Client:
Notes:
1. This checklist is intended for checking of layout drawings extracted from 3D CAD models.
2. As a minimum, the checklist shall be completed for the rst issue of the layout drawing.
3. Items like Fire and Gas detectors and other E, I & T items (e.g. JBs, switch boards, lighting ttings, etc.)
need not be shown in Piping Layouts.
DESIGN
2 Grade and paving levels and paving extents are shown. (Dimensions of paving not
required.)
5 All equipment nozzles and vendor package terminal points are clearly identi ed
and tagged.
6 All tie-in points and battery limits are clearly identi ed and tagged and
coordinates/elevations are indicated.
7 All lines are identi ed by line numbers and major locating dimensions & elevation
are given.
8 Flow directions and slope symbols are indicated as per the P&IDs.
9 All secondary pipe supports (standard & special) are indicated and tagged and the
locating dimensions marked.
10 All primary pipe supports are identi ed by appropriate symbols (e.g. guide, axial
stop, etc.).
13 Structural grid numbers of pipe racks, buildings and shelters are shown.
16 All platforms and ladders/staircases are located with dimensions and elevations are
marked.
DRAFTING
17 The drawing border conforms to the Project speci cations or Company standards,
as applicable.
19 Drawing title, drawing number and revision number in the title block are as per the
TDR.
21 Revision block contains initials of the originator, checker and approver (both
Discipline & Project).
22 Drawing scale is stated in the title block and graphic scale (bar scale) is shown.
23 The drawing scale conforms to the Project speci cations or Company standards, as
applicable.
24 All general notes are checked and the units for dimensions, coordinates & levels
are given in the notes.
25 Legend for applicable symbols is shown (e.g. pipe supports, new/existing facilities,
demolition, scope cloud, etc.).
26 Reference drawing numbers and titles are listed and checked. List shall include unit
plot plan and piping key plan as a minimum.
28 Revision clouds, along with revision number triangles are marked properly, if
applicable.
29 “Hold” clouds, if applicable, are properly marked and the list of “Holds” is indicated.
30 Key plan is shown and the applicable area/unit of the plot plan is highlighted.
31 Match line co-ordinates and drawing limits are clearly marked and are consistent
with the Key Plan drawing. Continuation drawing numbers are correctly written.
Name:
Designation:
Revision number:
Date: