You are on page 1of 12

ESSAR OIL AND GAS EXPLORATION AND

PRODUCTION LTD
INSPECTION REPORT : LIGHTING FIXTURE INSTALLATION

PROJECT RANIGANJ CBM PROJECT


OWNER EOGEPL
DOCUMENT NO. EPIL-EOL- ML - ELEC - IR - 03

STATION : REPORT NO:

LOCATION / AREA : DATE :

REF. DRG / DOC : Approved Equipment Layout Drawing and Cable trench layout Drawing

Fixtures Installed
Sl No Description Inspection status
Type Quantity
1 Installation of light fixtures
2 Installation of Swicthes / Sockets
3 Installation of LDB & Dressing of Cables inside DB.
4 Earthing of light fixtures & DBs
5 Operation of light fixture with lighting DB
Installation and functioning of exhaust fan & ceiling
6
fans.
7 Installation of Fixtures on light pole
8 Installation of FLP Junction Box.
9 Earthing of pole, light fixture & Junction boxes

10 Operation of External lighting fixtures with lighting DB

REMARKS : - ______________________________________________________________________________
______________________________________________________________________________

NAME

SIGNATURE

DATE

FOR CONTRACTOR EOGEPL


ESSAR OIL AND GAS EXPLORATION AND
PRODUCTION LTD
INSPECTION REPORT : SWITCHGEAR INSTALLATION

PROJECT RANIGANJ CBM PROJECT


OWNER EOGEPL
DOCUMENT NO. EPIL-EOL- ML - ELEC - IR - 03

STATION : REPORT NO:

LOCATION / AREA : DATE :

REF. DRG / DOC : Approved Equipment Layout Drawing and Cable trench layout Drawing

Sl. No Description Inspection status Remarks

1 Permanent installation & allingment of panel

2 Input / Output cable glanding & termination

3 Panel interconnections

4 Earthing of Panels

5 All bolted connection tightness

6 Termination of cable and wiring continuity.

Megger check of incoming and out going cables and


7
panel as a whole
8 Check of all accessaries for proper functioning.

REMARKS : - ______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

NAME

SIGNATURE

DATE

FOR CONTRACTOR EOGEPL


ESSAR OIL AND GAS EXPLORATION AND
PRODUCTION LTD
INSPECTION REPORT : UPS CHARGER INSTALLATION

PROJECT RANIGANJ CBM PROJECT


OWNER EOGEPL
DOCUMENT NO. EPIL-EOL- ML - ELEC - IR - 03

STATION : REPORT NO:

LOCATION / AREA : DATE :

REF. DRG / DOC : Approved Equipment Layout Drawing and Cable trench layout Drawing

Sl. No Description Inspection status Remarks

1 Alignment and fixing of Charger / Inverter

2 Cable glanding and Termination

3 Inter panel connection and wiring

4 Cleaning of panel

5 Earthing of panel

6 Megger check

REMARKS : - ______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

NAME

SIGNATURE
DATE
FOR CONTRACTOR EOGEPL
ESSAR OIL AND GAS EXPLORATION AND
PRODUCTION LTD
INSPECTION REPORT : CABLE TRAY INSTALLATION

PROJECT RANIGANJ CBM PROJECT


OWNER EOGEPL
DOCUMENT NO. EPIL-EOL- ML - ELEC - IR - 03

STATION : REPORT NO:

LOCATION / AREA : DATE :

REF. DRG / DOC : Approved Equipment Layout Drawing and Cable trench layout Drawing

Sl.No Description Inspection status Remarks

1 Welding and Alignment of tray supports.

2 Painting of suppoprts.

3 Installation of cable tray / Covers

4 Earthing of cable trays / Covers.

REMARKS : - ______________________________________________________________________________

______________________________________________________________________________

NAME

SIGNATURE

DATE
FOR CONTRACTOR EOGEPL
ESSAR OIL AND GAS EXPLORATION AND
PRODUCTION LTD
INSPECTION REPORT : CABLING REPORT

PROJECT RANIGANJ CBM PROJECT


OWNER EOGEPL
DOCUMENT NO. EOGEPL/VAD/QAC/FM – 001-1A

STATION : REPORT NO:

LOCATION / AREA : DATE :

REF. DRG / DOC : Approved Equipment Layout Drawing and Cable trench layout Drawing

CABLES
DEPTH OF DRESSING /
CABLE BRICKS TAGGING / MARKER ON
SR.NO FROM TO CABLE SAND
CABLE AND
TAG NO. COVERING OF CABLES
TRENCH BEDDING ALONG ROUTE

REMARKS : - ______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

NAME

SIGNATURE

DATE

FOR CONTRACTOR EOGEPL


nch layout Drawing

REMARKS

EPL
ESSAR OIL AND GAS EXPLORATION AND
PRODUCTION LTD
INSPECTION REPORT : INSTALLATION OF EARTH PIT

PROJECT RANIGANJ CBM PROJECT


OWNER EOGEPL
DOCUMENT NO. EPIL-EOL- ML - ELEC - IR - 03

STATION : REPORT NO:

LOCATION / AREA :
DATE :

REF. DRG / DOC : Approved Equipment Layout Drawing and Cable trench layout Drawing

Sl.No Description Inspection status Remarks

1 Depth of Earth Pit

2 Positioning of Earth Electrode

3 Filling of Salt & Coal/ Back fill Compound

4 Laying of Earth Grid

5 Dimensions of earth strip - Cu / GI

6 Welding of earth strip

7 Earth resistance of earth electrode and grid.

8 Watering arrengement

REMARKS : - _________________________________________________________________________________________
______________________________________________________________________________

NAME
SIGNATURE
DATE
FOR CONTRACTOR EOGEPL
ESSAR OIL AND GAS EXPLORATION AND
PRODUCTION LTD
INSPECTION REPORT : EARTHING RESISTANCE REPORT

PROJECT RANIGANJ CBM PROJECT


OWNER EOGEPL
DOCUMENT NO. EPIL-EOL- ML - ELEC - IR - 03

STATION : REPORT NO:

LOCATION / AREA : DATE :

REF. DRG / DOC : Approved Equipment Layout Drawing and Cable trench layout Drawing

EARTH RESISTANCE REMARKS


EARTH PIT
SL.NO AREA / LOCATION WITHOUT
NO. WITH GRID
GRID

REMARKS : - _________________________________________________________________________________________
______________________________________________________________________________

NAME

SIGNATURE

DATE
FOR CONTRACTOR EOGEPL
ESSAR OIL AND GAS EXPLORATION AND
PRODUCTION LTD
INSPECTION REPORT : EARTHING RESISTANCE REPORT

PROJECT RANIGANJ CBM PROJECT


OWNER EOGEPL
DOCUMENT NO. EPIL-EOL- ML - ELEC - IR - 03

STATION : REPORT NO:

LOCATION / AREA : DATE :

REF. DRG / DOC : Approved Equipment Layout Drawing and Cable trench layout Drawing

EARTHING STRIP LAYED SIZE OF CONDUCTOR Cu LENGTH OF


SL.NO REMARKS
FROM TO / GI / PVC WIRE STRIP

REMARKS : - _________________________________________________________________________________________
______________________________________________________________________________

NAME
SIGNATURE
DATE
FOR CONTRACTOR EOGEPL
ESSAR OIL AND GAS EXPLORATION AND PRODUCTION LTD
INSPECTION REPORT : CABLE MEGGERING REPORT

PROJECT RANIGANJ CBM PROJECT


OWNER EOGEPL
DOCUMENT NO. EOGEPL/VAD/QAC/FM – 001-1B

STATION : REPORT NO:

LOCATION / AREA : DATE :

No of cores x INSULATION RESISTANCE IN M.OHMS.


TYPE / CONTINUITY
SR.NO CABLE TAG NO. Size of cable
Voltage RY YB BR RN YN BN RE YE BE NE TEST
Cu/Al

REMARKS : - ______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

NAME
SIGNATURE
DATE
For CONTRACTOR EOGEPL