Professional Documents
Culture Documents
6
2
+
6
A0 A B C D E F G H I J 0 K L M N O P Q R S T U V W
0
dgn
15105.
WCML North West
RW -
N 0
DR-
+40
05-
2
16
ARP-
1
+ 90m
HS2-
16
230m Viaduct carrying Up Birmingham over Spur Lines
es\
2+
of
an and pr l
i
40
0
+ 83m
f
Postsit3 Pl
New Bridges to lift Birmingham lines over
es\
Motorway Link Roads (M6 - M42)
16
of
an and Pr l
i
2+
2
20
00
Pl
2
ons\
2+
16
i
ands_Opt
16
dl
2+
_M i
05_W est
00
0
161
ngs\
awi
3
+80
0_Dr
New Culvert
ngs\
0
161
awi
03 Dr
+60
Permanent Land
a\4-
Requirement
ectDat
0
161
+ 85.0m
+ 86.0m
oj
Existing road to be removed
nalPr
+40
er
Birmingham and Spur Lines
nt
Up Birmingham and other lines
0
For
161
4I
Green Lane
00\
4
Realignment
209742-
New Attleborough
+20
Con
Lane Overbridge
163+200
209000\
0
163+000
163+400
Existing road to be removed
t
\
i
J:
nua
800
600
Permanent Land Requirement
162+
163+
t
230kph Turnout
i
on R
0
0
+60
+80
5
ef
162
63
Birmingham
ert
1
0
0
+00
40
o HS
2+
164
16
London
0
2-
+20
ARP
0
164
20
230kph Turnout Schematic
2+
0
-
+40
16
+ 90.0m NORTH EAST
Up
Dn 400kph Mainline Speed 315 / 320kph Mainline Speed 400kph Mainline Speed
n
164
DR-
dg
BIRMINGHAM
3
2
0
kp
1200m Deceleration
INTERCHANGE
.
h
51 P
Region to Birmingham
-A n
4680m
+ 90.0m 415m Platforms
02
0
STATION
RW
o
-1 R
* *
i
00
LONDON
-R S2 t
Up Up
+ 96m
D o H nua
Dn Dn
2+
-
WCML NORTH
16
151
+ 88.5m * *
i
3980m 2750m Deceleration Region
5- rt t
o
in
g
W
e on
e
kphR
200kph
230
290m Viaduct carrying Birmingham
04.
R rC
7
0
Horz Geometry Key Lines over Flood Plain
kp
R
7 * 95kph Turnouts
h
R
= Straight
-0 f
Fo
e
dgn
g
BIRMINGHAM
e
o
= Curve / Transition
n
Dn Up
Plan
Scale 1:2500
BIRMINGHAM LONDON
100.0 100.0
98.0 230m Viaduct carrying Up Birmingham over High Speed lines 98.0
Route 847 Route 845 Up Birmingham Line 100m Bridge carrying Birmingham Lines over M6 / M42 Slips
9 96.0 96.0
94.0 94.0
Existing Ground along Birmingham Routes
92.0 92.0
9
Ch.163+143.
8m
90.0 90.0
8
ev.93.
9Ch.162+735.
3
Ch.163+386.
9m
88.0 88.0
1m
9
230kph Turnouts
ev.91.
Ch.163+899.
El
ev.91.
86.0 Up / Down Spur 86.0
8m
3
Ch.164+093.
to Birmingham Lines
ev.89.
3m
El
84.0 84.0
El
ev.87.
10
Ch.162+733.
El
3
8m
0
Ch.162+283.
82.0 82.0
Ch.163+749.
0
9
Ch.164+226.
Ch.162+243.
ev.91.
0m
El
8m
4m
ev.85.
4
ev.84.
80.0 80.0
Ch.162+043.
ev.84.
ev.84.
1
7
Ch.164+491.
8m
New Culvert
Ch.164+101.
El
9m
ev.82.
8m
78.0 78.0
El
El
El
ev.81.
El
ev.81.
76.0 76.0
El
Existing M6 / M42 Slip Level (Info provided by Highways Agency)
El
El
74.0 74.0
72.0 72.0
11
70.0 70.0
164+700
164+650
164+600
164+550
164+500
164+450
164+400
164+350
164+300
164+250
164+200
164+150
164+100
164+050
164+000
163+950
163+900
163+850
163+800
163+750
163+700
163+650
163+600
163+550
163+500
163+450
163+400
163+350
163+300
163+250
163+200
163+150
163+100
163+050
163+000
162+950
162+900
162+850
162+800
162+750
162+700
162+650
162+600
162+550
162+500
162+450
162+400
162+350
162+300
162+250
162+200
162+150
162+100
162+050
162+000
164+675
164+625
164+575
164+525
164+475
164+425
164+375
164+325
164+275
164+225
164+175
164+125
164+075
164+025
163+975
163+925
163+875
163+825
163+775
163+725
163+675
163+625
163+575
163+525
163+475
163+425
163+375
163+325
163+275
163+225
163+175
163+125
163+075
163+025
162+975
162+925
162+875
162+825
162+775
162+725
162+675
162+625
162+575
162+525
162+475
162+425
162+375
162+325
162+275
162+225
162+175
162+125
162+075
162+025
Chainage
1
1
2
2
0
0
6
8
5
5
95.
91.
86.
86.
86.
86.
85.
85.
84.
84.
85.
83.
94.
93.
90.
91.
90.
85.
85.
86.
85.
85.
85.
86.
86.
86.
82.
96.
88.
88.
88.
89.
91.
87.
87.
86.
86.
86.
86.
85.
86.
86.
86.
84.
84.
92.
91.
90.
90.
89.
87.
87.
87.
91.
91.
88.
87.
85.
85.
86.
86.
85.
85.
85.
85.
86.
86.
86.
86.
86.
85.
85.
85.
85.
86.
86.
86.
86.
85.
85.
85.
85.
84.
83.
83.
83.
83.
83.
83.
84.
84.
83.
82.
81.
81.
80.
86.
85.
86.
86.
86.
86.
86.
86.
86.
86.
84.
Existing Level
L=1561
.
Straight L=719.6
L=250.
0
Down Birmingham
R=7350.0 R=2250.0
Horizontal Alignment
L=41.1 L=2198.3
12
L=
L 43
L=563.
0 L=352.7 L=3627
. L=650.5 =450.
6 L=239.9 G
=0 4. Down Birmingham
. 9
G=0.
03% R=-20000.0 G=1
-.74% R=20000.0 G=1.
52% R=-20000.0 32 Vertical Alignment
%
1
1
2
2
0
4
6
7
9
8
5
5
86.
92.
94.
94.
94.
94.
92.
83.
82.
89.
94.
94.
90.
87.
84.
83.
82.
82.
82.
82.
83.
84.
84.
87.
87.
90.
93.
94.
94.
93.
92.
89.
89.
86.
86.
83.
82.
83.
83.
85.
85.
86.
88.
88.
89.
91.
91.
93.
93.
93.
93.
92.
91.
91.
90.
88.
88.
85.
85.
83.
82.
81.
81.
81.
81.
81.
81.
81.
81.
81.
81.
81.
81.
81.
81.
81.
81.
81.
81.
81.
81.
81.
81.
81.
81.
82.
84.
87.
90.
92.
93.
93.
90.
89.
87.
86.
84.
83.
82.
82.
82.
90.
92.
93.
93.
87.
84.
Down Birmingham
Proposed Level
1
1
2
2
0
0
3
7
8
9
5
5
13.
6.
7.
3.
+0.
+1.
+7.
+8.
+9.
+7.
+5.
+4.
+3.
+0.
9.
9.
2.
+7.
+7.
+4.
+2.
+1.
14.
6.
8.
9.
8.
3.
3.
3.
0.
+0.
+3.
+4.
+4.
+5.
+6.
+7.
+7.
+6.
+5.
+0.
0.
+0.
+1.
12.
11.
10.
8.
7.
4.
3.
3.
+0.
+1.
+1.
+8.
+8.
+8.
+8.
+7.
+6.
+5.
+5.
+4.
+3.
+2.
+1.
0.
0.
0.
+0.
9.
8.
5.
5.
5.
2.
0.
+0.
+0.
+4.
+6.
+6.
+7.
+6.
+4.
+3.
+3.
+3.
+3.
0.
+1.
6.
6.
7.
9.
9.
1.
+0.
+2.
+3.
+6.
+8.
+4.
+3.
+1.
Down Birmingham
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1
2
2
0
4
7
3
9
8
5
5
82.
84.
85.
86.
88.
90.
91.
92.
93.
94.
94.
94.
94.
92.
84.
82.
87.
89.
90.
92.
90.
87.
83.
82.
82.
82.
82.
82.
89.
91.
91.
93.
93.
94.
94.
93.
92.
89.
89.
86.
86.
83.
82.
82.
83.
83.
84.
85.
86.
87.
89.
90.
90.
90.
91.
91.
92.
92.
92.
93.
93.
93.
93.
92.
91.
91.
90.
88.
88.
85.
85.
82.
82.
82.
81.
81.
81.
81.
81.
81.
81.
82.
88.
89.
89.
90.
91.
91.
92.
93.
93.
93.
93.
90.
89.
87.
86.
84.
83.
88.
90.
91.
92.
93.
93.
87.
84.
83.
Up Birmingham
Proposed Level
1
1
2
2
0
4
3
7
9
9
5
5
12.
+4.
+9.
+9.
+6.
+5.
+4.
+4.
+4.
+1.
0.
+4.
+4.
+4.
+7.
+4.
+0.
+1.
14.
7.
4.
5.
1.
+4.
+5.
+6.
+6.
+6.
+8.
+8.
+8.
+7.
+6.
+5.
+5.
+2.
0.
+1.
11.
10.
8.
8.
6.
5.
5.
5.
4.
+2.
+3.
+4.
+4.
+6.
+6.
+6.
+6.
+7.
+7.
+7.
+7.
+7.
+8.
+8.
+6.
+6.
+5.
+4.
+4.
+3.
+3.
+1.
+0.
0.
+0.
+0.
+1.
12.
9.
8.
4.
5.
5.
2.
+5.
+5.
+5.
+6.
+6.
+6.
+6.
+7.
+7.
+7.
+6.
+5.
+3.
+2.
+0.
4.
4.
+0.
+6.
+6.
+6.
+7.
+8.
+6.
+4.
+0.
Up Birmingham
-
-
-
-
-
-
-
-
-
-
-
-
-
Profile
15
Scale H 1:2500 V 1:25000
Reproduced by permission of the Ordnance Survey on behalf of Her Majesty’s Stationery Office ' Crown
copyright and database right 2009. All rights reserved. Ordnance Survey Licence number 0100049190.
Listed buildings Special Protection Areas Flood Risk Zones 1. Refer to Key Plan Drawing on drg: 4. The drawings are for the use of HS2 only 7. The corridor shown does not consider 10.The rail corridor shown has been located High Speed 2 Delta Junction
HS2-ARP-05-DR-RW-15100 for drawing and are not for external distribution ground conditions. This is subject to to minimise the impact to the 2.0 11/1109
/ MJEP CB PH
Feasibility Study West Midlands Area
Area of Outstanding Natural Beauty National Nature Reserves location. further study. environmental constraints identified on the For Co-ordination Plan Profile Sheet 5 of 5
Highways Legend 5. The drawings show an indicative rail Environmental Features Legend shown.
Parks and Gardens corridor and are subject to further study. Drawing Status Job No
RAMSAR 2. Motorway levels based upon those 8. All vertical information is based on the OS The Arup Campus, Blythe Gate, Blythe Valley Park
1.0 23/
10/
09 MJRP CB PH
Solihull, West Midlands B90 8AE
New Roads provided by the Highways Agency Oct 09’ 5m grid, and interpolated levels. Scale at A0 For Co-ordination 209742-00
T +44(0)121 213 3000 F +44(0)121 213 3001
World Heritage Site Scheduled Ancient Monuments 6. The corridor shown does not consider For Co-ordination As Shown
www.arup.com
Drawing No Issue
Existing Roads to be removed 3. The information contained on the drawings utility locations. This is subject to further 9. Any turnout positions shown are indicative Discipline
Rail
SSSI Historical Battlefields are on a feasibility basis. study. and subject to further study. Issue Date By Chkd Appd
HS2-ARP-05-DR-RW-15105 2.0