TANGGAL NSC / PEKERJA PROGRESS HARIAN

NO. AREA KERJA PEKERJAAN


MULAI SELESAI MANDOR T L

1 Bangunan Samping (Ticket Gali, Pas. Sloof, Bekisting, & Cor


Office & Locker Room) Leveling, Perataan, & Pemadatan Level Lantai
Pekerjaan lantai kerja t = 8 cm
Pas. Hebel
Plesteran
Acian
Penutup Lantai
Plint
Penutup Dinding
Plafond
Pengecatan

2 Cafe -0.90 & +2.00 Pas. Hebel


Plesteran
Acian
Penutup Lantai
Plint
Penutup Dinding
Plafond
Pengecatan

3 Family Suite Repair & Pas. Railing Tangga (3 kamar)


Pas. List Plang Mezanin (1 kamar)
Pas. Hand Railing (1 Kamar)
Finish Melamik Listplang, Hand Railing, & Anak Tangga (3 kamar)
Repair & Finishing Plafond
Pengecatan

Taman Prefunction Tanggulan


Penutup Lantai
Plint
Pengecatan Skylight
PEK. STRUKTUR PEK. DINDING PEK. PENUTUP PEK. PLAFOND
Struktur Pas.
Besi Bekist Cor Plesteran Acian Lantai Plint Dinding Rangka Gypsum + Tali Air
Praktis Hebel

Dinding Samping Suite ke T. Putar OK OK OK OK


Kitchen
Taman Prefunction
Ballroom Hall
Meeting Room
Ballroom Entrance

VIP Room
Toilet Lobby
Toilet Ballroom
Teras Kitchen
Teras Ballroom Entrance
Taman Depan & Samping Ballroom
Taman Area Lobby
Talang Dak + 4.95 Ballroom
Talang Ampig Ballroom
Selasar Suite Ke Tangga Putar
Selasar Service Ballroom
R. Tangga D3 +0.00 s/d +11.60
R. Tangga D2 +0.00 s/d +11.60
R. Linen
Preparation Room
Prefunction Luar
Prefunction Dalam
Pantry Ballroom
Marketing Room
Management Office
Lobby Store
Lobby Lounge + Teras
Kitchen Storage
Honeymoon Suite
Family Suite
Dak + 4.95 Ballroom
Cafe -0.90 & +2.00
Buttler Room
Board Meeting Room
Bangunan Samping (Ticket Office & Locker Room)
Back Office, R. Server, & R. IT
Area Tangga Putar
Area Restaurant

Rumah Partisi 3 OK OK OK OK OK OK OK
Rumah Partisi 2 OK OK OK OK OK OK OK
Rumah Partisi 1 OK OK OK OK OK OK OK
K. PLAFOND PEK. CAT PEK. LAIN
Pas.
Coumpound Plafond Cat Dinding Bobok Kongliong
Glassblock

OK

Balok Gantung
Pintu
1