You are on page 1of 85
SSifezel a ENGI FOR ELECTRICAL WORKS: 6-82-1800 Rev 1 eames OR — TORSECTRICA worns Oe faga arf 2 frtanr sit ae alert (argent Ye Ufareré) INSPECTION & TEST PLANS FOR ELECTRICAL WORKS (ITEM RATE CONTRACTS) 12a eviseD 8 REISSUED Pe ORE Ln .. (0 18/11/2002 ISSUED AS STANDARD SPECIFICATION one ‘Standards Standards Committee Bureau —Gonvenor _Chairman ‘Approved by Rov. Prepared Checked Rev. pate Purpose ee Be Format No, 8-00-0001-F1 Rev 0 Copyright Ell. — Allights reserved ICATION No. SGT By ENCINEERS INSPECTION & TEST PLANS STANDARD SPECIFI 2 Tee @NAtnieD "For eLecTRIcAL WORKS 6-82-1800 Rev 4 ae eae (TEM RATE CONTRACTS) Page 2 of 85 Abbreviations: AC 5 Alternating Current AFC Approved For Construction AVR Automatic Voltage Regulator BB Blue Blue cB Circuit Breaker CCE Chief Controller of Explosives cr Current Transformer De : Direct Current pcs : igital Control System DPT Dye Penetration Testing EHT : Extra High Tension EMCC : Emergency Motor Control Centre FTB jeld Terminal Block GAD General Arrangement Drawing Gr Galvanised Iron HT High Tension HV 5 h Voltage IR : Insulation Resistance 1p Inspection & Test Plan JB : Junetion Box LcP E Local Control Panel LT F Low Tension Lv : Low Voltage McC Motor Control Centre MPI Magnetic Particle Inspection MV E Medium Voltage NDT : Non Destructive Testing NGR : Neutral Grounding Resistance OLTC : On Load Tap Changer orl Oil Temperature Indicator P&ID Piping and Instrumentation Drawings PCC Power Control Centre PI Polarization Index PLC Programmable Logic Controller PMG Permanent Magnet Generator PMs : Piping Material Specification Pr : Potential Transformer Pvc 5 Poly Vinyl Chloride PWHT Post Weld Heat Treatment QalQc Quality Assurance/Quality Control RR 5 Red Red SWGR : Switch Gear WPS Welding Procedure Specification WT! Winding Temperature Indicator yy : Yellow Yellow Construction Standards Committee Convenor: Sh. S.C. Barman, HOD (Construction) Members: Sh. A.K. Mittal, DGM (Projects) Sh. MP. Jain, AGM (Projects) Sh. Rakesh Nanda, AGM (Piping) Format No, &:00-0001-F1 Rev 0 Copyright EIL — Allights reserved ENCINEERS INSPECTION & TEST PLANS eaten S| INDIAUMITED FOR ELECTRICAL WORKS men semen (TEM RATE CONTRACTS) STANDARD SPECIFICATION No, 6-82-1800 Rev 1 Page 9085 CONTENTS S.NO DESCRIPTION TTP/FORMATNO.| ave | PAGE | SECTION-A_ __ITPs FOR ELECTRIC | Transformer | Gears/PCC/MCC/EMCC 5. Installation/Erection & Testing of EHT/HT Main Bus & Allied Eqpts Test Proforma - MV Switchboard Mechanical Acceptance Tests for EHT/ HT Main Bus & Allied Equipments asurement of Earth Resi [Test Measurement of IR Value 3t Proforma — Test Proforma — C. I ‘able Installation _ | Proforma for Measurement of IR Value | of Power Cable _ | roforma Measurement of IR Viaue & | Continuity Check of Control Cables Test Proforma ~ Lighting Installation E-18 Rev 1 “E19 Rev I 1. | Installation/Erection & Testing of Power | 1801 Rev 1 ta ingof Motor_| 1805 Rev 1 | Installation/Erection & Testing of 1810 Rev 1 | Generator | 4. | Installation/Erection & Testing of Switch 1815 Rev 1 1820 Rev I 05.2008 23.05.2008 23.05.2008 73.05.2008 23.05.2008 | | 23.05.2008 [23.05.2008 23.05.2008 23.05.2008 23.05.2008 | 77 + 3.05.2008 “1-13 14-16 17-18 21-22 3-24 26 2 28.33 2 48-59 60-66 16 78-81 Format No, 6:00-0001-F1 Rev 0 Copyright EL — Al rights reserved

You might also like