MODUL III : SISTIM MANAJEMEN GALANGAN KAPAL (1)

1. Manajemen Galangan Kapal


2. Proses Bisnis Galangan Kapal
3. Sistim Manajemen Galangan Kapal
4. Production Planning & Control
5. Pengendalian Proses
6. Material Control

2
MANAJEMEN GALANGAN KAPAL
Manajemen : pengelolaan kegiatan-kegiatan usaha melalui langkah-langkah Organizing,
Planning, Controlling, dan Directing, untuk mencapai sasaran yang telah ditetapkan. Skala/
ukuran dari manajemen tergantung dari ruang lingkup proses bisnis dari usaha yang dikelola.

© 2018 Tjahjono Yudo 3


PROSES BISNIS GALANGAN KAPAL
Marketing Des ign Dept. Production Planning & Purchas ing Dept. Production Dept. Quality As s . Dept.
Dept Control Dept.
Des ign Standard
Construction Standards
Inquiry Quality Standards
Building Program
Man-hour Loading
Technical Specification & Rough
Arrangem ent

Cos t Es tim ation


Quo tation
Negotiation DESIGN CONTROL
Contract PRODUCTION PLANNING
Intial Des ign
Budgetting (phas e I)
MATERIAL CONTROL
Delivery of intial Des ign to yard
Des ign Office

Budgetting (phas e II) PROCES CONTROL QUALITY CONTROL

Man-hour planning Sub-contracting Quality As s . Policy


Ins pection &
Cons truction Integrated Master scheduling
Material purchas ing lis t Quality Standard
Policy s chedule NDT Procedure
for Hull cons truction Each scheduling
Yard des ign for Outfitting
Audit
Shipbuilding procedure Man-pow er distribution
Production Mouldloft Negotiation
for Hull Cons truction Corrective Action
drawing Purchas e order for
Material
Shipbuilding procedure m aterials
reques t lis t Outf itting f ab. shop
for Hull Outfitting
Material delivery to Fabrication shop
Shipyard Sub. Assembly shop
Outfitting code Steel m aterial Assembly shop
Palleting table Warehous ing Outfitting m aterial Erection
Paint Launching
Des patch of m aterials of each Outf itting
s hop Delivery
Fabrication Productivity Control
Guarantee
Production Standard working tim e Af ter sales
Cons truction job order s ys tem
Man-hour
Cos t collection COST CONTROL Man-hour collecting
Divis ion of m an-hour to
Cos t reduction each s tage/ s hop Man-hour reduction

Cos t es tim ation MAN-HOUR CONTROL Man-hour es tim ation

© 2018 Tjahjono Yudo 4


SISTIM MANAJEMEN GALANGAN KAPAL

5
PRODUCTION PLANNING & CONTROL (1)

6
PRODUCTION PLANNING & CONTROL (2)

7
PENGENDALIAN PROSES (1)

© 2018 Tjahjono Yudo 8


PENGENDALIAN PROSES (2)
TARGET CONTROL
POSITION TOOLS FOR CONTROL PROCESS
Schedule Cost
Integrated Schedule  Process Control
PROJECT MANAGER
3 S-Curve   Man Hour Control

Master Schedule  Process Control


MANAGER
3 S-Curve   Man Hour Control

Monthly Schedule  Process Control


SHOP CHIEF
3 S-Curve   Man Hour Control

Weekly Schedule  Process Control


CHIEF OF SECTION
3 S-Curve  Man Hour Control