DESIGN STUDIO V

Final Design Review (70%), Week 14


8 to 10 x A1 panels*
Below are the details of the submission requirements:

Requirement s Some ideas to think with


Figure/ground plan of the study area Of the context, mostly from project 1; what is the urban relevance for your
(1:2000 or any suitable scale), site proposal of the Community library? What are your questions that your
sketches & site responses (300 to architecture formulates a narrative? Refer to the 3 Questions given to you
500 words) for the Interim 2.
Site plan 1:500 Of your proposal; on how your infill relates to the next door neighbour and
the nearest node.
Design narrative diagrams 1:500 or Idea translation into design.
narrative axo
Floor plans 1:100 INCLUDE THE ADJOINING CONTEXT. This should be coloured; at least
two colour coded representing public/community spaces.

Design Codes compliances in You might choose to draw a separate ground floor plan or layer this info
Ground Floor plan 1:100 over your main ground floor plan.
Need to represnt fire-run (a+b not more than 60m), fire-staircases and
setbacks)
Façades 1:100 INCLUDE THE ADJOINING CONTEXT. Main street and back-lane
facades; exploring the environmental aspects, urban scale and materiality
Sections 1:100 INCLUDE THE ADJOINING CONTEXT.
Colours same as in plan; but add human figures
Final model: preferably in scale INCLUDE THE ADJOINING CONTEXT.
1:100 Add landscape and human figures.
Have a purpose to communicate through the model. Discuss with your
tutor on this.
Diagrams/ detail drawings (1:20) for This could be a wall section; add human figures only if possible
demonstration of structural, lighting,
façade integration
3D rendering: one seller interior Add human figures; only of the community.
view and one seller exterior view in
addition to other views you may
wish to incorporate to exhibit design
ideas.
Evidence of integration BY design Consideration and integration of appropriate structural system and façade
systems (from Building Technology1) and lighting (From Building
Science2) for overall building design.
+ process folder (butter sheets of design progress/development) and working models

*All A1 panels must be mounted onto foam boards

Page 1/2
.
PROJECT 1 PANELS AND MODELS – DISPLAY IN THE CORRIDOR OUTSIDE YOUR RESPECTIVE STUDIO SPACES.

SUBMISSION DAY, DATE & TIME: WED, 28/11/2018, 2 to 5pm – LATE SUBMISSIONS WILL BE PENALISED.

SUBMISSION AND PIN-UP VENUE: E4 STUDIOS (TBC)


FINAL DESIGN REVIEW DAY, DATE & TIME: THURS, 29/11/2018, 8AM TO 12NOON; FORMAL ATTIRE.