Professional Documents
Culture Documents
MPT-HC Connections
MPT to MSS
Electrical (< 100 m)
MPT through power injector
plug-in Electrical (<100 m)
MPT to Ethernet device MPT to MSS MPT to core board or Ethernet
Electrical (<100 m) Optical ( >100 m) device Optical (>100 m)
Jumper
RJ45/N
Jumper
CAT5e cable CAT5e cable RJ45/N
MPT data and DC Coaxial cable to station
access data and DC battery with low-pass
1AC015760006 RJ45 cable data CAT5e cable Fiber
board 1AC015760006 Coaxial cable Fiber filter, pigtail, lightning
data and DC
1AC015760006 arrestor
Core board Option 1
Power injector box To any
Maintenance port − 48 V dc 3CC50129AAXX Option 2 switch
MSS-4/8
or or router
Optical user port
Power injector
Power feed over Ethernet port RJ45 to any plug-in
Power injector plug-in
switch or router 3CC50128AAXX MSS-4/8 or MSS-1c + pigtail
MSS-1c 3CC50120AAXX MSS-4/8 or any Ethernet devices
RPS module [1+1] MPT to MSS [1+1] MPT to MSS Coupler [1+1]
[1+1] MPT-HC with RPS module RPS LC-LC optical jumper
Electrical (<100 m) Optical (>100 m)
Maintenance port
Optical user port Note: In 1+1 configurations, you must inter-connect MSS-4/8 MSS-4/8
the two MPT-HCs using a preassembled RPS
Power feed over Ethernet port optical jumper and two optical SFP modules Note: See the applicable MPR user manual for Note: See the applicable MPR user manual for
(different lengths are available). other supported configurations. other supported configurations.
Coupler 11 to 38 GHz
[2+0] MPT-HC with XPIC-RPS XPIC-RPS module [2+0] XPIC MPT to MSS [2+0] XPIC MPT to MSS OrthoMode Transducer OMT OrthoMode Transducer OMT
Configuration XPIC [2+0]
Fiber t Coaxial
7 cable
Maintenance port e
Note: Two pole mounting installation kits are 3.1 Put silicone grease on the O-ring (mandatory) 4.1 Factory delivery is in V polarization. 5.1 Set the coupler polarization (antenna side) to 6.1 Follow the same process described in steps 3
Note: MPT toolbox is mandatory before inserting the MPT; see the following figure.
3CC50098AAXX. available: integrated antenna and non-Integrated To change the polarization, loosen the two match the antenna polarization (same process as and 4: Install and Set MPT polarization) and then
antenna. This procedure describes the antenna screws and line up the H or V polarization with steps 3 and 4: Install and Set MPT polarization), and connect.
1.1 Install the MSS indoor unit in one of three mount only. then connect.
the polarization references.
supported configurations (see the applicable user 5.2 Secure the module with the four hooks on the 6.2 Install the MPT [2+0] with the OMT.
manual): 2.1 Install the integrated antenna mounting kit. corresponding brackets.
– ETSI rack (21 in.) 2.2 Verify the polarization on the antenna nose and
– standard rack (19 in.) WARNING: Verify that the indication engraved
change it if required. on the coupler is directed toward the pole side.
– wall mount
Vertical Note: MPT [1+1] configuration is always in horizontal
1.2 Ground the MSS using the ground screw on polarization; this setting does not determine the link
H
the front panel of the bracket on the right side of Reference polarization.
H
the MSS; use grounding kit 3CC13423AAXX.
H
3.2 Remove the solar shield from the MPT by polarization
V
unscrewing the screws.
V
1.3 Connect the power supply cable between the
V
MSS and breakers or power panel: 3.3 Set the appropriate polarization on the MPT
– MSS1-c and power injector box: 2x1 mm² Horizontal (see step 4); the connectors must face down.
H
1AC007800068
– MSS4/8: 2x4 mm² 3DB18271AAXX 3.4 Open the four locking hooks on the MPT walls
– MSS8 (full configuration): 2x6 mm² and slide the MPT on the antenna nose adapter.
3CC52190AAXX WARNING: To avoid equipment damage, do not
3.5 Secure the MPT module with the four hooks. remove the waterproof tape that is glued on the
1.4 Install the integrated DDF; see the applicable
manual (75 Ω, 120 Ω, RJ45). MPT waveguide.
Example 11 to 38 Ghz coupler
8.3 Hoist the cable using the buckle on the R2CT cap.
8.4 Connect the assembled R2CT to the MPT, mount another RJ45 plug indoors, and verify all cables
and connectors using a cable tester (to avoid short circuit and verify continuity).
10 11 Electrical CAT5e
9 Connect optical cables 10 Perform alignment 11 Remove MPT [1+1] solar shield Contact
1 Contact support
Support
9.1 Use optical LC-LC preassembled cable 10.1 Plug the connector on the maintenance port on the
MPT; see (A). 11.1 For MPT 1+1 configuration with pole mounting
3CC52170xxxx for MPT optical connections. To access online customer support
Optical LC-LC preassembled cable is available in on the left side (only with 3CC10752AAAA), remove
10.2 Plug the banana plugs into the multi-meter to align
the pre-cut part for freq bands from 11 to 38 GHz.
(OLCS), go to:
different lengths to interconnect MPT to MSS. the antenna; see (B).
9.2 Use coaxial cable with N-to-Ethernet pairs http://alcatel-lucent.com/support/
pigtails on each side (plus RJ45 and R2CT supportredirect.html
connectors) for MPT power. 1.1 1.3
For product documentation:
Light Service Kit for Alignment 3CC52191AAXX On the OLCS page, select Sign In/Register
Measurement (MyAccess) and then log in to OLCS.
Service kit cable VDC: 5 4.71 4.12 3.5 2.9 2.3 1.71 1.11 0.59 0.14
RSL (dBm) : -10 -20 -30 -40 -50 -60 -70 -80 -90 -100
For technical support contact information:
10.3 Adjust the site elevation to the tracking path (line A-A)
and adjust the azimuth to the maximum RSL (lobe number 2). On the right side of the OLCS page under Product
1.2
Technical Support, select your country from the
Phone and Email Contact Information drop-down
11.2 For MPT 1+1 configuration with pole mounting list.
1.4 on the right side (only with 3CC10752AAAA),
The contact information is displayed.
remove the pre-cut part for freq bands from 11 to 38
Line A-A represents azimuth tracking path of a properly aligned antenna.
GHz.