You are on page 1of 1

Profil Muka Air pada Tampang Lintang St 800

Saluran Steady Flow Plan: Hitungan profil aliran permanen 30/10/2018 Nama : Ahmad Luthfi Mubarok

.03 NPM : 10315348


3.0 Legend

2.5 EG PF 2
Kelas : 4TA01
WS PF 2
Elevation (m)

2.0
EG PF 1
1.5
WS PF 1
1.0 Ground
Bank Sta
0.5

0.0
0 1 2 3 4 5 6
Station (m)

Profil Muka Air di sepanjang alur


Saluran Steady Flow Plan: Hitungan profil aliran permanen 30/10/2018
Steady Flow Grafika
5 Legend

EG PF 1
4 WS PF 1
Crit PF 1
Elevation (m)

Ground
3

0
0 2000 4000 6000 8000 10000
Main Channel Distance (m)

Profil Kecepatan Aliran di Sepanjang Alur


Saluran Steady Flow Plan: Hitungan profil aliran permanen 30/10/2018
Steady Flow Grafika
3.0
Vel Left (m/s), Vel Chnl (m/s), Vel Right (m/s)

Legend

Vel Chnl PF 2
2.5
Vel Chnl PF 1

2.0

1.5

1.0

0.5
0 2000 4000 6000 8000 10000
Main Channel Distance (m)

You might also like