PROJECT : G + 1 VILLA LOCATION OF M.D.B.

- IN SIDE VILLA
AREA : AL REHMANIA
M.D.B. DETAILS OF CONNECTED LOAD/MAX.DEMAND
PLOT : 258

CIRCUIT RATING. Amps. CABLE SIZE CONNECTED LOAD KW


FAULT PVC/
S/P ECC
FEEDER NO DUTY XLPE R.PH. Y.PH. B.PH. CONN. 1. PH. 3. PH. 3. PH. C. T.
T/P F/S 2/4X 2 / 3 / 4C SIZE REMARKS
ISO. MCCB ACB KA 2 2 2 KW KW KW KW (1) (2) (3) (4)
DB - NO. 1 C mm mm 1 C mm
SWA/PVC

IN COMING: TP 300 35 XLPE/SWA/PVC 4C 240 1C 120 57.63 56.56 54.03 168.22 1 300/5A

OUT COMING:
DB - G.F / L TP 40 25 XLPE/SWA/PVC 4C 16 1C 10 6.3 6.1 6.6 19.00
DB - G.F / P TP 63 25 XLPE/SWA/PVC 4C 25 1C 16 7.067 7.866 6.967 21.90
DB - F.F. TP 63 25 XLPE/SWA/PVC 4C 25 1C 16 9.7 8.9 9.2 27.86
DB - AC TP 125 25 XLPE/SWA/PVC 4C 50 1C 25 19.7 19.6 17.30 56.60
DB - K.B TP 63 25 XLPE/SWA/PVC 4C 25 1C 16 8.2 7.5 7.3 23.00
FUTURE LOAD 6.67 6.6 6.67 20.00

M.D.B. CONNECTED TO TRANSFORMER


TOTAL CONNECTED LOAD PER PHASE 57.63 56.56 54.03 168.22 TOTAL
S.M.D.B. CONNECTED TO M.D.B.

MAX. DEMAND (3PH.) 168.22 KW DIVERSITY 1.0 TOTAL CONNECTED LOAD (3PH) 168.22 KW

PROVIDE CT.METER WHEN MAX.DEMAND >100 KW


CONSULTANTS:
(1) 20-80A (2) 30-90/120 (3) 100-200A (4) 600/5

DB - G.F / L DB - G.F / P DB - F.F DB - A/C DB - K.B


19 KW 21.90 KW 27.86 KW 56.60 KW 23 KW FUTURE LOAD 20KW FOR
SWIMMING POOL AREA

4C x 16 mmsq XLPE/SWA/PVC 4C x 25 mmsq XLPE/SWA/PVC


1C x 10 mmsq ECC. Y/G 1C x 16 mmsq ECC. Y/G

4C x 50 mmsq XLPE/SWA/PVC
1C x 25 mmsq ECC. Y/G

CABLE GLAND

40A TP 63A TP 63A TP 125A TP 63A TP


MCCB MCCB MCCB MCCB MCCB
25KA 25KA 25KA 25KA 25KA

R Y B
EGEC
300A TP Al Dana Tower, Lake Corniche
V A MCCB P.O. Box : 204 Sharjah, United Arab Emirates
N Tel. : (+971) 6 55 67 402 Fax : (+971) 6 55 67 403

E
35KA
MDB Email: egec@egec-houseofexpertise.com

CABLE GLAND No. Description Date


4C x 240 mmsq XLPE/SWA/PVC
1C x 120 mmsq ECC. Y/G
Location Plot area Plot no.

Owner
300 / 5 W/P IP55 ENCLOSURE
C.T METER M RECESSED IN COMPOUND WALL
300A TP
MCCB LOCKABLE M.C.C.B. Project title
35KA
1C X 70mmsq
E N

Drawing title
T.C.L. = 168.22 KW
D.F. = 0.8
EPT1 ETP2
M.D.L. = 134.57 KW Project number
THE EARTHING RESISTANCE
SHOULD BE LESS THAN ONE OHM Date

Drawn by Asad
MAIN CABLE AS PER SEWA REQUIRED
Checked by ---

Scale 1:100