You are on page 1of 1

A0 LG A B C D E F G H I J K L

dgn
15103.
Environmental Features

RW -
163+200
1390m Viaduct carrying Up Spur over M42, High Speed
Legend

DR-
163+400
Mainlines, Existing Railways and Flood Plains

05-
163+600
Listed buildings

ARP-
1
North East

163+800

HS2-
65m Retaining Wall between Area of Outstanding Natural Beauty

164+000

es\
Up Spur and other lines

l
164+200

i
RAMSAR

of
Permanent Land Requirement

an and pr
164+400
World Heritage Site

164+600

t3 Pl
164+800
SSSI

f
New A446 Underpass

Postsi
440m Viaduct carrying Down North

165+000
Special Areas of Conservation
700m Retaining Wall between 270m Retaining Wall between Down East over High Speed Mainlines

165+200

es\
Up and Down North East North East and High Speed Mainlines London

l
i
s

of
dLn
ie Temporary Road Diversion Special Protection Areas

165+400
ghSpee

an and Pr
2 tandSo
lwHi
weenFas during Bridge Construction

165+600
oso
s e
v rbet
230kphCr National Nature Reserves

165+800

Pl
ons\
166+000
Parks and Gardens

i
ands_Opt
Permanent Land Requirement Existing road to be removed

166+200
Scheduled Ancient Monuments

166+400

dl
Proposed Highway layout

_M i
166+600
Permanent Land Requirement Historical Battlefields

05_W est
166+800
National Parks

ForCont
230kph Turnout

167+000
230kph Turnout

ngs\
Flood Risk Zones

awi
3

0_Dr
00
Highways Legend

ngs\
167+2

awi
00
Permanent Land Requirement New Roads

03 Dr
nuat
45m Retaining Wall

167+4

4-
Existing Roads to be removed

a\
ectDat
600

ion
Notes

oj
230kph Turnout

nalPr
167+

Ref
1. Refer to Key Plan Drawing on drg:

er
800

nt
HS2-ARP-05-DR-RW-15100 for drawing

4I
230kph Turnout location.

00\
4

ert
167+

209742-
20m Bridge over Existing Railway

000
2. Motorway levels based upon those provided
580m Retaining Wall between Down
0

o HS2-
by the Highways Agency Oct 09’

209000\
+00

North East and High Speed Mainlines

164+
New A446 Underpass for Down Spur 3. The information contained on the drawings

\
J:
168

are on a feasibility basis


230kph Turnouts

0
325m Viaduct over Flood Plain and Existing Railway

80

ARP-
4. The drawings are for the use of HS2 only and

3+
are not for external distribution

New Faraday Avenue Underpass

16
100m Retaining Wall
5. The drawings show an indicative rail corridor

05-
and are subject to further study.
5

110m Bridge over Flood Plain 200m Bridge carrying Down Spur over M42

DR-
6. The corridor shown does not consider utility

0
60
locations. This is subject to further study.

3+
New Kingsbury Road Overbridge

R
7. The corridor shown does not consider ground

16

W-
conditions. This is subject to further study.

15102.
8. All vertical information is based on the OS 5m

260m Viaduct over M42 and Proposed Highway Layout grid, and interpolated levels.

’Birmingham and Fazeley Canal’ Schematic 9. Any turnout positions shown are indicative
Existing Road to be removed n

0
and subject to further study.
West Midlands Delta Junction g

40
6
.d

dgn
NORTH EAST

3+
WCML North West Up 4 10.
The rail corridor shown has been located to
Dn
to 0

16
400kph Mainline Speed 315 / 320kph Mainline Speed 400kph Mainline Speed
85m Bridge over Flood Plain BIRMINGHAM r 51 minimise the impact to the environmental

3
2
fe

0
constraints identified on the Environmental
e -1

kp
1200m Deceleration
INTERCHANGE

h
Region to Birmingham 4680m 415m Platforms Features Legend shown.
STATION
* * LONDON
R W
Up Up n -R
Dn Dn
tio R
a
u 5-D
WCML NORTH
3980m * *
2750m Deceleration Region

hR
ego
in n
ti -0
p
k
n

200kph
230
P
0 Co R
All Turnouts / Crossovers are 230kph except where shown * 0

1
7
0
Horz Geometry Key 2

kp
7 * 95kph Turnouts
+ r A

h
o 2-
R
= Straight
3

e
g
BIRMINGHAM 6 F S

io
= Curve / Transition

n
Dn Up 1
H Birmingham

Plan
Scale 1:2500 LONDON
NORTH
110.0 110.0

108.0 108.0
440m Viaduct carrying Down North East over High Speed Mainlines
New Kingsbury Road Overbridge
106.0 106.0
8
104.0 1390m Viaduct carrying Up Spur Line over M42, High Speed Mainlines, Existing Railways and Flood Plains 104.0
Route 848 Route 844
102.0 102.0
Route 846

100.0 20m Bridge over Existing Railway 100.0


325m Viaduct over Existing Railway and Flood Plain 110m Bridge over Flood Plain (Down Spur and Mainline Routes) 200m Down Spur Bridge over M42

9
Ch.163+670.
98.0 98.0

5m
85m Bridge over Flood Plain 260m Viaduct over M42 and the Birmingham and Fazeley Canal

ev.91.
For Continuation Refer
96.0 to HS2-ARP-05-DR- 96.0
Up Spur Line RW-15104.dgn

El
94.0 94.0

1
Ch.163+871.
High Speed Mainlines

3m
9 92.0 92.0

ev.96.
Down North East Line

8
230kph Turnouts

Ch.164+283.
3
90.0 230kph Turnout 90.0

Ch.165+766.
230kph Turnout 230kph Turnout

3m
Mainline to Up North East

1m
Up Spur to Mainline Mainline to Down North East Down Spur Line

El
Down Spur to Mainline

ev.93.
230kph Turnouts

ev.93.
88.0 88.0
Mainline Fast to Slow 230kph Crossover - Mainline Fast to Slow

5
86.0 86.0

El
Ch.164+538.
El

3
Ch.165+406.

9
8m

Ch.163+890.
3

5
Ch.166+882.

4m
Ch.166+631.

8m
ev.88.
84.0 84.0

5m

2m

ev.88.

ev.87.
3
Ch.165+065.

Ch.164+908.
ev.87.

ev.87.

9
Ch.164+240.
1m
82.0 82.0

7m

El

1m
2 Track Railway 4 Track Railway High Speed Mainlines

ev.86.

ev.85.
El

El
ev.85.
El
80.0 80.0

El
10
4
Ch.167+702.

El
2m

El
78.0 78.0

El
ev.82.
4

76.0 76.0
Ch.167+952.
7m

Up North East Line Existing Ground along Mainline Route


El

New A446 Underpass


74.0 74.0
ev.78.

(Mainline Route)
New Faraday Avenue Underbridge Existing Railway
72.0 72.0
New A446 Underpass
El

Existing Ground along Mainline Route Existing Railway


(Down Spur Route)
70.0 70.0

68.0 68.0
11
66.0 66.0

64.0 64.0

62.0 62.0

60.0 60.0
168+000

167+950

167+900

167+850

167+800

167+750

167+700

167+650

167+600

167+550

167+500

167+450

167+400

167+350

167+300

167+250

167+200

167+150

167+100

167+050

167+000

166+950

166+900

166+850

166+800

166+750

166+700

166+650

166+600

166+550

166+500

166+450

166+400

166+350

166+300

166+250

166+200

166+150

166+100

166+050

166+000

165+950

165+900

165+850

165+800

165+750

165+700

165+650

165+600

165+550

165+500

165+450

165+400

165+350

165+300

165+250

165+200

165+150

165+100

165+050

165+000

164+950

164+900

164+850

164+800

164+750

164+700

164+650

164+600

164+550

164+500

164+450

164+400

164+350

164+300

164+250

164+200

164+150

164+100

164+050

164+000

163+950

163+900

163+850

163+800

163+750

163+700

163+650

163+600

163+550

163+500

163+450

163+400

163+350

163+300

163+250

163+200
167+975

167+925

167+875

167+825

167+775

167+725

167+675

167+625

167+575

167+525

167+475

167+425

167+375

167+325

167+275

167+225

167+175

167+125

167+075

167+025

166+975

166+925

166+875

166+825

166+775

166+725

166+675

166+625

166+575

166+525

166+475

166+425

166+375

166+325

166+275

166+225

166+175

166+125

166+075

166+025

165+975

165+925

165+875

165+825

165+775

165+725

165+675

165+625

165+575

165+525

165+475

165+425

165+375

165+325

165+275

165+225

165+175

165+125

165+075

165+025

164+975

164+925

164+875

164+825

164+775

164+725

164+675

164+625

164+575

164+525

164+475

164+425

164+375

164+325

164+275

164+225

164+175

164+125

164+075

164+025

163+975

163+925

163+875

163+825

163+775

163+725

163+675

163+625

163+575

163+525

163+475

163+425

163+375

163+325

163+275

163+225
Chainage

12
L=3500
.
Straight L=4350.0 Mainline
R=8220.0
Horizontal Alignment
L=1729.5

L=621.7 L=2500
. L=820.1 L=3798.3 Mainline 2.0 11/1109
/ MJEP CB PH
R=-56000.0 G=1
-.3%
8 R=56000.0 G=0.09% Vertical Alignment For Co-ordination
1

1
2

2
4

0
3

3
8

8
5

5
74.

75.

75.

74.

74.

77.

79.

79.

82.

100.

100.

101.

99.

98.

83.

83.

83.

83.

80.

74.

76.

76.
75.

74.

74.

75.

86.

90.

100.

101.

102.

85.

82.

77.

74.

74.

74.

77.

78.

79.

80.
72.

73.

75.

74.

79.

79.

80.

81.

92.

100.

102.

103.

101.

100.

97.

92.

88.

84.

83.

83.

81.

74.

75.

76.

76.

77.

81.

83.

84.

94.

94.
73.

73.

75.

74.

73.

75.

76.

78.

80.

81.

82.

83.

84.

85.

87.

93.

95.

96.

99.

100.

100.

100.

100.

101.

102.

102.

102.

102.

102.

94.

91.

90.

88.

87.

86.

82.

78.

77.

78.

76.

75.

73.

74.

73.

76.

76.

76.

75.

75.

76.

76.

76.

76.

81.

94.
72.

74.

74.

77.

78.

78.

83.

97.

98.

99.

99.

100.

101.

102.

102.

102.

102.

101.

100.

95.

85.

83.

82.

83.

83.

82.

82.

82.

81.

80.

78.

77.

77.

74.

73.

73.

74.

76.

75.

76.

76.

76.

77.

92.

93.
72.

72.

72.

74.

74.

80.

80.

88.

102.

93.

89.

79.

78.

74.

74.

75.

77.

78.

86.

90.

94.
Mainline 1.0 23/
10/
09 MJEP CB PH
Existing Level For Co-ordination
1

1
2

2
4

4
6

3
8

8
5

5
78.

79.

84.

85.

86.

87.

87.

87.

87.

87.

87.

86.

86.

86.

86.

85.

85.

85.

85.
80.

81.

82.

83.

87.

87.

87.

87.

87.

87.

86.

86.

86.

86.

86.

85.

85.

85.

85.

85.

84.

84.

84.

84.
78.

86.

87.

87.

87.

87.

87.

87.

87.

87.

87.

87.

87.

87.

86.

86.

86.

86.

86.

86.

86.

86.

86.

86.

85.

85.

85.

85.

85.

85.

85.

85.

85.

84.

84.

84.

84.
82.

84.

84.

85.

85.

86.

86.

86.

87.

87.

87.

87.

87.

87.

86.

86.

86.

86.

86.

86.

86.

86.

86.

86.

86.

86.

86.

85.

85.

85.

85.

85.

85.

85.

85.

85.

85.

85.

85.

85.

84.

84.

84.

84.

84.

84.

84.

84.

84.

84.

84.

84.

84.

84.
78.

79.

80.

81.

82.

83.

84.

85.

86.

86.

86.

86.

86.

86.

86.

86.

86.

86.

85.

85.

85.

85.

85.

85.

85.

85.

85.

84.

84.

84.

84.

84.

84.

84.

84.

84.
79.

80.

81.

83.

85.

87.

87.

87.

87.

87.

86.

86.

86.

86.

85.

85.

85.

85.

84.

84.

84.

84.

84.
Mainline Issue Date By Chkd Appd

13 Proposed Level
1

1
2

2
4

4
6

3
9

8
5

5
+8.

+10.

+8.

+8.

+2.

8.

13.

13.

15.

16.

16.

6.

5.

4.

+2.

+2.

+3.

+6.

+9.

+10.

+11.

+11.

+8.

+8.

+8.

0.

10.
+9.

+10.

+9.

+8.

+4.

+1.

1.

13.

14.

15.

16.

16.

7.

1.

+0.

+3.

+10.

+8.

+4.

2.

6.

10.
+6.

+7.

+10.

+10.

+8.

+7.

+5.

6.

13.

14.

14.

16.

16.

8.

+2.

+3.

+3.

+11.

+11.

+9.

+8.

+8.

+7.

+7.

+6.

+3.

+1.
+5.

+6.

+6.

+6.

+6.

+6.

+10.

+10.

+10.

+10.

+7.

+6.

4.

10.

11.

13.

13.

13.

16.

16.

15.

15.

13.

12.

11.

10.

3.

+1.

+2.

+2.

+4.

+6.

+7.

+8.

+7.

+7.

+10.

+11.

+11.

+10.

+9.

+8.

+8.

+9.

+9.

+8.

+8.

+7.

+7.

+7.

+6.

+6.

+5.

8.

10.
+5.

+6.

+6.

+6.

+6.

+7.

+10.

+9.

+7.

+7.

+6.

+6.

+5.

+4.

+2.

2.

12.

12.

14.

15.

15.

14.

1.

+0.

+2.

+2.

+2.

+2.

+2.

+3.

+4.

+7.

+6.

+6.

+10.

+11.

+10.

+8.

+8.

+8.

+7.

+2.

9.
+6.

+10.

+8.

+6.

+3.

9.

12.

13.

15.

14.

9.

2.

0.

+3.

+5.

+11.

+10.

9.
Mainline
-

-
-

-
-

-
-

-
-

-
-

-
-

-
-

-
-

-
-

-
-

-
-

-
Cut and Fill

400km/h Mainline
Maximum Speed: The Arup Campus, Blythe Gate, Blythe Valley Park
Solihull, West Midlands B90 8AE
T +44(0)121 213 3000 F +44(0)121 213 3001
R=5260.0
L=350.
0 www.arup.com
Down North East L=2574.7 Straight L=341.0
L=156.
1 L=1561
.
Straight L=80.0
L=200.
0
Down Spur
R=7350.0 R=7350.0 R=1300.0
Horizontal Alignment Horizontal Alignment Client
L=41.1 L=41.1 L=2258.3
14
Down North East L=1172.6 L=360.
0 L=341.0 L=197 L=477.
2 L=350.0 2200
. L=735.7 Down Spur
.
2 L=
G=1. G=0. G=0. 1 %
66
Vertical Alignment R=36000.0 31% R=-28000.0 09% 09% R=-20000.0 G=-. R=20000.0 Vertical Alignment
1

1
2

2
0

4
6

3
8

8
5

5
90.

94.

95.

96.

96.

95.

94.

86.

86.

85.

85.

85.

85.

85.

85.

86.

88.

93.

94.

94.
92.

93.

96.

96.

96.

96.

96.

96.

87.

86.

85.

85.

85.

85.

85.

90.

92.

94.

94.

94.

94.
91.

91.

94.

95.

96.

96.

96.

96.

95.

94.

91.

90.

89.

88.

88.

87.

86.

86.

86.

86.

86.

86.

85.

85.

85.

85.

89.

91.

91.

93.
89.

90.

92.

93.

94.

95.

95.

95.

95.

95.

95.

94.

93.

93.

92.

92.

91.

91.

90.

90.

89.

89.

88.

86.

86.

85.

85.

85.

85.

85.

85.

85.

86.

86.

87.

87.

90.

93.

94.

94.
91.

92.

93.

94.

95.

95.

94.

93.

92.

91.

87.

86.

85.

85.

85.

85.

86.

88.

89.

91.

92.

93.

93.

93.

93.
87.

86.

85.

85.

85.

85.

88.

92.
Down North East Down Spur
Proposed Level Proposed Level Job Title

R=5260.0
1
R=7350.0 R=7350.0
L=
High Speed 2
L=350.
0 L=156. 154.
4
Up North East L=2574.7 Straight L=151.8 L=41.1 L=41.7 Straight L=421.3
L=200.
0
Up Spur Feasibility Study
R=1323.0
Horizontal Alignment Horizontal Alignment
L=2344.5

Up North East L=734.2 L=1372.


0 L=201 L=369.7 2547
. L=412.7 L=613.
3 Up Spur
.
2 L=
15 L=342.8
G=0 G=0. 1 %
76 G=0.
Vertical Alignment R=36000.0 .
09% 09% R=-20000.0 G=-. R=20000.0 30%
R=20000.0
Vertical Alignment Drawing Title

Delta Junction
1

1
2

2
0

4
3

3
8

8
5

5
87.

87.

87.

87.

87.

87.

87.

86.

86.

86.

86.

87.

92.

96.

96.

96.

95.

95.

94.
87.

87.

87.

87.

87.

87.

87.

86.

86.

86.

86.

86.

86.

88.

91.

94.

95.

96.

96.

95.
87.

87.

87.

87.

87.

86.

86.

86.

86.

86.

86.

86.

86.

89.

93.

93.

95.

96.

96.

96.

96.

95.

95.

95.

94.
86.

86.

87.

86.

86.

86.

86.

86.

86.

86.

86.

86.

86.

86.

86.

86.

85.

85.

85.

85.

85.

86.

88.

90.

91.

94.

95.

96.

96.

96.

95.

95.

95.

94.

94.

94.
86.

86.

86.

86.

86.

86.

86.

86.

86.

86.

86.

85.

85.

85.

85.

85.

85.

85.

85.

86.

87.

89.

90.

93.

94.

95.

95.

95.

95.

94.

94.

94.
86.

86.

86.

86.

86.

86.

87.

89.

92.

95.

94.

94.
Up North East Up Spur West Midlands Area
Proposed Level Proposed Level
Plan Profile Sheet 3 of 5

NE Connections 320km/h 230km/h 230km/h 170km/h Spurs


Maximum Speed: Maximum Speed: Scale at A0
As Shown

Discipline
Rail

Drawing Status Job No


16

Profile For Co-ordination 209742-00


Drawing No Issue
Scale H 1:2500 V 1:25000
HS2-ARP-05-DR-RW-15103 2.0
Reproduced by permission of the Ordnance Survey on behalf of Her Majesty’s Stationery Office ' Crown
copyright and database right 2009. All rights reserved. Ordnance Survey Licence number 0100049190.
Do not scale ' Arup

You might also like