You are on page 1of 47

HSE Plan

Saudi Readymix Concrete Co.


Document Title: HSE PLAN
Document No.: SRMCC- QHSE-PLAN-0001 Rev: 1 Page 1 -45

HEALTH SAFETY AND ENVIRONMENT (HSE) PLAN

1 05-04-2017 Initial Issue for Review & Approval Regional HSE-Officer QHSE Director

Rev Date Description Prepared by Approved by

1
Saudi Readymix Concrete Co.
TABLE OF CONTENTS

PAGES

I. Introduction 3
a. HSE Policy
b. Specific Objectives
II. Individual responsibilities 4
III. Risk Assessment 5-6
IV. Method statement 6
V. Training, Awareness & Competences 7-8
VI. Emergency Procedures 9-13
VII. Welfare 14
VIII. Safety Procedures 14-19
IX. Personnel Protective Equipment (PPE) 19-21
X. PPE Matrix 22-23
XI. Safety Signs 24-25
XII. Vehicle/Equipment Safety 26
XIII. Defensive Driving, Aggressive Driving, 27-28
XIV. Other Controls 29-30
XV. Environmental Safety & Policy 31-39
a. Purpose
b. Definition and Acronyms
c. Environmental Policy
d. Environmental Aspect
e. Legal and other Requirements
f. Objective, Target and Program
g. Roles and Responsibilities
h. Competence, Awareness & Training
i. Operational Control
j. Emergency Preparedness & Response
k. Monitoring & Measurement
l. Evaluation of Compliance
m. Nonconformity, Corrective Action & Preventive Action
n. Control of Records
o. Internal Audit
p. Management review
XVI. Site Rules 40-41
XVII. Traffic Plan 41-42
XVIII. Evacuation Plan 43
XIX. Reporting system 44

2
Saudi Readymix Concrete Co.
I. INTRODUCTION

HSE POLICY

The Management of Saudi Ready mix Concrete Company is committed to the health, safety and general welfare
of its employees; and extends this commitment to ensuring that our operations do not place our visitors and
members of the local communities in which we are working at risk of injury, illness or property damage.

Accordingly, we will ensure full compliance to all applicable Health and Safety Regulations and current industry
standards by:

 Providing and maintaining a healthy and safe work environment


 Developing, promoting, and implementing HSE policies and procedures
 Ensuring that nominated HSE personnel are adequately trained and supported
 Training and supervising personnel in all employment levels on the safe conduct of assigned tasks
 Providing adequate financial and human resources to meet the HSE requirements
 Providing personnel with protective equipment
 Continuously reviewing and improving our HSE performance

In turn, all Saudi Ready mix employees are obliged to:

 Take strict precautions to ensure their own health and safety, and that of their co-workers; by adhering to
documented HSE policies and procedures
 Immediately report all observed hazards and potential health and safety risks.

This Policy is applicable to all operators and functions of Saudi Ready mix Concrete Company; including those
where business activities are taking place off site. It is equally applicable to contractors and suppliers operating in
the company’s premises.

SPECIFIC OBJECTIVES

 Immediately notification investigation and reporting of accident


 Maintaining a healthy, safe working environment
 Protecting the environment by identifying and removing all hazardous wastes and by proper housekeeping to
eliminate all impacts aspects
 Enhancing employees HSE awareness through toolbox meeting, safety campaign and involve in training
programs and implementations
 To achieve and sustain zero accident through continues improvement practices

3
Saudi Readymix Concrete Co.
II. INDIVIDUAL RESPONSIBILITIES

The HSE Manager is responsible for:

 Specifying and documenting the formal Occupational Health & Safety Management System, according to
current best global practice.
 Monitoring and reviewing the HSE Management System in operation, and the generation of reports that will
provide an accurate account for measuring the system performance.
 Ensuring the promotion and awareness of the Occupational Health & Safety requirements throughout the
company.

The Department Directors and Regional Managers are responsible for:

 Implementation of the controls identified to prevent incidents and keep the workplace safe and healthy.
 Monitoring the adequacy of resources available to achieve the system objectives.
 Inviting their employees to identify risks through the Risk Assessment Process.

The RHSEO (Regional Health Safety Environment Officer) is responsible for;


Monitoring the implementation of the HSE system in their regions, via the FHSEO/AHSEO

Ensuring the promotion and awareness of the Health & Safety requirements in the region.

Leading the regular and spot system audits, recording findings in safety Audit Checklists (HSR 15)

Leading the Accident Investigation Process

Reviewing the performance of the system through the General Station Meeting in the region.

Monitoring the records generated and submitting the Monthly Safety Statistics Report to the HSE Manger in
the Head Office.
 Circulating all HSE issues to the Regional Manager, functional Regional Managers, and FHSEO/AHSEO.
 Identify safe workers in the region based on criteria predefined by the HSE department, by filling in the safe
worker Assessment Criteria (HSR 14)
a. The FHSEO (Factory Health Safety Environment Officer) /AHSEO (Area Health Safety Environment Officer)

is responsible for:

 Monitoring system implementation in his station(s)facility, recording observations in the daily Observation
Record (HSR 06) and reporting any violation to the RHSEO for realization and corrective action identifications
 Leading the emergency situations, assign the Incident Action team members, and call the public civil defense
if required
 Leading the Risk Assessment Process in the Station(s)/ facility(s).
 Keeping First Aid rooms functional
 Administering First Aid in cases of injuries and illnesses
 Recording PPE non-compliances in the PPE No Compliances in the PPE Non-Compliance List and reporting
them to station manager.
 Submitting Weekly Safety Performance Report and monthly Safety Statistics Report and Monthly Safety
Statistics Report to the RHSEO
4
Saudi Readymix Concrete Co.
III. RISK ASSESSMENT

PURPOSE

To define the roles, responsibilities, authorities, and direct the controls applied to Hazard Identification, Risk
Assessment & Risk Control.

SCOPE

The scope of this document covers all working areas of SRMCC employees, including public roads and construction
sites.

METHODS OF OPERATION

DEFINITIONS
INCIDENTS: Undesired, but avoidable event resulting in death, ill health, injury, and/or damage to equipment and
property

HAZARD: Source or situation with a potential to contribute to an incident taking place

RISK: Combination of the likelihood and consequences of a specified hazardous event occurring

TOLERABLE RISK: Risk that has been reduced to a level that can be tolerated by the company with regard to its
legal obligations and its own HSE policy

RISK ASSESSMENT: Overall process of estimating the magnitude of a risk, and declining whether or not the risk is
tolerable

Hazard identification

All SRMCC employees are obliged to continually monitor their work environment for safe working conditions. If
any hazard is detected, employees must instantly report this to their foreman or supervisor.

The foreman or supervisor will describe the reported hazard on the Hazard/Mishap Report form and submit the
form to the FHSEO/AHSEO, who will review the described hazard with the station manager for any potential to
cause an incident.

If such a potential is confirmed, the FHSEO/AHSEO will enter the hazard description in the Risk Assessment &
Control form and submit the form to the RHSEO for risk assessment.

Risk Assessment & Control:

 Risk Assessment- based on the hazard description, the RHSEO, Factory P & M manager, workers who has expertise
in their field, supervisor and staff will participate in the assessment of the risk associated in the processes that are
present in our facilities:
- The kind and magnitude of incidents that the reported hazard may facilitate to occur
- The likelihood of death, ill health, injury, and., or property because of such incidents
- The employee or group of employees who are exposed to the risk of such incidents occurring

5
Saudi Readymix Concrete Co.
- Whether adequate measures are in place to safeguard employees, equipment, and property from the
consequences of such incidents.

Risk Control Measure applies ERICPD law, known risk and hazard identified are cope with the Hierarchy of control
to remove or reduce hazard and risk.

ELIMINATING –associated risk associating known risk.

REDUCING/SUBSTITUTION-substituting less hazardous materials use in or QC operation, or limit working hour on


considerably hazardous task.

ISOLATION- safety device, guarding and other means of isolation procedure are considered.

CONTROL- employing engineering controls.

PERSONAL PROTECTIVE EQUIPMENT- PPE usage is based on the worker’s task and requirements for minimal
protection.

DISCIPLINE- deduction, suspension, and termination to those violators.

The findings/ results of the risk assessment process must be documented in the Risk Assessment and Control
Form.

Measures devised shall be documented in the Risk Assessment & Control form, including actions required, names
of the employees responsible for the implementation, and timetable.

The RHSEO and the Regional P & M Manager will monitor the proper implementation and effectiveness of the
measures. They may delegate this task to the FHSEO/AHSEO and the station /facility Manager.

IV. Method Statements:


These are to be used always where residual HSE risks have been identified. These will incorporate all
Identified safe systems of work as outlined above. Copies of all Method Statements must be approved
by Dar Al Handasah prior commencement of the mentioned activity. The method statements should be
in line with the 10 Point Health and Safety Procedures found in DAH-HSE.S-02 Contractors Guidance
Manual.

6
Saudi Readymix Concrete Co.
V. TRAINING, AWARENESS, AND COMPETENCE

PURPOSE: To describe the training required to prevent or minimize the injuries of employees

SCOPE: The scope of this document covers all SRMCC employees

METHOD OF OPERATION

Safety and Health Orientation

 Workplace Safety & Health Orientation begins on the first day of initial employment or job transfer
 Every employee has access to a copy of all safety manuals, through his supervisor
 For review and future reference, an employee will be given the safety rules, policies and procedures pertaining
to his job
 Supervisors will ask employees questions and answers their queries, to ensure knowledge and understanding
of safety rules, policies, and job specific procedures
 At the end of the orientation, the employee safety induction record will be signed by the employees.
 All the above activities are performed in coordination between supervisors, station managers, FHSEO/AHSEO
and RHSEO.

TRAINING MODULES:

1. PPE Training
2. Working at Heights Training
3. LOTO (Lock Out & Tag Out) Training
4. Confined Space Entry Training
5. Machine Guarding
6. Fire Extinguisher Training
7. Emergency Response
8. Ladder Safety
9. Defensive Driving
10. MSDS (Material Safety Data Sheet)
11. ERC (Employee Report Card)
12. Hot Work (Arc/Ace/Ox Gas welding)
13. Job Hazard Analysis/ Job Safety Analysis
14. Heat
15. Work Permit
16. Safety Behavior
17. First Aid
18. Accident Reporting
19. Fire Safety
20. Project Hazards and Risks
21. Dress Code
22. Disciplinary Procedures
23. Plant and Equipment
24. Site Rules
25. Tool box Talks

7
Saudi Readymix Concrete Co.
Training Plan:
STANDARD 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
PPE Height LOTO CSE MG FET ER LS DD MSDS ERC H.W. JHA Heat WP SB FA AR FS PHR DC DP PE SR TBT
Dept. Position
P&M F. Mgr. A A A A A A A A A A A A A A A A A F F F F F F F F
F. Supv. F F F F F F F F F F F F F F F F F F F F F F F F
Shipper F A A A A A A A F A F A A A A F F F F F F F F F F
Dispatcher F A F F A F F A A A F A A A A F F F F F F F F F F
Batcher F A F F A F F A A A F A A A A F F F F F F F F F F

M. Engineer F F F F F F F F F F F F F F F F F F F F F F F F F

Foreman F F F F F F F F F F F F F F F F F F F F F F F F F
Mechanic F F F F F F F F F F F F F F F F F F F F F F F F
Plt. Maint. F F F F F F F F F F F F F F F F F F F F F F F F F
Plant Elect. F F F F F F F F F F F F F F F F F F F F F F F F F
A/C Tech F F F F F F F F F F F F F F F F F F F F F F F F
Tireman F A F F F F F F F F F F F F F F F F F F F F F F F
Welder F F F F F F F F F F F F F F F F F F F F F F F F F
Labor F F F F F F F F F F F F F F F F F F F F F F F F F
Erector F F F F F F F F F F F F F F F F F F F F F F F F F
Mixer Optr. F A F A A F F F F A F A F F A F F F F F F F F F F

Trailer Optr. F A F A A F F F F A F A F F A F F F F F F F F F F

Pump Optr. F A F A A F F F F A F A F F A F F F F F F F F F F
Maintenanc
F F F F F F F F F F F F F F F F F F F F F F F F F
e
Technic
QC Mgr. A A A A A A A A A A A A A A A A A F F F F F F F
al
QC Supv. F A A A A A A A F F A A A A A A F F F F F F F F F
QC Insp. A A A A A A A A F A A A A A A A A F F F F F F F F

Sr. QC Tech. F A A A A F F A F F F A A F A F F F F F F F F F F

Lab. Tech. F F A A A F F A F F F A A F A F F F F F F F F F F
F F F F F F F F
Sls./Mkt
ALL A A A A A A A A A A A A A A A A A F F F F F F F F
g.
HR/Adm
ALL A A A A A A A A A A A A A A A A A F F F F F F F F
.

MAINTENANCE

PPE Height LOTO CSE MG FET ER LS DD MSDS ERC H.W. JHA Heat WP SB FA AR FS PHR DC DP PE SR TBT
M.
F F F F F F F F F F F F F F F F F F F F F F F F F
Engineer
Foreman F F F F F F F F F F F F F F F F F F F F F F F F F
Mechanic F F F F F F F F F F F F F F F F F F F F F F F
Plt. Maint. F F F F F F F F F F F F F F F F F F F F F F F F F

F FULL KNOWLEDGE PROGRAM


A AWARENESS PROGRAM

8
Saudi Readymix Concrete Co.
VI. EMERGENCY PROCEDURES

PURPOSE: To produce Emergency plans for all potential incidents and emergency situations.

DEFINITIONS:

 EMERGENCY is an unplanned situation or event resulting in involvement of public emergency services, police,
fire, paramedics, or environmental regulatory authorities

EMERGENCY PLANNING:

 Emergency plan shall identify the potential for, and responses to incidents and emergency situations; to
prevent death, illness, injury, and / or damage to equipment and property
 Consequently, there is a series of plans covering all possible emergencies. Each plan provides easy reference
to relevant basic information for handling the situation.
 The Emergency plan is not intended to be comprehensive instruction for handling the emergency. This can
only be achieved through training and regular practice drills.
 The actual incidents, accidents and emergencies are reported and followed up as per the management
Procedure
 The Regional P & M Managers are assisted in identification of potential incidents and emergencies by the HSE
Officers who advise on potential emergency situations and events.
 Aspects of operations that cause a significant Health & Safety impact under incident and emergency
conditions are identified and recorded as per the Hazard Identification & Risk Assessment Management
Procedure
 Fire Precautions - We will ensure that adequate fire prevention and precautions have been taken
when undertaking activities, especially hot works e.g. burning, welding, grinding etc. A Fire Risk Assessment
is produced and displayed using a Fire Risk Assessment

We will ensure that the provision, inspection and maintenance of a suitable number of fire extinguishers are
located in the site offices, in work pieces, In welfare accommodation stores etc. as deemed appropriate.

Additional fire extinguishers and! or blankets will be provided in designated areas where highly flammable
liquids or substances are stored or used. Adequate training is to be given In their storage, handling and use.

Empty and full gas cylinders must be secured and stored upright. Flashback arrestors will be fitted
to all gas lines. No combustible heat source will be placed upon combustible roots unless adequate protection
Is provided.

 First Aid Provision — We will provide suitable and sufficient first aid provisions which are readily.
First Alders will be properly trained by a reputable training body. it is advised that untrained personnel should
not attempt to administer first aid unless they are qualified to do so.

9
Saudi Readymix Concrete Co.
An appropriate and complete first aid kit will be kept in the site offices always. Signage will be displayed In a
prominent position on site or premises to Identify the first alder(s). First aiders on site will display a white
cross on a green background helmet sticker.

 Accident, incident, and ill-Health Reporting - All accidents, incidents and near misses involving staff will be
reported to the Site Manager immediately or as otherwise stated within the Contract.

The recording of accident / incident information should be undertaken hi accordance with the Consultant’s
procedures. Each workplace will ensure any injured person on site can record his/ her details of the accident
with the assistance of the Site Manager.

An Accident / Incident Report Forms must be completed immediately by the Project Safety Manager /
Engineer and distributed in accordance with the Project incident Reporting Procedure. A copy will be retained
on site until the completion of the contract.

In the event of a fatality to any person on site, the HSE Manager / HSE Engineer responsible for the workplace
will inform the Consultant’s HSE Manager immediately.

The scene of a fatality must be left undisturbed except for the necessary release of the Injured personnel or
If requested by the authorities. If disturbance is unavoidable before the HSE Manager has visited, then the
Project / Site Manager should take careful notes of the scene, measurements and If possible photographs.

In a major emergency, the FHSE/AHSEO establishes an emergency control center at the best suitable location,
to assist in communication and coordination. Essential items to have in this center are listed in Emergency
Action (HWS 5.04)

The RHSEO and FHSE/AHSEO receive appropriate training in the incident and emergency procedures and the
use of equipment.

All other personnel are made aware of the principal hazards and trained in evacuation procedures.

All personnel participate in regular practice drill to test the effectiveness of the procedure and plans.

Each emergency plan is reviewed and tested by practice drill at least annually.

The results of drills are reviewed and documented by the RHSEO in Memorandum including any training,
changes to procedures, plans or equipment agreed with respective Department Managers and P & M Director

10
Saudi Readymix Concrete Co.
FIRE EVACUATION FLOW CHART
Fire Emergency Case-

FIRE ALARM

FALSE ALARM REAL FIRE


RESET/ DE-ACTIVATE THE Verify NOTIFY THE FACTORY
ALARM MANAGER/SAFETY OFFICER

1st CALL Emergency Response Team- (In-House


Firefighting Team)

2.) CIVIL DEFENSE: Call 998

Evacuate the employee to designated Assembly


Point Area - (If needed))

Emergency Coordinator to account the employees


and inform the factory Manager their status

Inform the Security to direct the civil defense team


the location of the fire and to prevent
unauthorized personnel to enter the fire scene

Emergency Coordinator/Factory Manager orders to


return to work after ALL CLEAR notification from
Civil Defense

Prepare and submit the Fire


END 11
Investigation Report
Saudi Readymix Concrete Co.
MEDICAL EVACUATION FLOW CHART

Medical Emergency Case

Notify the following

HS-Officer (S.O.)

Factory
Manager/Supervisor

MINOR CASES SUCH AS MAJOR CASES SUCH AS;

1.) Minor wounds /cuts 1) Unconscious result of DM, Stroke


2.) Nose bleeding result for & HBP
exposure to the sun long 2) Laceration, punctures and
duration abrasions
3.) Foreign body in eye, mild 3) Ankle Sprains & Strain
inflammation 4) Chemical Splash in Eye
4.) Mechanical Back Pain" 5) Eye Scratch
acute" Classify 6) Bone Fracture" Open or Close"
5.) 1st Degree of Burn 7) Uncontrolled Bleeding" internal
6.) Conscious Choking or External"
8) 2nd & 3rd degree of Burns
(Fire/Chemical/Electric)
9) Major wound-deep wounds or
deep cuts

First Aider does careful to the 1st Ambulance:Call 997


victim" First Aid Process"
2nd Clinic/Welfare Superviso; Hussain Al
Ghanem= 0566199093

Prepare and submit injury report First Aider dose the first Aid Process to
12 the Victim until arrival of Ambulance
Saudi Readymix Concrete Co.

Notify the Admin. Manager to forward


GOSI referral # through fax to GOSI
hospitals

S.O.-Assist the victim to ER while


waiting the GOSI paper

S.O.-Notify /Update

-QHSE Manager

-President

-General Manager

Wait for medical result and Request


medical report

NOTE: The lists of the GOSI Hospitals are mentioned below.

Code Hospital Branch/Region

500641738 Dr. Taha Bakhsh Hospital Makkah Office

110040008 Dr. Amin Almghrabi Hospital Makkah/ Jeddah Office

110078609 Dr. Suleiman Al-Faqih Hospital Makkah/ Jeddah Office

100021293 Saudi Industrial Services Cisco Clinic Makkah/Jeddah Office

13224315 Riyadh Care Hospital Riyadh Office

200068211 Aston Hospital Dammam Office

250107463 Almana General Hospital Jubail

919900180 Royal Commission for direct recruitment clinic Yanbu

13
Saudi Readymix Concrete Co.
VII. WELFARE
Will ensure that suitable welfare facilities will b. provided with suitable and sufficient washing areas,
toilet facilities, refreshments, and accommodation for drying clothes where the need arises,

Will ensure that the welfare standards on site will meet the requirements of the contract conditions, and
comply with current Industry best practice standards and applicable Labor laws.

All welfare facilities will be kept clean and if food is stored in workplaces, it will be kept in a hygienic
manner end at the correct temperature. The changing of do thing or the storage of equipment and tools
will not be allowed in the canteen. Food waste will be disposed of as soon as possible. All personnel
should change their clothing and wash themselves before taking meals particularly when working in
environmental conditions, which have exposed them to bacteria and harmful substances.

VIII. SAFETY PROCEDURES

A.Permit to Work - The permit to work system ensures that the potentially hazardous elements of an
operation have been considered, the relevant parties Informed, and action taken to ensure that hazards and
associated risks are reduced as far as reasonably practicable.

Some of the operations requiring a permit to work are as follows:

- Hot Works

- Electrical (Use Working)

- Confined Space

- Use of Hazardous Substances

Permit to work systems and procedures constitute the most formal method of ensuring safe working practices
and safe systems of work on site.

The HSE Manager / HSE Engineer will ultimately be responsible for the permit to work procedure on site, and
shall ensure that all the hazardous circumstances have been checked with the Consultant’s HSE Manager/HSE
Engineer before commencing the work.

The HSE Manager / HSE Engineer must ensure that either a Method Statement or Risk Assessment accompany
the permit before been issued.

When carrying out works under a permit to work system, all personnel must be given specific instruction on the
relevant risks and hazards, precautions and emergency procedures that need to be taken during the works.

14
Saudi Readymix Concrete Co.
A competent and suitably experienced Supervisor from the Contractor must oversee all work and associated
activities.

B. Lone Working - Out of hours working Is defined as ‘any work undertaken outside of the working day ‘whether
of a temporary or permanent nature. Out of hours working falls into three categories:

-Completion of work in progress which would normally be completed during the working day.

-Work specifically requested to be accomplished out of hours on a working day.

-Work specifically requested to be done on a nonworking day whenever possible.

If lone working is required out of hours ie. power floating, a safe method of working and emergency
communication must be set up and agreed with the Contractor beforehand.

Method Statements containing emergency procedures and Supervision will be provided to DAH and approved,
before permission for any out of hours working will be given.

Appropriate experienced supervision will be available to advise and control the work especially regarding access
and safety issues.

Before any lone working Is undertaken a risk assessment will be carried out identifying the hazards of the work,
assess the risks involved and devise and implement safe working arrangements to ensure that the risks are
either eliminated or adequately controlled, Lone workers will have full knowledge of the hazards and risks to
which they are being exposed.

C. Electrical Safety - The Project Manager, Site Manager and HSE Manager / Engineer are responsible for
ensuring that a safe system of work k implemented, monitored, and where necessary conveyed to the
Consultant to the workforce in respect to electrical safety on sites. Records on such
conveyance either via Tool Box Talk or documented Risk Assessments are to be retained in the Project HSE File.

Portable Appliance Testing (PAT) will be undertaken on all electrical equipment on a regular basis not exceeding
6 months. Labels will be applied to the relevant items and records retained it must demonstrate that all
electrical appliances brought onto the sites are fit for purpose, in good
repair and pose no significant risks to the users and others.

Equipment will therefore will be inspected and maintained on a regular basis I.e. every six months or when
electrical equipment is taken off site or returned to an independent hire company. it must be Inspected, any
faults recorded and suitable tagging information applied where necessary for re Issue. Records of maintenance
and repairs will be kept.

Installation, modification, or repairs of any electrical equipment in the offices or on sites will only be carried out
by a qualified competent individual and such work must comply with the requirements of applicable industry
standards and local legislation

All equipment must be treated as ‘live’ unless isolated and written confirmation is received to the contrary. A
permit to work system will be implemented.

15
Saudi Readymix Concrete Co.
Where possible, only 110V equipment will be used to reduce the risk at source and help ensure the protection of
all workers on site. However, it may become necessary where special Items of equipment are installed that 240V
tools may need to be used, It is therefore Imperative that the HSE Manager/HSE Engineer is made aware of the
situation prior to work commencing and a safe system of work agreed. All 240-volt supply cables will be of the
armored type and fitted with RCDs. A Permit to Work System may be required If the Isolation cannot be achieved
when working on Individual circuits.

D. Electrical Lighting - Electrical installations will only be installed altered or maintained by competent individuals.

General access lighting must be supplied to any area devoid of natural light, to supplement poor lighting or for
after dark working.

The Project Manager / Site Manager will ensure that adequate and suitable lighting ¡s provided for safe access
and egress and that this is considered as part of the HSE plan, where necessary temporary emergency lighting will
also be considered.

General purpose lighting operating at 110v consisting of either guarded festoon cables or guarded Fluorescent
tube lighting will be fixed securely at high level. Moving of lights as work progresses will only be carried out by a
competent person.

In addition to general purpose lighting, the Project Manager will ensure that adequate task lighting is provided.
The provision of basic lighting will be confirmed at the per-start meeting by the Project Manager.

Site floodlighting and office lighting may be provided at 240v but must be installed in compliance with local
legislation and industry best practice.

Electrical power and lights to temporary accommodation In excess of >100v must be interrupted by a suitably
rated residual current device (RCD or ELCS).

Lighting provided In the vicinity of a flammable atmosphere will be speedily protected to avoid any fire or
explosion risks e.g. flameproof.

Low voltage lighting unless specially protected is not suitable for such purposes, it must be “intrinsically safe’. The
advice of the HSE Manager/ Engineer should be sought in all such cases.

E. Highly Flammable Liquids - The Project Site Manager will ensure there Is planned storage facility provided and
maintained, and that all highly flammable liquids are kept in these storage facilities until required.

There will be fire resistant absorbent material Is available to soak up any spillages of highly flammable liquids and
that this material Is Immediately disposed of safely after use.

16
Saudi Readymix Concrete Co.
There will be a person designated to check any fire-fighting equipment, storage facilities, signs notices, containers,
etc. on weekly intervals and that action is taken to rectify any defects noted.

F. Working at Height’s - The Work at Height Regulations requires the risks of a fail to be prevented wherever the fall
is liable to cause injury. This applies to work at any height and therefore the 2-meter rule no longer applies.

Ladders and Stepladders - Ladders will only be used in situations where It Is impractical to erect a safer means of
access e.g. scaffolding or mobile scaffold towers etc. Where ladders are used, they will be checked of any defects
prior to use, records of any inspections will be kept by the

HSE department and copies made available to DAH upon request Ladders will not be used when:

- If damaged or defective.

- If it is not secured properly or has an unstable base.

- Where the work entails the use of both hands (except in certain circumstances).

- For the carriage of tools or materials where there is a risk of falls of persons

- Where there is a risk of damage to the ladder.

- Where the task to be carried out would require the operative to reach outside the line of the ladder which may
cause a risk of falls.

Made up ladders of screwed o’ nailed together components are strictly forbidden. Ladders must not be painted.
Ladders will be stored In a manner such that damage will not occur preferably in a dry area and supported In the
middle if over 6 meters in length.

G. Plant and Equipment - Electrically Operated Hand Held Tools and Equipment.

Ensure that all electrically operated hand tools will be Inspected and tested before Issue and will be clearly marked
with an identity number and due date of the next Inspection, Thereafter, electrical tests and Inspections will be
carried out every six months on all frequently used hand held electrical tools.

All operatives will be instructed or trained in the use of hand tools and the safe tag system during the first day of
induction. Further Instruction must be given during frequent toolbox talks, or as and when required.

All tools and equipment will be returned to a secure store at the end of each working day, and will be visually
inspected before re-use. Site supervisors will, as a part of their normal duties, inspect tools and equipment and
remove from use any faulty equipment found on site.

17
Saudi Readymix Concrete Co.
The HSE Manager/ Engineer reserves the right to confiscate any equipment deemed unfit for purpose where a
significant risk to the health of any employee is evident.

H. Plant Operators - The HSE Manager / HSE Engineer must obtain proof of competence of any person employed to
operate plant equipment on behalf of the appointed Contractor.

No person can operate an Item of plant unless such proof has been obtained, and that they are authorized. Must
provide certification to Consultant for all plant operators engaged on the Project.

No person under the age of 18 years will operate any plant on site. The Contractor will select a competent person
to complete weekly checks on all plant vehicles on site, and ensure an inspection register Is maintained and copied
to DAH PMC upon request.

I. Concrete Pumps - Operatives (other than the driver/operator) working with concrete pumps must be adequately
trained in the handling and placing techniques of the boom and concrete operations.

Pumps will only be operated by trained and competent persons over 21 years of age. Pumps will be properly
maintained and checked before use.

An effective system of communication between the pump operator and the placing gang will be established.
Where any part of the boom or placement hose is out of sight of the pump operator, a competent flagman will be
used.

Concrete pumping units must be sited to allow safe access for truck mixers and care must be taken to ensure that
there Is no danger of a placement boom approaching too close to overhead electric cables or other obstructions.
Units will stand on firm level ground and outriggers will be extended to ensure stability.

Pump lines will be laid to form as little hazard or hindrance as possible and care will be taken to avoid contact
with, or close approach to overhead lines. Sharp bends and kinks in the hose are not permitted. All couplings,
adapters, nuts, and bolts including fixing pins, must be checked for security before pumping starts. Where it is
necessary to secure pump lines against movement, scaffolds or formwork WIU. NOT be used as an anchor unless
designed for the purpose.

All covers or acoustic panels on the pump unit will be closed when the pump is in operation.

The Contractor must provide PPE to all operatives engaged within the pumping of concrete. PPE must be of good
standard and must be worn/ used where a possibility of Injury exists. Pump receiving hoppers will be guarded
always during use. Pump line pressure gauges must be checked at the beginning of each shift. Access to the pump
by concrete vehicles Is to be kept clear always.

18
Saudi Readymix Concrete Co.
When cleaning out pump lines1 care must be taken so that material is ejected in safe direction and that
unnecessary danger Is not caused. If a bail is used for cleaning, a cage will be installed to contain the ejected ball.
Compressed air will not be used to clean the pump lines or to release blockages.

Slurry and washing down water will be kept away from the pump in a bunded area and not discharged into water
courses and sewers. The “cleaning out” procedure will be carried out by the pump operator only and strictly In
accordance with the approved method statement.

The pump unit will normally be cleaned with the machine running and the discharge outlet switch in position. If,
at any time, the discharge outlet must be removed, the pump must be switched off. Serious accidents have
occurred when the outlet has been removed for cleaning with the machine running and the operative’s hands
have been trapped by the gate valve. Only persons trained in the procedures involved will carry out these cleaning
operations.

IX. PERSONNEL PROTECTIVE EQUIPMENT

A. PURPOSE

To define the purpose of wearing and using personal protective equipment that is generally encountered within
the Concrete Ready-mix industry

B. SCOPE

The wearing of Personal Protective Equipment applies to all SRMCC personnel who are exposed at Concrete
Ready-mix activities including delivery of materials the constructors where there is a risk of physical injury.

C. METHOD OF OPERATION

If hazards are present, controls shall be implemented to eliminate, reduce or isolate hazard but if controls are not
available and/or the hazard is not eliminated, the requisite Personal Protective Equipment (PPE) on the job shall
be used.

• Issued correct PPE accordance to the task the workers.

• Communicate/ educate workers on effect of exposure without using of PPE, the benefits, and the right
way to use the issued PPE. (Training)

• Instruction and information shall be properly defined and demarcate signage in areas employees requires
them to use.

• Supervision compliance is required to ensure employees are following instruction in protecting


themselves.

19
Saudi Readymix Concrete Co.
• Defective or damaged PPE shall be removed from service and shall not be reused.

SRMCC shall ensure that each employee who is required to wear PPE is trained in the following:

• When PPE is necessary.

• What PPE is necessary?

• How to put on, take off, adjust, and wear the PPE.

• The limits of the PPE.

• The proper care, maintenance, useful life, inspection, and disposal of the PPE.

Common types of PPE used and issued in our facilities base on the type of jobs workers are exposed.

Respiratory Protection Equipment

Eye Protection Equipment

Hand Protection Gloves

Safety Footwear

Head Protection

Fall Protection

Visibility Vest

Hearing Protection

General Instructions

 Do not paint or drill holes in hard hats.


 Do not wear hard hats that are dented or cracked.
 Do not wear anything under a hard hat, such as a baseball cap, except for manufacturer approved liners.
 Do not continue to work if your goggles become fogged. Stop work and clean the glasses until the lenses are
clear.
 Check the suitable PPE for you with your OHS officer and PPE matrix
 Working unsupported platform above 1.8m /6ft requires employees to wear fall protection.

Sub part: PPE Responsibilities

Employer Responsibilities

20
Saudi Readymix Concrete Co.
 Employer shall provide and issue employees with required PPE in accordance to the employee’s task assessed
for requirements.
 Performing a "hazard assessment" of the workplace to identify and control physical and health hazards.
 Identifying and providing appropriate PPE for employees.
 Training employees in the use and care of the PPE.
 Maintaining PPE, including replacing worn or damaged PPE.
 Periodically reviewing, updating, and evaluating the effectiveness of the PPE program

Employee Responsibilities

 The employee shall use PPE in accordance the type of job requires them to wear the PPE, “right PPPE for the
right job”.
 Use PPE as required by the job and task
 Attend training session
 Use of proper care, maintenance, useful life, and disposal of PPE.

21
Saudi Readymix Concrete Co.

X. PPE MATRIX
PPE
/

Eqpt.
Pump

Electrician
Sr. Plant Operator

REQUI

Material Receiver
P & M Supervisor

Mechanic Helper
Loader Operator

Plant Technician
REME
Pump Operator

Plant Mechanic

Pipeline Helper
Truck Foreman

Plant Operator

Plant Engineer
NT

Maintenance
Refrigeration

Pump Helper
Store Keeper

Plant Helper
Truck Driver

Automotive

Serviceman
Mechanical
Workshop

Carpenter
Machinist

Tyreman
Shipper

Welder
Heavy

Auto
Sr.
HARD                              
HAT
COVE                              
RALL
SAFET                              
Y
GLASS
ES
SAFET                              
Y
SHOE
S
WELD 
ING
MASK
HIGH                             
VISIBI
LITY
CLOT
HING
RESPI 
RATO
RY
GLOV                            
ES
EAR                          
PLUG
DUST                              
MASK
UNIF
ORM
FULL
MASK
WELD 
ING
BOOT
S
LEATH 
ER
APRO
N
FALL  
PROT
ECTIO
N

22
Saudi Readymix Concrete Co.

Work
shop Safety Sand
PPE REQUIREMENT foreman Officer Mechanic Painter Blaster Helper Security

HARD HAT       
COVERALL       
SAFETY GLASSES       
SAFETY SHOES       
WELDING MASK
HIGH VISIBILITY CLOTHING       
RESPIRATORY  
GLOVES      
EAR PLUG      
DUST MASK       
UNIFORM COVERALL 
FULL MASK  
WELDING BOOTS
LEATHER APRON
FALL PROTECTION   

23
Saudi Readymix Concrete Co.

XI. MANDATORY SAFETY SIGNS:

Saudireadymix Batching Plant facilities are designed symmetrically with other plant areas, positioning of that
posted safety signage based on plant designs assessed located hazards.

IITS Approach:

 Instruction given directly to the respondent on the site rules.


 Information circulated and posted on the safety board
 Training
 Supervision of management ensuring employees comply with the regulated signage posted on the location.

Enforcement:

 Requires supervision from the management, monitoring of assigned safety officers on the area and gate
inspection from the security group ensure minimum compliance.
 Issuance of violation tickets for noncompliance, failure to comply with the request shall result in disciplinary
procedures which may be a written warning, deduction of salary or suspension.

Note: The locations where the PPE is used and the distribution to employees are defined in “HSE ST-001PPE” and
“PPE Matrix”, respectively.

SN LOCATION SAFETY SIGN QTY


1 Office Area Parking 1
Reverse park signage 1
Assembly Point 1
No smoking 1
2 Service Control Area Electrical hazard 1
Safety Shoes 1
Safety glass 1
hard hat 1
Gloves 1
Noise 1
Keep out/warning 1
3 a. Genset (SCA) No smoking 1
Keep out/warning 1
Wear ear protection 1
Electrical hazard 1
b. Deisel Tank(SCA) No smoking 1

24
Saudi Readymix Concrete Co.
Flammable 1
Danger 1
Deisel 1
c. Electrical Panel Board high voltage 1
Danger 1
Plant access
4 (Accommodation) Safety glass 1
Safety Shoes 1
hard hat 1
Welding mask 1
Welding gloves 1
Safety glass 1
Workshop Area Welding shoes 1
Leather apron 1
No entry/ restriction sign 1
5 No smoking 1

Common Safety Signage found in SRMCC

25
Saudi Readymix Concrete Co.

XII. VEHICLE / EQUIPMENT SAFETY

The vehicle shall have the adequate capacity for the required duty and have been purposely designed for the
service as well as maintained in safe working order. As a minimum, the vehicle shall be equipped with the following
features;

 Left and right side view mirrors


 Rear window defogger
 Dual airbags
 Anti-locking braking systems (ABS)
 Side impact bars

The vehicle such as trailers, cranes, front end loaders, etc., include;

 Overhead protection canopy


 Automatically switch back-up alarm with intermittently sounding tone
 A horn, which is audible above engine noise
 Convex type rear view mirror
 Parking brakes
 Hearing protection & PPE required such as safety shoes, uniforms, hard hats

Each vehicle shall be equipped with fire extinguishers properly rated

A first Aid kit shall be carried in each vehicle

The drivers as well as the passengers must wear seat belt during the journey

For any motor vehicle parked on the road in the project sites, engine should be put off and ignition keys kept
inside the motor vehicles so that in an emergency the motor vehicle can be evacuated easily.

REGULATORY REQUIREMENTS;

All laws and regulation concerning driving must be followed, including;

 Driver must have valid Saudi license


 All traffic regulations must be obeyed.
 Motor vehicles must be maintained in road worthy conditions
 Lights must be used as required
 Following alcohol/drug prohibition
 Must have appropriate vehicle insurance
26
Saudi Readymix Concrete Co.
 Motor vehicles must be parked only at the assigned places and applied brakes

XIII. DEFENSIVE DRIVING

The most important part of defensive driving is anticipating the actions of other drivers. Know how to react
(responsibly) to other drivers and changes in the driving environment. Watch for the pedestrian and bicyclists and
monitor yourself-your physical and mental condition affects how you drive.

Rear-ending other vehicles is a leading cause of vehicle accidents. Maintained a three-second following distance
to give you time to react and stop safely. Increase your following distance during adverse weather and when you
drive larger or heavier vehicles.

AGGRESSIVE DRIVING

Some drivers will do almost anything to get to their destination- tailgating, weaving in traffic, ignoring traffic lights
and the rights of other drivers. It’s called aggressive driving. It’s dangerous and causes an increasing number of
traffic crashes. Aggressive driving is different than media-inspired road rage, in which the driver uses a vehicle as
a weapon or physically assaults another driver. Road rage is a criminal offense. Plan ahead; allow plenty of time
to reach your destination, check traffic conditions before you leave.

DISTRACTED DRIVING

Now, everyone seems to be talking or texting on cellphones while they’re driving-but driving is not the time for
multi-tasking. You make more than 200 traffic related decisions per mile when you’re driving so it’s critical to
focus only on driving. Distracted driving is a factor in 25-30 percent of motor vehicle crashes. Driving should be
your only job when you’re behind the wheel.

Pull off the road when you need to talk, text, or read e-mail on your cell phone. The crash risk with a hand-free
model is just as great as using a hand-held phone.

DROWSY DRIVING

 Due to inadequate sleep


 Health problem and medication
 Fatigue and Mental stress
 Stressful road condition
 Shift work and extended duty

A Project specific Traffic Management Plan shall be created. The Plan will identify key safety issues, a pictorial
representation of the work location is preferred which can be readily displayed on site.

The Plan will include but not be limited to;

27
Saudi Readymix Concrete Co.
- Site Layout

- Access and Egress Routes

- Direction of Traffic

- Mandatory Speed Limits (2Okph maximum)

- Loading and Unloading Areas

- Pedestrian Routes

- Parking Arrangements

The following control measures are mandatory and will be documented in the Plan,

- Reversing of all vehicles must be under the supervision of a nominated flagman or vehicle marshal.

- The density of vehicle movement must be planned to ensure that the capacity of the facility is not exceeded.

- Ground conditions and standards of house-keeping must be maintained such that safe access to vehicles can
be achieved.

- All non-essential personnel will be excluded from work areas where vehicles are being maneuvered or
worked upon.

- As far as is practicable, vehicles should be parked so that to exit the work area the first movement is forward.
This extends to private vehicles when parked.

28
Saudi Readymix Concrete Co.

XIV. OTHER CONTROLS

Manual Handling - Where practicable, the Contractor will ensure that designated loading/unloading areas will
be made available on site and clearly identified.

Where uneven ground conditions prevail, efforts will be made to make good or relocate to an alternative
location. Good standards of housekeeping will be maintained always.

A hierarchy of risk mitigation control measures will be used for all manual handling operations.

As far as is practicable all loads will be minimized. Materials tri excess of 25kg will not be lifted by a single
individual Load sharing, e.g. tandem, group lifts will be encouraged.

Will ensure a suitable Risk Assessment covers all Manual Handling activities and provide onsite training In
respect to these tasks Tool Box Talks will cover Manual Handling operations and copies of such talks retained on
site for reference.

Health Hazards - Control of Substances Hazardous to Health

Create a library for all chemicals on site to eliminate, substitute or effectively control risks arising from the
handling, storage, use and dì5posaI of substances hazardous to heath. Prepare suitable COSHH Assessments
including Material Safety Data Sheets (MSDS) that identify the risks of such substances.

Where a hazardous substance can be substituted for a less hazardous substance, a less hazardous alternative
will be selected.

The Contractors Site Management are responsible for all COSHH matters including the validity of risk
assessments, providing suitable PPE, monitoring control measures and health surveillance where necessary.

All personnel should receive sufficient instruction, information and training in the identified method of work
with a specified hazardous substance.

Dust Control - The Site Manager / HSE Manager will the hazards associated with air pollution, in the form of
dust, gas or smoke, and the controls needed to keep these to a minimum always. Dust will be controlled at
source to prevent the spread of contamination around the area of the Project by dampening down the problem
areas or avoiding the use of plant and machinery in the areas concerned, where possible. When dampening
down methods will be used, rio run off into local water courses or sewers will be permitted

No burning of waste materials will be permitted on the Project. Waste materials will be disposed of using skips
placed as near as possible to the working areas.

The Contractor will be responsible for implementing the following dust measures:

- Consider other forms of working practices to reduce dust levels.


29
Saudi Readymix Concrete Co.
- Risk Assessments where excessive amounts of dust are generated.
- Provide training and Instruction for all site personnel I.e. toolbox talks, demonstrations.
- Monitoring of dust levels in the working areas may be required.
- Prevent exhaust from entering the working area.
- Dampening of floors prior to sweeping up operations.

When using compressed air lance for removal of dust particles and tying wire from formwork the debris must be
collected at one point and not allowed to be blown and dissipated into the air.

Where possible it should be physically removed by hand into buckets and then into containers.

Confined Space - A confined space can be defined as any space which has limited means of access and egress,
restricted natural ventilation, lack of oxygen and is not intended for continual occupancy by persons, e.g.
storage tanks, pits, trenches, ducts, some areas, or rooms within buildings, particularly below ground level,
sewers, tunnels, boilers, etc.

Hazards associated with confined spaces fall into 2 categories:

Conditions which exist in the confined space before work takes place, e.g. lack of oxygen, toxic chemicals,
explosive gases, contamination soil etc.

Hazards which can be introduced into the confined space by the work to be carried out or produced by others
working nearby e.g. fumes from welding operations, unsuitable electrical equipment, application and use of
certain materials etc. Testing of the atmosphere must take place if there Is any doubt.

Structural Safety – in conformance to the standard all component of the plant shall be in accordance to Safe
Practices.

 Silo platforms shall be protected with rail guarding system and toe board.
 Landing platform of all laydown containers shall have safety safe access ladder, protected with rail guarding
system and toe board.
 Fully bolting system in all connecting part, base structure, and others.
 Full weld on all connecting part and no tacking is allowed.
 Vibrating part shall be properly secure either full bot system of full weld, no testing on part shall be done
unless requirements are made.

30
Saudi Readymix Concrete Co.

XV. ENVIRONMENTAL SAFETY and POLICY

A. Purpose

To identify the environmental aspects and controls applied to avoid environmental pollution and consequential
harm to employees and the community.

The Environmental Aspects is an element of the organization’s activities, products, or services that can interact
with the environment.

B. Definitions & Acronyms

Saudi Readymix : Saudi Readymix Concrete Company Ltd.

IMS : Integrated Management System

EMS : Environmental Management System

HSE : Health, Safety & Environment

EMR : Environmental Management Representative

AHSEO : Area HSE Officer

FHSEO : Factory HSE Officer

NCR : Nonconformance Report

C. Environmental Policy

The management and employees of Saudi Readymix are committed to ensuring that the company’s operations:

 Comply with all the applicable regulations

 Minimize and prevent pollution arising out of its activities products and services

 Promote resource conservation, waste ministration by technology, reuse and recycle options

 Continual improvement of the Environmental Performance through review and corrective measures

31
Saudi Readymix Concrete Co.
 Promote adequate Environmental Awareness among personnel

 Set dynamic environmental objectives through Environmental Management Programs, and review them
regularly

 Communicate the Environmental Policy to its employees, stake holders and the public.

D. Environmental Aspects

Saudi Readymix has established procedures to identify environmental aspects of its activities and products,
including those that can have an adverse impact on the environment. The frequency of review of
environmental aspects is once every 24 months.

The environmental aspects and impacts associated with the activities of Saudi Readymix are:

# Aspect Impact

1. Dust Emission Air pollution

2. Noise Affects human health

3. Waste Water Land contamination

4. Solid waste Land contamination


Admixture / oil /diesel / acid
5. Land contamination
spills and leaks

The above aspects have been considered during normal operating conditions as well as emergency
situations.

Environmental aspects, thus identified are mentioned in the Environmental aspects record of Saudi
Readymix.

The significant aspects have been evaluated using appropriate ranking criteria and have been considered
while setting the environmental objectives.

The Master list of significant aspects is kept up to-date by considering the impact of any new process /
equipment.

E. Legal and Other Requirements

All legislative and regulatory requirements pertinent to the environmental aspects of its activities and
products are identified and registered in Environmental Legislative Register.

Legal and other requirements will be updated as and when changes in legislations and environmental
scenario occur.

32
Saudi Readymix Concrete Co.
Saudi Readymix conducts an evaluation of current practices against legal and other requirements,
determines existing gaps and implements an action plan to ensure full compliance.

F. Objectives, Targets, and Programs

Environmental Objectives and Targets for all significant aspects have been established in line with:

 Environmental policy of COMPANY


 Significant environmental aspects
 Statutory and other legal requirements
 Technological options
 Business requirements
 Views of interested parties

Due emphasis has been given to prevention of pollution while identifying and establishing the
environmental objectives and targets.

The Environmental Objectives and Targets are furnished as part of Environmental Management Programs
in the Environmental Aspects record.

Environmental objectives and targets are reviewed whenever there are changes in environmental policy
and/or in significant aspects.

Saudi Readymix has developed an Environmental Management Program (EMP) for achieving its objectives
and targets. The EMP describes for every target, the activities to be carried out, the corresponding
responsibilities, time frame for completion and appropriate performance indicators if any.

For any new development or expansion, EMP's are amended or separate EMPs are established wherever
the modifications cause significantly different environmental aspects.

The revision/updating of EMP is carried out periodically as and when required in the event of revisions in
Environmental Policy / Objectives / Targets.

G. Roles and Responsibilities

Saudi Readymix has defined, documented and communicated the roles, authority and responsibilities of all
concerned personnel to facilitate effective environmental management.

The Management provides essential resources of manpower, technology and finance for implementation
and controls of environmental management system.

The Responsibility and Authority of key personnel for Implementing EMS are as follows:

The IMS Manager is responsible for:


33
Saudi Readymix Concrete Co.
 Specifying and documenting the formal Environmental Management System.
 Monitoring and reviewing the Environmental Management System in operation, and the generation of reports
that will provide an accurate account for measuring the system performance.
 Ensuring the promotion and awareness of the EMS requirements throughout the company.
The HSE Manager is responsible for:
 Ensuring safety of the Saudi Readymix operations
 Ensuring proper handling of emergencies including fire, oil & gas leak, and environmental hazards.

The EMR is responsible for:


 Administering the Environmental Management System.

The Factory Manager is responsible for:

 Preparation and implementation of Environmental Management programs for the factory.


 Initiate, recommend and provide solutions to environmental issues.
 Ensure adequately trained personnel are involved in maintenance of critical process equipment, air pollution
control system, waste water management, waste disposal, and firefighting facilities.
 Review and monitor facilities to reduce impacts on environment.
 Nominates personnel for different training programs at all levels based on identified environmental and
competence training needs.
 Coordinating / Liaison with regulatory and other authorities for compliance with the statutory requirements.

H. Competence, Awareness & Training

Saudi Readymix has an established procedure for identifying training needs and providing training to all personnel
whose work may create a significant impact upon the environment. This ensures that employees at each relevant
function and level are aware of:

 The importance of conformance with the environmental policy and procedures and with the requirements of
the environmental management system.

 The significant environmental aspects, actual or potential, of their work activities and the environmental
benefits of improved personal performance.

 Their roles and responsibilities in achieving conformance with the environmental policy, procedures and with
the requirements of the environmental management system, including emergency preparedness and
response requirements.

 The potential consequences of deviation from specified procedures.

 In addition to above, discussions shall also be carried out to create awareness amongst the employees.

34
Saudi Readymix Concrete Co.
 Recruitment of employees is done based on their education and experience. Appropriate training is provided,
wherever required, to ensure competence on the tasks being performed.

I. Operational Control

Saudi Readymix has identified those operations and activities that are associated with identified significant
environmental aspects in line with its policy, objectives, and targets. Activities are carried out under
specified condition using Environmental operational work instructions. The work instructions specify the
operating criteria to be followed while carrying out the activities.

Relevant procedures and instructions are made available and known to all concerned persons.

Controls for identified aspects are as follows:

a) Control of Dust Emission


 Install Jet Filters to cement silos
 Install adequate covers for cementitious materials store in bags.
 Pave (concrete) yard
 Use water sprinklers in aggregate stock bays.
 Install covers for ground hopper, radial conveyor & material bins
 Instruct transporters to install covers on aggregate loads.
 Using ground sweeper to clean the yard
 Spray the yard by water 2-3 times daily
 Follow the speed limits inside the plant (20 km/hr.)
 Use masks

b) Noise
 Install generators in generator rooms
 Proper maintenance of all mechanical equipment
 Use ear plugs in high noise area

c) Waste Water
 Install settling tanks in to collect truck washing water.
 Recycle waste water for spraying in yard for dust control.
 Install proper drains to collect storm water.

d) Waste
Concrete
 Proper quality controls to reduce dumped concrete.
 Dispose concrete in accordance with regulatory requirements.

Used Batteries / Oil


 Stored in designated shaded areas
 Disposed through approved disposal companies.
35
Saudi Readymix Concrete Co.
Used tyres / scrap
 Properly stored in designated areas
 Disposed through approved disposal companies

e) Admixture / Oil / Diesel / Acid spills and leaks


 Proper checks and maintenance of admixture and diesel pipe connections.
 Storage inside specially constructed secondary containment, in shaded area, as applicable.
 Use drip trays during transfer of liquids.
 Use drip trays during maintenance of mobile and stationary equipment.
 Availability and use of emergency equipment (spill kits, fire-fighting equipment, etc.)

J. Emergency Preparedness & Response

Saudi Readymix has established potential emergency situations and maintains proper emergency response plans:
 To respond to such situations; and
 Prevent and mitigate the environmental impacts that may be associated with them.

Emergency plans are carefully designed and frequently tested for its effectiveness.

• Emergency plan identify the potential for, and responses to incidents and emergency situations; in order
to prevent death, illness, injury, and / or damage to equipment and property
• Consequently, there is a series of plans covering all possible emergencies. Each plan provides easy
reference to relevant basic information for handling the situation.
• The actual incidents, accidents and emergencies are reported and followed up as per the management
Procedure
• The Factory Manager is assisted in identification of potential incidents and emergencies by the HSE
Officers who advise on potential emergency situations and events.
• Aspects of operations that cause a significant Health & Safety impact under incident and emergency
conditions are identified and recorded as per the Hazard Identification & Risk Assessment Management
Procedure

In a major emergency, the FHSE/AHSEO establishes an emergency control centre at the best suitable location, to
assist in communication and coordination. Essential items to have in this centre are listed in Emergency Action.
The RHSEO and FHSE/AHSEO receive appropriate training in the incident and emergency procedures and the use
of equipment. All other personnel are made aware of the principal hazards and trained in evacuation procedures.

Emergency plans in place are for:


a. Fire
b. Spillage
c. Power Failure
d. Heavy Rain
e. Heavy Wind

36
Saudi Readymix Concrete Co.
K. Monitoring & Measurement

The key characteristics of Saudi Readymix operations and activities that can have a significant impact on the
environment are evaluated for compliance to relevant environmental legislation and regulations, Environmental
Management Program (EMP) progress, Manpower performance and machine performance.

Saudi Readymix has established, documented, and maintained procedure to monitor and measure these key
characteristics on a regular basis to ensure compliance with Environmental objectives and targets.

The result of monitoring, measurement and corrective and preventive actions decided are recorded.

The critical equipment used in monitoring and measurement are identified, calibrated and record of the same are
maintained as per documented procedure.

L. Evaluation of Compliance

Saudi Readymix has environmental management programs covering all the significant aspects identified including
the legal and other requirements. The records related to all these monitoring and measurement activities are
maintained by the Factory Manager.

M. Nonconformity, Corrective Action & Preventive Action

Non-conformance to the Environmental Management System in Saudi Readymix are those related to
Environmental performance, regulatory compliance, Environmental Management Program (EMP) progress and
emergency occurrences.

Saudi Readymix has an established procedure for defining responsibility and authority for handling and
investigating these non-conformances, acting to mitigate any impacts and for initiating and completing corrective
and preventive action.

The non-conformances, depending on magnitude, are reviewed in Management Review meetings and Technical
meetings. Records of these meetings are maintained.

Saudi Readymix identify and implement any change required in the documented procedures resulting from the
corrective and preventive actions.

N. Control of Records

All environmental records are generated in the Environment Management System (EMS) and maintained to
demonstrate the conformance with the planned arrangement and to take corrective and preventive actions based
on analysis of records.

37
Saudi Readymix Concrete Co.
The environmental records consist of records as prescribed in various elements of EMS like Initial environmental
review record, List of legal permits, monitoring of environment management program and operation control,
Objective & targets, Complaints, Non-conformance reports, Incident reports, Internal audit records, Safety data
sheets, management review records, Corrective and preventive action requests, External and internal
communication log, information on applicable environmental laws, training records, information on emergency
preparedness, inspection and testing records, calibration records, records concerning sub-contractors etc.

All environmental related records in the form of paper or electronic media are identified, filed and maintained in
a manner to ensure easy accessibility and retrievability.

All such records are stored and preserved to prevent damage and loss. The records are retained as per established
retention period or as per regulatory requirement. The records are reviewed and disposed after retention period.

The responsibility for maintaining and controlling different records and their retention period are defined and
documented in the respective procedures.

O. Internal Audit
Environmental Management System (EMS) audits are carried out to:

a. Determine whether the environmental management system:


b. Conforms to requirements of the International Standard ISO 14001.
c. Has been properly implemented and maintained;
d. Provide information on the results of audits to the Saudi Readymix management

The EMS audits are carried in accordance with an annual Audit Plan. The frequency of the audits may be increased
in any area depending on the environmental importance of the activity concerned and the results of previous
audits.

Trained auditor(s) independent of the area to be audited are identified to carry out and report the audit.

The results of the audit are recorded and reviewed during Environmental Management Review meetings.

P. Management Review

The performance of EMS is reviewed to ensure its suitability, adequacy, and effectiveness and to ensure the
continual improvement and in meeting the requirements of ISO 14001standard.

The management review is carried out at least once every twelve months.

The scope of the review shall include the following:


a. Internal EMS audit results.
b. Progress achieved in objectives & Targets.
c. Non-conformances.
d. Corrective and preventive action status.
e. Complaints on EMS.
f. Legal compliance status.
38
Saudi Readymix Concrete Co.
g. Environmental monitoring data.
h. Improvement opportunities.
i. Resource needs.
j. Objectives and targets.
k. Environmental policy.
The result of review is recorded in the form of minutes of the management review meeting. Based on the review,
the Corrective and preventive action is initiated and their effectiveness is assessed and reported in the subsequent
review meeting.

MR is responsible for convening management review meeting and maintaining necessary records. He shall ensure
that the recommendations of the review meeting are implemented.

39
Saudi Readymix Concrete Co.

XVI. SITE RULES

PURPOSE:

To establish the minimum requirements for Housekeeping on all SRMCC site facility thus includes the following
offices, warehouse, or work shop locations.

This procedure applies to all SRMCC employees at their associated designated location, office, warehouse, or
workshop locations.

 Cleanliness and orderliness of the job site is an indication of efficient operations. Poor housekeeping usually
results in loss of time and money to all concerned. Routine good housekeeping can be achieved only by a
cooperative effort by all employees. Conditions of neatness, arrangement, and cleanliness must be made a
part of day-to-day activities rather than depending upon periodic clean-ups to maintain a neat and orderly
job.
 Poor housekeeping practices are a primary leading HSE indicator of inadequate supervision and will result in
recommendation disciplinary action up to and including termination. SRMCC supervisors and managers shall
ensure that:

• Work areas, passageways, stairways, and other areas shall be kept free of debris and materials.

• There shall be unobstructed access always to such areas as electrical panels, safety disconnect switches,
fire extinguishers, emergency exits, etc.

• Containers shall be provided for the collection and separation of waste, trash, oily and used rags, and
other refuse. Containers used for garbage and other oily, flammable, or hazardous wastes, such as caustics, acids,
harmful dusts, etc. shall be equipped with covers.

• Trash, which does not contain any hazardous waste, shall not be stored, or disposed of bags or containers
marked for hazardous waste. Trash disposal containers shall be provided with covers and emptied daily.

• Lunch and eating areas shall be kept clean and free of all food scraps, wrappers, cups, and other disposable
items.

• Work areas shall be cleaned as often as necessary to eliminate tripping and fire hazards. Attention shall
be paid to the areas around elevated work, plant platform, silo platform, ladders, ramps, stairs, and electrical and
mechanical equipment. Tools and loose materials that create a hazard will be removed from these areas.

• Cords, wires, and electrical cables shall be kept in an elevated position to prevent damage by activities or
equipment and to eliminate potential hazards to personnel.

40
Saudi Readymix Concrete Co.
• Spills of oil, grease, or other liquids shall be removed immediately or sprinkled with an absorbent material
and disposed of in accordance with the Environmental Management Plan and application environmental
legislation.

• Workshop scraps, tire pipes and other materials must have allocated lanyard and proper segregation
requires.

• Protruding nails shall either be removed or bent over (immediately as identified) in such a way that they
no longer present a hazard.

• Cleaned lumber shall be stacked in orderly piles. Workers performing this task shall wear heavy gloves
and hard-soled shoes.

• When nails are removed from lumber, the nails shall be collected and disposed of properly to eliminate
puncture hazards.

• Storage and lay down areas shall be kept clean and materials neatly stacked or placed. Material shall be
stacked in a secured manner to prevent toppling or spillage.

• Combustible scrap and debris shall be removed. A safe means shall be provided to facilitate such
movement.

• Appropriate fire -fighting equipment shall be available and readily accessible for the specific type of fire
hazard present.

• Areas within 3 feet of the bottom and top of all ladders, stairways, and other access points are to be free
of any material, equipment, cords, and hoses.

• Ladders shall be properly secured.

• Tool Rooms and Change Rooms shall be maintained in clean, orderly, and hygienic manner.

• All floor openings and holes that present a trip hazard shall be properly colored and marked.

XVII. REPORTING SYSTEM


Basis system OSHA standard, below requirements is strictly compliance.
 Any incident and accident minor or major need to be reported to the Safety Department.

Major incident: Factory manager/ Factory Supervisor must report this incident to the Safety Department
(Amputation, job suffer work related incident, killed, loss of eye)

This procedure must be communicated to all employees (information must be relayed any minor or major incident
factory personnel is required to report the incident).

- FATALITY must be reported with 8hrs.

41
Saudi Readymix Concrete Co.
- Amputation, hospitalize or loss of eyes must be reported within 24hrs.

Method of incident reporting (issues will be undermined simply because we didn’t respond to the situation
accordingly, we required this procedure to be followed in any incident that might arise on your region so could
establish prompt action to any incident situation.

a) Near Miss Incident Process;


Personnel involve/ witness;
- Inform immediate supervisor/manager on the situation ASAP.
Supervisor and manager;
- Inform Regional Safety Officer/ Safety Officer of the situation ASAP.
Safety Regional Officer/ Safety Officer
- Not more than 24hrs release Spot report address to SAFETY MANAGER.
Safety officer/Safety Supervisor/Direct Supervisor of LTI personnel;
- Within 24hrs release incident investigation report base on attached H-10 report format.
- Comprehensive recommendation needs to be circulated through tool box and safety memo not more than
24hrs after the incident occurred.
MANAGEMENT of the Site;
- Address IITS (INSTRUCTION/ INFORMATION/ TRAINING & SUPERVISION) to avoid recurrence of the incident

b) In any case of LTI, Incident or accident which prohibits the worker to work on his job due to the injury that he
sustains during the incident.
LTI Action process:
Personnel involve;
- Inform immediate supervisor/manager on the situation ASAP.
Supervisor and manager;
- Inform safety Regional Officer/Safety Officer of the situation ASAP.
Safety Regional Officer/ Safety Officer;
- Not more than 8hrs release spot report address to SAFETY MANAGER
Safety officer/Safety Supervisor/Direct Supervisor of LTI personnel;
- Within 24hrs release incident investigation report base on attached H-10 report format.
- Comprehensive recommendation needs to be circulated through tool box and safety memo not more than
24hrs after the incident occurred.
MANAGEMENT of the site;
- Address IITS (INSTRUCTION/ INFORMATION/ TRAINING & SUPERVISION) to avoid recurrence of the incident

c) FATALITY Action Process:


Action process:
Supervisor/Manager;
- Inform the Safety Manager.
Safety Manager;
- Inform Safety Officer and Regional Safety Supervisor ASAP.
Safety Officer/Regional Safety Officer
- Visit incident site ASAP and inform Safety Manager by phone.
- Not more than 8hrs release spot report address to SAFETY MANAGER
Safety Officer/Regional Safety Supervisor/ Direct Supervisor of the Fatality

42
Saudi Readymix Concrete Co.
- Within 24hrs to 36hrs release incident investigation report base on attached H-10 report format, (in this
event representative from the head office Safety Department will be involved of the investigation).
- Comprehensive recommendation needs to be circulated through tool box and safety memo not more than
24hrs after the incident occurred.
MANAGEMENT
- Address IITS (INSTRUCTION/ INFORMATION/ TRAINING & SUPERVISION) to avoid recurrence of the incident.

XVIII. FACTORY TRAFFIC PLAN – all factories are designed one way traffic system, demarcation of signage
indicating direction shall be in placed prior to the turning over of the plant.
(ONE-WAY TRAFFIC SYSTEM)

43
Saudi Readymix Concrete Co.
TRAFFIC PLAN

TRUCK WASHI NG &


DUMPI NG AREA

CONTROL SERVICE FOUNDATI ON #01


BATCHING BATCHING
PLANT-1 Ba tc h
PLANT-2

SILO FOUNDATION #02


Ca bin

Ch il le d Wa te r T an k 1

Ch il le d Wa te r T an k 2
Control Ser vice Area
CHIL LER

22.00
IC E PLANT
Ice
Plant

PERIMETER LINE
Admixture

Admixture
Tank #01

Tank #02
Ra w Wa ter Ta nk 2

Ra w Wa ter Ta nk 2
Receiver Room
Material

1.55

Mud Settling Tank #01 Mud Settling Tank #02


OFFICE PORTABLE

7.00
EDS
RO OM
6.40

RAW MATERIALS BIN


PERIMETER LINE

GENSET 1

3.90 3.90 3.90 3.90


11.70

GENSET 2
DIESEL T ANK

GENSET 3 D IESEL T ANK

CONTROL SERVICE FOUNDATION #02


14.00

GROUND HOPPER GROUND HOPPER

SETTLING TANK AREA


Washing Pla nt

AGGREG ATE Aggregate Stock Bays AGGREGATE


STOCKYARD STOCKYARD
AGGREGATE
STOCKYARD

PERIMETER LINE

XIX. EVACUATION PLAN- Access, Passage ways shall be freed from obstruction and shall have an established
MUSTER POINT.

44
Saudi Readymix Concrete Co.
EVACUATION PLAN

CONTROL S ERVICE FOUNDATION #01


BATCHING BATCHING
PLANT-1 PLANT-2
Ba tc h

Ch il le d Wate r Tan k 1
Ca bin

Ch il le d Wate r Tan k 2

SILO FOUNDATION #02


Control Ser vice Area
CH IL LER

22.00
IC E PLANT
Ice
Plant

PERIMETER LINE
Admixture

Admixture
Tank #01

Tank #02
Raw W ater Tank 2

Raw W ater Tank 2


Receiver Room
Material

1.55

Mud Settling Tank #01 Mud Settling Tank #02


OFFICE PORTABLE

7.00
ED S
RO OM
6.40

RAW MATERIALS BIN


PERIMETER LINE

GENSET 1

3.90 3.90 3.90 3.90

GENSET 2
11.70

D IE SEL T ANK

GENS ET 3 DIESEL T ANK

CONTROL SERVICE FOUNDATION #02


14.00

GROUND HOPPER GROUND HOPPER

SETTLING TANK AREA


Washing Plant

AGGREG ATE Aggregate Stock Bays AGGREG ATE


STOCKYARD STOCKYARD
AGGREG ATE
STOCKYARD

PERIMETER LINE

45
Saudi Readymix Concrete Co.

46

You might also like