ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA

ANALISA HARGA SATUAN JASA


PEMASANGAN INSTALASI LISTRIK

NO JENIS PEKERJAAN HARGA BIAYA JUMLAH


SATUAN (Rp.) DIBULATKAN
(Rp.) (Rp.)

1 2 3 4 5

DASAR UPAH
- Pekerja (pembantu tukang) upah minim
- Tukang
- Kepala Tukang
- Mandor
- Teknisi
- Supervisi
- Tenaga Ahli (Expert)

1 PEKERJA
Upah 1 hari 17250 17250
Transfort 1 hari 8000 8000
Uang Makan 1 hari 7000 7000
32250 32250

32250

2 TUKANG
Upah 1 hari 24500 24500
Transfort 1 hari 8000 8000
Uang Makan 1 hari 8000 8000
40500 40500

40500

3 TEKNISI
Upah 1 hari 38250 38250 56250
Transfort 1 hari 8000 8000
Uang Makan 1 hari 10000 10000
56250 56250

56250

4 TENAGA AH
Upah 1 hari 93500 93500
Transfort 1 hari 15000 15000
Uang Makan 1 hari 15000 15000
123500 123500
123500

5 SUPERVISI
Upah 1 hari 139750 139750
Transfort 1 hari 15000 15000 168750
Uang Makan 1 hari 20000 20000
174750 174750

168750
ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA

ANALISA HARGA SATUAN


PEKERJAAN PEMASANGAN INSTALASI GARDU
Belum termasuk resiko,over head,keuntungan 10 % dan PPN 10 %
2004
HARGA BIAYA JUMLAH
NO JENIS PEKERJAAN SATUAN ( Rupiah ) DIBULATKAN
( Rupiah ) ( Rupiah )
1 2 3 4 5
1a PEKERJAAN PEMASANGAN INSTALASI GARDU
1.1 Pemasangan kubikel LBS/PT/B1
- Tenaga Ahli Muda 0.38 Hari 123,500 46,312.50
2 Tukang 40,500 81,000.00
2 Pekerja 32,250 64,500.00
- Pengadaan/Pemasangan Angkur 4 Buah 3,738 14,952.00
206,764.50 206,760.00
1.2 Pemasangan Kubikel PGDB/PGDT
- Tenaga Ahli Muda 0.50 Hari 123,500 61,750.00
4 Tukang 40,500 162,000.00
2 Pekerja 32,250 64,500.00
- Pengadaan/Pemasangan Angkur 3 Buah 3,738 11,214.00
299,464.00 299,460.00
1.3 Pemasangan SACO
- Tenaga Ahli Muda 0.50 Hari 123,500 61,750.00
4 Tukang 40,500 162,000.00
2 Pekerja 32,250 64,500.00
- Pengadaan/Pemasangan Angkur 4 Buah 3,738 14,952.00
303,202.00 303,200.00
1.4 Pemasangan RMU.3 dan 4 Terminal(Panel Kontrol UPD)
- Tenaga Ahli Muda 0.50 Hari 123,500 61,750.00
4 Tukang 40,500 162,000.00
1 Pekerja 32,250 32,250.00
- Pengadaan/Pemasangan Angkur 4 Buah 3,738 14,952.00
270,952.00 270,950.00
1.5 Pemasangan RMU ( LBS,LBS,PB) ( Beton,Kiosk,Portal)
- Tenaga Ahli Muda 0.50 Hari 123,500 61,750.00
4 Tukang 40,500 162,000.00
2 Pekerja 32,250 64,500.00
- Pengadaan/Pemasangan Angkur 4 Buah 3,738 14,952.00
303,202.00 303,200.00
1.6 Pemasangan ( Peletakan ke posisi sebenarnya ) Trafo 100 kVA s/d 315 KVA
- Tenaga Ahli Muda 0.38 Hari 123,500 46,312.50
2 Tukang 40,500 81,000.00
3 Pekerja 32,250 96,750.00
224,062.50 224,060.00
1.7 Pemasangan ( Peletakan ke posisi sebenarnya )Trafo 400 kVA s/d 630 kVA
- Tenaga Ahli Muda 0.38 Hari 123,500 46,312.50
2 Tukang 40,500 81,000.00
5 Pekerja 32,250 161,250.00
288,562.50 288,560.00
1.8 Pemasangan ( Peletakan ke posisi sebenarnya )Trafo 1.000 kVA s/d 1.250 KVA
- Tenaga Ahli Muda 0.38 Hari 123,500 46,312.50
2 Tukang 40,500 81,000.00
8 Pekerja 32,250 258,000.00
385,312.50 385,310.00
1.9 Pemasangan ( Peletakan ke posisi sebenarnya )Trafo 1.600 kVA s/d 2.000 KVA
- Tenaga Ahli Muda 0.38 Hari 123,500 46,312.50
2 Tukang 40,500 81,000.00
12 Pekerja 32,250 387,000.00
514,312.50 514,310.00
1.10 Bracket (Kabel Tray) dan Grounding
- Tenaga Ahli Muda 0.25 Hari 123,500 30,875.00
2 Tukang 40,500 81,000.00
32,250 111,875.00 111,870.00
1.11 Rak TR 4 Jurusan
- Tenaga Ahli Muda 0.13 Hari 123,500 15,437.50
2 Tukang 40,500 81,000.00
32,250 96,437.50 96,430.00
1.12 Rak TR 6 & 8 Jurusan
- Tenaga Ahli Muda 0.13 Hari 123,500 15,437.50
2 Tukang 40,500 81,000.00
1 Pekerja 32,250 32,250.00
128,687.50 128,680.00
1.13 Pemasangan LBS untuk Gardu Beton Open Type
- Tenaga Ahli Muda 0.38 Hari 123,500 46,312.50
2 Tukang 40,500 81,000.00
- Pengadaan/Pemasangan angkur 4 Pekerja 32,250 129,000.00
256,312.50 256,310.00
1.14 L.V.C.B Outdoor untuk gardu CANTOL
- Tenaga Ahli Muda 0.13 Hari 123,500 15,437.50
2 Tukang 40,500 81,000.00
96,437.50 96,430.00
1.15 L.V.S.B Outdoor untuk gardu Portal
- Tenaga Ahli Muda 0.13 Hari 123,500 15,437.50
2 Tukang 40,500 81,000.00
3 Pekerja 32,250 96,750.00
193,187.50 193,180.00
1.16 Single Core TM 3 x ( 1x 25 mm2 ) di MV Cell
- Tenaga Ahli Muda 0.67 Hari 123,500 82,333.33
0.67 Tukang 40,500 27,000.00
0.33 Pekerja 32,250 10,750.00
120,083.33 120,080.00
1.17 Single Core TM 3 x ( 1x 25 mm2 ) di Trafo
- Tenaga Ahli Muda 0.67 Hari 123,500 82,333.33
0.67 Tukang 40,500 27,000.00
0.33 Pekerja 32,250 10,750.00
120,083.33 120,080.00
1.18 Single Core TR 7 x ( 1x 240 mm2 ) di Trafo
- Tenaga Ahli Muda 0.25 Hari 123,500 30,875.00
0.13 Tukang 40,500 5,062.50
0.13 Pekerja 32,250 4,031.25
39,968.75 39,960.00
1.19 Single Core TR 7 x ( 1x 240 mm2 ) di TR
- Tenaga Ahli Muda 0.25 Hari 123,500 30,875.00
0.13 Tukang 40,500 5,062.50
0.13 Pekerja 32,250 4,031.25
39,968.75 39,960.00
1.20 Pengadaan Penyangga Kabel TM 20 kV
- Tenaga Ahli Muda 0.13 Hari 123,500 15,437.50
1 Tukang 40,500 40,500.00
2 Pekerja 32,250 64,500.00
- Pengad/Pemas Besi U 85x45x6 m 1 Meter 15,600 15,600.00
- Pengad/Pemas Klem Besi 1 Buah 1,950 1,950.00
137,987.50 137,980.00
1.21 IndikatormGangguan Tanah/GFD
- Tenaga Ahli Muda 0.13 Hari 123,500 15,437.50
2 Tukang 40,500 81,000.00
96,437.50 96,430.00
1.22 Pemasangan Instalasi Heater Kubikel
- Tenaga Ahli Muda 0.13 Hari 123,500 15,437.50
1 Tukang 40,500 40,500.00
55,937.50 55,930.00
1.23 Pengadaan Kabel Heater Kubikel 1 Meter 2,210 2,210.00 2,210.00
1.24 Pembersihan Ruangan Gardu 2 Pekerja 26,250 52,500.00 52,500.00

1.25 Bantuan Tenaga untuk Pengujian 2 Tukang 37,500 75,000.00


Pengopersian 2 Pekerja 26,250 52,500.00
127,500.00 127,500.00
1.b PEKERJAAN PEMBONGKARAN INSTALASI GARDU
1 No: 1 s/d 19 sama dengan Pekerjaan Pemasangan
2 Pembongkaran Terminal Indoor 20 KV di Cubikel 1 Pekerja 26,250 26,250 26,250.00
II PEMASANGAN APP TYPE KHUSUS IB,IC DAN IIF
2.1 Dengan Pondasi
- Galian tanah biasa/rumput untk po 0.13 m3 20,386 2,650.18
- Pasang Batu Bata 0.26 m3 201,578 52,410.28
- Pasang Angkur 4 Buah 3,738 14,952.00
- Pasang Fisher 4 Buah 1,430 5,720.00
- Plesteran 1 PC: 2 Ps ( tebal 15 mm 2.27 m2 10,777 24,463.79
- Acian Beton 2.27 m2 4,420 10,033.40
- Jasa Pelaksanaan Sipil 0.5 Hari 123,500 61,750.00
3 Tukang 40,500 121,500.00
- Jasa Pelaksanan Listrik 0.13 Hari 123,500 16,055.00
2 Tukang 40,500 81,000.00
390,534.65 390,530.00
2.2 Dengan Strain Hook
- Pasang Strain Hook 4 Buah 6,500 26,000.00
- Tenaga Ahli Muda 0.13 Hari 123,500 15,437.50
1 Tukang 40,500 40,500.00
2 Pekerja 32,250 64,500.00
146,437.50 146,430.00
III PEKERJAAN PEMELIHARAAN INSTALASI GARDU
3.1 Kubikel TM
- Tenaga Ahli Muda 0.13 Hari 123,500 15,437.50
- Tukang 2 Tukang 40,500 81,000.00
- Majun 0.5 Kg 8,000 4,000.00
- YC.8513 ( Minyak Pembersih ) 0.5 Liter 75,000 37,500.00
- Pasline Putih Type G.658 SFG 0.25 Kg 87,500 21,875.00
159,812.50 159,810.00
3.2 Kubikel pengukuran ( PGDB )
- Tenaga Ahli Muda 0.13 Hari 123,500 15,437.50
- Tukang 2 Tukang 40,500 81,000.00
- Majun 0.5 Kg 8,000 4,000.00
- YC.8513 ( Minyak Pembersih ) 0.5 Liter 75,000 37,500.00
- Pasline Putih Type G.658 SFG 0.25 Kg 87,500 21,875.00
159,812.50 159,810.00
3.3 Trafo Distribusi
- Tenaga Ahli Muda 0.13 Hari 123,500 15,437.50
- Tukang 2 Tukang 40,500 81,000.00
- Majun 0.5 Kg 8,000 4,000.00
- YC.8513 ( Minyak Pembersih ) 0.5 Liter 75,000 37,500.00
137,937.50 137,930.00
3.4 Rak TR
- Tenaga Ahli Muda 0.13 Hari 123,500 15,437.50
- Tukang 1 Tukang 40,500 40,500.00
- Majun 0.25 Kg 8,000 2,000.00
- YC.8513 ( Minyak Pembersih ) 0.5 Liter 75,000 37,500.00
- Pasline Putih Type G.658 SFG 0.25 Kg 87,500 21,875.00
117,312.50 117,310.00
3.5 Detektor gangguan tanah/GFD
- Tukang 1 Tukang 40,500 40,500.00
- YC.8513 ( Minyak Pembersih ) 0.5 Kg 75,000 37,500.00
78,000.00 78,000.00
3.6 Pembersihan Ruangan Gardu
- Alat Vacum Cleaner 1 Buah 13,000 13,000.00
- Bahan Bakar/Olie 1 Liter 2,600 2,600.00
- Instalator 1 Tukang 40,500 40,500.00
56,100.00 56,100.00
IV PEKERJAAN LAIN - LAIN
4.1 Pemasangan Gardu Besi/Kios berikut Pondasi
a Pekerjaan Persiapan 1 Lokasi 130,000 130,000.00
b Pasang Bouplank 17 Meter 8,398 142,766.00
c Galian Tanah Biasa/Rumput 9 m3 20,386 183,474.00
d Urugan Pasir Padat 0.5 m3 49,842 24,921.00
e Pondasi Beton Tulang 1:2:3 4.6 m3 689,193 3,170,287.80
f Pantek Pipa Arde Komplit 4 Batang 130,000 520,000.00
g Plesteran 1:2 35 m2 10,738 375,830.00
h Acian Beton 35 m2 4,420 154,700.00
i Pasang Arde Keliling Pondasi 10 Kg 2,925 29,250.00
j Beton Lantai Kerja 1:2:3 6 m2 23,375 140,250.00
k Pekerjaan Stel Kios
- Pelaksana 1 Ten.Ahl.Md 123,500 123,500.00
2 Tukang 40,500 81,000.00
3 Pekerja 32,250 96,750.00
l Pembuangan tanah keluar lokasi 9 M3 21,125 190,125.00
Angkutan Truk dengan Kap.3.m3 5,362,853.80 5,362,850.00
2 Pemasangan Gardu Kios Compact berikut Pondasi
a Pekerjaan Persiapan 1 Lokasi 130,000 130,000.00
b Pasang Bouplank 9 Meter 8,398 75,582.00
c Galian Tanah Biasa/Rumput 4.5 m3 7,878 35,451.00
d Urugan Pasir Padat 0.25 m3 49,842 12,460.50
e Pondasi Beton Tulang 1:2:3 2.3 m3 689,193 1,585,143.90
f Pantek Pipa Arde Komplit 4 Batang 130,000 520,000.00
g Plesteran 1:2 18 m2 10,738 193,284.00
h Acian Beton 18 m2 4,420 79,560.00
i Pasang Arde Keliling Pondasi 10 Kg 2,925 29,250.00
j Beton Lantai Kerja 1:2:3 3 m2 23,375 70,125.00
k Pekerjaan Stel Kios
- Pelaksana 1 Ten.Ahl.Md 123,500 123,500.00
2 Tukang 40,500 81,000.00
6 Pekerja 32,250 193,500.00
l Sewa Mobil Crane 0.88 Hari 112,500 98,437.50
m Pembuangan tanah keluar lokasi 4.5 Rit 0.00
Angkutan Truk dengan Kap.3 m3 3,227,293.90 3,227,290.00

3 Pengadaan Gardu Susun GRC 400 KVA Kososng (1,5x2,5x3,9)m 39,000,000.00


dan saluran kabel GRC 630 KVA Kosong (1,5x2,5x4,2) 650,000.00
4 Pengadaan Gardu Susun GRC 400 KVA Kososng (1,5x2,5x3,9)m 43,225,000.00
dan saluran kabel GRC 630 KVA Kosong (1,5x2,5x4,2) 650,000.00
ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA

ANALISA HARGA SATUAN


PEKERJAAN SALURAN KABEL TEGANGAN RENDAH
Belum termasuk resiko, over head, keuntungan 10 % dan PPN 10 %
2004
HARGA JUMLAH JUMLAH
NO. URAIAN PEKERJAAN SATUAN BIAYA DIBULATKAN
(RUPIAH) (RUPIAH) (RUPIAH)
1 2 3 4 5

1. PEKERJAAN GALIAN, URUGAN DAN PEMADATAN


1.1 GALIAN URUGAN DAN PEMADATAN
PADA TANAH BIASA / TANAH RUMPUT
a. 1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 )
- GALIAN TAN = 0.32 m3 20,386.15 6,523.57
- URUGAN TAN= 0.24 m3 9,464.00 2,271.36
- PEMADATAN = 0.40 m2 3,713.30 1,485.32
10,280.25
b. 3 Jalur (1,00 x 0,50 x 0,80 )
- GALIAN TAN = 0.40 m3 20,386.15 8,154.46
- URUGAN TAN= 0.30 m3 9,464.00 2,839.20
- PEMADATAN = 0.50 m2 3,713.30 1,856.65
12,850.31
c. 4 Jalur (1,00 x 0,65 x 0,80 )
- GALIAN TAN = 0.52 m3 20,386.15 10,600.80
- URUGAN TAN= 0.39 m3 9,464.00 3,690.96
- PEMADATAN = 0.65 m2 3,713.30 2,413.65
16,705.40
d. GALIAN PENYUNTIKAN KABEL PADA
TANAH BIASA/TN.RUMPUT (1,50 x 0,50 x 0,80 )
- GALIAN TAN = 0.60 m3 20,386.15 12,231.69
- URUGAN TAN= 0.45 m3 9,464.00 4,258.80
- PEMADATAN = 0.75 m2 3,713.30 2,784.98
19,275.47
e. GALIAN LUBANG SAMBUNGAN PADA
TANAH BIASA/TN.RUMPUT
( 1 s/d 2 Jalur = 1,50 X 0,50 X 0,80 )
- GALIAN TAN = 0.72 m3 20,386.15 14,678.03
- URUGAN TAN= 0.45 m3 9,464.00 4,258.80
- PEMADATAN = 0.75 m2 3,713.30 2,784.98
21,721.80
f. GALIAN LUBANG SAMBUNGAN PADA
TANAH BIASA/TANAH RUMPUT
( 3 s/d 4 Jalur = 1,50 X 0,85 X 0,80 )
- GALIAN TAN = 1.02 m3 20,386.15 20,793.87
- URUGAN TAN= 0.77 m3 9,464.00 7,239.96
- PEMADATAN = 1.28 m2 3,713.30 4,734.46
32,768.29
g. GALIAN LUBANG PENGEBORAN MANUAL PADA
TANAH BIASA/TANAH RUMPUT
(2,00 X 1,50 X 3,00 )
- HS SAMA DENGAN HS SKTM 0.00

Catatan :
- Rp. 20.386,15 -HS.Sipil Hal.2-No.02
- Rp. 9.464, -HS.DKI Hal.2-TN.10
- Rp. 3.713,3 = 2xRp.1068-HS.DKI Hal.3 TN.24

1.2. GALIAN URUGAN DAN PEMADATAN


PADA TANAH KERAS / TANAH KORAL
a. 1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 )
- GALIAN TAN = 0.32 m3 24,233.23 7,754.63
- URUGAN TAN= 0.24 m3 9,464.00 2,271.36
- PEMADATAN = 0.40 m2 3,713.30 1,485.32
11,511.31
b. 3 jalur ( 1,00 x 0,50 x 0,80 )
- GALIAN TAN = 0.40 m3 24,233.23 9,693.29
- URUGAN TAN= 0.30 m3 9,464.00 2,839.20
- PEMADATAN = 0.50 m2 3,713.30 1,856.65
14,389.14
c. 4 jalur ( 1,00 x 0,65 x 0,80 )
- GALIAN TAN = 0.52 m3 24,233.23 12,601.28
- URUGAN TAN= 0.39 m3 9,464.00 3,690.96
- PEMADATAN = 0.65 m2 3,713.30 2,413.65
18,705.88
d. GALIAN PENYUNTIKAN KABEL PADA
TANAH KERAS / KORAL
- GALIAN TAN = 0.60 m3 24,233.23 14,539.94
- URUGAN TAN= 0.45 m3 9,464.00 4,258.80
- PEMADATAN = 0.75 m2 3,713.30 2,784.98
21,583.71
e. GALIAN LUBANG SAMBUNGAN PADA
TANAH KERAS / KORAL
( 1 s/d 2 jalur = 1,50 x 0,60 x 0,80 )
- GALIAN TAN = 0.72 m3 24,233.23 17,447.93
- URUGAN TAN= 0.54 m3 9,464.00 5,110.56
- PEMADATAN = 0.90 m2 3,713.30 3,341.97
25,900.46
f. GALIAN LUBANG SAMBUNGAN PADA
TANAH KERAS / KORAL
( 3 s/d 4 jalur = 1,50 x 0,85 x 0,80 )
- GALIAN TAN = 1.02 m3 24,233.23 24,717.89
- URUGAN TAN= 0.77 m3 9,464.00 7,239.96
- PEMADATAN = 1.28 m2 3,713.30 4,734.46
36,692.31
g. GALIAN LUBANG PENGEBORAN MANUAL PADA
TANAH KERAS / KORAL
( 2,00 x 1,50 x 3,00 )
- HS SAMA DENGAN HS SKTM 0.00
Catatan :
- Rp. 24.233,23 HS.Sipil Hal.1 No.06

1.3. GALIAN URUGAN DAN PEMADATAN


PADA CONBLOK / INTERBLOK
a. 1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 )
- BONGKAR CO= 0.60 m2 1,600.20 960.12
- GALIAN TAN = 0.30 m3 24,233.23 7,173.04
- URUGAN TAN= 0.16 m3 9,464.00 1,514.24
- PEMADATAN = 0.40 m2 3,713.30 1,485.32
11,132.72
b. 3 jalur ( 1,00 x 0,50 x 0,80 )
- BONGKAR CO= 0.70 m2 1,600.20 1,120.14
- GALIAN TAN = 0.37 m3 24,233.23 8,966.30
- URUGAN TAN= 0.20 m3 9,464.00 1,892.80
- PEMADATAN = 0.50 m2 3,713.30 1,856.65
13,835.89
c. 4 jalur ( 1,00 x 0,65 x 0,80 )
- BONGKAR CO= 0.85 m2 1,600.20 1,360.17
- GALIAN TAN = 0.48 m3 24,233.23 11,656.18
- URUGAN TAN= 0.26 m3 9,464.00 2,460.64
- PEMADATAN = 0.65 m2 3,713.30 2,413.65
17,890.64
d. GALIAN PENYUNTIKAN KABEL PADA
CONBLOK / INTERBLOK ( 1,50 X 0,50 X 0,80 )
- BONGKAR CO= 1.05 m2 1,600.20 1,680.21
- GALIAN TAN = 0.56 m3 24,233.23 13,449.44
- URUGAN TAN= 0.30 m3 9,464.00 2,839.20
- PEMADATAN = 0.75 m2 3,713.30 2,784.98
20,753.83
e. GALIAN LUBANG SAMBUNGAN PADA
CONBLOK / INTERBLOK ( 1,50 X 0,60 X 0,80 )
( 1 s/d 2 jalur = 1,50 x 0,60 x 0,80 )
- BONGKAR CO= 1.20 m2 1,600.20 1,920.24
- GALIAN TAN = 0.67 m3 24,233.23 16,139.33
- URUGAN TAN= 0.36 m3 9,464.00 3,407.04
- PEMADATAN = 0.90 m2 3,713.30 3,341.97
24,808.58
f. GALIAN LUBANG SAMBUNGAN PADA
CONBLOK / INTERBLOK ( 1,50 X 0,85 X 0,80 )
( 3 s/d 4 jalur = 1,50 x 0,85 x 0,80 )
- BONGKAR CO= 1.58 m2 1,600.20 2,520.32
- GALIAN TAN = 0.94 m3 24,233.23 22,864.05
- URUGAN TAN= 0.51 m3 9,464.00 4,826.64
- PEMADATAN = 1.28 m2 3,713.30 4,734.46
34,945.47
g. GALIAN LUBANG PENGEBORAN MANUAL PADA
CONBLOK / INTERBLOK ( 1,50 X 0,85 X 0,80 )
( 2,00 x 1,50 x 3,00 )
- HS SAMA DENGAN HS SKTM 0.00

Catatan :
- Rp. 1.600,2 --HS DKI Hal.38 BKR.59
Pekerjaan Bongkar di tambah 10 Cm kiri dan kanan dari lebar galian

1.4. GALIAN URUGAN DAN PEMADATAN


PADA UBIN BADAK / KERAMIK / FLOOR BETON BIASA
a. 1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 )
- BONGKAR U.B
= 0.60 m2 1,600.20 960.12
- GALIAN TAN = 0.29 m3 24,233.23 6,979.17
- URUGAN TAN= 0.17 m3 9,464.00 1,571.02
- PEMADATAN = 0.40 m2 3,713.30 1,485.32
10,995.63
b. 3 jalur ( 1,00 x 0,50 x 0,80 )
- BONGKAR U.B
= 0.70 m2 1,600.20 1,120.14
- GALIAN TAN = 0.36 m3 24,233.23 8,723.96
- URUGAN TAN= 0.21 m3 9,464.00 1,987.44
- PEMADATAN = 0.50 m2 3,713.30 1,856.65
13,688.19
c. 4 jalur ( 1,00 x 0,65 x 0,80 )
- BONGKAR U.B
= 0.85 m2 1,600.20 1,360.17
- GALIAN TAN = 0.47 m3 24,233.23 11,341.15
- URUGAN TAN= 0.27 m3 9,464.00 2,583.67
- PEMADATAN = 0.65 m2 3,713.30 2,413.65
17,698.64
d. GALIAN PENYUNTIKAN KABEL PADA
UBIN BADAK / F.BETON BIASA ( 1,50 X 0,50 X 0,80 )
- BONGKAR U.B
= 1.05 m2 1,600.20 1,680.21
- GALIAN TAN = 0.54 m3 24,233.23 13,085.94
- URUGAN TAN= 0.32 m3 9,464.00 2,981.16
- PEMADATAN = 0.75 m2 3,713.30 2,784.98
20,532.29
e. GALIAN LUBANG SAMBUNGAN PADA
UBIN BADAK / F.BETON BIASA
( 1 s/d 2 jalur = 1,50 x 0,60 x 0,80 )
- BONGKAR U.B
= 1.20 m2 1,600.20 1,920.24
- GALIAN TAN = 0.65 m3 24,233.23 15,703.13
- URUGAN TAN= 0.38 m3 9,464.00 3,577.39
- PEMADATAN = 0.90 m2 3,713.30 3,341.97
24,542.74
f. GALIAN LUBANG SAMBUNGAN PADA
UBIN BADAK / F.BETON BIASA
( 3 s/d 4 jalur = 1,50 x 0,85 x 0,80 )
- BONGKAR U.B
= 1.78 m2 1,600.20 2,840.36
- GALIAN TAN = 0.92 m3 24,233.23 22,246.11
- URUGAN TAN= 0.54 m3 9,464.00 5,067.97
- PEMADATAN = 1.28 m2 3,713.30 4,734.46
34,888.89
g. GALIAN LUBANG PENGEBORAN MANUAL PADA
UBIN BADAK / F.BETON BIASA ( 2,00 x 1,50 x 3,00 )
HS SAMA DENGAN HARGA SKTM 0.00

Catatan :
Pekerjaan Bongkar di tambah 10 Cm kiri dan kanan dari lebar galian

1.5. GALIAN URUGAN DAN PEMADATAN


PADA FLOOR BETON COR
a. 1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 )
- BONGKAR F = 0.04 m2 212,815.30 8,938.24
- GALIAN TAN = 0.29 m3 24,233.23 7,076.10
- URUGAN TAN= 0.15 m3 9,464.00 1,438.53
- PEMADATAN = 0.40 m2 3,713.30 1,485.32
18,938.19
b. 3 jalur ( 1,00 x 0,50 x 0,80 )
- BONGKAR F = 0.05 m2 212,815.30 10,427.95
- GALIAN TAN = 0.37 m3 24,233.23 8,845.13
- URUGAN TAN= 0.19 m3 9,464.00 1,798.16
- PEMADATAN = 0.50 m2 3,713.30 1,856.65
22,927.89
c. 4 jalur ( 1,00 x 0,65 x 0,80 )
- BONGKAR F = 0.60 m2 212,815.30 126,625.10
- GALIAN TAN = 0.47 m3 24,233.23 11,498.67
- URUGAN TAN= 0.25 m3 9,464.00 2,337.61
- PEMADATAN = 0.75 m2 3,713.30 2,784.98
143,246.35
d. GALIAN PENYUNTIKAN KABEL PADA
FLOOR BETON COR ( 1,50 x 0,50 x 0,80 )
- BONGKAR F = 0.07 m2 212,815.30 15,641.92
- GALIAN TAN = 0.55 m3 24,233.23 13,267.69
- URUGAN TAN= 0.29 m3 9,464.00 2,697.24
- PEMADATAN = 0.75 m2 3,713.30 2,784.98
34,391.83
e. GALIAN LUBANG SAMBUNGAN PADA
FLOOR BETON COR
( 1 s/d 2 jalur = 1,50 x 0,60 x 0,80 )
- BONGKAR F = 1.08 m2 212,815.30 230,691.79
- GALIAN TAN = 0.66 m3 24,233.23 15,921.23
- URUGAN TAN= 0.34 m3 9,464.00 3,236.69
- PEMADATAN = 0.90 m2 3,713.30 3,341.97
253,191.68
f. GALIAN LUBANG SAMBUNGAN PADA
FLOOR BETON COR
( 3 s/d 4 jalur = 1,50 x 0,85 x 0,80 )
- BONGKAR F = 0.11 m2 212,815.30 23,409.68
- GALIAN TAN = 0.93 m3 24,233.23 22,553.87
- URUGAN TAN= 0.48 m3 9,464.00 4,585.31
- PEMADATAN = 1.28 m2 3,713.30 4,734.46
55,283.32
g. GALIAN LUBANG PENGEBORAN MANUAL PADA
FLOOR BETON COR ( 2,00 x 1,50 x 3,00 )
HS SAMA DENGAN HARGA SKTM 0.00

Catatan :
- Rp. 212.815,30-- HS.DKI hAL.33 - bkr.03
Pekerjaan Bongkar di tambah 10 Cm kiri dan kanan dari lebar galian

1.6. GALIAN URUGAN DAN PEMADATAN


PADA FLOOR BETON BERTULANG
a. 1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 )
- BONGKAR F = 0.01 m2 295,701.25 1,774.21
- GALIAN TAN = 0.28 m3 24,233.23 6,785.30
- URUGAN TAN= 0.16 m3 9,464.00 1,514.24
- PEMADATAN = 0.40 m2 3,713.30 1,485.32
11,559.07
b. 3 jalur ( 1,00 x 0,50 x 0,80 )
- BONGKAR F = 0.01 m2 295,701.25 2,069.91
- GALIAN TAN = 0.35 m3 24,233.23 8,481.63
- URUGAN TAN= 0.20 m3 9,464.00 1,892.80
- PEMADATAN = 0.50 m2 3,713.30 1,856.65
14,300.99
c. 4 jalur ( 1,00 x 0,65 x 0,80 )
- BONGKAR F = 0.09 m2 295,701.25 25,134.61
- GALIAN TAN = 0.46 m3 24,233.23 11,026.12
- URUGAN TAN= 0.26 m3 9,464.00 2,460.64
- PEMADATAN = 0.65 m2 3,713.30 2,413.65
41,035.01
d. GALIAN PENYUNTIKAN KABEL PADA
FLOOR BETON BERTULANG ( 1,50 x 0,50 x 0,80 )
- BONGKAR F = 1.11 m2 295,701.25 326,749.88
- GALIAN TAN = 0.53 m3 24,233.23 12,722.45
- URUGAN TAN= 0.30 m3 9,464.00 2,839.20
- PEMADATAN = 0.75 m2 3,713.30 2,784.98
345,096.50
e. GALIAN LUBANG SAMBUNGAN PADA
FLOOR BETON BERTULANG
( 1 s/d 2 jalur = 1,50 x 0,60 x 0,80 )
- BONGKAR F = 1.12 m2 295,701.25 331,185.40
- GALIAN TAN = 0.63 m3 24,233.23 15,266.93
- URUGAN TAN= 0.36 m3 9,464.00 3,407.04
- PEMADATAN = 0.90 m2 3,713.30 3,341.97
353,201.34
f. GALIAN LUBANG SAMBUNGAN PADA
FLOOR BETON BERTULANG
( 3 s/d 4 jalur = 1,50 x 0,85 x 0,80 )
- BONGKAR F = 0.16 m2 295,701.25 46,572.95
- GALIAN TAN = 0.89 m3 24,233.23 21,628.16
- URUGAN TAN= 0.51 m3 9,464.00 4,826.64
- PEMADATAN = 1.28 m2 3,713.30 4,734.46
77,762.20
g. GALIAN LUBANG PENGEBORAN MANUAL PADA
FLOOR BETON BERTULANG ( 2,00 x 1,50 x 3,00 )
HS SAMA DENGAN HARGA SKTM 0.00

Catatan :
- Rp. 295.701.25,- - HS.SIPIL Hal.36 - BKR.04
Pekerjaan Bongkar di tambah 10 Cm kiri dan kanan dari lebar galian

1.7. GALIAN URUGAN DAN PEMADATAN


PADA A S P A L / H O T M I X
a. 1 s/d 2 jalur ( 1,00 x 0,40 x 0,80 )
- BONGKAR AS= 0.40 m2 11,766.92 4,706.77
- GALIAN TAN = 0.30 m3 40,751.00 12,225.30
16,932.07
b. 3 jalur ( 1,00 x 0,50 x 0,80 )
- BONGKAR AS= 0.50 m2 11,766.92 5,883.46
- GALIAN TAN = 0.38 m3 40,751.00 15,281.63
21,165.09
c. 4 jalur ( 1,00 x 0,65 x 0,80 )
- BONGKAR AS= 0.65 m2 11,766.92 7,648.50
- GALIAN TAN = 0.49 m3 40,751.00 19,866.11
27,514.61
d. GALIAN PENYUNTIKAN KABEL PADA
ASPAL / HOTMIX ( 1,50 x 0,50 x 080 )
- BONGKAR AS= 0.75 m2 11,766.92 8,825.19
- GALIAN TAN = 0.56 m3 40,751.00 22,922.44
31,747.63
e. GALIAN LUBANG SAMBUNGAN PADA
AS PAL / H O T M I X
( 1 s/d 2 jalur = 1,50 x 0,60 x 0,80 )
- BONGKAR AS= 0.90 m2 11,766.92 10,590.23
- GALIAN TAN = 0.68 m3 40,751.00 27,506.93
38,097.15
f. GALIAN LUBANG SAMBUNGAN PADA
AS PAL / H O T M I X
( 3 s/d 4 jalur = 1,50 x 0,85 x 0,80 )
- BONGKAR AS= 1.28 m2 11,766.92 15,002.82
- GALIAN TAN = 0.96 m3 40,751.00 38,966.11
53,968.93
g. GALIAN LUBANG PENGEBORAN MANUAL PADA
AS PAL / H O T M I X
- HS SAMA DENGAN HS SKTM

1.8. POMPONGAN
- Pekerja 0.33 Pekerja 32,250.00 10,750.00 10,750.00
Catatan :
- Rp.11.766.92,- - HS.DKI Hal.36 - BRK.07
- Rp.40.751,- - HS Sipil Hal.2 No.07

2 PENARIKAN , PENYAMBUNGAN DAN TERMINASI KABEL


2.1. Penarikan Kabel 4 x 16 S/D 50 mm2
Gelar Kabel / hari = 750 meter
- Teknisi 1.00 orang 123,500.00 123,500.00
- Mandor 1.00 Mandor 56,250.00 56,250.00
- Pekerja 65.00 Pekerja 32,250.00 2,096,250.00
Rp.3.575,- --HS DKI Hal.33--BKR-09 2,276,000.00
750
2.2. Penarikan Kabel 4 x 70 s/d 150 mm2 3,034.67 3,034.67
Gelar Kabel / hari = 600 meter
- Tenaga Ahli Muda 1.00 Orang 123,500.00 123,500.00
- Teknisi 1.00 Orang 56,250.00 56,250.00
- Pekerja 65.00 Pekerja 32,250.00 2,096,250.00
2,276,000.00
600.00
3,793.33 3,793.33
2.3. Penyambungan Kabel
- Tenaga Ahli Muda 0.25 Orang 123,500.00 30,875.00
- Tukang / Instalator 1.00 Tuk./ Ins 40,500.00 40,500.00
- Pekerja 1.00 Pekerja 32,250.00 32,250.00
103,625.00
2.4. Terminasi Kabel Indoor
- Tenaga Ahli Muda 0.25 Orang 123,500.00 30,875.00
- Tukang / Instalator 1.00 Tuk./ Ins 40,500.00 40,500.00
- Pekerja 1.00 Pekerja 32,250.00 32,250.00
103,625.00
2.5. Terminasi Kabel Outdoor
- Tenaga Ahli Muda 0.25 Orang 123,500.00 30,875.00
- Tukang / Instalator 1.00 Tuk./ Ins 40,500.00 40,500.00
- Pekerja 2.00 Pekerja 32,250.00 64,500.00
135,875.00
3. MATERIAL PELENGKAP BERIKUT PEMASANGAN
- Keramik Tanda Peringatan Kabel PLN 845.00 850.00
Ukuran (22,5 x 30 x 4) Cm - Sertifikat LMK
- Batu Merah 137.00 140.00
- Pasir Urug Darat 49,959.00 49,960.00
- Buis Beton O 20 Cm 11,102.00 11,100.00
- Papan Penahan Tanah 5,107.00 5,110.00
- PVC O 4" type AW 20,215.00 20,220.00
Catatan :
Rp. 5.107 = Rp.572.000,- (Harga Papan / M3)
4 x 28 lembar papan / M3

4. PENGEBORAN / CROSSING
4.1. Pengeboran dgn menggunakan Bor Manual/Hari dapat 8 M
- Teknisi 1.00 Orang 56,250.00 56,250.00
- Tukang Kayu 1.00 T.kayu 40,500.00 40,500.00
- Pekerja 5.00 Pekerja 32,250.00 161,250.00
- Papan penahan tanah (2x3x2) + (3x1,5x2)x2x0,03 = 258,000.00
(12 + 9) x 2 = = 1.26 M3 572,000.00 720,720.00
- Dolken 5/7 = 12.00 Batang 3,250.00 39,000.00
- Paku = 1.00 Kg 2,600.00 2,600.00
1,020,320.00
8.00
4.2. Pengeboran dengan menggunakan Mesin Khusus Sesuai 127,540.00 127,540.00
Kontrak
5 PERBAIKAN BEKAS GALIAN ( BERIKUT MATERIAL )
5.1. T.Biasa/T.Rumput (perbaikan/pemadatan sudah termasuk
dlm pek galian)
5.2. T.Keras/Koral (perbaikan/pemadatan sudah termasuk
dlm pek galian)
5.3. Conblok (Interblok) / M2 22,697.00 22,700.00
5.4. Ubin Badak 26,707.00 26,710.00
5.5. Floor Beton Biasa 14,053.00 14,050.00
5.6. Floor Beton Cor 26,083.00 26,080.00
5.7. Floor Beton Bertulang 75,200.00 75,200.00
5.8. Shat Sheet 10,920.00 10,920.00
5.9. Aspal Biasa / Penetrasi
Penetrasi tebal 5 Cm 13,314.00 13,314.00
Macadam tebal 20 Cm 17,186.00 17,186.00
Sirtu Tebal 30 Cm 16,190.00 16,190.00
46,690.00 46,690.00
5.10. Aspal Hotmix 3/5/20/32
Hotmix tebal 3 Cm 12,517.00 12,517.00
Tack Coating 3,188.00 3,188.00
Penetrasi tebal 5 Cm 13,314.00 13,314.00
Macadam 20 Cm 17,186.00 17,186.00
Sirtu 32 Cm 16,190.00 16,190.00
62,395.00 62,390.00
5.11. Aspal Hotmix 5/5/20/28
Hotmix tebal 5 Cm 20,744.00 20,744.00
Tack Coating 3,188.00 3,188.00
Penetrasi tebal 5 Cm 13,314.00 13,314.00
Macadam 20 Cm 17,186.00 17,186.00
Sirtu 32 Cm = 32/30 16,190.00 16,190.00
70,622.00 70,620.00
5.12. Aspal Hotmix 7/5/20/28
Hotmix tebal 7 Cm 28,972.00 28,972.00
Tack Coating 3,188.00 3,188.00
Penetrasi tebal 5 Cm 13,314.00 13,314.00
Macadam 20 Cm 17,186.00 17,186.00
Sirtu 28 Cm = 28/30 16,190.00 16,190.00
78,850.00 78,850.00
5.13. Perbaikan Keramik
- Pasang Keramik 10 x 20 1.00 m2 37,999.00 38,000.00
- Pasang Keramik 20 x 20 1.00 m2 40,742.00 40,740.00
- Pasang Keramik 30 x 20 1.00 m2 33,440.00 43,470.00

5.14. Perbaikan rumput disesuaikan dgn HS DKI/Pertanaman


( Dalam bestek biaya perbaikan rumput/taman tidak
dicantumkan dan akan dibayar sesuai realisasi berdasarkan
bukti yang dapat dipertanggung jawabkan ).
7880 - Rp. 3.713,3 = 2xRp.1068-HS.DKI Hal.3 2136
3445 - Rp. 11.139,9 =6xRp.1068-HS.DKI HAl.3 4408.24
2140 - Rp. 20.386,15 -HS.Sipil Hal.2-No.02 7878
- Rp. 30.579,- (300/200)x7878 HS. Sipil H 11817
- Rp. 9.464, -HS.DKI Hal.2-TN.10 3445
- Rp.11.766.92,- - HS.DKI Hal.36 - BRK.07
- Rp.40.751,- - HS Sipil Hal.2 No.07
- Rp. 1.856.65 - HS.DKI Hal.3 TN.24
0

21093.75 42187.5
ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA

ANALISA HARGA SATUAN


PEKERJAAN : SUTR DAN SAMBUNGAN LISTRIK
Belum Termasuk resiko, over head, keuntungan 10 % dan PPN 10 %
2004
HARGA BIAYA JUMLAH
NO. JENIS PEKERJAAN SATUAN DIBULATKAN
(RUPIAH) (RUPIAH) (RUPIAH)
1 2 3 4 5

1 PENANAMAN TIANG BESI 9 METER


1.1 Tiang Besi 9 meter 200 daN
- Pengebora 0.33333333 Mandor 56,250.00 18,750.00 0.33333333
Mendirika 1.66666667 Tukang 40,500.00 67,500.00 1.66666667
86,250.00
1.2 Tiang Besi 9 meter 350 daN
- Pengebora 0.33333333 Mandor 56,250.00 18,750.00 0.33333333
Mendirika 2 Tukang 40,500.00 81,000.00 2
99,750.00
1.3 Tiang Besi 9 meter 500 daN
- Pengebora 0.33333333 Mandor 56,250.00 18,750.00 0.33333333
Mendirika 2 Tukang 40,500.00 81,000.00 2
99,750.00
1.4 Tiang Besi 9 meter 800 daN
- Pengebora 0.33333333 Mandor 56,250.00 18,750.00 0.33333333
Mendirika 2.66666667 Tukang 40,500.00 108,000.00 2.66666667
126,750.00
1.5 Tiang Besi 9 meter 1.200 daN
- Pengebora 0.33333333 Mandor 56,250.00 18,750.00 0.33333333
Mendirika 3.33333333 Tukang 40,500.00 135,000.00 3.33333333
153,750.00
2 PENGECATAN TIANG BESI 9 METER
2.1 Tiang Besi 9 3.175 m2 10,257.00 32,566.00 32,570.00
2.2 Tiang Besi 9 3.954 m2 10,257.00 40,556.00 40,560.00
2.3 Tiang Besi 9 4.376 m2 10,257.00 44,885.00 44,890.00
2.4 Tiang Besi 9 5.506 m2 10,257.00 56,475.00 56,480.00
2.5 Tiang Besi 9 6.423 m2 10,257.00 65,881.00 65,890.00

3 PENANAMAN TIANG BETON 9 METER


3.1 Tiang Beton 9 meter 200 daN
- Pengebora 0.33333333 Mandor 56,250.00 18,750.00 0.33333333
Mendirika 2.66666667 Tukang 40,500.00 108,000.00 2.66666667
126,750.00
3.2 Tiang beton 9 meter 350 daN
- Pengebora 0.33333333 Mandor 56,250.00 18,750.00 0.33333333
Mendirika 3.33333333 Tukang 40,500.00 135,000.00 3.33333333
153,750.00
3.3 Tiang beton 9 meter 500 daN
- Pengebora 0.5 Mandor 56,250.00 28,125.00 0.5
Mendirika 4 Tukang 40,500.00 162,000.00 4
190,125.00
3.4 Tiang beton 9 meter 800 daN
- Pengebora 0.5 Mandor 56,250.00 28,125.00 0.5
Mendirika 4.5 Tukang 40,500.00 182,250.00 4.5
210,375.00
3.5 Tiang beton 9 meter 1.200 daN
- Pengebora 0.5 Mandor 56,250.00 28,125.00 0.5
Mendirika 5 Tukang 40,500.00 202,500.00 5
230,625.00
4 PEMBUATAN PONDASI TIANG BESI/BETON 9 METER
4.1 Pondasi Tiang 9 meter Type A
- Galian Tan 0.60 m3 7,878.00 47,268.00
- Sirtu dipad 0.60 m3 89,842.00 29,905.00
- Beton Block0.03 m3 687,193.00 20,616.00
- Urugan Pasi0.03 m3 49,842.00 1,495.00
99,280.00
4.2 Ponsdasi Tiang 9 meter Type B
- Galian Tan 0.50 m3 7,878.00 3,939.00
- Beton Tumb0.38 m3 216,242.00 82,172.00
- Beton Block0.03 m3 687,193.00 20,616.00
- Urugan Pasi0.03 m3 49,842.00 1,495.00
108,220.00
4.3 Pondasi Tiang 9 meter Type C
- Galian Tan 0.60 m3 7,878.00 4,727.00
- Beton Tumb0.54 m3 216,242.00 116,771.00
- Beton Block0.03 m3 687,193.00 20,616.00
- Urugan Pasi0.03 m3 49,842.00 1,495.00
143,610.00
4.4 Pondasi Tiang 9 meter Type D
- Galian Tan 0.50 m3 7,878.00 3,939.00
- Beton Tumb0.38 m3 216,242.00 82,172.00
- Beton Block0.10 m3 687,193.00 68,719.00
- Urugan Pasi0.03 m3 49,842.00 1,495.00
156,330.00
4.5 Pondasi Tiang 9 meter Type E
- Galian Tan 0.60 m3 7,878.00 4,727.00
- Beton Tumb0.54 m3 216,242.00 116,771.00
- Beton Block0.20 m3 687,193.00 137,439.00
- Urugan Pasi0.03 m3 49,842.00 1,495.00
260,430.00
5 PEMASANGAN/PERBAIKAN KUTR
5.1 Pemasangan KUTR 4 Kawat BC 25/50 mm2
- Penarikan 0.5 Mandor 56,250.00 28,125.00
2 Tukang 40,500.00 81,000.00
1.5 Pekerja 32,250.00 48,375.00
157,500.00
5.2 Pemasangan Twisted Cable 3 x 35 s/d 70 mm2 + N
- Penarikan 0.33333333 Mandor 56,250.00 18,750.00
1.33333333 Tukang 40,500.00 54,000.00
1.33333333 Pekerja 32,250.00 43,000.00
115,750.00
5.3 Pemasangan SL 1 Phase Twisted/Kawat Udara
- Sambungan 0.25 Mandor 56,250.00 14,062.50
1 Tukang 40,500.00 40,500.00
54,562.50
5.4 Pemasangan SL 3 Phase Twisted/Kawat Udara
- Sambungan 0.5 Mandor 56,250.00 28,125.00
1 Tukang 40,500.00 40,500.00
68,625.00

5.5 Perbaikan K Sama dengan pasang 157,500.00 157,500.00 157,500.00


5.6 Perbaikan KUSama dengan pasang 115,750.00 115,750.00 115,750.00
5.7 Pemasangan / Montage Joint Sleve Uk.35 s/d 70 mm2 Set (4 Bh)
0.125 Mandor 56,250.00 7,031.25
0.125 Tukang 40,500.00 5,062.50
12,093.75
5.8 Pemasangan / Montage Conector Uk.35 s/d 70 mm2 Set (4 Bh)
0.0625 Mandor 56,250.00 3,515.63
0.125 Tukang 40,500.00 5,062.50
8,578.13
5.9 Pemasangan / Perbaikan Jumper SUTR/Phase (Buah)
- Mandor Pe 0.08333333 Mandor 56,250.00 4,687.50
- Tukang 0.08333333 Tukang 40,500.00 3,375.00
- Pekerja 0.08333333 Pekerja 32,250.00 2,687.50
10,750.00
5.10 Pemasangan Suspension Assemby (Set)
- Mandor Pe 0.08333333 Mandor 56,250.00 4,687.50
- Tukang 0.25 Tukang 40,500.00 10,125.00
- Pekerja 0.5 Pekerja 32,250.00 16,125.00
30,937.50
5.11 Pemasangan Dead End Essembly (Set)
- Mandor Pe 0.08333333 Mandor 56,250.00 4,687.50
- Tukang 0.33333333 Tukang 40,500.00 13,500.00
- Pekerja 0.66666667 Pekerja 32,250.00 21,500.00
39,687.50
5.12 Pemasangan Pelindung Listrik & Mekanik (Bundle end Protection)
- Mandor Pe 0.08333333 Mandor 56,250.00 4,687.50
- Tukang 0.25 Tukang 40,500.00 10,125.00
- Pekerja 0.5 Pekerja 32,250.00 16,125.00
30,937.50
5.13 Pemasangan/Penanaman Pipa Arde (1,5 inc per 1,5 mtr) perbatang
0.25 Pemasangan 26,000.00 6,500.00
Pengadaan pip 0.25 Pemasangan 50,718.00 12,680.00
19,180.00
5.14 Pemasangan Pipa Arde (1,5 inc) & (6) pengikat (3) dipipa (3) dikabel
0.25 Mandor 56,250.00 14,062.50
0.5 Tukang 40,500.00 20,250.00
34,312.50
5.15 Pemasangan Pipa Opstyg (2,5) & (6) pengikat (3) dipipa (3) dikabel
0.25 Mandor 56,250.00 14,062.50
0.5 Tukang 40,500.00 20,250.00
34,312.50

6 PERBAIKAN PONDASI DAN TIANG MIRING 9 METER


( BESI DAN BETON )
6.1 Pondasi Tiang 9 meter Type A
- Galian tan 0.42 m3 7,878.00 3,309.00
- Sirtu dipad 0.42 m3 49,842.00 20,934.00
24,240.00
6.2 Pondasi Tiang 9 meter Type B
- Galian tan 0.35 m3 7,878.00 2,727.00
- Beton tumb 0.27 m3 216,242.00 58,385.00
61,140.00
6.3 Pondasi Tiang 9 meter Type C
- Galian tan 0.42 m3 7,878.00 3,309.00
- Beton tumb 0.38 m3 216,242.00 82,172.00
85,480.00
6.4 Pondasi Tiang 9 meter Type D
- Galian tan 0.35 m3 7,878.00 2,752.00
- Beton tumb 0.27 m3 216,242.00 58,385.00
61,143.00
6.5 Pondasi Tiang 9 meter Type E
- Galian tan 0.42 m3 7,878.00 3,309.00
- Beton tumb 0.38 m3 216,242.00 82,172.00
85,480.00
7 PEMBONGKARAN TIANG BESI
7.1 Pembongkaran
Sama Dengan Pasang 86,250.00 86,250.00 86,250.00
7.2 Pembongkaran
Sama Dengan Pasang 99,750.00 99,750.00 99,750.00
7.3 Pembongkaran
Sama Dengan Pasang 99,750.00 99,750.00 99,750.00
7.4 Pembongkaran
Sama Dengan Pasang 126,750.00 126,750.00 126,750.00
7.5 Pembongkaran
Sama Dengan Pasang 153,750.00 153,750.00 153,750.00
7.6 Pembongkaran Drak Skur sama dengan pa 86,250.00 86,250.00 86,250.00
7.7 Pembongkaran Drak Skur sama dengan pasang arde KUTR
1 / 4 Pemasang 26,000.00 6,500.00 6,500.00
7.8 Bongkar Pasang Box SKTR
Panel Utama 1 Mandor 56,250.00 56,250.00
1 Tukang 40,500.00 40,500.00
1 Pekerja 32,250.00 32,250.00
129,000.00
7.9 Panel Pembag 0.5 Mandor 56,250.00 28,125.00
1 Tukang 40,500.00 40,500.00
1 Pekerja 32,250.00 32,250.00
100,875.00
8 PEMBONGKARAN TIANG BETON
8.1 Pembongkaran
Sama Dengan Pasang 126,750.00 126,750.00 126,750.00
8.2 Pembongkaran
Sama Dengan Pasang 153,750.00 153,750.00 153,750.00
8.3 Pembongkaran
Sama Dengan Pasang 190,125.00 190,125.00 190,125.00
8.4 Pembongkaran
Sama Dengan Pasang 210,375.00 210,375.00 210,375.00
8.5 Pembongkaran
Sama Dengan Pasang 230,625.00 230,625.00 230,625.00
9 PEMBONGKARAN KUTR
9.1 Kawat Udara Sama Dengan Pasang 157,500.00 157,500.00 157,500.00
9.2 Twisted kabel Sama Dengan Pasang 115,750.00 115,750.00 115,750.00
9.3 Pembongkara0.08333333 Mandor 56,250.00 4,687.50
8 Tukang 40,500.00 324,000.00
328,687.50
10 PERBAIKAN LISTRIK (SL)
10.1 SL 1 Phase T 0.50 Pasang 18,644.00 9,347.00 9,350.00
10.2 SL 3 Phase T 0.50 Pasang 24,375.00 12,188.00 12,190.00

11 PEMBONGKARAN 7 REHABILITASI SAMBUNGAN LISTRIK SL


11.1 SL 1 Phase Twisted / Kawat 1 Pasang 18,694.00 18,694.00 18,690.00
11.2 SL 3 Phase Twisted / Kawat 1 Pasang 24,375.00 24,375.00 24,380.00
11.3 Rehabilitasi SL 1 Phase akibat penggeseran tiang
- Pelaksana 1 / 2 Pasang 18,694.00 9,347.00 9,350.00

12 PEKERJAAN LAIN - LAIN


12.1 Menyetel KWH meter 1 phase pada tutup OK.I & memasang MCB
- Mandor Pe 0.04545455 Mandor 53,250.00 2,420.45
- Tukang 0.27272727 Tukang 37,500.00 10,227.27
12,647.73
12.2 Menyetel KWH meter 3 phase pada tutup OK.III & memasang MCB
1 0.2 Mandor 56,250.00 11,250.00
0.4 Tukang 40,500.00 16,200.00
27,450.00
12.3 Pemasangan APP Type Khusus I A
- Pelaksana 0.5 Mandor 56,250.00 28,125.00
1 Tukang 40,500.00 40,500.00
68,625.00
12.4 Pemasangan Box TR
- Galian Pon 0.41 m3 7,878.00 3,230.00
- Pondasi Ba 0.135 m3 201,578.00 27,213.00
- Pelaksana 0.5 Mandor 56,250.00 28,125.00
1 Tukang 40,500.00 40,500.00
99,068.00
12.5 Potong Cabang pohon dengan minimal dari hantaran
- Pekerjaan 0.33333333 Mandor 56,250.00 18,750.00
1 Tukang 40,500.00 40,500.00
1 Pekerja 32,250.00 32,250.00
91,500.00
ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA

ANALISA HARGA SATUAN


PEKERJAAN SALURAN KABEL TEGANGAN MENENGAH
Biaya belum termasuk resiko,overhead,keuntungan 10% dan PPN 10%

2004
HARGA JUMLAH JUMLAH
NO URAIAN PEKERJAAN SATUAN BIAYA DIBULATKAN
(Rp.) (Rp.) (Rp.)
01 02 03 04 05

I PEKERJAAN GALIAN-URUGAN DAN PEMADATAN

1 TANAH BIASA/TANAH RUMPUT


a 1 dan 2 jalur (1,00 x0,50 x 1,30 )
- Galian Tanah= 0.65 m3 20,386.15 13,251.00
- Urugan Tanah
= 0.4 m3 9,464.00 3,785.60
- Pemadatan = 0.4 m2 3,713.30 1,485.32
18,521.92 18,522
b 3 Jalur (1,00 x 0,60 x1,20)
- Galian Tanah= 0.72 m3 20,386.15 14,678.03
- Urugan Tanah
= 0.6 m3 9,464.00 5,678.40
- Pemadatan = 0.6 m2 3,713.30 2,227.98
22,584.41 22,584
c 4 Jalur (1,00
- Galian Tanah= 0.96 m3 20,386.15 19,570.70
- Urugan Tanah
= 0.8 m3 9,464.00 7,571.20
- Pemadatan = 0.8 m2 3,713.30 2,970.64
30,112.54 30,113
d 5 dan 6 Jalur
- Galian Tanah= 0.84 m3 20,386.15 17,124.37
- Urugan Tanah
= 0.6 m3 9,464.00 5,678.40
- Pemadatan = 0.6 m2 3,713.30 2,227.98
25,030.75 25,031
e 7 dan 8 Jalur (1,00 x 0,80 x1,40)
- Galian Tanah= 1.12 m3 20,386.15 22,832.49
- Urugan Tanah
= 0.8 m3 9,464.00 7,571.20
- Pemadatan = 0.8 m2 3,713.30 2,970.64
33,374.33 33,374
f 9 dan 10 Jalur (1,00 x 1,00 x1,40)
- Galian Tanah= 1.4 m3 20,386.15 28,540.61
- Urugan Tanah
= 1 m3 9,464.00 9,464.00
- Pemadatan = 1 m2 3,713.30 3,713.30
41,717.91 41,718
g 11 dan 12 Jalur (1,00 x 1,00 x1,40)
- Galian Tanah= 1.66 m3 20,386.15 33,841.01
- Urugan Tanah
= 0.2 m3 9,464.00 1,892.80
- Pemadatan = 0.2 m2 3,713.30 742.66
36,476.47 36,476
h 13,14 dan 15 Jalur (1,00 x 1,00 x 1,60)
- Galian Tanah= 1.6 m3 20,386.15 32,617.84
- Urugan Tanah
= 1 m3 9,464.00 9,464.00
- Pemadatan = 1 m2 3,713.30 3,713.30
45,795.14 45,795
i Penyuntikan Kabel (1,50 x 0,50 x 1,10 )
- Galian Tanah= 0.825 m3 20,386.15 16,818.57
- Urugan Tanah
= 0.75 m3 9,464.00 7,098.00
- Pemadatan = 0.75 m2 3,713.30 2,784.98
26,701.55 26,702
j Galian Lub.Sambungan 1 s/d 2 jalur(2,00x
- Galian Tanah= 3.12 m3 20,386.15 63,604.79
- Urugan Tanah
= 2.6 m3 9,464.00 24,606.40
- Pemadatan = 2.6 m2 3,713.30 9,654.58
97,865.77 97,866
k Galian Lub.Pengeboran Manual (2,00 x 1,
- Galian Tanah= 9 m3 30,579.00 275,211.00
- Urugan Tanah
= 8.4 m3 9,464.00 79,497.60
- Pemadatan = 3 m2 11,139.90 33,419.70
388,128.30 388,128
Catatan :
- Rp. 3.713,3 = 2xRp.1068-HS.DKI Hal.3 TN.24 2136
- Rp. 11.139,9 =6xRp.1068-HS.DKI HAl.3 TN.24 4408.24
- Rp. 20.386,15 -HS.Sipil Hal.2-No.02 7878
- Rp. 30.579,- (300/200)x7878 HS. Sipil Hal.2 No.02 11817
- Rp. 9.464, -HS.DKI Hal.2-TN.10 3445

2 TANAH KERAS/TANAH KORAL


a 1 dan 2 Jalur (1,00x0,50x1,30)
- Galian Tana = 0.65 m3 24,233.23 15,751.60
- Urugan Tana= 0.4 m3 9,464.00 3,785.60
- Pemadatan = 0.4 m2 3,713.30 1,485.32
21,022.52 21,022.52
b 3 Jalur (1,00x0,60x1,20)
- Galian Tana = 0.72 m3 24,233.23 17,447.93
- Urugan Tana= 0.6 m3 9,464.00 5,678.40
- Pemadatan = 0.6 m2 3,713.30 2,227.98
25,354.31 25,354.31
c 4 Jalur (1,00x0,80x1,20)
- Galian Tana = 0.96 m3 24,233.23 23,263.90
- Urugan Tana= 0.8 m3 9,464.00 7,571.20
- Pemadatan = 0.8 m2 3,713.30 2,970.64
33,805.74 33,805.74
d 5 dan 6 Jalur (1,00x0,60x1,20)
- Galian Tana = 0.84 m3 24,233.23 20,355.91
- Urugan Tana= 0.6 m3 9,464.00 5,678.40
- Pemadatan = 0.6 m2 3,713.30 2,227.98
28,262.29 28,262.29
e 7 dan 8 Jalur (1,00x0,80x1,40)
- Galian Tana = 1.12 m3 24,233.23 27,141.22
- Urugan Tana= 0.6 m3 9,464.00 5,678.40
- Pemadatan = 0.8 m2 3,713.30 2,970.64
35,790.26 35,790.26
f 9 dan 10 Jalur (1,00x100x1,40)
- Galian Tana = 1.4 m3 24,233.23 33,926.52
- Urugan Tana= 1 m3 9,464.00 9,464.00
- Pemadatan = 1 m2 3,713.30 3,713.30
47,103.82 47,103.82
g 11 dan 12 Jalur (1,00x1,20x1,40)
- Galian Tana = 1.68 m3 24,233.23 40,711.83
- Urugan Tana= 1.2 m3 9,464.00 11,356.80
- Pemadatan = 1.2 m2 3,713.30 4,455.96
56,524.59 56,524.59
h 13,14 dan 15 Jalur (1,00x1,00x1,60)
- Galian Tana = 1.6 m3 24,233.23 38,773.17
- Urugan Tana= 1 m3 9,464.00 9,464.00
- Pemadatan = 1 m2 3,713.30 3,713.30
51,950.47 51,950.47
i Penyuntikan Kabel (1,50x0,50x1,10)
- Galian Tana = 0.825 m3 24,233.23 19,992.41
- Urugan Tana= 0.75 m3 9,464.00 7,098.00
- Pemadatan = 0.75 m2 3,713.30 2,784.98
29,875.39 29,875.39
j Galian Lub. Sambungan 1s/d2 Jalur ( 2,00x1,30x1,20 )
- Galian Tana = 3.12 m3 24,233.23 75,607.68
- Urugan Tana= 2.6 m3 9,464.00 24,606.40
- Pemadatan = 2.6 m2 3,713.30 9,654.58
109,868.66 109,868.66
k Galian Lub. Pengeboran Manual ( 2,00x1,50x3,00 )
- Galian Tana = 9 m3 24,233.23 218,099.07
- Urugan Tana= 2.6 m3 9,464.00 24,606.40
- Pemadatan = 2.6 m2 3,713.30 9,654.58
252,360.05 252,360.05
l Galian Lub. Sambungan 1s/d2 Jalur ( 2,00x1,30x1,20 )
- Galian Tana = 3.12 m3 24,233.23 75,607.68
- Urugan Tana= 2.6 m3 9,464.00 24,606.40
- Pemadatan = 2.6 m2 3,713.30 9,654.58
109,868.66 109,868.66
m Galian Lub. Pengeboran Manual ( 2,00x1,50x300 )
- Galian Tana = 9 m3 36,349.84 327,148.56
- Urugan Tana= 8.4 m3 9,464.00 79,497.60
- Pemadatan = 3 m2 3,713.30 11,139.90
417,786.06 417,786.06
Catatan:
- Rp. 24.233,23 HS.Sipil Hal.1 No.06
- Rp. 36.349,84. 300/200xRp.10.504 HS. Sipil Hal.1-No.06

3 CONBLOCK/INTERBLOCK
a 1 dan 2 Jalur (1,00x0,40x1,20)
- Bongkar Con= 0.6 m2 1,600.20 960.12
- Galian Tana = 0.456 m3 24,233.23 11,050.35
- Urugan Tan = 0.32 m3 9,464.00 3,028.48
- Pemadatan = 0.4 m2 3,713.30 1,485.32
16,524.27 16,524.27
b 3 Jalur (1,00x0,60x1,20)
- Bongkar Con= 0.8 m2 1,600.20 1,280.16
- Galian Tana = 0.654 m3 24,233.23 15,848.53
- Urugan Tan = 0.48 m3 9,464.00 4,542.72
- Pemadatan = 0.6 m2 3,713.30 2,227.98
23,899.39 23,899.39
c 4 Jalur (1,00x0,80x1,20)
- Bongkar Con= 1 m2 1,600.20 1,600.20
- Galian Tana = 0.912 m3 24,233.23 22,100.71
- Urugan Tan = 0.64 m3 9,464.00 6,056.96
- Pemadatan = 0.8 m2 3,713.30 2,970.64
32,728.51 32,728.51
d 5 dan 6 Jalur (1,00x0,60x1,40)
- Bongkar Con= 0.8 m2 1,600.20 1,280.16
- Galian Tana = 0.804 m3 24,233.23 19,483.52
- Urugan Tan = 0.48 m3 9,464.00 4,542.72
- Pemadatan = 0.6 m2 3,713.30 2,227.98
27,534.38 27,534.38
e 7 dan 8 Jalur (1,00x0,80x1,40)
- Bongkar Con= 1 m2 1,600.20 1,600.20
- Galian Tana = 1.072 m3 24,233.23 25,978.02
- Urugan Tan = 0.64 m3 9,464.00 6,056.96
- Pemadatan = 0.8 m2 3,713.30 2,970.64
36,605.82 36,605.82
f 9 dan 10 Jalur (1,00x1,00x1,40)
- Bongkar Con= 1.2 m2 1,600.20 1,920.24
- Galian Tana = 1.34 m3 24,233.23 32,472.53
- Urugan Tan = 0.8 m3 9,464.00 7,571.20
- Pemadatan = 1 m2 3,713.30 3,713.30
45,677.27 45,677.27
g 11 dan 12 Jalur (1,00 x 1,20 x 1,40)
- Bongkar Con= 1.4 m2 1,600.20 2,240.28
- Galian Tana = 1.608 m3 24,233.23 38,967.03
- Urugan Tan = 0.96 m3 9,464.00 9,085.44
- Pemadatan = 1.2 m2 3,713.30 4,455.96
54,748.71 54,748.71
h 13,14 dan 15 Jalur (1,00 x 1,00 x 1,60)
- Bongkar Con= 1.2 m2 1,600.20 1,920.24
- Galian Tana = 1.54 m3 24,233.23 37,319.17
- Urugan Tan = 0.8 m3 9,464.00 7,571.20
- Pemadatan = 1 m2 3,713.30 3,713.30
50,523.91 50,523.91
i Penyuntikan Kabel (1,50 x 0,50 x 1,10)
- Bongkar Con= 1.05 m2 1,600.20 1,680.21
- Galian Tana = 0.78 m3 24,233.23 18,901.92
- Urugan Tan = 0.63 m3 9,464.00 5,962.32
- Pemadatan = 0.75 m2 3,713.30 2,784.98
29,329.42 29,329.42
j Galian Lub.Sambungan 1 s/d 2 Jalur (2,00 x 1,30 x 1,20)
- Bongkar Con= 3 m2 1,600.20 4,800.60
- Galian Tana = 2.964 m3 24,233.23 71,827.29
- Urugan Tan = 2.444 m3 9,464.00 23,130.02
- Pemadatan = 2.6 m2 3,713.30 9,654.58
109,412.49 109,412.49
k Galian Lub.Pengeboran Manual (2,00 x 1,50 x 3,00)
- Bongkar Con= 3.4 m2 1,600.20 5,440.68
- Galian Tana = 8.82 m3 36,349.84 320,605.59
- Urugan Tan = 8.22 m3 9,464.00 77,794.08
- Pemadatan = 3 m2 3,713.30 11,139.90
414,980.25 414,980.25
Catatan :
- Rp. 1.600,2 --HS DKI Hal.38 BKR.59
- Pekerjaan bongkar di tambah 10 cm kiri dan kanan dari lebar
galian.

4 UBIN BADAK/KERAMIK/FLOOR BETON BIASA


a 1 dan 2 Jalur (1,00 x 0,40 x 1,20 )
- Bongkar Ubi = 0.6 m2 1,600.20 960.12
- Galian Tana = 0.446 m3 24,233.23 10,808.02
- Urugan Tan = 0.328 m3 9,464.00 3,104.19
- Pemadatan = 0.4 m2 3,713.30 1,485.32
16,357.65 16,357.65
b 3 Jalur (1,00 x 0,60 x 1,20 )
- Bongkar Ubi = 0.8 m2 1,600.20 1,280.16
- Galian Tana = 0.672 m3 24,233.23 16,284.73
- Urugan Tan = 0.492 m3 9,464.00 4,656.29
- Pemadatan = 0.6 m2 3,713.30 2,227.98
24,449.16 24,449.16
c 4 Jalur (1,00
- Bongkar Ubi = 1 m2 1,600.20 1,600.20
- Galian Tana = 0.896 m3 24,233.23 21,712.97
- Urugan Tan = 0.656 m3 9,464.00 6,208.38
- Pemadatan = 0.8 m2 3,713.30 2,970.64
32,492.20 32,492.20
d 5 dan 6 Jalur (1,00 x 0,60 x 1,40 )
- Bongkar Ubi = 0.8 m2 1,600.20 1,280.16
- Galian Tana = 0.792 m3 24,233.23 19,192.72
- Urugan Tan = 0.492 m3 9,464.00 4,656.29
- Pemadatan = 0.6 m2 3,713.30 2,227.98
27,357.15 27,357.15
e 7 dan 8 Jalur (1,00 x 0,80 x 1,40 )
- Bongkar Ubi = 1 m2 1,600.20 1,600.20
- Galian Tana = 1.056 m3 24,233.23 25,590.29
- Urugan Tan = 0.656 m3 9,464.00 6,208.38
- Pemadatan = 0.8 m2 3,713.30 2,970.64
36,369.51 36,369.51
f 9 dan 10 Jalur (1,00 x 1,00 x 1,40 )
- Bongkar Ubi = 1.2 m2 1,600.20 1,920.24
- Galian Tana = 1.32 m3 24,233.23 31,987.86
- Urugan Tan = 0.82 m3 9,464.00 7,760.48
- Pemadatan = 1 m2 3,713.30 3,713.30
45,381.88 45,381.88
g 11 dan 12 Jalur (1,00 x 1,20 x 1,40 )
- Bongkar Ubi = 1.4 m2 1,600.20 2,240.28
- Galian Tana = 1.584 m3 24,233.23 38,385.44
- Urugan Tan = 0.984 m3 9,464.00 9,312.58
- Pemadatan = 1.2 m2 3,713.30 4,455.96
54,394.25 54,394.25
h 13, 14 dan 15 Jalur (1,00 x 1,00 x 1,60)
- Bongkar Ubi = 1.2 m2 1,600.20 1,920.24
- Galian Tana = 1.52 m3 24,233.23 36,834.51
- Urugan Tan = 0.82 m3 9,464.00 7,760.48
- Pemadatan = 1 m2 3,713.30 3,713.30
50,228.53 50,228.53
i Penyuntikan Kabel (1,50 x 0,50 x 1,10)
- Bongkar Ubi = 1.05 m2 1,600.20 1,680.21
- Galian Tana = 0.765 m3 24,233.23 18,538.42
- Urugan Tan = 0.6525 m3 9,464.00 6,175.26
- Pemadatan = 0.75 m2 3,713.30 2,784.98
29,178.87 29,178.87
i Galian Lub. Sambungan 1 s/d 2 Jalur (2,00 x 1,30 x 1,20)
- Bongkar Ubi = 3 m2 1,600.20 4,800.60
- Galian Tana = 2.912 m3 24,233.23 70,567.17
- Urugan Tan = 2.522 m3 9,464.00 23,868.21
- Pemadatan = 2.6 m2 3,713.30 9,654.58
108,890.55 108,890.55
k Galian Lub. Pengeboran (2,00 x 1,50 x 3,00)
- Bongkar Ubi = 3.4 m2 1,600.20 5,440.68
- Galian Tana = 8.75 m3 36,349.84 318,061.10
- Urugan Tan = 8.31 m3 9,464.00 78,645.84
- Pemadatan = 3 m2 3,713.30 11,139.90
413,287.52 413,287.52
5 FLOOR BETON COR
a 1 dan 2 Jalur (1,00 x 0,40 x 1,20)
- Bongkar Flo = 0.042 m3 212,815.30 8,938.24
- Galian Tana = 0.452 m3 24,233.23 10,953.42
- Urugan Tan = 0.312 m3 9,464.00 2,952.77
- Pemadatan = 0.42 m2 3,713.30 1,559.59
24,404.02 24,404.02
b 3 Jalur (1,00
- Bongkar Flo = 0.056 m3 212,815.30 11,917.66
- Galian Tana = 0.678 m3 24,233.23 16,430.13
- Urugan Tan = 0.468 m3 9,464.00 4,429.15
- Pemadatan = 0.6 m2 3,713.30 2,227.98
35,004.92 35,004.92
c 4 Jalur (1,00 x 0,80 x 1,20)
- Bongkar Flo = 0.07 m3 212,815.30 14,897.07
- Galian Tana = 0.904 m3 24,233.23 21,906.84
- Urugan Tan = 0.624 m3 9,464.00 5,905.54
- Pemadatan = 0.8 m2 3,713.30 2,970.64
45,680.09 45,680.09
d 5 dan 6 Jalur (1,00 x 0,60 x 1,40)
- Bongkar Flo = 0.056 m3 212,815.30 11,917.66
- Galian Tana = 0.798 m3 24,233.23 19,338.12
- Urugan Tan = 0.468 m3 9,464.00 4,429.15
- Pemadatan = 0.6 m2 3,713.30 2,227.98
37,912.91 37,912.91
e 7 dan 8 Jalur (1,00 x 0,80 x 1,40)
- Bongkar Flo = 0.07 m3 212,815.30 14,897.07
- Galian Tana = 1.064 m3 24,233.23 25,784.16
- Urugan Tan = 0.624 m3 9,464.00 5,905.54
- Pemadatan = 0.8 m2 3,713.30 2,970.64
49,557.40 49,557.40
f 9 dan 10 Jalur (1,00 x 1,00 x 1,40)
- Bongkar Flo = 0.084 m3 212,815.30 17,876.49
- Galian Tana = 1.33 m3 24,233.23 32,230.20
- Urugan Tan = 0.728 m3 9,464.00 6,889.79
- Pemadatan = 1 m2 3,713.30 3,713.30
60,709.77 60,709.77
g 11 dan 12 Jalur (1,00 x 1,20 x 1,40)
- Bongkar Flo = 0.098 m3 212,815.30 20,855.90
- Galian Tana = 1.596 m3 24,233.23 38,676.24
- Urugan Tan = 0.936 m3 9,464.00 8,858.30
- Pemadatan = 1.2 m2 3,713.30 4,455.96
72,846.40 72,846.40
h 13,14 dan 15 Jalur (1,00 x 1,00 x 1,60)
- Bongkar Flo = 0.084 m3 212,815.30 17,876.49
- Galian Tana = 1.53 m3 24,233.23 37,076.84
- Urugan Tan = 0.78 m3 9,464.00 7,381.92
- Pemadatan = 1 m2 3,713.30 3,713.30
66,048.55 66,048.55
i Penyuntikan Kabel (1,50 x 0,50 x 1,10)
- Bongkar Flo = 0.0735 m3 212,815.30 15,641.92
- Galian Tana = 0.7725 m3 24,233.23 18,720.17
- Urugan Tan = 0.6225 m3 9,464.00 5,891.34
- Pemadatan = 0.75 m2 3,713.30 2,784.98
43,038.41 43,038.41
j Galian Lub. Sambungan 1 s/d 2 Jalur (2,00 x 1,30 x 1,20)
- Bongkar Flo = 0.21 m3 212,815.30 44,691.21
- Galian Tana = 2.938 m3 24,233.23 71,197.23
- Urugan Tan = 2.418 m3 9,464.00 22,883.95
- Pemadatan = 0.6 m2 3,713.30 2,227.98
141,000.37 141,000.37
k Galian Lub. Pengeboran Manual (2,00 x 1,50 x 3,00)
- Bongkar Flo = 0.238 m3 212,815.30 50,650.04
- Galian Tana = 8.79 m3 24,233.23 213,010.09
- Urugan Tan = 8.19 m3 9,464.00 77,510.16
- Pemadatan = 3 m2 3,713.30 11,139.90
352,310.19 352,310.19
Catatan :
- Rp. 212.815,30-- HS.DKI hAL.33 - bkr.03 79970

6 FLOOR BETON BERTULANG


a 1 dan 2 (1,00 x 0,40 x 1,20)
- Bongkar Flo = 0.06 m3 295,701.25 17,742.08
- Galian Tana = 0.44 m3 24,233.23 10,662.62
- Urugan Tan = 0.32 m3 9,464.00 3,028.48
- Pemadatan = 0.3 m2 3,713.30 1,113.99
32,547.17 32,547.17
b 3 Jalur (1,00 x 0,60 x 1,20)
- Bongkar Flo = 0.08 m3 295,701.25 23,656.10
- Galian Tana = 0.66 m3 24,233.23 15,993.93
- Urugan Tan = 0.48 m3 9,464.00 4,542.72
- Pemadatan = 0.6 m2 3,713.30 2,227.98
46,420.73 46,420.73
c 4 Jalur (1,00 x 0,80 x 1,20)
- Bongkar Flo = 0.1 m3 295,701.25 29,570.13
- Galian Tana = 0.88 m3 24,233.23 21,325.24
- Urugan Tan = 0.64 m3 9,464.00 6,056.96
- Pemadatan = 0.8 m2 3,713.30 2,970.64
59,922.97 59,922.97
d 5 dan 6 Jalur (1,00 x 0,60 x 1,40)
- Bongkar Flo = 0.08 m3 295,701.25 23,656.10
- Galian Tana = 0.78 m3 24,233.23 18,901.92
- Urugan Tan = 0.48 m3 9,464.00 4,542.72
- Pemadatan = 0.6 m2 3,713.30 2,227.98
49,328.72 49,328.72
e 7 dan 8 Jalur (1,00 x 0,80 x 1,40)
- Bongkar Flo = 0.1 m3 295,701.25 29,570.13
- Galian Tana = 1.04 m3 24,233.23 25,202.56
- Urugan Tan = 0.64 m3 9,464.00 6,056.96
- Pemadatan = 0.8 m2 3,713.30 2,970.64
63,800.28 63,800.28
f 9 dan 10 Jalur (1,00 x 1,00 x 1,40)
- Bongkar Flo = 0.12 m3 295,701.25 35,484.15
- Galian Tana = 1.3 m3 24,233.23 31,503.20
- Urugan Tan = 0.8 m3 9,464.00 7,571.20
- Pemadatan = 1 m2 3,713.30 3,713.30
78,271.85 78,271.85
g 11 dan 12 Jalur (1,00 x 1,20 x 1,40)
- Bongkar Flo = 0.14 m3 295,701.25 41,398.18
- Galian Tana = 1.56 m3 24,233.23 37,803.84
- Urugan Tan = 0.96 m3 9,464.00 9,085.44
- Pemadatan = 1.2 m2 3,713.30 4,455.96
92,743.41 92,743.41
h 13,14 dan 15 Jalur (1,00 x 1,00 x 1,60)
- Bongkar Flo = 0.12 m3 295,701.25 35,484.15
- Galian Tana = 1.5 m3 24,233.23 36,349.85
- Urugan Tan = 0.8 m3 9,464.00 7,571.20
- Pemadatan = 1 m2 3,713.30 3,713.30
83,118.50 83,118.50
i Penuntikan Kabel (1,50 x 0,50 x 1,10)
- Bongkar Flo = 0.105 m3 295,701.25 31,048.63
- Galian Tana = 0.75 m3 24,233.23 18,174.92
- Urugan Tan = 0.6 m3 9,464.00 5,678.40
- Pemadatan = 1.75 m2 3,713.30 6,498.28
61,400.23 61,400.23
j Galian Lub. Sumbangan 1 s/d 2 Jalur (2,00 x 1,30 x 1,20)
- Bongkar Flo = 0.3 m3 295,701.25 88,710.38
- Galian Tana = 2.86 m3 24,233.23 69,307.04
- Urugan Tan = 2.34 m3 9,464.00 22,145.76
- Pemadatan = 2.6 m2 3,713.30 9,654.58
189,817.75 189,817.75
k Galian Lub. Pengeboran Manual (2,00 x 1,50 x 3,00)
- Bongkar Flo = 0.34 m3 295,701.25 100,538.43
- Galian Tana = 8.7 m3 24,233.23 210,829.10
- Urugan Tan = 8.1 m3 9,464.00 76,658.40
- Pemadatan = 3 m2 3,713.30 11,139.90
399,165.83 399,165.83
Catatan :
- Rp. 295.701.25,- - HS.SIPIL Hal.36 - BKR.04

7 ASPAL BIASA/HOTMIX
a 1 dan 2 Jalur (1,00 x 1,40 x 1,20)
- Bongkar Asp= 0.4 m2 11,766.92 4,706.77
- Galian Tana = 0.26 m3 40,751.00 10,595.26
- Galian Tana = 0.2 m3 24,233.23 4,846.65
- Urugan Tan = 0.12 m3 9,464.00 1,135.68
- Pemadatan = 0.4 m2 1,856.65 742.66
22,027.01 22,027.01
b 3 Jalur (1,00 x 0,60 x 1,20)
- Bongkar Asp= 0.6 m2 11,766.92 7,060.15
- Galian Tana = 0.39 m3 40,751.00 15,892.89
- Galian Tana = 0.3 m3 24,233.23 7,269.97
- Urugan Tan = 0.18 m3 9,464.00 1,703.52
- Pemadatan = 0.6 m2 1,856.65 1,113.99
33,040.52 33,040.52
c 4 Jalur (1,00 x 0,80 x 1,20)
- Bongkar Asp= 0.8 m2 11,766.92 9,413.54
- Galian Tana = 0.52 m3 40,751.00 21,190.52
- Galian Tana = 0.4 m3 24,233.23 9,693.29
- Urugan Tan = 0.24 m3 9,464.00 2,271.36
- Pemadatan = 0.8 m2 1,856.65 1,485.32
44,054.03 44,054.03
d 5 dan 6 Jalur (1,00 x 0,60 x 1,40)
- Bongkar Asp= 0.6 m2 11,766.92 7,060.15
- Galian Tana = 0.39 m3 40,751.00 15,892.89
- Galian Tana = 0.42 m3 24,233.23 10,177.96
- Urugan Tan = 0.18 m3 9,464.00 1,703.52
- Pemadatan = 0.6 m2 1,856.65 1,113.99
35,948.51 35,948.51
e 7 dan 8 Jalur (1,00 x 0,80 x 1,40)
- Bongkar Asp= 0.8 m2 11,766.92 9,413.54
- Galian Tana = 0.52 m3 40,751.00 21,190.52
- Galian Tana = 0.56 m3 24,233.23 13,570.61
- Urugan Tan = 0.24 m3 9,464.00 2,271.36
- Pemadatan = 0.8 m2 1,856.65 1,485.32
47,931.34 47,931.34
f 9 dan 10 Jalur (1,00 x 1,00 x 1,40)
- Bongkar Asp= 1 m2 11,766.92 11,766.92
- Galian Tana = 0.65 m3 40,751.00 26,488.15
- Galian Tana = 0.7 m3 24,233.23 16,963.26
- Urugan Tan = 0.3 m3 9,464.00 2,839.20
- Pemadatan = 1 m2 1,856.65 1,856.65
59,914.18 59,914.18
g 11 dan 12 Jalur (1,00 x 1,20 x 1,40)
- Bongkar Asp= 1.2 m2 11,766.92 14,120.30
- Galian Tana = 0.78 m3 40,751.00 31,785.78
- Galian Tana = 0.84 m3 24,233.23 20,355.91
- Urugan Tan = 0.36 m3 9,464.00 3,407.04
- Pemadatan = 1.2 m2 1,856.65 2,227.98
71,897.02 71,897.02
h 13, 14 dan 15 Jalur (1,00 x 1,00 x 1,60)
- Bongkar Asp= 1 m2 11,766.92 11,766.92
- Galian Tana = 0.65 m3 40,751.00 26,488.15
- Galian Tana = 0.9 m3 24,233.23 21,809.91
- Urugan Tan = 0.3 m3 9,464.00 2,839.20
- Pemadatan = 1 m2 1,856.65 1,856.65
64,760.83 64,760.83
i Penyuntikan Kabel ( 1,50 x 0,50 x 1,10 )
- Bongkar Asp= 0.75 m2 11,766.92 8,825.19
- Galian Tana = 0.4875 m3 40,751.00 19,866.11
- Galian Tana = 0.3 m3 24,233.23 7,269.97
- Urugan Tan = 0.225 m3 9,464.00 2,129.40
- Pemadatan = 0.75 m2 1,856.65 1,392.49
39,483.16 39,483.16
j Galian Lub. Sambungan 1 s/d Jalur ( 2,00 x 1,30 x 1,20 )
- Bongkar Asp= 2.6 m2 11,766.92 30,593.99
- Galian Tana = 1.69 m3 40,751.00 68,869.19
- Galian Tana = 1.3 m3 24,233.23 31,503.20
- Urugan Tan = 0.78 m3 9,464.00 7,381.92
- Pemadatan = 2.6 m2 1,856.65 4,827.29
143,175.59 143,175.59
k Galian Lub. Pengeboran Manual ( 2,00 x 1,50 x 3,00 )
- Bongkar Asp= 3 m2 11,766.92 35,300.76
- Galian Tana = 1.95 m3 40,751.00 79,464.45
- Galian Tana = 6.9 m3 24,233.23 167,209.29
- Urugan Tan = 6.3 m3 9,464.00 59,623.20
- Pemadatan = 3 m2 1,856.65 5,569.95
347,167.65 347,167.65
8 POMPONGAN
- Pekerja 0.3 pekerja 32,250.00 10,750.00 10,750.00
Catatan :
- Rp.11.766.92,- - HS.DKI Hal.36 - BRK.07 3575
- Rp.40.751,- - HS Sipil Hal.2 No.07 15769
- Rp. 1.856.65 - HS.DKI Hal.3 TN.24 1068

II PENARIKAN DAN PENYAMBUNGAN


1 a Penarikan/Penggelaran Kabel 3 x 150 mm2
1 Hari / 8 Jam = 600 Meter
- Tenaga Ahl 1 Tenaga.Ah.Muda 123,500.00 123,500.00
- Teknisi 1 Teknisi 56,250.00 56,250.00
- Pekerja 75 Pekerja 32,250.00 2,418,750.00
2,598,500.00
Biaya Penggelaran Kabel / Meter = 2.598.500 / 600 4,330.83 4,330.00
b Penarikan/Penggelaran Kabel 3 x 240 mm2
1 Hari / 8 Jam = 500 Meter
- Tenaga Ahl 1 Tenaga.Ah.Muda 123,500.00 123,500.00
- Teknisi 1 Teknisi 56,250.00 56,250.00
- Pekerja 75 Pekerja 32,250.00 2,418,750.00
2,598,500.00
Biaya Penggelaran Kabel / Meter = 2.598,500 / 500 5,197.00 5,190.00
c Penarikan/Penggelaran Kabel 3 x 300 mm2
1 Hari / 8 Jam = 500 Meter
- Tenaga Ahl 1 Tenaga.Ah.Muda 123,500.00 123,500.00
- Teknisi 1 Teknisi 56,250.00 56,250.00
- Pekerja 75 Pekerja 32,250.00 2,418,750.00
2,598,500.00
Biaya Penggelaran Kabel / Meter = 2.598.500 / 500 5,197.00 5,190.00

2 Penyambungan SKTM 20 KV 3 x 150 / 240 / 300 mm2


a Dengan Pola S / E
1 Hari / 6 Jam = 1 Set
- Tenaga Ahli 0.5 Tenaga.Ah.Muda 123,500.00 61,750.00
- Tukang 0.5 Tukang 40,500.00 20,250.00
82,000.00
- Supervisi Pabrikan 174,750.00
Main Kontraktor 50% 169,375.00
426,125.00 426,125.00

3 Terminasi Kabel Indoor 20 KV 3 x 150,3 x 240,3 x 300 mm2


a Dengan Pola S / E
1 Hari / 4 Jam = 1 Set
- Tenaga Ahli 0.5 Tenaga.Ah.Muda 123,500.00 61,750.00
- Tukang 0.5 Tukang 40,500.00 20,250.00
82,000.00
- Supervisi Pabrikan 174,750.00
Main Kontraktor 50% 169,375.00
426,125.00 426,125.00
b Terminasi Kabel Outdoor 20 KV 3 x 150,3 x 240,3 x 300 mm2
Dengan Pola S / E
1 Hari / 4 Jam = 1 Set
- Tenaga Ahli 0.5 Tenaga.Ah.Muda 123,500.00 61,750.00
- Tukang 0.5 Tukang 40,500.00 20,250.00
82,000.00
- Supervisi Pabrikan 174,750.00
Main Kontraktor 50% 169,375.00
426,125.00 426,125.00

III MATERIAL PELENGKAP


a Pengadaan dan Pemas.Patok Tanda Kabel 20 KV PLN
- Beton Bertulang 1:2:3 = 0.012 m3 687,193.00 8,246.00
- Angkatan ( Rit ) 1/ 40 Buah 65,000.00 1,625.00
9,871.00 9,870.00
b Pengadaan dan Pemasangan Tanda Mof Kabel 20 KV
- Beton Bertulang 1:2:3 = 0.012 m3 687,193.00 8,246.00
- Angkatan ( Rit ) 1/ 40 Buah 65,000.00 1,625.00
9,871.00 9,870.00
c Pengadaan & Pemasangan Batu Bata Merah ( 5x10x20 ) 136.00
d Pengad. & Pemas.Timah Lebel Uk.(5cm x 25cm x 1,2mm)
- Harga Timah = Rp.5.200.000/Ton 867.00
- 1 Ton timah Dpt = 6.000 buah Timah lebel
- Bahan timah = Rp.5.200.000/6.000 buah

- Pekerja = 2/ 60 Buah 32,250.00 1,075.00


- Angkutan ( Rit ) = 1/ 4,000 Buah 65,000.00 16,250.00
18,192.00 18,192.00

Catatan :
- Beton 1:2:3 / m3 (100 kg) Rp.687.193,- HS.SIPIL No.34
- Angkutan Rp. 65.000,-/Rit HS.DKI Hal.122 - 15007
- Rp.137,- (Harga Batu Bata Rp.130 + ongkos Pasang Rp.7,-)

e Pengad. & Pemasangan Keramik Tanda Peringan Kabe


- Bahan (0,225 x 0,30) + Produksi 449.00 449.00
- Biaya Penyusutan 104.00 104.00
- Angkutan dari pabrik ke lokasi pekerjaan 260.00 260.00
- Ongkos Pasang 98.00 96.00
(*) Catatan : 909.00 910.00
Sumber Analisa dan Pabrikan

f Pengadaan/pemasangan pasir urug darat sepanjang gal


dan lubang sambungan kabel 20 KV PLN. 49,959.00
g Pengad.&Pemas.pipa Buis Beton Konstruksi Khusus O 20cm/mtr 11,102.00
h Pengad.& Pemas.Pipa Pralon O 6 Insi type AW / meter 33,215.00
i Pengad.& Pemasangan Besi Kanal UNP 120.55.7 Double
- UNP .120.55.7 = 26.80 Kg/Mtr Double 112,533.00
j Pengad.& Pemasangan Besi Kanal UNP 140.60.7 Double
- UNP .140.60.7 = 32.00 Kg/Mtr Double 134,368.00

Catatan :
- Rp. 4.200,- Hs Sipil No.44
- Rp. 49.960,- Hs.Sipil No.7
- Rp. 11.100,- HS.Sipil No.50
- Rp. 33.220,- Hs.Sipil No.45

IV PENGEBORAN CROSSING JALAN

a Crossing / Boring Manual


Boring Manual = 1 Hari = 8 meter
- Mandor 1 Mandor 56,250.00 56,250.00
- Tukang Kayu1 Tk.Kayu 40,500.00 40,500.00
- Pekerja 5 Pekerja 32,250.00 161,250.00
- Papan Pena 1.26 m3 572,000.00 720,720.00
- Dolken 5/7 12 batang 3,250.00 39,000.00
- Paku 1 kg 2,600.00 2,600.00
1,020,320.00
Harga Pengeboran 127,570.00 127,540.00 127,540.00
b Boring Mesin(Lihat HS.Boring Mesin/sesuai Kontrak)
c Ijin Boring Jalan Tol Jasa Marga (4 Jalur) 91,130.00
d Ijin Boring Rel Kereta Api/PJKA (Dalam Bestek sewa lahan
tidak dicantumkan dan akan di bayar sesuai realisasi
berdasarkan bukti yang dapat diPertanggungJawabkan
- Biaya Penguatan 1 Spoor 2,073,500.00
- Biaya Penguatan 2 Spoor 3,822,000.00
- Biaya Penguatan 3 Spoor 5,505,500.00
- Biaya Penguatan 4 Spoor 7,252,700.00

V PERBAIKAN BEKAS GALIAN KABEL ( BERIKUT MATERIAL )


a Tanah Biasa/Tanah Rumput ( Pekerjaan Perbaikan/pemadatan
sudah termasuk dalan pekerjaan galian )
b Tanah Keras/Koral ( Pekerjaan perbaikan / pemadatan sudah
pekrjaan galian
c Conblock/Interblock
- Pengadaan Conblock/Interblock
Abu-abu se = 15 buah 640.00 9,594.00
- Ongkos Kerj = 1 m2 5,005.00 5,005.00
- Lapisan Pas = 1 m2 12,961.00 3,240.00
- Lapisan Sirt = 1 m2 16,189.00 4,857.00
(*) Rp. 640 = Rp. 31.980/50 buah 22,696.00 22,700.00
d Ubin Badak
- Ubin badak = 1 m2 26,707.00 26,707.00
Alas Pasir Tebal 5 cm 26,707.00 26,710.00

e Floor Beton Biasa


- Lap.F.Beton = 1.00 m2/(5/100) 216,242.00 10,812.10 0.05
- Lapisan Pas = 1.00 m2/(5/20) 12,961.00 3,240.25 0.25
14,052.35 14,052.35

Catatan : (*)
- Lapisan Pasir tebal 20 cm/m2 Rp.12.960 - HS.SKI Hal.36-LBJ.03
- Lapisan Sirtu tebal 30 cm/m2 Rp.16.190-HS.DKI Hal.25-LBJ.13
- Rp. 216.240,- Hs. Sipil No.136
- Rp. 233.750,- Hs. Sipil No. 27
- Rp. 687.190 - Hs. Sipil No. 34
- Rp. 26.710 Hs. DKI Lt.03 +LBJ.04(16.960 + 9.750)
- Rp. 572.000,- Hs.DKI Hal.108 - 3007
- Rp. 3.250,- Hs.DKI Hal.108 - 3034
- Rp. 2.600,- Hs.DKI Hal.118 - 12001
- Rp. 31.980,- Hs.DKI Hal. 31 - TBJ.04
- Rp. 5.000,- Hs.DKI Hal.31 - TBJ.04

f Floor Beton Cor


- Lap.Floor Bet= 1.00 m2/(7/100) 233,753.00 11,687.65 0.05
- Lapisan Pasir= 1.00 m2/(15/20) 12,961.00 9,720.75 0.75
21,408.40 21,408.40
g Beton Bertulang
- Lap.Floor C = 1.00 m2/(10/100) 687,193.00 68,719.30 0.1
- Lapisan Pasir= 1.00 m2/(10/20) 12,961.00 6,480.50 0.5
75,199.80 75,199.80
h Shand sheet = 1.00 m2 10,920.00 10,926.00 10,930.00
i Aspal Biasa/Penetrasi : 5/20/30
- Lapisan Pen= 1.00 m2 13,313.00 13,313.00
- Lapisan Ma = 1.00 m2 17,186.00 17,186.00
- Lapisan Sir = 1.00 m2 16,190.00 16,190.00
46,689.00 46,700.00
j Aspal Hotmix : 5/5/20/30 ( Jalan kelas III )
- Lapisan Hot = 1.00 m2 20,744.00 20,744.00
- Lapisan teba= 1.00 m2 3,188.00 3,188.00
- Lapisan Pen= 1.00 m2 13,314.00 13,314.00
- Lapisan Ma = 1.00 m2 17,186.00 17,186.00
- Lapisan Sir = 1.00 m2 16,190.00 16,190.00
70,622.00 70,630.00

k Aspal Hotmix : 5/5/20/40 ( Jalan kelas II )


- Lapisan Hot = 1.00 m2 20,744.00 20,744.00
- Lapisan teba= 1.00 m2 3,188.00 3,188.00
- Lapisan Pen= 1.00 m2 13,314.00 13,314.00
- Lapisan Ma = 1.00 m2 17,186.00 17,186.00
- Lapisan Sir = 1.00 m2 22,024.00 22,024.00
76,456.00 76,460.00

l Aspal Hotmix : 5/5/20/70 ( Crossing Open Cut Jalan kelas II )


- Lapisan Hot = 1.00 m2 20,744.00 20,744.00
- Lapisan teba= 1.00 m2 3,188.00 3,188.00
- Lapisan Pen= 1.00 m2 13,314.00 13,314.00
- Lapisan Ma = 1.00 m2 17,186.00 17,186.00
- Lapisan Sir = 1.00 m2 (70/40) 22,024.00 38,541.00
92,973.00 92,980.00
m Aspal Hotmix : 7/5/20/40 ( Jalan kelas I )
- Lapisan Hot = 1.00 m2 28,972.00 28,972.00
- Lapisan teba= 1.00 m2 3,188.00 3,188.00
- Lapisan Pen= 1.00 m2 13,314.00 13,314.00
- Lapisan Ma = 1.00 m2 17,186.00 17,186.00
- Lapisan Sir = 1.00 m2 22,024.00 22,024.00
84,684.00 84,680.00
n Aspal Hotmix : 7/5/20/70 ( Crossing Open Cut Jalan kelas I )
- Lapisan Hot = 1.00 m2 28,972.00 28,972.00
- Lapisan teba= 1.00 m2 3,188.00 3,188.00
- Lapisan Pen= 1.00 m2 13,314.00 13,314.00
- Lapisan Ma = 1.00 m2 17,186.00 17,186.00
- Lapisan Sir = 1.00 m2 (70/40) 22,024.00 38,541.00
101,201.00 101,201.00
o Aspal Hotmix : 7/5/20/30 ( Jalan kelas IV )
- Lapisan Hot = 1.00 m2 12,517.00 12,517.00
- Lapisan teba= 1.00 m2 3,188.00 3,188.00
- Lapisan Pen= 1.00 m2 13,314.00 13,314.00
- Lapisan Ma = 1.00 m2 17,186.00 17,186.00
- Lapisan Sir = 1.00 m2 16,190.00 16,190.00
62,395.00 62,390.00

p Ubin Keramik
- Pasang Kera= 1.00 m2 37,999.00 37,999.00 38,000.00
- Pasang Kera= 1.00 m2 40,742.00 40,742.00 40,740.00
- Pasang Kera= 1.00 m2 43,472.00 43,472.00 43,470.00

q Rumput / Taman
- Perbaikan rumput/taman disesuaikan dengan HS.DKI/Pertamanan
( Dalam bestek biaya perbaikan rumput/taman tidak dicantumkan dan
akan dibayar sesuai realisasi berdasarkan bukti yang dapat di
pertanggung jawabkan )

Catatan (*)
- Rp. 13.320 Hs.DKI hal.30 LAJ.04 - Rp. 12.520,21 Hs.DKI Hal.49 - Rp. 38.000 - HS.Sipil No.84
- Rp. 17.200 Hs.DKI hal.36 LBJ.07 - Rp. 20.745 Hs.DKI Hal.49 - Rp. 40740 - HS.Sipil No.80
- Rp. 10.920, - Hs.DKI hal.36 LBJ.17 - Rp. 28.970 Hs.DKI Hal.49 - Rp. 43.470 - HS.Sipil No.81
- Rp. 16.200 Hs.DKI hal.36 LBJ.13 - Rp. 22.025 Hs.DKI Hal.36 LBJ.14
- Rp. 3.200 - Hs.DKI hal.30 LBJ.07

VI PERBAIKAN BEKAS GALIAN PADA LUB.SAMBUNGAN


- HS. sama dengan HS. Perbaikan Bekas Galian Kabel

VII PERBAIKAN BEKAS GALIAN PADA LUB.PENGEBORAN


- HS. sama dengan HS. Perbaikan Bekas Galian Kabel

VIII PERBAIKAN BEKAS GALIAN PADA LUB.PENYUNTIKAN


- HS. sama dengan HS. Perbaikan Bekas Galian Kabel

IX PEKERJAAN LAIN-LAIN
a Pembuangan tanah bekas galian dengan truck kapasitas 21,125.00 21,130.00
3 s/d 4m3 jarak>20 Km (Volume yang di buang =Lebar galianx
(tinggi lapisan pasir urug + lapisan penutup galian)xpanjang
(trace galian)
b Penjagaan 32,250.00 32,250.00 32,250.00
- 1 Pekerja/Hari
c Penyediaan tenaga untuk bantu pengujian kabel TM PLN
- Pekerja 2 Pekerja 32,250.00 64,500.00
- Instalatir 2 Instalatir 13,000.00 26,000.00
90,500.00 90,500.00
d Pemasangan arrester 20 KV termasuk pentanahan
( Sama dengan HS.SUTM )
- Pmasangan arresterdan pengadaan dudukan arreter 118,872.00 118,872.00
- Pengadaan/Pemasangan pipa arde 0 1,5 inci - 6 mtr 76,713.00 76,713.00
195,585.00 195,585.00
X BIAYA PENGURUSAN IJIN
1 Pemda DKI
a SPS BKJS ( Pengawasan,Perencanaan) 60% RAB perbaikan
b Q. Control pada hotmix/km 1,000/ 100 x 1 Titik 58,570.00 585,700.00 585,700.00
c Q. Control pada hotmix/km 1,000/ 100 x 1 Titik 10,790.00 107,900.00 107,900.00
d Proctor ( b + c )/ Km 75,660.00 151,320.00 151,320.00
e SPS.DTK ( Trace dan Gambar ) 501,260.00 501,260.00 501,260.00
f Pengurusan
2 Diluar Pemda DKI dan Instalasi lain
a Biaya Restribusi 130.00 130.00 130.00
b Pengurusan 65.00 65.00 65.00
3 Perum Otorita Jatiluhur/ Pengairan
a Biaya sewa lahan (Dalam bestek sewa lahan tidak dicantumkan
dan akan dibayar sesuai realisasi berdasarkan bukti - bukti
yang dapat dipertanggungjawabkan)
b Pengurusan ke Jatiluhur Purwakarta 65.00 65.00 65.00

Catatan :
Rp- Rp 21.25,- HS.DKI hal.5-AG.11

XI PENGANGKUTAN KABEL

1 Angkutan kabel TM./Meter


a Angkutan SKTM 10 - 50 meter 86,125.00 86,125.00
b Angkutan SKTM 50 - 100 meter 105,625.00 105,625.00
c Angkutan SKTM 100 - 200 meter 105,625.00 105,625.00

2 Angkutan kabel TM./ haspel 160,225.00 160,225.00


a Angkutan SKTM 1 Haspel 160,255.00 160,255.00
b Angkutan SKTM 2 Haspel 290,225.00 290,225.00
c Angkutan SKTM 3 Haspel
XII DIREKSI KEET
a Pengdaan dan Pemasangan Diteksi Kett 2 x 4 meter = 8 m2
untuk pekerjaan dengan masa kerja :
- 1 s/d 30 HKL = 1/3 x 8 m2 148,772.00 396,725.00 396,725.00
- 31 s/d 180 HKL = 1/2 x 8 m2 148,772.00 595,088.00 595,088.00
- 181 s/d 360 HKL = 1/1 x m2 148,772.00 1,190,176.00 1,190,176.00

b Pengadaan dan Pemasangan Pagar dari seng


Gelombang ( 1,80 mtr/2 )
- Seng gelombang ( 180 x 90 x 0,2 ) = 2.00 lembar 11,050.00 22,100.00
- Kaso 5/7 = 2.50 batang 6,319.00 15,798.00
- Paku = 0.06 KG. 2,600.00 156.00
- Cat = 1.00 KG. 9,100.00 9,100.00
- Pekerja = 0.75 9,750.00 7,313.00
- Tukang Kayu = 0.075 13,000.00 975.00
55,442.00
Harga pagar pengaman per meter = Rp. 72.45/1,80 = Rp.40.25,-
karena dianggap 3 kali pakai rusak maka harga pagar pengaman /meter
menjadi Rp.40.040/3

Catatan :
- HS. Angkutan kabel TM sesuai HS.Biaya Jasa Angkutan
- Rp. 193.400,- HS.Sipil No.143 - Rp.14.365,- HS.DKI Hal.118/11035
- 1/3 Direksi Keet dianggap 3 kali pakai Rp.11.830,- HS DKI Hal. 111/6001
- 1/2 Direksi Keet dianggap 2 kali pakai - Rp.2.600 HS.DKI Hal.118-12001
- Rp.8.215 = Rp.591.500/72 batang - HS.DKI Hal.108 - 3027

XIII DOKUMENTASI
a Foto dokumentasi 2 x 36 lembar berwarna
- Film = 1 rool 10,400.00 10,400.00
- Cuci film = 1 roll 2,600.00 2,600.00
- Cetak 2 x 36 = 72 lembar 520.00 37,440.00
50,440.00 50,440.00
b Foto dokumentasi perlembar berwarna
- Film = 1 rool 10,400.00 10,400.00
- Cuci film = 1 roll 2,600.00 2,600.00
- Cetak 1 x 36 = 72 lembar 520.00 18,720.00
31,720.00 881.00
c As.build drawing 1 : 200 (1 kalkir + 5 blue print + 1 film )
Sesuai panjang galian, kanal dan crossing.
- Mengambar 1 km Trace
- Tenaga Ahli Muda (D - 2) = 2 jam/ 1 orang 11,089.00 22,178.00
- Petugas Survey (E - 5) = 8 jam/1 orang 9,620.00 76,960.00
- Pekerja = 2 Orang 9,750.00 19,500.00
- Tukang Gambar ( E - 5 ) = 32 Jam 9,620.00 307,840.00
- Kertas kalkir ukuran = 0.30 x 5 3,900.00 19,500.00
- Cetak Blue Print = 5 lembar 3,120.00 15,600.00
- Cetak film Ukuran = 0.30 x 5 19,500.00 97,500.00
559,078.00
Biaya Menggambar / Meter = 559.078/1.000 = 559.00 559.00
d As.Build Drawing 1:5000 (1 kalkir + 5 blue print) print gambar spindle
- Tenaga Ahli Muda ( D - 2 ) = 1 jam /1 Orang 11,089.00 11,089.00
- Tukang Gambar (E - 5 ) = 16 Jam/1 Orang 9,620.00 153,920.00
1 13,000.00 13,000.00
- Kertas Kalkir Ukuran = 1 Meter 3,900.00 3,900.00
- Cetak Blue Print 1,950.00 9,750.00
191,659.00 191,659.00
Catatan (*)
- Rp.10.400,- Hs.DKI Hal.122 - 15001
- Rp.2.600,- Hs.DKI Hal.122 - 15002
- Rp.520,- Hs.DKI Hal.122 - 15003
0.65

0.72

5.835
0.825

3.12

3713.3
11139.9

0.65
1.5
14196
5569.5

9
14197.5

10504
15756
33585.72

0.072
0.096
0.06
0.44
0.32
0.39981273
0.03
10812.1
ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA

ANALISA HARGA SATUAN


PEKERJAAN : SALURAN UDARA TEGANGAN MENENGAH
Belum termasuk resiko,over head,keuntungan 10% dan PPN 10%
2004
HARGA BIAYA JUMLAH
NO URAIAN PEKERJAAN SATUAN DIBULATKAN
(Rp.) (Rp.) (Rp.)
1 2 3 4 5
I PEKERJAAN PEMASANGAN
1 TIANG TUNGGAL
1.a Tiang besi 12 meter 200 daN
-Mendirikan Tiang 1/3 Teknisi 240,000 80,000.00
2 Tukang 84,000 168,000.00
248,000.00 248,000.00
2 PEMASANGAN TIANG BESI & BETON DOUBLE
( 2 X Biaya Pemasangan Tiang Tunggal )
3 PEMBUATAN PONDASI TIANG BESI & BETON

3.f Pondasi Tiang 13 meter Type A


- Galian tanah biasa/rumput 0.9 M3 20,386 18,347.54
- Beton Tumbuk 1:2:3 0.78 M3 216,242 168,668.76
- Beton block 1:2:3 0.03 M3 687,193 20,615.79
- Urugan pasir 0.03 M3 49,959 1,498.77
209,130.86 209,130.00
3.g Pondasi Tiang 13 meter Type B
- Galian tanah biasa/rumput 0.9 M3 20,386 18,347.54
- Beton Tumbuk 1:2:3 0.54 M3 216,242 116,770.68
- Beton block 1:2:3 0.03 M3 687,193 20,615.79
- Urugan pasir 0.03 M3 49,959 1,498.77
157,232.78 157,230.00

5 PEMASANGAN / PENGADAAN TRAVERS


5.a Travers tunggal: UNP 12-1800 mm
- Pemasangan 1/12 Teknisi 56,250 4,687.50
2/ 3 Tukang 40,500 27,000.00
- Pengadaan 1 Buah 39,000 39,000.00
70,687.50 70,680.00
5.b Travers tunggal: UNP 12-2200 mm
- Pemasangan 1/ 6 Teknisi 56,250 9,375.00
1 1/ 2 Tukang 40,500 60,750.00
- Pengadaan 1 Buah 49,634 49,634.00
119,759.00 119,750.00
5.c Travers tunggal: UNP 12-2400 mm
- Pemasangan 1/ 6 Teknisi 56,250 9,375.00
1 1/ 2 Tukang 40,500 60,750.00
- Pengadaan 1 Buah 54,600 54,600.00
124,725.00 124,720.00
5.d Pemasangan Suspensi Assembly
1/12 Teknisi 56,250 4,687.50
1/ 4 Tukang 40,500 10,125.00
1/ 2 Pekerja 32,250 16,125.00
30,937.50 30,930.00
5.e Pemasangan Small Angle Assembly
1/12 Teknisi 56,250 4,687.50
1/ 3 Tukang 40,500 13,500.00
2/ 3 Pekerja 32,250 21,500.00
39,687.50 39,680.00
5.f Pemasangan Large Angle Assembly
1/12 Teknisi 56,250 4,687.50
1/ 3 Tukang 40,500 13,500.00
1/ 2 Pekerja 32,250 16,125.00
34,312.50 34,310.00
5.g Pemasangan Daed End Assembly
1/12 Teknisi 56,250 4,687.50
1/ 3 Tukang 40,500 13,500.00
1/ 2 Pekerja 32,250 16,125.00
34,312.50 34,310.00
6 PEMASANGAN PIN ISOLATOR
- Pemasangan 1/10 Teknisi 56,250 5,625.00
1/10 Tukang 40,500 4,050.00
9,675.00 9,670.00
7 PEMASANGAN HANG ISOLATOR
- Pemasangan 1/ 8 Teknisi 56,250 7,031.25
1/ 8 Tukang 40,500 5,062.50
12,093.75 12,090.00
8 PEMASANGAN POLE TOP SWITCH
- Pemasangan 1 Teknisi 56,250 56,250.00
6 Tukang 40,500 243,000.00
2 Pekerja 32,250 64,500.00
363,750.00 363,750.00

9 PEMASANGAN PIPA ARDE (1,5 Inc per 6 mtr) per batang 26,000 26,000.00
PENGADAAN PIPA ARDE (1,5 Inc per 6 mtr) per batang 50,718 50,718.00
76,718.00 76,710.00
10 PENARIKAN KAWAT HANTARAN/Gawang (Jarak Mx.40 m)

10.a Kawat A3C 3 x 35 s/d 150 mm2


- Penarikan 1/ 3 Teknisi 56,250 18,750.00
2 Tukang 40,500 81,000.00
1 1/ 3 Pekerja 32,250 43,000.00
142,750.00 142,750.00
10.b Kawat A3C 3 x 35 s/d 150 mm2
- Penarikan 1/ 2 Teknisi 56,250 28,125.00
3 Tukang 40,500 121,500.00
2 Pekerja 32,250 64,500.00
214,125.00 214,120.00

10.e Pemasangan Kawat Pengikat Hantaran Isolator


1/10 Tukang 40,500 4,050.00 4,050.00

11 PEMASANGAN JUMPER /PHASE


- Mandor Pengawas 1/12 Teknisi 56,250 4,687.50
- Tukang 1/12 Tukang 40,500 3,375.00
- Pekerja 1/12 Pekerja 32,250 2,687.50
10,750.00 10,750.00
13 PENGADAAN DAN PEMASANGAN TANDA KILAT 20MKV
( 20 cm X 30 cm ), Tebal Plat 4mm
- Pengadaan 11,050 11,050.00
- Ongkos pasang 1,950 1,950.00
13,000.00 13,000.00
14 PENGADAAN DAN PEMASANGAN PENGHALANG PANJAT
- Pengadaan 29,445 29,445.00
- Ongkos pasang 1,950 1,950.00
- Pengelasan + Bahan 31,395.00 31,390.00

15 PEMASANGAN ARRESTER DAN PENGADAAN DUDUKAN


- Tenaga Ahli Muda 1/ 8 Hari 112,500 14,062.50
- Tukang 1 Tukang 40,500 40,500.00
- Pekerja 1/ 2 Pekerja 32,250 16,125.00
- Dudukan Arrester 1 set 56,628 56,628.00
- Angkutan 1/ 2 Rit 65,000 32,500.00
159,815.50 159,810.00
16 PEMASANGAN CUT OUT DAN PENGADAAN DUDUKAN
- Tenaga Ahli Muda 1/ 8 Hari 112,500 14,062.50
- Tukang 1 Tukang 40,500 40,500.00
- Pekerja 1/ 2 Pekerja 32,250 16,125.00
- Dudukan Arrester 1 set 56,628 56,628.00
- Angkutan 1/ 2 Rit 65,000 32,500.00
159,815.50 159,810.00
16A PEMASANGAN TREE GUARD 1 GAWANG
- Teknisi 1/ 3 Teknisi 56,250 18,750.00
- Instalator 1 1/ 3 Tukang 40,500 54,000.00
- Pekerja 1 1/ 3 Pekerja 32,250 43,000.00
115,750.00 115,750.00
17 PEMELIHARAAN JARINGAN
- Majun 1/ 4 Kg 8,000 2,000.00
- YC 8513 type G658SF6 1/ 2 Ltr 75,000 37,500.00
- Pasline 1/ 4 Kg 87,500 21,875.00
- Mandor Pengawas 1/ 2 Teknisi 56,250 28,125.00
- Angkutan 1/ 2 Rit 65,000 32,500.00
122,000.00 122,000.00
18 PEMELIHARAAN CUT OUT
- Majun 1/25 Kg 8,000 320.00
- YC 8513 type G658SF6 3/10 Ltr 75,000 22,500.00
- Pasline 1/ 4 Kg 87,500 21,875.00
- Mandor Pengawas 1/ 3 Teknisi 56,250 18,750.00
- Angkutan 1/ 3 Rit 65,000 21,666.67
85,111.67 85,110.00
19 PEMELIHARAAN GARDY/BOX SEKERING
- Majun 1/ 4 Kg 8,000 2,000.00
- YC 8513 type G658SF6 1/ 2 Ltr 75,000 37,500.00
- Pasline 1/ 4 Kg 87,500 21,875.00
- Mandor Pengawas 1/ 2 Teknisi 56,250 28,125.00
- Angkutan 1/ 2 Rit 65,000 32,500.00
122,000.00 122,000.00

20 PEMELIHARAAN RAK TR PADA GARDU PORTAL


- Majun 1/ 4 Kg 8,000 2,000.00
-Spirtus 1/ 2 Ltr 7,150 3,575.00
- Pasline 1/ 4 Kg 87,500 21,875.00
- Mandor Pengawas 1/ 2 Teknisi 56,250 28,125.00
- Tukang 2 Tukang 40,500 81,000.00
- Pekerja 2 Pekerja 32,250 64,500.00
201,075.00 201,070.00
22 PENGADAAN DAN PEMASANGAN NOMOR GARDU
- Pengadaan 26,936 26,936.00
- Ongkos Pasang 1,950 1,950.00
28,886.00 28,890.00

IV LAIN - LAIN
1 PEMBERSIH BENAMG LAYANGAN SUTM/GAWANG
- Pembersihan 1/5 Teknisi 56,250 11,250.00
2/5 Tukang 40,500 16,200.00
27,450.00 27,450.00
2 PEMANGKASAN CABANG POHON SUTM/GAWANG
- Pemangkasan 1/5 Teknisi 56,250 11,250.00
4/5 Tukang 40,500 32,400.00
1 1/3 Pekerja 32,250 43,000.00
3 FOTO DOKUMENTASI : 36 LEMBAR 86,650.00 86,650.00

1/ 1 Rol Film 10,400 10,400.00


1/ 1 Cuci Film 2,600 2,600.00
36/ 1 Cetak 2x 520 18,720.00
31,720.00 31,720.00
ASOSIASI KONTRAKTOR LISTRIK DAN MEKANIKAL INDONESIA

ANALISA HARGA SATUAN


JASA PEKERJAAN ANGKUTAN
Biaya Belum termasuk resiko,overhead, keuntungan 10% dan PPN 10%
2004
HARGA BIAYA JUMLAH
NO URAIAN PEKERJAAN SATUAN DIBULATKAN
(RUPIAH) (RUPIAH) (RUPIAH)
1 2 3 4 5
1 BIAYA ANGKUTAN
1.1 Pick Up Per Rit 65,000.00 65,000.00
1.2 Truck Kecil /2 - 4 Ton Per Rit 84,500.00 84,500.00
1.3 Truck Kecil /5 - 7 Ton Per Rit 130,000.00 130,000.00
1.4 Truck Tronton /> 7 Ton Per Rit 214,500.00 214,500.00
1.5 Sepeda Motor Per Rit 7,150.00 7,150.00
1.6 Forklift 5 Ton Per Rit 14,300.00 14,300.00
1.7 Forklift 10 Ton Per Jam 21,450.00 21,450.00
1.8 Crane Per Jam 42,900.00 42,900.00

2 ANGKUTAN KU 1 Rit 84,500.00 84,500.00


- Truck Kecil / 3 Jam 14,300.00 42,900.00
- Forklift 5 Ton 3 Mandor 56,250.00 168,750.00
- Pelaksana 0.33 Pekerja 32,250.00 10,750.00
306,900.00 306,900.00
3 ANGKUTAN TRAFO 100 S/D 315 KVA
-Truck Kecil / 1 Rit 84,500.00 84,500.00
-Forklift 10 T 3 Jam 21,450.00 64,350.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
209,225.00 209,225.00
4 ANGKUTAN TRAFO 400 s/d 630 KVA
-Truck Kecil / 1 Rit 84,500.00 84,500.00
-Forklift 10 T 3 Jam 21,450.00 64,350.00
- Pelaksana 1 Mandor 56,250.00 56,250.00
2 Pekerja 32,250.00 64,500.00
269,600.00 269,600.00
5 ANGKUTAN TRAFO 400 s/d 1.250 KVA
-Truck Kecil / 1 Rit 84,500.00 84,500.00
-Forklift 10 T 3 Jam 21,450.00 64,350.00
=- Pelaksana 1 Mandor 56,250.00 56,250.00
2 Pekerja 32,250.00 64,500.00
269,600.00 269,600.00
6 ANGKUTAN TRAFO 1.000 s/d 1.250 KVA
Truck Tronton 1 Rit 214,500.00 214,500.00
-Forklift 10 T 3 Jam 21,450.00 64,350.00
-Pelaksana 1 Mandor 56,250.00 56,250.00
2 Pekerja 32,250.00 64,500.00
399,600.00 321,100.00
7 ANGKUTAN RAK TR DAN PERLENGKAPANNYA
Pick Up 1 Rit 65,000.00 65,000.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
125,375.00 125,375.00
8 ANGKUTAN SKTM 10 - 50 METER
Pick Up 1 Rit 65,000.00 65,000.00
- Pelaksana 1 Mandor 56,250.00 28,125.00
0.67 Pekerja 32,250.00 21,500.00
114,625.00 114,625.00
9 ANGKUTAN SKTM 50 - 100 METER
Truck kecil / 2 1 Rit 84,500.00 84,500.00
- Pelaksana 2 Mandor 56,250.00 112,500.00
2 Pekerja 32,250.00 64,500.00
261,500.00 261,500.00
10 ANGKUTAN SKTM 100 - 200 METER
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 1 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
144,875.00 144,875.00
11 ANGKUTAN SKTM 1 HASPEL
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Forklift 10 T 3 Mandor 56,250.00 168,750.00
- Pelaksana 2 Pekerja 32,250.00 64,500.00
317,750.00 317,750.00
12 ANGKUTAN SKTM 2 HASPEL
- Truck Besar 1 Rit 130,000.00 130,000.00
- Forklift 10 To 3 Mandor 56,250.00 168,750.00
- Pelaksana 0.50 Pekerja 32,250.00 16,125.00
314,875.00 314,875.00
13 ANGKUTAN SKTM 3 HASPEL
- Truck Besar 1 Rit 214,500.00 214,500.00
- Forklift 10 To 3 Mandor 56,250.00 168,750.00
- Pelaksana 0.50 Pekerja 32,250.00 16,125.00
399,375.00 399,375.00
14 ANGKUTAN POLE TOP SWITCH 1 s/d 2 BUAH
-Pick Up 1 Rit 65,000.00 65,000.00
- Pelaksana 1 Mandor 56,250.00 28,125.00
1.50 Pekerja 32,250.00 48,375.00
141,500.00 141,500.00
15 ANGKUTAN ISOLATOR 1 s/d 10 PETI
-Pick Up 1 Rit 65,000.00 65,000.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
125,375.00 125,375.00
16 ANGKUTAN FITTING 1 s/d 30 SET
-Pick Up 1 Rit 65,000.00 65,000.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
125,375.00 125,375.00
17 ANGKUTAN KAWAT A3C 150 mm2 50 - 150 METER
- Pick Up 1 Rit 65,000.00 65,000.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
18 ANGKUTAN KAWAT A3C 150 mm2 150 - 250 METER 125,375.00 125,375.00
-Truck kecil / 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
144,875.00 144,875.00
19 ANGKUTAN TIANG BESI 9/200 DAN (1 S/D 4 BT)
- Pick Up 1 Rit 65,000.00 65,000.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
125,375.00 125,375.00
20 ANGKUTAN TIANG BESI 9/200 DAN (5 S/D 9 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
144,875.00 144,875.00
21 ANGKUTAN TIANG BESI 9/200 DAN (10 S/D 20 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
144,875.00 144,875.00
22 ANGKUTAN TIANG BESI 9/350 DAN (3 S/D 6 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1.50 Pekerja 32,250.00 48,375.00
161,000.00 161,000.00
23 ANGKUTAN TIANG BESI 9/350 DAN (7 S/D 15 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1.50 Pekerja 32,250.00 48,375.00
161,000.00 161,000.00
24 ANGKUTAN TIANG BESI 9/500 DAN (2 S/D 6 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
2 Pekerja 32,250.00 64,500.00
177,125.00 177,125.00
25 ANGKUTAN TIANG BESI 9/500 DAN (7 S/D 10 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
2 Pekerja 32,250.00 64,500.00
177,125.00 177,125.00
26 ANGKUTAN TIANG BESI 9/800 DAN (2 S/D 4 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
2.50 Pekerja 32,250.00 80,625.00
193,250.00 193,250.00
27 ANGKUTAN TIANG BESI 9/800 DAN (5 S/D 8 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
2.50 Pekerja 32,250.00 80,625.00
193,250.00 193,250.00
28 ANGKUTAN TIANG BETON 9/200 DAN (1 S/D 6 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1.50 Pekerja 32,250.00 48,375.00
161,000.00 161,000.00
29 ANGKUTAN TIANG BETON 9/350 DAN (1 S/D 5 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
2 Pekerja 32,250.00 64,500.00
177,125.00 177,125.00
30 ANGKUTAN TIANG BETON 9/500 DAN (1 S/D 4 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
2.50 Pekerja 32,250.00 80,625.00
193,250.00 193,250.00
31 ANGKUTAN TIANG BESI 11/200 DAN (1 S/D 3 BT)
- Pick Up 1 Rit 65,000.00 65,000.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
125,375.00 125,375.00
32 ANGKUTAN TIANG BESI 11/200 DAN (4 S/D 8 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
144,875.00 144,875.00
33 ANGKUTAN TIANG BESI 11/200 DAN (9 S/D 20 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
144,875.00 144,875.00
34 ANGKUTAN TIANG BESI 11/350 DAN (2 S/D 6 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1.50 Pekerja 32,250.00 48,375.00
161,000.00 161,000.00
35 ANGKUTAN TIANG BESI 11/350 DAN (7 S/D 15 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1.50 Pekerja 32,250.00 48,375.00
161,000.00 161,000.00
36 ANGKUTAN TIANG BESI 11/500 DAN (2 S/D 4 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
2 Pekerja 32,250.00 64,500.00
177,125.00 177,125.00
37 ANGKUTAN TIANG BESI 11/500 DAN (5 S/D 10 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
2 Pekerja 32,250.00 64,500.00
177,125.00 177,125.00
38 ANGKUTAN TIANG BESI 11/800 DAN (2 S/D 3 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
2.50 Pekerja 32,250.00 80,625.00
193,250.00 193,250.00
39 ANGKUTAN TIANG BESI 11/800 DAN (4 S/D 8 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
2.50 Pekerja 32,250.00 80,625.00
193,250.00 120,250.00
40 ANGKUTAN TIANG BESI 11/200 DAN (2 S/D 3 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
2.50 Pekerja 32,250.00 80,625.00
193,250.00 193,250.00
41 ANGKUTAN TIANG BESI 11/1200 DAN (4 S/D 7 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
2.50 Pekerja 32,250.00 80,625.00
193,250.00 193,250.00
42 ANGKUTAN TIANG BESI 13/1200 DAN (1 S/D 10 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1.50 Pekerja 32,250.00 48,375.00
161,000.00 161,000.00
43 ANGKUTAN TIANG BESI 13/350 DAN (1 S/D 8 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
2 Pekerja 32,250.00 64,500.00
177,125.00 177,125.00
44 ANGKUTAN TIANG BESI 13/500 DAN (1 S/D 8 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
2.50 Pekerja 32,250.00 80,625.00
193,250.00 193,250.00
45 ANGKUTAN TIANG BESI 13/500 DAN (1 S/D 6 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
3 Pekerja 32,250.00 96,750.00
209,375.00 209,375.00
46 ANGKUTAN TIANG BESI 13/1200 DAN (1 S/D 6 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
3.50 Pekerja 32,250.00 112,875.00
225,500.00 225,500.00
47 ANGKUTAN TIANG BETON 11/200 DAN (1 S/D 4 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1.50 Pekerja 32,250.00 48,375.00
161,000.00 161,000.00
48 ANGKUTAN TIANG BETON 11/350 DAN (1 S/D 3 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
2 Pekerja 32,250.00 64,500.00
177,125.00 177,125.00
49 ANGKUTAN TIANG BETON 11/500 DAN (1 S/D 3 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
2.50 Pekerja 32,250.00 80,625.00
193,250.00 193,250.00
50 ANGKUTAN TIANG BETON 13/200 DAN (1 S/D 3 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
2 Pekerja 32,250.00 64,500.00
177,125.00 115,380.00
51 ANGKUTAN TIANG BETON 13/350 DAN (1 S/D 2 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
2.50 Pekerja 32,250.00 80,625.00
193,250.00 193,250.00
52 ANGKUTAN TIANG BETON 13/500 DAN (1 S/D 2 BT)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
3 Pekerja 32,250.00 96,750.00
209,375.00 209,375.00
53 ANGKUTAN KABEL TWISTED 3x70+50 mm2 (10 S/D 250 MTR)
- Pick Up 1 Rit 65,000.00 65,000.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
125,375.00 125,375.00
54 ANGKUTAN KABEL TWISTED 3x70+50 mm2 (250 S/D 500 MTR)
- Truck Kecil 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
144,875.00 144,875.00
55 ANGKUTAN KABEL TWISTED 3x70+50 mm2 1 HASPEL
- Pick Up 1 Rit 65,000.00 65,000.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
- Pekerja 1 Pekerja 32,250.00 32,250.00
- Sewa Forklif 2 Jam 14,300.00 28,600.00
153,975.00 153,975.00
56 ANGKUTAN KABEL TWISTED 3x70+50 mm2 2 HASPEL
- Truck Kecil / 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
- Pekerja 1 Pekerja 32,250.00 32,250.00
- Sewa Forklif 2 Jam 14,300.00 28,600.00
173,475.00 173,475.00
57 ANGKUTAN KABEL TWISTED 3x70+50 mm2 3 - 4 HASPEL
- Truck Kecil / 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
- Pekerja 1 Pekerja 32,250.00 32,250.00
- Sewa Forklif 3 Jam 14,300.00 42,900.00
187,775.00 187,775.00
58 ANGKUTAN BC 25 - 50 mm2 S/D 500 Kg
- Pick Up 1 Rit 65,000.00 65,000.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
125,375.00 125,375.00
59 ANGKUTAN BC 25 - 50 mm2 S/D 500 Kg - 1 Ton
- Truck Kecil / 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
144,875.00 144,875.00
60 ANGKUTAN BC 25 - 50 mm2 2 - 4 HASPEL
- Truck Kecil / 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
- Forklift 5 To 2 Jam 14,300.00 28,600.00
173,475.00 173,475.00
61 ANGKUTAN BC 25 - 50 mm2 5 - 8 HASPEL
- Truck Kecil / 1 Rit 65,000.00 65,000.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
- Forklift 5 To 4 Jam 14,300.00 57,200.00
182,575.00 162,830.00
62 ANGKUTAN KABEL NYFGBY 4x95 mm2, 4x120 mm2,
4x150 mm S/D 50 METER
- Pick Up 1 Rit 65,000.00 65,000.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
125,375.00 125,375.00
63 ANGKUTAN KABEL NYFGBY 4x95 mm2, 4x120 mm2,
4x150 mm S/D 200 METER
- Truck Kecil / 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
144,875.00 144,875.00
64 ANGKUTAN KABEL NYFGBY 4x95 mm2, 4x120 mm2,
4x150 mm2, 200- 300 METER
- Truck Kecil / 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
144,875.00 144,875.00
65 ANGKUTAN KABEL NYFGBY 4x95 mm2, 4x120 mm2,
4x150 mm2, 1 - 2 HASPEL
- Truck Kecil / 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
- Forklift 5 To 2 Jam 14,300.00 28,600.00
173,475.00 173,475.00
66 ANGKUTAN KABEL NYFGBY 4x95 mm2, 4x120 mm2,
4x150 mm2, 3 - 4 HASPEL
- Truck Kecil / 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
- Forklift 5 To 3 Jam 14,300.00 42,900.00
187,775.00 187,775.00
67 ANGKUTAN APP TYPE KHUSUS IB,IC,IFF: (1 - 4 Buah)
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
- Sepeda Mot 1 Rit 7,150.00 7,150.00
67,525.00 67,525.00
68 ANGKUTAN APP 1.A (1 - 6 Buah)
- Pick Up 1 Rit 65,000.00 65,000.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
125,375.00 125,375.00

69 ANGKUTAN APP TYPE KHUSUS IB,IC,IIF : ( 1 - 4 Buah)


- Pick Up 1 Rit 65,000.00 65,000.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1 Pekerja 32,250.00 32,250.00
125,375.00 86,130.00
70 ANGKUTAN UPS 40 KVA, 1 BUAH
- Pick Up 1 Rit 65,000.00 65,000.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
2.50 Pekerja 32,250.00 80,625.00
173,750.00 173,750.00
71 ANGKUTAN UPS 100 KVA, 1 BUAH
- Tuck Kecol / 1 Rit 84,500.00 84,500.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
2.50 Pekerja 32,250.00 80,625.00
193,250.00 193,250.00
72 ANGKUTAN GENSET 10 S/D 50 KVA, 1 BUAH
- Pick Up 1 Rit 65,000.00 65,000.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
1.50 Pekerja 32,250.00 48,375.00
141,500.00 141,500.00

73 ANGKUTAN PERALATAN KONTROL

a. Pengangkutan Lemari Spindel


a). Pick Up 1 Rit 65,000.00 65,000.00
b). Sewa Forkl 3 Jam 14,300.00 42,900.00
- Pelaksana 0.50 Mandor 56,250.00 28,125.00
3 Pekerja 32,250.00 96,750.00
232,775.00 232,775.00

b. Pengangkutan Lemari RTU = Angkutan Lemari Spindel 148,525.00 148,525.00


c. Pengangkutan Lemari MDF = Angkutan Lemari Spindel 148,525.00 148,525.00
d. Pengangkutan Lemari Rectifi= Angkutan Lemari Spindel 148,525.00 148,525.00
e. Pengangkutan Lemari Box R= Angkutan Lemari Spindel 148,525.00 148,525.00
f. Pengangkutan Lemari Box = Angkutan Lemari Spindel 148,525.00 148,525.00
g. Pengangkutan Lemari Box = Angkutan Lemari Spindel 148,525.00 148,525.00