SYSTEM REHABILITATION FOR "NRW"

TODA - SIERRA JV PROJECT REDUCTION IN NORTH OF COLOMBO CITY.


REV.
Sheet pile design at Asphalt plant, 1
STRUCTURE NO.
Madampitiya RD. - Transmission Main
COMPONENT

DESIGNED NR CHECKED NB DATE 27/04/2017

Reference Calculations Output


Design Data
Material Properties

Use Hot Rolled Sheet Piling- U sections


From section
data sheet.
1) 400mmx125mmx13.1mmx 9M;58.4 kg/m

Driving distance(width) of a = 0.4 m


sheet pile

= 220 N/mm2
Allowable design stress of a pile
= 220000 kN/m2

Soil properties

Dry density of dry soil, γ d = 18 kN/m3


Saturated density of soil,γ s,sat = 20 kN/m3
Water density γ w = 10 kN/m3
Cohesiveness, C = 0 kN/m2
Average of BH- Friction angle, Ф = 25 Degrees
2 0.436

Surcharge load (S) = 10.0 kN/m2


SYSTEM REHABILITATION FOR "NRW"
TODA - SIERRA JV PROJECT REDUCTION IN NORTH OF COLOMBO CITY.
REV.
Sheet pile design at Asphalt plant, 1
STRUCTURE NO.
Madampitiya RD. - Transmission Main
COMPONENT

DESIGNED NR CHECKED NB DATE 27/04/2017

Reference Calculations Output

Ka = (1-sin φ)/(1+ sin φ) = 0.41


Kp = 1/Ka = 2.46

Dead Load-

Pressure due to soil


Active Soil Pressure(pa) = Kaγh
Passive Soil Pressure(pp) = Kpγh
Pressure due to water(Pw) = γw h

Live Load-

Pressure due to surcharge,


Pressure = KaxS

9m length sheet pile = h4


CMC premises ground level 1.1
P
Road shoulder level
Fa1 3.1 = h3
GWT
Pa1
Dredge Line 0.2 = h2

X Fa5

Sheet pile 3.40 = h1


Fa2
Fa4
Fp1 Fp2 Fa3

pp1 pp2 Pa2 Pa3 Pa4


Lateral support P will be applied from outside of sheet pile.
Pp1 = Kp *(γ s,sat-γw)*h1
= 2.46*3.4*(20-10)
Pp1 = 83.8 kN/m2

Pp2 = γw*h1
= 10*3.4
Pp2 = 34.0 kN/m2
SYSTEM REHABILITATION FOR "NRW"
TODA - SIERRA JV PROJECT REDUCTION IN NORTH OF COLOMBO CITY.
REV.
Sheet pile design at Asphalt plant, 1
STRUCTURE NO.
Madampitiya RD. - Transmission Main
COMPONENT

DESIGNED NR CHECKED NB DATE 27/04/2017

Reference Calculations Output

Pa1 = Ka *(γ s,d)*h3


= 0.41*18*3.1
Pa1 = 22.6 kN/m2

Pa2 = Ka *(γ s,sat-γw)*(h1+h2)+ Pa1


= 0.41*(20-10)*(0.2+3.4)+22.9
Pa2 = 37.3 kN/m2

Pa3 = γw*(h1+h2)
= 10*(0.2+3.4)
Pa3 = 36.0 kN/m2

Pa4 = Ka *S
= 0.41*10
Pa4 = 4.1 kN/m2

Fp1 = 1/2*Pp1*h1 y1 = 1/3*h1


= 1/2*83.8*3.4 = 1/3*3.4
Fp1 = 142.4 kN/m y1 = 1.1 m

Fp2 = 1/2*Pp2*h1 y2 = 1/3*h1


= 1/2*34*3.4 = 1/3*3.4
Fp2 = 57.8 kN/m y2 = 1.1 m

Fa1 = 1/2*Pa1*h3 y4 = (h1+h2)+1/3*h3


= 1/2*22.9*3.1 = 3.4+0.2+1/3*3.1
Fa1 = 35.1 kN/m y4 = 4.6 m

Fa2 = Pa1*(h1+h2) y5 = 1/2*(h1+h2)


= 22.9*(3.4+0.2) = 1/2*(3.4+0.2)
Fa2 = 81.5 kN/m y5 = 1.8 m

Fa3 = 1/2*(Pa2-Pa1)*(h1+h2) y6 = 1/3*(h1+h2)


= 1/2*(37.3-22.9)*3.6 = 1/3*(3.4+0.2)
Fa3 = 26.3 kN/m y6 = 1.2 m

Fa4 = 1/2*Pa3*(h1+h2) y7 = 1/3*(h1+h2)


= 1/2*36*(3.4+0.2) = 1/3*(3.4+0.2)
Fa4 = 64.8 kN/m y7 = 1.2 m
SYSTEM REHABILITATION FOR "NRW"
TODA - SIERRA JV PROJECT REDUCTION IN NORTH OF COLOMBO CITY.
REV.
Sheet pile design at Asphalt plant, 1
STRUCTURE NO.
Madampitiya RD. - Transmission Main
COMPONENT

DESIGNED NR CHECKED NB DATE 27/04/2017

Reference Calculations Output


Fa5 = Pa4*(h1+h2+h3) y8 = 1/2*(h1+h2+h3)
= 4.1*(3.4+0.2+3.1) = 1/2*(3.4+0.2+3.1)
Fa5 = 27.2 kN/m y8 = 3.4 m

Stability Check

Overturning moment = 509.8 kNm/m


Restoring moment = 226.9 + P x( 6.7 ) kNm/m

Overturning moment < Restoring moment


P > 42.22 kN
Take P = 60 kN/m
Maximum bending moment
Maximum bending moment at distance x below dredge line.(at point of zero shear)

1/2* Ka *(γ s,sat-γw)*X*X + 1/2*γw*X*X - 1/2*Pa1*h3 - Pa1*(X+h2)


- 1/2*Ka*(γ s,sat-γw)*(X+h2)*(X+h2) - 1/2*γw*(x+h2)2 - Pa4*(X+h2+h3)
+ 60 = 0

2
12.3 X2 + 5 X2 - 35.1 - 23 (X+0.2) - 2 (X+0.2)
- 5 (X+0.2)2 - 4.1 (X + 3.3 ) + 60.0
= 0
10.3 X2 - 29.5 X + 6.69 = 0

X2 - 2.87 X + 0.65 = 0

X = 0.25 m

Mmax = -133 kNm/m

Beding Moment per a sheet pile = -53.2 kNm


Required Section Moduless of a Sheet Pile = 0.00024171 m3
= 241.71 cm3

2) 400mmx125mmx13.1mmx 9M;58.4 kg/m


Sectional moduless = 250 cm3

Hence section is satisfied.


SYSTEM REHABILITATION FOR "NRW"
TODA - SIERRA JV PROJECT REDUCTION IN NORTH OF COLOMBO CITY.
REV.
Sheet pile design at Asphalt plant, 1
STRUCTURE NO.
Madampitiya RD. - Transmission Main
COMPONENT

DESIGNED NR CHECKED NB DATE 27/04/2017

Reference Calculations Output

Calculation for Lateral Suopport System.

UB- 150x100 will be welded to sheet pile as shown on the figure.


UB- 150x100 will be supported laterally by steel jacks as shown on the figure.

UB-150x100

P = 60.0 kN/m
Steel Jack
1.1 F
Road Level
θ
2.50

Sheet pile

Length of the steel jack = 2.73


Cos θ = 0.92

F = p / cos θ
= 65.6

Safe load capacity of a steel jack (prop) = 26 kN


No of jacks required for 1m length = 2.31
= 3 Nos.