Insert Contractor’s
logo
JUDUL PROJECT
HSE PLAN
NAMA CONTRACTOR
NAMA KONTRAKTOR
CONTRACTOR’S NAME
NOMOR KONTRAK
CONTRACT NUMBER
DURASI KONTRAK
CONTRACT PERIOD
Pemilik kontrak dalam Pimpinan tertinggi K3LL Pimpinan tertinggi Pimpinan tertinggi K3LL
PDC PDC kontrator yang kontrator
Signed by the contract Signed by highest HSE bertanda-tangan dalam Signed by highest HSE
owner of PDC personnel in PDC kontrak personnel in contracting
Signed by highest company
officials in contracting
company
1. INFORMASI UMUM
GENERAL INFORMATION
Kontraktor akan menempatkan kebijakan K3L miliknya yang sudah ditanda tangani oleh pejabat
tertinggi di perusahaan kontraktor pada halaman ini.
The contractor shall place their SHE policy which has already signed by the highest officials in
contracting companies in this page.
Stipulate how will Contractor inform and ensure that all workers including subcontractor workers
for this project understand the intent of SHE policy both contractor's policy and PDC Policy?
Sebutkan apa yang menjadi target Kontractor dalam pencapaian K3LL terutama dalam
pelaksanaan proyek ini? Isi table dibawah sebagai panduan.
Stipulate what are targets and strategies that Contractor plan to achieve during the duration of
contract? Use the following table for guidance.
EVALUASI PENCAPAIAN HSE PERFORMANCE INDICATOR
Untuk mencapai target diatas, kontraktor akan melampirkan program-program K3LL yang akan
dilaksanakan selama masa durasi kontrak (Lampiran 1).
To achieve the above target, contractor shall enclose HSE programs that will be implemented
within the duration of the contract (Enclosure 1).
Kontraktor akan menempatkan struktur organisasi pelaksanaan proyek dan struktur organisasi
pusat, termasuk menyertakan peran dan tanggung jawab K3L dari masing-masing jabatan pada
halaman ini.
Contractor shall attach Project Organization Structure and Head Office Organization Chart,
including Roles and Responsibilities in SHE for each job position in this page.
Struktur organisasi yang dimasukan harus dilengkapi nama dari pemegang jabatannya disertai
nomor telepon dan alamat email dari nama tersebut.
Organization Structure shall be completed with person name of each job position held, phone
number and e-mail address.
3. PERSYARATAN UMUM
GENERAL REQUIREMENTS
Setiap kontraktor yang bekerja di lingkungan PDC harus mematuhi peraturan-peraturan dibawah,
dan bersedia untuk memenuhi segala persyaratan yang timbul akibat adanya peraturan tersebut.
Kontraktor bertanggung jawab penuh dalam menyediakan sarana dan prasarana yang diperlukan,
sebagaimana diperhitungkan dalam biaya project/kontrak.
Any contractor who works in PDC premises must comply with the rules below, and willing to fulfill
all the requirements that arised because of these regulations. Contractor shall be fully responsible
in providing the necessary facilities and infrastructure, as calculated in the cost of project /
contract.
Pekerja yang bekerja dalam kontrak ini adalah pekerja yang memiliki kompetensi sesuai bidang
pekerjaannya termasuk didalamnya personil K3L kontraktor sesuai dengan yang tercantum dalam
kontrak. Untuk itu kontraktor akan melampirkan dalam lampiran 2, persyaratan kompetensi
pekerja yang berisi sebagai berikut:
Field Personnel who work in this contract are employees who have competences related to their
job description, including the HSE personnel, as stipulated in the contract. Hence the contractor
shall submit in their enclosure 2, personnel competencies requirement list that consist of the
following:
TRAINING MATRIX
Kontraktor akan melampirkan matrix pelatihan serta jadwal rencana dilaksanakannya pelatihan
bagi personil yang akan bekerja dalam pekerjaan yang diberikan sesuai dengan struktur organisasi
pelaksanaan proyek.
Pelatihan meliputi pelatihan wajib serta pelatihan tambahan. Matrix pelatihan berikut jadwal
rencana pelatihan akan dilampirkan dalam lampiran 3.
Contractor shall attach training matrix and its schedule for personnel who work for the project as
mentioned in the Project Organization Structure.
Training shall consist of mandatory and recommendatory. Training matrix as well as training plan
and its schedule shall be attached in enclosure 3.
Kontraktor harus memastikan bahwa seluruh pekerja yang terlibat dalam proyek ini adalah sehat
untuk bekerja. Sebagai bukti sehat untuk bekerja, setiap pekerja kontraktor wajib mengikuti
pemeriksaan kesehatan dari rumah sakit ataupun klinik kesehatan meliputi sebagai berikut:
Contractor shall ensure that all personnel involves in the project are fit for work. As evidence all
contractors’ personnel shall undergo medical examination from hospital/clinic for the following:
A. Umum / General
01. Anamnesis dan riwayat kesehatan
02. Pemeriksaan Fisik termasuk mata dan gigi
03. Pemeriksaan Chest X – Ray
04. Pemeriksaan EKG
05. Pemeriksaan Laboratorium, meliputi pemeriksaan darah lengkap, urine lengkap, fungsi
hati termasuk Hepatitis B, fungsi ginjal, fungsi lemak dan gula darah
B. Food Handler
01. Seluruh pemeriksaan umum, ditambah:
02. Pemeriksaan spesifik: stool culture dan resistance test, Anti HAV total dan IgM HAV.
Kontraktor harus mempunyai aturan-aturan umum berkaitan dengan HSE yang meliputi:
Contractor shall provide its personnel with general HSE rules that consist as follow:
A. Peraturan kontraktor bagi para pekerjanya mengenai kebijakan merokok / general rules for
its employee regarding smoking policy
B. Peraturan kontraktor bagi para pekerjanya mengenai hal-hal yang dilarang termasuk senjata
tajam; alkohol; obat-obatan terlarang / general rules for its employee regarding prohibited
items such weapons; alcohol; drugs
C. Peraturan kontraktor bagi para pekerjanya mengenai bercanda di area kerja / general rules
for its employee regarding horse playing
D. Peraturan kontraktor bagi para pekerjanya mengenai aturan berkendara di jalanan padat
penduduk / general rules for its employee regarding driving in public area
E. Peraturan kontraktor bagi para pekerjanya mengenai aturan berkendara di jalanan padat
penduduk / general rules for its employee regarding driving in public area
Contractor is responsible to provide required PPE for their workers, includes stock for replacement
of damaged or missing PPE.
Spesifikasi dari APD yang akan digunakan oleh kontraktor dalam proyek ini sebagaimana
disebutkan dibawah:
Detail specification of PPE used by contractor for the project as specified in the following list:
Pelindung Kaki
sebutkan sebutkan
Foot Protection
Pelindung Mata
sebutkan sebutkan
Eye Protection
Pelindung Tangan
sebutkan sebutkan
Hand Protection
Pelindung Pendengaran
sebutkan sebutkan
Hearing Protection
Pelindung Tubuh
sebutkan sebutkan
Body Protection
Pelindung Jatuh
sebutkan sebutkan
Fall Protection
APD lain (jika ada)
sebutkan sebutkan
Other PPE (if any)
4. PERSYARATAN KHUSUS
SPECIFIC REQUIREMENTS
Setiap kontraktor wajib menyediakan bagi pekerjanya peraturan mengenai prosedur operasi
standar yang berkaitan dengan aktivitas pekerjaannya sesuai dalam ruang lingkup kontrak untuk
disebutkan dalam dokumen rencana HSE ini.
All contractors shall provide its employee with standard operating procedures related to specific
job as stipulated in their contract to be placed in this HSE plan.
Sebutkan bagaimana sistem pengamatan K3L yang dimiliki kontraktor serta cara penggunaannya
termasuk bagaimana strategi agar seluruh pekerja terlibat aktif dalam sistem tersebut.
Explain what is the HSE observation system that is applied by contractors, how to use it as well as
strategy to have all personnel to buy into the system.
Kontraktor akan melampirkan dalam lampiran 4, catatan atau daftar identifikasi bahaya, penilaian
resiko serta bagaimana upaya untuk membatasinya, spesifik terhadap pekerjaan yang akan
dilakukan sesuai dengan ruang lingkup pekerjaan sebagaimana disebutkan dalam kontrak.
Contractor shall attach in the enclosure 4, register or record of hazard identification, risk
assessment and determining control related to the scope of work as stipulated in the contract.
Sebutkan persyaratan-persyaratan teknis operasional berkaitan dengan aspek K3L yang akan
digunakan oleh kontraktor dalam proyek ini ini meliputi (sebutkan hanya yang berkaitan saja):
Stipulate the technical and operational requirements related to HSE that will be applied by
contractor during the execution of project (mention only that apply for contractor’s services):
A. Persyaratan pekerjaan mengenai sistem ijin kerja termasuk LOTO / work permit system
including Lock Out & Tag Out
B. Persyaratan pekerjaan di ketinggian / working at height requirements
C. Persyaratan kegiatan pengangkatan / lifting activity requirements
D. Persyaratan pekerjaan dengan bahan kimia / chemical related work requirements
Khusus untuk bahan kimia, kontraktor wajib melampirkan dalam lampiran 5, MSDS dari
bahan kimia yang akan digunakan dalam proyek ini
Specific to chemical substances, contractor shall attach in enclosure 5, MSDS of chemical
substances to be applied for the project
E. Persyaratan pekerjaan pengelasan dan pemotongan / welding and cutting requirements
F. Persyaratan pekerjaan dengan radioaktif / radioactive requirements
G. Persyaratan pekerjaan dengan bahan peledak / explosive requirements
H. Persyaratan pekerjaan di ruang terbatas / confined space entry requirements
I. Persyaratan pencegahan kebakaran / fire prevention requirements
J. Persyaratan pengaturan transportasi darat / land transport arrangement requirements
K. Persyaratan pengaturan transportasi laut / sea transport arrangement requirements
L. Persyaratan pengaturan transportasi udara / air transport arrangement requirements
M. Persyaratan peralatan mekanis dan permesinan / mechanical equipment and machinery
requirements
N. Persyaratan peralatan kelistrikan / electrical equipment requirements
O. Persyaratan peralatan perancah / scaffold equipment requirements
P. Persyaratan menggunakan silinder gas / gas cylinder requirements
Q. Persyaratan lainnya (jika ada) / other requirements (if any)
5. PERSYARATAN LINGKUNGAN
ENVIRONMENTAL REQUIREMENTS
Sebutkan bagaimana cara Kontraktor dalam menangani limbah yang dihasilkan dari pekerjaan
yang dilakukan dalam proyek ini ini.
Stipulate hot the contractor manage waste produced from its work during the service of project.
Sebutkan bagaimana cara Kontraktor dalam menangani material B3 yang dihasilkan dari
pekerjaan yang dilakukan dalam proyek ini ini.
Stipulate hot the contractor manage hazardous material produced from its work during the service
of project.
Contractor shall attach in the enclosure 6, environmental monitoring program including all aspect
that have been mentioned in the section 5.1 and 5.2.
Setiap kontraktor wajib menyediakan bagi pekerjanya peraturan mengenai prosedur operasi
standar yang berkaitan dengan kesehatan kerja, termasuk di dalamnya jadwal pemeriksaan
kesehatan secara berkala.
All contractors shall provide its employee with standard operating procedures related to
occupational health including regular medical examination schedule.
Setiap kontraktor wajib menyediakan bagi pekerjanya peraturan mengenai prosedur operasi
standar yang berkaitan dengan kerapihan dan pengaturan tempat kerja termasuk tempat
penyimpanan material.
All contractors shall provide its employee with standard operating procedures related to
housekeeping and workplace arrangement including material storage.
Khusus bagi kontraktor yang menangani penyediaan makanan, sebutkan prosedur mengenai
penyajian makanan yang aman, sejak dimulai dari proses pengiriman bahan, penyimbanan bahan,
pengaturan dan pengolahan serta penyajian.
Specific to food service contractor, stipulate the procedure applied for food service since the
delivery process, storage, food processing and servicing.
7. KOMUNIKASI K3L
HSE COMMUNICATION
Stipulate the contractor’s plan regarding contractor’s management visit to drilling field including
type of information to be shared by the management to all field personnel. PDC requires the
management visit to be conducted at minimum every 6 months.
Sebutkan jenis-jenis pertemuan K3L apa saja yang akan dijalankan oleh kontraktor berikut periode
pertemuan, termasuk di dalamnya pertemuan K3L harian, pertemuan K3L pra-pekerjaan,
pertemuan K3L bulanan, dll.
Stipulate types and period of HSE meeting carried out by the contractor such as daily HSE meeting,
toolbox HSE meeting, monthly HSE meeting, etc.
Sebutkan metode apa saja yang akan digunakan oleh kontraktor dalam menyampaikan informasi
kepada para pekerjanya selama pekerjaan ini, seperti memo K3L, papan pengumuman, majalah,
dll.
Stipulate kind of method applied by the contractor in distributing information related to HSE
during the project, such as through HSE memo, notice board, HSE news, etc.
Kontraktor wajib membuat laporan rutin K3L setiap bulan selama durasi proyek yang meliputi:
Contractor shall submit monthly HSE report during the duration of project that consist of:
01. Jumlah pekerja dan komposisinya (lokal, nasional dan ekspatriat) / total number of employee
(local, national, expatriate)
02. Jumlah jam kerja per bulan / monthly manhours
03. Jumlah km untuk kendaraan ringan maupun berat yang digunakan / monthly km driven for
light vehicle
04. Jumlah kasus kecelakaan yang terjadi yang melibatkan pekerjanya / number of incident case
that involve its personnel
05. Catatan pelaksanaan program K3L sesuai rencana yang terlampir pada lampiran 1 / HSE
program records as specified in enclosure 1
Rencana format laporan dilampirkan dalam lampiran 7 dokumen ini. Laporan dibuat dengan
mengacu pada format laporan bulanan PDC untuk proyek ini. Format laporan PDC sebagaimana
terlampir.
Proposed report form shall be attached in enclosure 7 in this document. Report shall be developed
align with PDC monthly report specific for the project, as guideline.
HSE reward to be distributed by contractor to each personnel shall be classified into two
categories:
Sebutkan jenis-jenis inspeksi rutin berikut periode pelaksanaan yang dilakukan oleh kontraktor
selama pelaksanaan proyek ini.
Stipulate types of regular inspection including its period during the project.
Sebutkan jenis-jenis audit rutin berikut periode pelaksanaan yang dilakukan oleh kontraktor
selama pelaksanaan proyek ini.
Stipulate types of regular audit including its period during the project.
Dalam hal audit terhadap pelaksanaan HSE Plan masing-masing kontraktor, PDC akan melakukan
audit kepada kontraktor di lapangan setiap 6 bulan sekali selama pelaksanaan proyek ini.
In the case of HSE Plan audit onto each contractor’s HSE Plan, PDC will carry field audit to
contractor every 6 months during the duration of project.
9. TANGGAP DARURAT
EMERGENCY RESPONSE
Sebutkan bagaimana cara pelaporan dan investigasi terhadap kecelakaan yang akan digunakan
oleh kontraktor selama pelaksanaan proyek ini.
Stipulate how contractor conduct investigation and reporting to incident involved during the
execution of project.
Sebutkan bagaimana prosedur tanggap darurat yang akan digunakan oleh kontraktor selama
pelaksanaan proyek ini. Lampirkan dalam lampiran 8 mengenai bagan alir komunikasi selama
terjadinya kejadian darurat serta dalam lampiran 9 mengenai informasi kontak yang digunakan
untuk tanggap darurat termasuk rujukan rumah sakit serta rencana evakuasi.
Stipulate how contractor will response to emergency case during the execution of project. Attach
in the enclosure 8 regarding emergency response flowcharts in case of emergency as well as
enclosure 9 regarding emergency response contact number including the referral hospital and
evacuation plan proposed.
JUDUL PROJECT
LAMPIRAN 1
PROGRAM K3L / HSE PROGRAM
Tabel diatas ini hanya contoh / the above table is sample only
JUDUL PROJECT
LAMPIRAN 2
PERSYARATAN KOMPETENSI PEKERJA / PERSONNEL COMPETENCIES REQUIREMENT
Tabel diatas ini hanya contoh / the above table is sample only
JUDUL PROJECT
LAMPIRAN 3
MATRIX PELATIHAN / TRAINING MATRIX
Tabel diatas ini hanya contoh / the above table is sample only
JUDUL PROJECT
LAMPIRAN 4
DAFTAR IDENTIFIKASI BAHAYA / HIRADC
Tingkat Resiko
Tingkat Resiko
Kemungkinan
Kemungkinan
Consequence
Consequence
No
Konsekuensi
Konsekuensi
Probability
Probability
Risk Level
Risk Level
Activities Hazards Prevention / Control Measures / Remark
Mitigations
LAMPIRAN 5
MSDS
Lampirkan list MSDS dari bahan kimia yang akan digunakan selama proyek ini dan sertakan salinannya
setelah lembar berikut.
Please attach MSDS of chemical being used for the project as well as enclosed copy of MSDS after this
page.
JUDUL PROJECT
LAMPIRAN 6
PROGRAM PEMANTAUAN LINGKUNGAN / ENVIRONMENTAL MONITORING PROGRAM
Durasi
Cara Pemantauan
Indikator Lingkungan / Sumber / Pemantauan Pemantauan 1 Pemantauan 2 Pemantauan 3
No Method of
Environmental Indicator Source Duration of 1st Monitoring 2nd Monitoring 3rd Monitoring
Monitoring
Monitoring
Sampah Organik
Organic Waste
Sampah In-organik
In-organic Waste
Limbah B3
Hazardous Waste
Limbah cair
Waste water
Kebisingan
Noise
Emisi Udara
Emission
Tabel diatas ini hanya contoh / the above table is sample only
LAMPIRAN 7
FORMAT LAPORAN K3L BULANAN / MONTHLY HSE REPORT
Tabel diatas ini hanya contoh / the above table is sample only
LAMPIRAN 8
BAGAN ALIR TANGGAP DARURAT / EMERGENCY RESPONSE FLOW CHART
Incident,
Person injured
YES
NO
Medivac required?
YES
Diagram diatas ini hanya contoh / the above flowchart is sample only
LAMPIRAN 9
KONTAK TANGGAP DARURAT / EMERGENCY CONTACT
Tabel diatas ini hanya contoh / the above table is sample only