METRADO PRESIO

PART. EDIFICACIÓN
N° unid Cantidad Unitario Parcial
1.00 OBRAS PROVICIONALES Y TRABAJOS PRELIMINARES
1.01 Oficinas glb 622.23 116.70 122.00
1.02 Servicios higienicos glb 1,097.52 154.44 223.76
1.03 instalaciones provicionales ml 600.00 73.03 156.00
1.04 agua para la construcción m3 600.00 69.84 163.90
1.05 trabajos preliminares unid 347.96 4,112.83 270.00
1.06 trazos, niveles y replanteo ml 347.60 2.76 959.38
1.07 estructuras unid 400.00 1,641.12 656,448.00
excavaciones m2 300.00 867.00 343.00
excavaciones simples m2 342.00 110.00 867.00
concreto ciclope m2 500.00 244.00 876.45
sobrecimientos m2 243.00 894.00 456.09
para concreto m2 345.00 534.00 554.45
zapatas m2 244.00 345.66 345.67
viga de cimentacion m2 2,334.00 123.35 234.56
columnas m2 243.00 232.76 342.57
vigas m2 671.00 454.87 123.67
losas aligeradas m2 565.00 545.78 242.65

SUB TOTAL 662,729.15


Gastos Generales y Utilidad (10%) 66,272.91
TOTAL 729,002.06
COEFICIENTES DE INCIDENCIA

COEFICIENTES DE INCIDENCIA QUE INTEGRAN LA FÓRMULA

K = 0.349Jr/Jo + 0.200 Tr/To + 0.166 CMFr/CMFo +

k= 1
1 2 3 4
49 - MAQUINARIA
47 - MANO DE OBRA 69 - TUBERIA DE °C°S 04 - AGREGADO FINO 21 - CEMENTO PORTLAND
IMPORTADA
% S/ % S/ % S/ % S/ %

23.00 28.06
31.38 70.21 63.56 142.22 0.58 1.30 3.54
93.15 145.32 6.85 10.68
1.07 1.76 22.87 37.48
53.15 143.51 1.64 4.43 10.20
71.74 688.25
39.65 260,304.00 37.66 247,200.00 1.00 6,552.00 0.67
2.04 3,000.00
3.90 24,345.00
5.40 4,343.56 34.00 765.00
6.50 234.40 4,535.00
12.30 654.78 3,456.00 345.00
4.00 756.98 2,134.00 3,345.00
35.50 686.79 6,345.35 345.00
4.50 564.68 35.00
6.34 7,546.67 453.54 3.00
9.90 546.65

304,060.62 48.16 259,731.11 15,930.74


0.238 0.356 0.022
4
6
5
7
9

0.349

o + 0.166 CMFr/CMFo + 0.173 Er/Eo + 0.112 Dr/Do


5 6 7 8 9 10
05 - AGREGADO 43 - MADERA 03 - ACERO 37 - HERRAMIENTA
21 - CEMENTO PORTLAND 02 - ACERO LISO
GRUESO NACIONAL CORRUGADO MANUAL
S/ % S/ % S/ % S/ % S/ % S/

2.91 3.55
7.93 0.94 2.10

27.54 7.66 20.68 10.36 27.97 1.85 4.99 13.54 36.57

4,376.00 0.31 2,016.00 3,123.00

899.00
78.67
3,421.00 45.67

43.00
213.00

123.00

4,411.47 2,036.68 3,827.97 3,127.99 1,059.91 5.66


0.006 0.003 0.005 0.004 0.001 0.000
0.022 8 0.004
0.003 9 0.006
0.031
0.000
0.006
0.200
0.200 0.166
11 12 13
48 - MAQUINARIA 31 - TAPA DE 31 - INDICE GEN.
NACIONAL CONCRETO DE P. AL C.
% S/ % S/ % S/

76.06 124.66
1.60 4.31
28.26 271.13
20.72 136,000.00

400.10 136,000.00
0.001 0.187 0.112
10 0.000 maq.nac.
2 0.238 maq.imp.
0.239

0.173 0.112

You might also like