr.
Asst. Manager
1) WT, 1) SR 1) TH, 1) Lighting systems, 1) CHP storekeeping,
2) CRH, 2) Lifts, hoists, 2) MT, Bunker motors 2) welding supplies, 2) Checklists updation of
3) HT swgr 3) Battery, Battery chargers, UPS 3) LT swgr 3) Fans & exhaust periodical activities
4) Transformers, 4) ILMS, SM, MD 4) PA system fans, a) Motor PM checklist
5) PLC, DDCMIS 5) TP#12 Pump house, 2A Pump 5) TP#5 Pump house, 2B 4) Painting b) Temperature scanner
6) WT Pump house house pump house, 2C pump reading of
house. Transformers, HT
Conveyors: motors
All conveyors upto CRH All conveyors connected to SR All bunker related conveyors c) AC status
(14A/B, 1A/B, 15A/B) (from CRH to TP#3 & TP#17 ) (from TP#3 & TP#17 to d) Transformer checks
(2A/B, 3A/B 11A/B,12A/B,13A/B, Bunkers) e) Battery, UPS readings
4A/B; 5A/B,6A/B,7A/B,8A/B,9A,9B, f) AF, SR drives
16A/B,17A/B,25A/B,26A/B,27A, 10A,10B; monitoring
27B) 18A/B,19A/B,20A/B,21A/B,22 g) IRT of ILMS, SM, HT
A/B,23A,23B,24A,24B,28,29, motors
30) h) PLC, DDCMIS major
Contracts management: alarms
1. AMC – Electr. 1. BMC of Mekaster make 1) AMC – Lighting
Maintenance lifts 2) Service - LED lights
2. BMC of Parametrics 2. OH of Mekaster make lifts installation
make PCS & TP-5 cage replacement 3) BOT maintenance
3. BMC of Siemens make 3. BMC of Hi-Rel make UPS
AC&DC Drives & PLCs
Special projects:
1. HT swgr. interconnection 1. UPS replacement in SR-1,2 1. CTs installation in PDB in
cable arrangement 2. Stress relieving Roller of 3.3kv MCC#2.
2. Implementation of FCU cable roller at LMJB 2. Energy chain
logics in PLC. 3. TP-5 cage replacement commissioning
3. St#2 HT motor current
transducers
Overhauling, PMs, Belt protections, day-to-day belt protection complaints shall be taken care by respective area in-charge.

M.Nageswara Rao, DGM shall coordinate overall activities.