Professional Documents
Culture Documents
CATALOGUE
Version 1
DISCLAIMER
The copyright to this catalogue vests in AEL Intelligent Blasting Limited. Any unauthorised reproduction, adaptation, translation, publication, distribution or dissemination of a whole
or any part of this catalogue, without the written consent of AEL Intelligent Blasting Limited will constitute an act of copyright infringement. AEL Intelligent Blasting Limited reserves
its rights to take civil and/or criminal action against such infringement. AEL Intelligent Blasting Limited disclaims all warranties and liabilities for the use of this catalogue and the
information contained herein and assumes no responsibility for any errors that may appear in this document. AEL Intelligent Blasting Limited makes no commitment to update the
information contained here and may make changes at any time without notice. Other product and corporate names may be trademarks or registered trademarks of other companies
and are used only for explanation and to the owner’s benefit, without intent to infringe.
© AEL Intelligent Blasting Limited
Product Catalogue 2018 03
Contents
A proud member
of the AECI Group
AEL Intelligent Blasting is a proud member of From our own manufacturing plants, AEL produces
the JSE- listed AECI Group, domiciled in South world-class ammonium nitrate in both dense and porous
Africa. AEL is a leading developer, producer and prill forms as well as ammonium nitrate solution. AEL's
supplier of commercial explosives, initiating scalable bulk emulsion manufacturing plants provide the
group with the ability to deploy rapidly to new regions
systems and blasting services for mining,
and from them, to produce a wide series of emulsion
quarrying and construction markets in Africa explosive products. AEL also supplies a comprehensive
and selected international markets. AEL is the series of packaged explosives.
largest supplier of explosives technology and
initiating systems in Africa. Through its in-house engineering division, AEL designs
and builds Mobile Processing Units (MPUs) for surface
With its head office in Johannesburg, South Africa, AEL and underground mining, bulk emulsion manufacturing
was established in 1896 and has over the years become plants and modular initiating systems assembly plants.
one of the world’s leading suppliers of explosives and In addition, AEL offers underground mobile and fixed
initiating systems. The AEL group contains a number emulsion pumping systems.
of subsidiary companies and these have offices and
production facilities in over 20 countries. Through AEL's IntelliBlast™ total value proposition, this
holistic and flexible approach deploys blasting services
Using world-class technologies, AEL unearths wealth that extract optimum value from any blasting operation,
in the countries in which it operates, providing world with its combination of products, services and solutions.
class mining solutions in all key mining, quarrying These include prime, load, tie and shoot (PLTS) as well
and construction applications such as open pit, open as Rock-on-Ground contracting.
cast, underground massive, underground narrow reef,
dimensional stone and aggregate stone quarrying. AEL’s Blast Consult team offers expert technical
services across a wide range of related disciplines
AEL offers the latest generation of products and services such as blast monitoring, design, timing, fragmentation
for blasting operations. These include bulk explosives, analysis, technology conversion, i-Mining productivity
packaged explosives, electronic and conventional programmes and blasting consulting services to
initiating systems, blasting accessories and delivery providing training in basic blasting principles.
systems as well as technical services via AEL’s technical
arm; Blast Consult. AEL partners, invests and contributes to economies in
regions where it operates, by meticulously caring for
both people and the environment to unearth wealth for
current and future generations.
AEL
SAFETY
A philosophy that matters
to us most…
ZERO HARM is a belief system which moves beyond the immediate contingent of AEL employees but also includes
all those who AEL interacts with. Our commitment to this belief system is reflected in the last 10 years as seen in the
graphic representation below:
0,8
0,7
0,6
AEL
0,5
INTELLIGENT
BLASTING 0,4
TREND 0,2
0,1
0,0
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
If they should function when not intended to do so, the AEL always applies strict safety testing regimes to the
unintended consequences do not bear contemplation. prototypes and final products to ensure they meet our
As with all hazardous material, there are good practices standard, often well above the minimum legislated
which should be followed when handling explosive standard for the countries we operate in. This translates
precursors or applying any explosive products and, for to products that have a solid safety record built up over
these reasons, we urge all our customers to obtain the time. A practical example of this is the AEL DigiShot®
required training; available through AEL; before working Electronic Detonator series of products which have not
with any of our products. Always ensure you perform any experienced an unintended initiation during mining use
blasting within the legal framework for the country that in over 24 Million detonators sold.
you operate in.
Our packaging is designed and tested to conform to
Because of the attributes described in the preceding UN standards. This ensures that the receiving country
paragraph, the design and manufacture of energetic receives quality product in globally accepted packaging
materials systems must be performed with utmost that can be tracked and traced back to the manufacturer.
regard to the hazard inherent to these products. Our
Research and Development engineers start at the design Be assured that AEL Intelligent Blasting value the safety
phase with safety in mind and build on this concept of our customers and the communities in which they
through development, testing and final manufacture. operate. Our research and development on evolving
technologies are driven with a holistic view of safety,
environment and efficiency.
CHRISTO PELTZ
Company Risk and Safety Manager
ms Millisecond
AEL's suite of Surface Bulk Explosives is amongst the − The cap-sensitive UG100 emulsion continues to
best researched and developed in the market. With impress customers in the narrow reef environment as
the environment foremost in mind, the Eco series has a cost-effective replacement for packaged explosives.
been specifically developed to optimise the available In conjunction with industry leading delivery systems
benefits to surface mining through the use of recycled such as the Vertical Drop and portable charging units
oils. The Eco series also provides products with high (PCU), safety, efficiency, handling and loading is
energy's and adequate in-hole stability. AEL's highly improved significantly.
skilled team, combined with its broad series of products,
solutions, equipment and technical resources have These emulsion technologies and AEL's initiating
made the company an acknowledged leader in the global systems combine to optimise safety while improving
explosives arena. blasting efficiencies in a variety of surface and
underground mining applications. Even under the most
Underground Bulk Explosives and its respective trying blasting conditions, AEL's proven technologies
pumping and delivery systems are continuously evolving deliver tangible benefits to its customers across the
through the efforts of AEL's Research and Development entire mining operation.
department. New and improved emulsion formulations,
delivery systems and value-add services, targeted Through its strategically placed network of depots
to this industry, are continuously being realised. and manufacturing facilities, AEL is able to provide
a full series of explosives and services to the most
Two examples which are changing the use of traditional remote customers in the African and International
explosives are: markets. This includes a wide series of specifically
formulated Emulsions, Watergels, Drygels, Anfex and
− AEL’s series of specially formulated products that Non-detonating solutions.
can be effectively placed in vertical up-holes;
appropriately named “sticky” formulations. These
products offer customers a competitive edge in cost
effective up-hole and development blasting,
EXPLOSIVES
AEL's Surface Bulk Explosives are specifically Our base emulsion has passed the UN “Hazardous
designed with the end-user in mind. A holistic Goods” series of tests. This enables the transportation
view of safety, environment and efficiency is and handling of base emulsions (S100, S200, and S300) as
the driving force behind our formulations. We an un-sensitized product.
consider surrounding communities, geological
anomalies and the environmental impact to
name but a few.
Emulsion Offerings
SURFACE BULK PRODUCTS
Doped (mixed with TGAN and sensitised) or Blend (sensitised with TGAN)
DOPED: BLENDED:
20 %, 30 % or 35 % TGAN 50 %, 54 %, 57 %, 60 %, 64 %, 71 %, 74 %
Minimum hole diameter: or 80 % TGAN
75–100 mm
Minimum hole diameter:
RATIOS 150-250mm Water resistance is good
@
50 % and 54 % Water resistance is poor
@
57 %, 60 %, 64 %, 71 %, 74 % and 80 %
S100 SERIES
PRODUCT SERIES
PRODUCT S100 S120 S130 S135 S150 S154 S157 S160 S164 S171 S174 S180
Ammonium
Nitrate 100 80 70 65 50 46 43 40 36 29 26 20
Emulsion (%)
Minimum Hole
75 75 100 100 229 229 200 150 150 150 150 150
Diameter (mm)
Maximum
40
Hole Depth (m)
Water
Excellent Good
Resistance
Typical In-hole
1.00-1.25 1.35 1.30 1.25 1.20 1.10 1.05 1.00
Density (g/cm3)
Proposed
400 g Booster
Primer
Ideal Delivered
2.1- 2.3- 2.4- 2.5- 2.6- 2.8- 2.7- 2.7- 2.6- 2.5- 2.5- 2.4-
Energy (MJ/kg)
2.3 2.5 2.6 2.7 2.8 3.1 3.0 2.9 2.8 2.7 2.7 2.6
@ 100 Mpa
*RWS @ 95- 103- 107- 111- 115- 123- 121- 119- 117- 112- 109- 107-
100 Mpa 99 107 111 115 119 127 125 123 121 116 114 111
149- 163- 169- 174- 180- 210- 198- 186- 176- 154- 143- 135-
*RBS @ 100 Mpa
153 167 173 178 184 214 202 190 180 158 147 139
Notes:
1. The availability of the above offering is subject to MPU configuration
2. Please consult AEL Technical Services when loading holes deeper than 40 m
3. In-hole densities of emulsions vary with depths. Please contact your regional sales office for assistance in finding the best product fit for
your application
4. Primer size is dependent on hole diameter. Please contact your regional sales office for guidance on primer selection
* The Relative Weight and Bulk Strengths are relative to ANFO (=100 %) at a density of 0.80 g/cm3. The figures have been determined using the
VIXEN-i detonation code
− S100 Eco blends are NOT for use in underground − Do not use in hot-holes that are in excess of 80 °C
mines or reactive ground conditions (Thermal stability of emulsions are dependent on the
flashpoint of the diesel/oil used within the country you
FEATURES operated in. Ask your regional office for the operating
value relevant to the region you operate in.)
− Safe to handle
INITIATION
PRODUCT SERIES
PRODUCT S100 ECO S120 ECO S130 ECO S135 ECO S150 ECO
Ammonium Nitrate
100 80 70 65 50
Emulsion (%)
Minimum Hole Diameter
75 75 100 100 229
(mm)
Maximum Hole Depth (m) 40
Notes:
1. The availability of the above offering is subject to MPU configuration
2. Please consult AEL Technical Services when loading holes deeper than 40 m
3. In-hole densities of emulsions vary with depths. Please contact your regional sales office for assistance in finding the best product fit for
your application
4. Primer size is dependent on hole diameter. Please contact your regional sales office for guidance on primer selection
* The Relative Weight and Bulk Strengths are relative to ANFO (=100 %) at a density of 0.80 g/cm3. The figures have been determined using the
VIXEN-i detonation code
AEL's S200 Eco base emulsion is used in surface − In normal blasting applications, the booster is
mining applications within most geological usually toe-primed and initiated electronically or with
conditions but can also be used in hot-hole shock tube
blasting applications limited to a 35 % dope
with TGAN. The formulation is able to inhibit the − In hot-hole blasting applications, the boosters
thermal effect within the hot-hole blast column are usually collar primed and initiated with
detonating cord
in order to provide a safety window during which
charging operations can continue. In addition to − The use of detonating cord and/or packaged
this, AEL have designed the “Hot- Hole Monitor” explosives as primers is not recommended
as an early warning system to supplement safety,
specifically when blasting in hot-holes or reactive SPECIAL PRECAUTIONS
ground. S200 Eco has excellent water resistance
with a brown to black appearance attributed to Base emulsions are classified as a 5.1 oxidiser and are not
the recycled oil content within the formulation. sensitive to normal stimuli, but under certain conditions
It can be doped with Technical grade Ammonium they can explode, and may result in accidental detonation.
Nitrate (TGAN) to form various blends as − Handle with care
outlined in the tables below. The sensitised S200
Eco product has a Velocity of Detonation (VOD) in − Although S200 Eco does not burn easily, it must be
excess of 4500 m/s (subject to confinement and kept clear of flames and intense heat
ground conditions).
− Collar priming is recommended in hot-hole conditions
APPLICATION
− When blasting in hot-hole applications, S200 Eco
S200 Eco base emulsion is delivered to mine sites in
should be used in conjunction with AEL’s Hot-Hole
tankers and offloaded into silos or the Mobile Processing
Monitor to enhance on-bench safety
Unit (MPU). The MPU mixes and sensitises the required
explosive blend. STORAGE
− Charging procedures must be followed at all times − The shelf life of the base emulsion is 12 weeks from
the date of manufacture
− S200 Eco can either be pumped or augured,
depending on the ratio of TGAN doped/blended in the − Maximum sleep time for dopes up to 35% is 21 days.
explosive Although water resistance is good, sleep time is
not recommended for blends of 50% and above in
− S200 Eco can be used in dry or de-watered blast- wet conditions
holes depending on the TGAN ratio doped/blended
in the emulsion − Sleeping is not recommended in hot-hole conditions
− S200 Eco blends are NOT for use in − The shelf life of the aqueous sensitiser is 6 months
underground mines from the date of manufacture
− Not to be used in reactive ground applications − The emulsion and sensitiser should be stored separately
FEATURES BEST PRACTICE
− Safe to handle − S200 Eco can be used in hot-holes (The use of Hot-
Hole monitors are strongly advised)
− On-bench blending of explosives
− Collar priming is advised
− A series of explosive blends to choose from, offering
variable explosives properties for energy partitioning − Doping is not recommended in hot-hole blasting
applications without the use of a hot-hole monitor
INITIATION
− S200 Eco is initiated with Pentolite boosters that are − Use blended product in heavy friable or jointed ground
suitable for the respective hole diameter (Not for hot-holes)
PRODUCT SERIES
PRODUCT S200 ECO S220 ECO S230 ECO S235 ECO S250 ECO S254 ECO
Ammonium Nitrate
100 80 70 65 50 46
Emulsion (%)
Minimum Hole
75 75 100 100 229 229
Diameter (mm)
Maximum Hole Depth
40
(m)
Sensitised Product
1.00-1.25
Density (g/cm3)
Ideal Delivered
Energy 1.9-2.3 2.1-2.5 2.2-2.6 2.3-2.7 2.4-2.9 2.5-3.0
(MJ/kg) @ 100 Mpa
Notes:
1. The availability of the above offering is subject to MPU configuration
2. Please consult AEL Technical Services when loading holes deeper than 40 m
3. In-hole densities of emulsions vary with depths. Please contact your regional sales office for assistance in finding the best product fit for
your application
4. Primer size is dependent on hole diameter. Please contact your regional sales office for guidance on primer selection
* The Relative Weight and Bulk Strengths are relative to ANFO (=100 %) at a density of 0.80 g/cm3. The figures have been determined using the
VIXEN-i detonation code
S300 Series
Reactive Ground
− Charging procedures must be followed at all times − Sleeping of the product is not recommended due to
safety requirements but can be achieved dependent on
− S300 can either be pumped or augured, depending on compatibility and sleep time testing
the ratio of TGAN doped/blended in the emulsion
− The shelf life of the aqueous sensitiser is 6 months
− S300 blends are NOT for use in underground mines from the date of manufacture
− Suitable for use in reactive ground with more than − The emulsion and sensitiser should be
1 % but less than 6 % pyrites, dependent on stored separately
compatibility testing
BEST PRACTICE
FEATURES
− Use blended product in heavy friable or jointed ground
− Safe to handle
− Ensure that toe loading occurs in wet holes in order to
− On-bench blending of explosives displace water
− A series of explosive blends to choose from, offering − Do not use in hot-hole blasting applications (Thermal
variable explosives properties for energy partitioning stability of emulsions are dependent on the flashpoint
of the diesel/oil used within the country you operate
INITIATION in). Ask your regional office for the operating
temperature relevant to your region or area.)
− S300 is initiated with Pentolite boosters that are
suitable for the respective hole diameter
PRODUCT SERIES
Notes:
1. The availability of the above offering is subject to MPU configuration
2. Please consult AEL Technical Services to determine reactivity levels, in order to have the most suitable product for the relevant conditions
3. Please consult AEL Technical Services when loading holes greater than 40 m
4. In-hole densities of emulsions vary with depths. Please contact your regional sales office for assistance in finding the best product fit for
your application
5. Primer size is dependent on hole diameter. Please contact your regional sales office for guidance on primer selection.
* The Relative Weight and Bulk Strengths are relative to ANFO (=100 %) at a density of 0.80 g/cm3. The figures have been determined using the
VIXEN-i detonation code
− S300 Eco can either be pumped or augured, depending − Sleeping of the product is not recommended due to
on the ratio of TGAN doped/blended in the emulsion safety requirements but can be achieved dependent on
compatibility and sleep time testing
− S300 Eco can be used in dry or de-watered blast-
holes depending on the TGAN ratio doped/blended in − The shelf life of the aqueous sensitiser is 6 months
the emulsion from the date of manufacture
− S300 Eco blends are NOT for use in underground mines − The emulsion and sensitiser should be stored separately
− Suitable for use in reactive ground with more than BEST PRACTICE
1 % but less than 6 % pyrites, dependent on
compatibility testing − Use blended product in heavy friable or jointed ground
PRODUCT SERIES
PRODUCT S300 ECO S320 ECO S330 ECO S335 ECO S350 ECO
Ammonium Nitrate Emulsion
100 80 70 65 50
(%)
Minimum Hole Diameter
75 75 100 100 230
(mm)
Maximum Hole Depth (m) 40
Notes:
1. The availability of the above offering is subject to MPU configuration
2. Please consult AEL Technical Services to determine reactivity levels, in order to have the most suitable product for the relevant conditions
3. Please consult AEL Technical Services when loading holes greater than 40 m
4. In-hole densities of emulsions vary with depths. Please contact your regional sales office for assistance in finding the best product fit for
your application
5. Primer size is dependent on hole diameter. Please contact your regional sales office for guidance on primer selection
* The Relative Weight and Bulk Strengths are relative to ANFO (=100 %) at a density of 0.80 g/cm3. The figures have been determined using the
VIXEN-i detonation code
S300 Supreme
Highly Reactive Ground
PRODUCT SERIES
Pumping Stages 6
Notes:
1. The availability of the above offering is subject to MPU configuration
2. Please consult AEL Technical Services when loading holes greater than 40 m
3. In-hole densities of emulsions vary with depths. Please contact your regional sales office for assistance in finding the best product fit for
your application
4. Primer size is dependent on hole diameter. Please contact your regional sales office for guidance on primer selection
* The Relative Weight and Bulk Strengths are relative to ANFO (=100) at a density of 0.80 g/cm3. The figures have been determined using the
VIXEN-i detonation code
Notes
GS123 (Green)
Minimum Hole
32 mm 45 mm 45 mm 45 mm 45 mm 45 mm
Diameter
UG100 Series
− Charging procedures must be followed at all times − The shelf life of the aqueous sensitiser is 6 months
from the date of manufacture
− UG100 is NOT for use in surface mines. UG100 should
not be used in reactive ground conditions − The emulsion and sensitiser should be
stored separately
FEATURES
BEST PRACTICE
− Safe to handle
− Priming is required when critical densities
− At the face mixing and manufacturing of explosives are exceeded
that become sensitised inside the blast-hole
− Base emulsion and sensitiser must be
− A range of densities to choose from to vary stored separately
energy output
− Avoid horizontal pumping exceeding 50 m in length
− High VOD
INITIATION
PRODUCT SERIES
Pumping Stages 6
Primer 8 D Detonator
Notes:
1. In-hole density requirements vary with application, hole-diameter and hole-length. Please contact your regional sales office for assistance in
finding the best product fit for your application
2. Primer size is dependent on hole diameter. Please contact your regional sales office for guidance on primer selection
* The Relative Weight and Bulk Strengths are relative to ANFO (=100 %) at a density of 0.80 g/cm3. The figures have been determined using the
VIXEN-i detonation code
UG101S Series
PRODUCT SERIES
Sensitiser GS30
Pumping Stages 4
Notes:
1. The availability of the above offering is subject to MCU configuration
2. In-hole density requirements vary with application, hole-diameter and hole-length. Please contact your regional sales office for assistance in
finding the best product fit for your application
3. Primer size is dependent on hole diameter. Please contact your regional sales office for guidance on primer selection
* The Relative Weight and Bulk Strengths are relative to ANFO (=100 %) at a density of 0.80 g/cm3. The figures have been determined using the
VIXEN-i detonation code
UG201S Series
− Charging procedures must be followed at all times − The shelf life of the aqueous sensitiser is 6 months
from the date of manufacture
− UG201S is NOT for use in surface mines UG201S
should not be used in reactive ground conditions − The emulsion and sensitiser should be
stored separately
FEATURES
BEST PRACTICE
− Safe to handle
− Boosters should be used
− At the face mixing and manufacturing of explosives
that become sensitised inside the blast-hole − Priming is required in development
INITIATION
PRODUCT SERIES
Sensitiser GS30
Pumping Stages 4
Notes:
1. The availability of the above offering is subject to MCU configuration
2. In-hole density requirements vary with application, hole-diameter and hole-length. Please contact your regional sales office for assistance in
finding the best product fit for your application
3. Primer size is dependent on hole diameter. Please contact your regional sales office for guidance on primer selection
* The Relative Weight and Bulk Strengths are relative to ANFO (=100 %) at a density of 0.80 g/cm3. The figures have been determined using the
VIXEN-i detonation code
UG300 Series
Reactive ground
− UG300 can be used in reactive ground conditions − The shelf life of the aqueous sensitiser is 6 months
with pyrite levels less than 6 %, dependent on from the date of manufacture
compatibility testing
− The emulsion and sensitiser should be
FEATURES stored separately
− A range of densities to choose from to vary − Base emulsion and sensitiser must be
energy output stored separately
PRODUCT SERIES
Pumping Stages 6
Primer 8 D Detonator
Notes:
1. In-hole density requirements vary with application, hole-diameter and hole-length. Please contact your regional sales office for assistance in
finding the best product fit for your application
2. Primer size is dependent on hole diameter. Please contact your regional sales office for guidance on primer selection
* The Relative Weight and Bulk Strengths are relative to ANFO (=100 %) at a density of 0.80 g/cm3. The figures have been determined using the
VIXEN-i detonation code
UG300S Series
Reactive ground
INITIATION
Base emulsions are classified as non-detonable and are
not sensitive to normal stimuli, but under certain conditions
they can explode, and may result in accidental detonation.
PRODUCT SERIES
Sensitiser GS30
Pumping Stages 4
Notes:
1. The availability of the above offering is subject to MCU configuration
2. In-hole density requirements vary with application, hole-diameter and hole-length. Please contact your regional sales office for assistance in
finding the best product fit for your application
3. Primer size is dependent on hole diameter. Please contact your regional sales office for guidance on primer selection
* The Relative Weight and Bulk Strengths are relative to ANFO (=100 %) at a density of 0.80 g/cm3. The figures have been determined using the
VIXEN-i detonation code
Compatibility Matrix
DONOR
Magnum® Control X X X X X X
Magnum® Frag X X X X X X
Magnum Plus
®
X X X X X X
**Electronic Delay
X
Detonators
Instantaneous Electric
X
Detonator (IED)
Pentolite Primers X X X X X X
* UG200 can be manufactured as a permitted product (requiring PE Permitted and Statsafe Detonators as a donor only)
** All variants
Notes
Packaged
Explosives
Our strategically placed network of regional Anfex® is a packaged, free flowing Technical Ammonium
depots and integrated supply chain provides a Nitrate (TGAN) and fuel oil blasting agent for use in
full series of explosives and services to the most commercial blasting operations.
remote customers in African and International
markets. This portfolio includes a wide series of
specifically formulated Emulsions, Watergels,
Drygels, Anfex® and non-detonating solutions.
Magnum®
Watergel Series
APPLICATION
Although Magnum® products are not very sensitive to − Abide by the legal storage requirements for the region
normal stimuli they are powerful explosives and the
effects of an accidental detonation can be catastrophic. − Always rotate stock-first in, first out (FIFO)
FEATURES
PRODUCT SERIES
Primer 6 D Detonator
Magnum®
Drygel Series
APPLICATION FEATURES
Magnum® Control can be used in easy breaking − Improved rheology compared to conventional
conditions or areas where over break needs to be Watergel cartridges
minimised. Typical applications include, ledging,
undercutting, blasting of cubbies or where breaking − Due to the consistency of the cartridges the product
conditions do not require high energy. loads and tamps well, even in up-holes
Magnum® Frag can be used where good fragmentation − Magnum® Drygel is designed to provide excellent
and full face advance is required. Typical applications fragmentation
include narrow reef stoping.
− The energy partitioning within the offered series of
Magnum® Plus can be used in hard breaking products enables the user to select the appropriate
conditions where additional energy is required. Typical product for the task at hand
applications are tunnelling, UG2 stoping and other tough
breaking conditions. − Magnum® Drygel has excellent gap sensitivity
Magnum® Drygel products are not for use in − Good post detonation fume characteristics
underground coal mines.
STORAGE
SPECIAL PRECAUTIONS
− The shelf life of the product is 12 months from the
Although Magnum® products are not very sensitive to date of manufacture. Legal storage in customers
normal stimuli they are powerful explosives and the magazine is 6 months
effects of an accidental detonation can be catastrophic.
− Store in a segregated, approved, cool, well-ventilated,
− Handle with care dry and labelled area
− Keep away from flames, sparks and all sources − Keep packaging sealed until ready for use
of ignition
− Abide by the legal storage requirements for the region
− Keep detonators stored away from explosives
− Always rotate stock-first in, first out (FIFO)
− Damage to the product could lead to misfires
BEST PRACTICE
− Consult with AEL Explosives Representative before
attempting to destroy old/unwanted products − Use with AEL 8 D strength detonators
PRODUCT SERIES
Primer 6 D Detonator
Magnum® Buster
ZAMBIA
APPLICATION
− Keep away from all sources of ignition − Keep packaging sealed until ready for use
− Consult with AEL representatives before destroying old/ − Abide by the legal storage requirements for the region
unwanted products
− Always rotate stock-first in, first out (FIFO)
FEATURES
BEST PRACTICES
− Safe to use
− Use with AEL 8 D strength detonators
− Easy loading
− Always embed detonator charge firmly into at least one-
− High performance third of the cartridge
− Suitable for use in wet holes − When using detonating cord, a knot in intimate contact
with the cartridge is recommended
− Stiffness of Magnum® Buster does not lend itself to
compaction in the hole − When using for secondary blasting, ensure that a
minimum product layer of 25mm is maintained
− Waterproof
PRODUCT SERIES
MAGNUM® BUSTER-ZAMBIA
Water Resistance Excellent
Velocity of Detonation
5000-6000
(m/s) (VOD)
Ideal Delivered Energy
2.1–2.5
(MJ/kg) @ 100 Mpa
SPECIALISED EXPLOSIVES
Magnum®
PB Control 40/60
Magnum® PB Control 40/60 was designed for
perimeter control in tunnelling applications.
Due to the rigid nature of the unit after the
clip is attached, it is easy to load and presents
more resistance to ejection during the blast.
This ensures that the unit remains in the hole
for execution of its purpose, which is to protect
the integrity of the sidewall and hanging
wall in tunnelling operations. The product is
packaged in printed sleeves.
APPLICATION
STORAGE
The cartridge is used in conjunction with the cartridge
connector in order to create a firmer unit for loading into − The shelf life of the product is 12 months from the
blast-holes. Used for perimeter control in underground date of manufacture. Legal storage is 6 months in
blasting applications. customers magazine
− Waterproof
PRODUCT SERIES
Primer 8 D Detonator
Splitex®
APPLICATION
SPECIAL PRECAUTIONS
INITIATION
Although Splitex® as a product is not very sensitive to
normal stimuli it is a powerful explosive and the effects − The minimum initiator for Splitex® is a 6 D detonator
of an accidental detonation can be catastrophic. or 5 g/m detonating cord
− All mining precautions for hazardous goods must − Abide by the legal storage requirements for the region
be followed
− Always rotate stock-first in, first out (FIFO)
FEATURES
BEST PRACTICE
− Safe to use
− Use a sharp, smooth blade for cutting the
− High velocity of detonation-up to 7000 m/s detonating cord
− Cap sensitive explosives cartridges in a continuous − Use correct split factor for optimal results
length around a string of detonating cord. A strainer
line is crimped on the outside to support the weight of
the cartridge column.
PRODUCT SERIES
SPLITEX®
Cartridge Density (g/cm3) 1.18-1.25
InstaStem™
APPLICATION
FEATURES
InstaStem™ is a non-detonating, self-stemming rock
breaking cartridge that is suitable for both soft and hard − Safe to use
rock and concrete breaking. The boosters are suitable for
use in conjunction with the cartridges for additional energy, − Excellent water resistance
as required. The boosters do not have an initiation system
and cannot be used without the cartridges. − Accelerates loading time by eliminating the need
for stemming
SPECIAL PRECAUTIONS
− Allows for continuous operations
− Do not use InstaStem™ Cartridges without valid and
up-to-date User-Training − Significant improvement in commodity recovery
and yields
− Always wear appropriate PPE
(Personal Protective Equipment) SHOCK TUBE ADAPTOR BLASTING CARTRIDGE
− Use only certified "explosives-approved" continuity This blasting Cartridge provides a flexible solution where
testers and shot blasters an adaptor is provided within the cartridge to enable
the end-user to insert a detonator. This will provide a
− Whilst InstaStem™ Cartridges are insensitive to cell sequential firing capability where the burning front of
phones and walky-talkies, it is good practice to avoid the shock tube can be used to create initiation intervals.
using these items while charging up a drill-hole Classified as 1.4S UN 0349, the product can be transported
anywhere by passenger plane (in South Africa or abroad),
− Check site to ensure that no old explosives or which makes it a quick-delivery solution to secondary
previously charged drill-holes are present breaking and underground blasting applications.
− Ensure that the booster touches adjacent cartridge − Stacking in magazines and for transportation should
for proper initiation be adhered to aligned with local legislation
Generation 1
The InstaStem™ Generation 1 cartridge contains a self-stemming unit fitted to the top of the cartridge.
INSTASTEM™
PROPERTIES
Density (g/cm3) 1.6
Vibration
(Peak Particle Velocity) <2 at 6 meters
(mm/s)
60 100
NET QUANTITY (g) 20 40 60 80 100
BOOSTER BOOSTER
Gross mass of carton (kg) 19.6 19.6 19.6 19.6 17.7 19.6 17.7
Generation 3
GENERATION3: GENERATION3: GENERATION3:
FUSE HEAD SERIES DETONATOR
READY
The InstaStem™ Generation 3 cartridge contains a safety switch as an added safety precaution to ensure that unless in the
“Fire” position, initiation cannot take place. This is not relevant to the detonator ready unit.
INSTASTEM™
Properties
Vibration
(Peak Particle Velocity) <2 at 6 meters
(mm/s)
NET QUANTITY (g) 300 200 350 550 500 700 1000 1700
Diameter (mm) 35 43 43 43 60 60 87 87
Quantity of Cartridges 50 50 35 30 20 20 8 8
Anfex®
Anfex® can be used in both surface and underground − Although Anfex® is not very sensitive to normal
(Development and Stoping) operations, but only in stimuli they are powerful explosives and the effects of
dry conditions. Anfex® is NOT for use in underground an accidental detonation can be catastrophic
coal mines. Anfex® can be poured into down holes or
pneumatically loaded into horizontal or vertical holes. − Handle with care
− Safe handling thanks to low sensitivity to friction, − Keep away from all sources of ignition
impact and shock
− Static Electricity can be generated while
− Improved flowability thanks to a special pneumatically loading Anfex®. The pneumatic loader
anti-caking agent and conductive hoses must always be earthed
and detonators that are sensitive to electrostatic
− Low friability guarantee of the structural integrity of discharge should not be used
the prill which is maintained when subjected to the
rigors of transport and storage BEST PRACTICE
− Cost effective − Always prime with largest initiator possible
− Misfires can be safely washed out with water − Pneumatically loaded ANFO can be primed with a high
strength detonator, booster or an explosive cartridge
STORAGE
PRODUCT SERIES
ANFEX®
PRODUCT ANFEX® PNUEMATICALLY LOADED ANFEX® POUR LOADED
PACKAGING
Anfex® is packaged in a 25 kg plastic bag that contains four 6.25 kg “multibags”.
Cone-Pak®
Cone-Pak® products are used in secondary blasting in both − Although the emulsion in Cone-Pak® products is
underground and surface applications. Cone-Pak® products not very sensitive to normal stimuli, it is a powerful
are NOT for use in coal mines or under fiery conditions. explosive and the effects of an accidental detonation
can be catastrophic
FEATURES
− Handle with care
− Units are pre-assembled and ready for use
− Keep away from all sources of ignition
− Cone-Pak products are designed to be directional
®
and offer a degree of controlled blasting. When − Although Cone-Pak® does not burn easily it must be
used correctly blasting damage can be limited, as kept clear of flames and intense heat
the explosive force is directed into the rock, with a
minimum of energy escaping in any other direction. − Do not use extreme force when inserting the
This limits the damage to underground installations detonator or the detonating cord into the cone
− The emulsion is tacky enough, to enable CP 1, CP 1-S, − Do not remove explosive from the Cone-Pak®
CP 3 and CP 3-S to stick to dry vertical or overhanging
surfaces, after removal of the lid and protective layer − Damage to the product could lead to misfires
− Multi-blasting is possible by inserting detonating cord − The shelf life of the product is 12 months from the
into the connector, or by folding it and inserting it into date of manufacture
the emulsion
− Store in a segregated, approved, cool, well-ventilated,
− Good contact between rock and emulsion is ensured dry and labelled area
by pushing the cone firmly onto the rock
− Keep packaging sealed until ready for use
PRODUCT SERIES
CONE-PAK®
CP 10 1
CP 15 1.5
CP 25 2.5
CP 40 4
PACKAGING
Initiation
The minimum initiator for Cone-Pak® is a 6 D detonator or 10 g/m detonating cord
Compatibility Matrix
PACKAGED AND SPECIALISED EXPLOSIVES
PB CONTROL
BUSTER GEL
MAGNUM®
MAGNUM®
MAGNUM®
MAGNUM®
MAGNUM®
MAGNUM®
MAGNUM®
DONOR
CONTROL
SPLITEX®
BUSTER
365 GEL
ANFEX®
FRAG
PLUS
Magnum® Buster X X X X X X X X X
Magnum® Control X X X X X X X X X
Magnum® Frag X X X X X X X X X
Magnum® Plus X X X X X X X X X
Anfex® X X X X X X X X X
Magnum® PB Control X X X X X X X X X
Splitex® X X X X X X X X X
Power Cord® 8 X X X X X X X X
Power Cord® 10 X X X X X X X X
Pentolite Primers X X X X X X X X X
Notes
Non–Electric
Initiators
SHOCK TUBE ASSEMBLIES
Shock Tube
Shock Tube Uni-Delay LP 200/4000 ms (Conventional)
UNI–DELAY LP
A Uni-Delay LP (long period) is a non-electric
initiation system which is designed for use in
underground mines. The unit consists of an out-
hole and an in-hole delay detonator. Assembled
with clear or brilliant yellow shock tube, the Shock Tube Uni-Delay LP 200/4000 ms (Vivid)
latter for the Vivid product series where improved
visibility characteristics are required.
APPEARANCE
A length of clear or brilliant yellow shock tubing, − Reliably initiates shock tube in both directions
which incorporates a 4000 ms delay in-hole detonator
that is crimped onto one end and a 200 ms short delay − The in-hole detonator reliably initiates pneumatically
out-hole detonator crimped onto the other end. Both loaded Anfex®, cartridge and pumpable emulsions,
detonators include either a rubber plug or sleeve. The Watergels and Pentolite boosters
out-hole detonator is located in a plastic connector
body. The plastic body consists of two variants, − The initiation signal in the tubing propagates through
one which holds up to 3 shock tubes and the other loose kinks, bends, knots and constrictions
can hold up to six tubes simultaneously. The Vivid
series offering is the same with the exception of the − The tubing is left intact after use
highly visible yellow shock tube and the neon orange
connectors to improve the visibility in dark, muddy BENEFITS
and dusty working environments.
− Accurate pyrotechnic delay timing
APPLICATION
− Rugged, abrasive resistant tubing which reduces the
A SHOCK TUBE-UNI-DELAY LP assembly is used: likelihood of tangling
− Underground for use in narrow reef stopes, gullies, − Easy to use, quick and secure connections
development ends, bord and pillar applications.
− Reliable
− Surface/Civil for use in trenching
− Low noise
FEATURES
− Low shrapnel
− High strength 8D in-hole detonator
− All in-hole detonators have the same delay
− 20 Hole burning front
− Easy to check connection sequence
− Clear or Neon Orange connector block, capable
of containing 6 shock tubes or the orange/neon − Ergonomically designed connector block allows easy
connector clip capable of holding 3 shock tubes connection of tubing
− Clear or brilliant yellow coloured shock tube, 18 kg − Vivid product variant remains highly visible in dark,
breaking load, resistant to hot and cold temperatures, oil dusty and muddy environments
resistant for 4 days in Anfex® at 40 °C, water resistant
SAFETY BENEFITS − Avoid coupling the donor out-hole assembly onto the
following unit within 150 mm of the receptors out-
Shock tube cannot be initiated by: hole assembly, ideally at 500 mm distance
− Static discharge (when tubing is intact) − The shelf life of the product is 36 months from the
date of manufacture
− Burning/heat
− Store in moderate temperatures and dry conditions in
− Impact with a hammer or similar implement on the a well-ventilated magazine
shock tube
− Abide by the legal storage requirements for the region
− Friction
− Temperatures above 90 °C may result in
− Vivid variant ensures improved visibility in the harsh spontaneous explosion
underground environments
− Always rotate stock (first in, first out)
INITIATION
PRODUCT SERIES
SHOCK TUBE-UNI-DELAY LP assemblies can be initiated
by any of the following products:
OUT-HOLE IN-HOLE
− Electric detonators
Nominal Delay
200 4000
− Electronic detonators Periods (ms)
− Severe impact on the detonator can result in 3.5 & 4.0 250 0.38
an explosion
4.5 & 5.0 200 0.30
− Never pull, stretch or kink the shock tube
6.0 180 0.23
− Never connect the blast until all the charging
operations have been completed 7.0 150 0.23
Shock Tube
SPLITTER
− SHOCK TUBE-SPLITTER assemblies have been − The unit will initiate up to twelve (2x6) Uni-Delay and/
developed to work in conjunction with SHOCK TUBE- or TRUNKLINE assemblies
UNI-DELAY LP assemblies to initiate tunnel rounds, in
underground mining only SAFETY BENEFITS
− Rugged, abrasion resistant tubing which reduces the − SHOCK TUBE-UNI-DELAY LP assemblies
likelihood of tangling
− SHOCK TUBE-TRUNKLINE assemblies
SPECIAL PRECAUTIONS
− Never carry SHOCK TUBE SPLITTER assemblies by SHOCK TUBE SPLITTER PRODUCT
holding onto the detonator/connector block
Nominal Delay
100/100 200/200 100/200
− Always keep detonators pointing away from you Periods (ms)
− Never connect the blast until all the charging PACKAGING (22 kg GROSS)
operations have been completed
UNITS PER
LENGTH (m) NEQ (kg)
− When coupling out-hole connectors to subsequent CASE
assemblies, ensure the receptor shock tube is
1.0 200 0.1
correctly inserted into the donor assembly connector
1.5 200 0.1
− Avoid coupling the donor out-hole assembly onto the
following unit within 150mm of the receptors out-hole
2.0 200 0.1
assembly, ideally at 500mm distance
− Avoid placing two or more out-hole connectors directly * Combo packs containing 100 assemblies of 100 ms
alongside one another, ideally a hands breadth apart and 100 assemblies of 200 ms are available on request
Shock Tube
MULTI SPD
APPEARANCE BENEFITS
A length of yellow shock tubing, which includes a short − Accurate pyrotechnic delay timing
period delay in-hole detonator. The detonator includes
either a rubber plug or sleeve that is crimped on one end. − Rugged, abrasive resistant tubing which reduces the
The detonator delay period is printed along the length likelihood of tangling
of the detonator shell. The free end of the shock tube is
sealed and incorporates a colour-coded connector clip, − Easy to tie-up
which indicates the delay period.
− Easy to check connection sequence
APPLICATION
− Easy to check blast for correct timing sequence due to
A SHOCK TUBE-MULTI SPD assembly is used: highly visible connector clip colour coding
− Connector clip is used for coupling to detonating cord − Static discharge (when tubing is intact)
INITIATION
PRODUCT SERIES
SHOCK TUBE-MULTI SPD assemblies can be initiated by
any of the following products: SHOCK TUBE MULTI SPD PRODUCT
− The shelf life of the product is 36 months from the date Transport (UN Classification)
Standard Packaging: Class 1.1B, UN no. 0360, DETONATOR
of manufacture
ASSEMBLIES, NON-ELECTRIC for blasting
Special Packaging: Class 1.4S, UN no. 0500, DETONATOR
− Store in moderate temperatures and dry conditions in ASSEMBLIES, NON-ELECTRIC for blasting
a well-ventilated magazine
Shock Tube
MULTI LPD
APPEARANCE
− Handle with care; damage to clip or tubing could lead − The shelf life of the product is 36 months from the date
to misfires of manufacture
− Never carry SHOCK TUBE-MULTI LPD assemblies by − Store in moderate temperatures and dry conditions in
holding onto the detonator a well-ventilated magazine
− Always keep detonators pointing away from you − Abide by the legal storage requirements for the region
− Severe impact on the detonator can result in − Temperatures above 90 °C may result in
an explosion spontaneous explosion
− Never pull, stretch or kink the shock tube − Always rotate stock (first in, first out)
6 175 0.18
8 150 0.15
12 100 0.10
20 & 25 60 0.06
45 25 0.025
UN CLASSIFICATION
Delay Period 8 9 10 11 12 13 14 15
Nominal Delay (ms) 800 1000 1250 1500 1750 2000 2500 300
Delay Period 16 17 18 19 20 21 22
Nominal Delay (ms) 3500 4000 5000 6000 7000 8000 9000
Aqua
Colour Code Coral Amethyst Stone Tanzanite Ruby Jade
Marine
Shock Tube
UNI-DELAY SP
− Colour-coded connector block indicates out-hole Shock tube cannot be initiated by:
delay time
− Radio transmissions
− Connector block, capable of containing 6 tubes
− Radiations
− High strength in-hole detonator with the delay time
printed on the shell − Stray currents
− The in-hole detonator reliably initiates Anfex®, − Static discharge (when tubing is intact)
cartridge and pumpable emulsions, Watergels and
Pentolite boosters − Burning/heat
− Reliably initiates shock tube in both directions − Impact with a hammer or similar implement on the
shock tube
− Yellow coloured shock tube, 18 kg minimum breaking
load, resistant to hot and cold temperatures, oil − Friction
resistant for 4 days in Anfex® 40 °C, water resistant
− Never connect the blast until all the charging 9 & 10 100 0.15
operations have been completed
12, 15 & 18 75 0.14
− Ensure that the detonator is in intimate contact with
the explosive column for reliable initiation 20, 21, 25 & 30 50 0.08
UN CLASSIFICATION
OUT-HOLE IN-HOLE
Nominal Delay
17 25 42 75 350 or 450 or 500
Periods (ms)
Shock Tube
TRUNKLINE
APPEARANCE BENEFITS
A length of shock tubing, which includes a short period − Accurate pyrotechnic delay timing
out-hole delay detonator crimped on one end. The
out-hole detonator is located in a plastic connector − Rugged, abrasive resistant tubing which reduces the
block, which is colour-coded according to the delay of likelihood of tangling
the detonator. The free end of the shock tube is sealed
and incorporates a colour-coded connector clip which − Easy to use, secure connections
matches the nominal delay time and colour as indicated
by the connector block. − Highly visible components
A SHOCK TUBE-MULTI SPD assembly is used: − Eliminates detonating cord and relays
INITIATION STORAGE
SHOCK TUBE TRUNKLINE assemblies can be initiated − The shelf life of the product is 36 months from the
by any of the following products: date of manufacture
− SHOCK TUBE-TRUNKLINE assemblies − Always rotate stock (first in, first out)
− Never connect the blast until all the charging 10 120 0.07
operations have been completed
12 100 0.06
− Ensure that the detonator is in intimate contact with
the explosive column for reliable initiation 15 75 0.05
UN CLASSIFICATION
Shock Tube
CLUSTER
APPEARANCE
A length of green shock tubing that incorporates a − The tubing is left intact after use
short period delay detonator. One end of the tubing is
crimped into a short period delay detonator. The free − Can initiate up to 2 strands of detonating cord
end of the shock tube is sealed and incorporates a (5,5 mm Ø) at the same time
colour coded connector clip which indicates the delay
period. The delay period is also printed along the − Can initiate up to 6 strands of shock tube (3 mm Ø) at
length of the detonator shell. The detonator is fitted the same time
into a colour-coded cluster connector block which
indicates the detonator delay period. BENEFITS
APPLICATION − Accurate pyrotechnic delay timing
A SHOCK TUBE-CLUSTER assembly is used: − Rugged, abrasive resistant tubing which reduces the
likelihood of tangling
− Surface delays in trenching, open pit, quarries,
surface mines, civil engineering projects − Easy to use, secure connections
and demolition
− Flexible blast design
FEATURES
− Highly visible components
− A cluster connector block which accepts shock tube
or detonating cord, with a positive locking cover − Reliable
− Additional delays and lengths are available on request − Positive initiation control
− Three primary delays, other custom delays and length − Initiates detonating cord or shock tube
combinations available on request
SAFETY BENEFITS
− Colour coded connector clip and cluster connector
block indicate delay time Shock tube cannot be initiated by:
− Impact with a hammer or similar implement on the − Never connect shock tube and detonating cord in the
shock tube connector block to be initiated simultaneously
− Friction STORAGE
INITIATION − The shelf life of the product is 36 months from the
date of manufacture
SHOCK TUBE-CLUSTER assemblies can be initiated by
any of the following products: − Store in moderate temperatures and dry conditions in
a well-ventilated magazine
− Electric detonators
− Abide by the legal storage requirements for the region
− Electronic detonators
− Temperatures above 90 °C may result in spontaneous
− Detonating cords (minimum 5 g PETN/m) explosion
− SHOCK TUBE-UNI-DELAY SP and LP assemblies − Always rotate stock (first in, first out)
SPECIAL PRECAUTIONS
PACKAGING (22 kg GROSS)
− Handle with care; damage to clip or tubing could lead
UNITS PER
to misfires LENGTH (M) NEQ (kg)
CASE
− Never carry SHOCK TUBE-CLUSTER assemblies by 3 200 0.14
holding onto the detonator
4&5 175 0.13
− Always keep detonators pointing away from you
6 150 0.11
− Severe impact on the detonator can result in
an explosion 10, 12 & 15 75 0.06
UN CLASSIFICATION
Shock Tube
LEAD-IN
APPEARANCE
APPLICATION − Reliable
− Green coloured shock tube, 18 kg minimum breaking Shock tube cannot be initiated by:
load, resistant to hot and cold temperatures, oil
resistant for 4 days in Anfex® at 40 °C, water resistant − Radio transmissions
− Can initiate up to 2 strands of detonating cord − Impact with a hammer or similar implement on the
(5,5 mm Ø) at the same time shock tube
INITIATION STORAGE
SHOCK TUBE TRUNKLINE assemblies can be initiated by − The shelf life of the product is 36 months from the
any of the following products: date of manufacture
UN CLASSIFICATION
Shock Tube
EXTENDER
− Burning/heat
− Friction
INITIATION
PACKAGING (15 kg GROSS)
SHOCK TUBE EXTENDER can be initiated by any of the UNITS PER
following products: LENGTH (m) NEQ (kg)
CASE
− Electric detonators 200 10 0.01
STORAGE
APPEARANCE
APPLICATION
FEATURES
BENEFITS
PACKAGING
− Approved for use in fiery mines
UNITS MASS
SAFETY BENEFITS PRODUCT PER (kg)
CASE
− The unit is powered by a rechargeable battery, which BIT Delay Time 25 0.55
must be recharged when the timing light double
flashes at the start of the timing cycle
BIT
25 0.55
Fixed-time
Notes
Notes
Electronic
Indicators
Electronic initiation systems enable functions This increased functionality affords the advanced user the
that traditional pyrotechnic systems lack. opportunity to utilise accurate blast timing to optimise
Besides the immediately obvious benefits of the outcome of the blasting process. As a result, the
reduced environmental impacts such as blast downstream mining processes benefit hugely making the
entire mining cycle much more cost efficient.
induced vibration and overpressure (air blast as
a result of scatter); the systems increased timing Leading mining companies across the globe have come to
control allows for accurate blast modelling and realise the substantial cost benefits which AEL electronic
optimisation of the initiation sequence before detonators provide where they are applied in this manner.
triggering the blast. AEL Intelligent Blasting have extensive experience in
providing the electronic detonator solution for your
specific mining need and can assist in optimising your
blast designs to enhance value through precision blasting.
The AEL series of electronic initiating systems is safe and To cope with the mining industry's varied mining
robust. All our electronic detonator systems are designed environments, AEL's electronic detonator systems are
to eliminate unintended initiation. The systems use safety extremely diverse, making them ideal to use in both
keys, which now also include Near Field Communication the simplest and toughest situations. These include
(NFC) contactless smart cards, with encrypted codes tunnelling, shaft sinking, underground stoping and all
which ensure that only authorised personnel can initiate forms of surface mining environments.
the systems. The detonator and control equipment
designs are subjected to stringent, internationally
recognised safety tests, before release to the market.
Electronic
DIGISHOT®
DigiShot® is an easy-to-use, reliable, electronic SAFETY BENEFITS
initiating system for use primarily in smaller
blasting operations that demand accurate timing. DigiShot® detonator
Examples include environmentally sensitive assemblies cannot be
operations such as quarrying, tunnelling initiated by:
operations and smaller civil blasts. The DigiShot®
− Radio transmissions
electronic initiation system represents an
innovative advance in technology which enables − Radiations
users to achieve the accurate timing benefits
of electronic initiation systems with robust all- − Stray currents
weather downlines and surface connectors. As an − Static discharge
added benefit, the ability to blast wirelessly has
now been included in this system. − Conventional initiation units (e.g. shot exploders]
APPEARANCE INITIATION
The detonator shell is copper with 2 wires covered in DigiShot® detonator assemblies can be programmed/
a robust red polymer with an extremely high breaking initiated by any of the following dedicated
strain. Deployment is via the proven heat-shrink coil DigiShot® systems:
deployment system.
− CE4 Tagger
APPLICATION − V8 Tagger
DigiShot® system is used: − DigiShot® Blaster
− Highly resistant to stray currents − Always keep detonators pointing away from you
− Designed to be initiated by firing equipment specifically − Severe impact on the detonator can result in an
designed for the DigiShot® system explosion
− Remote firing capability − Never pull the wires off the assemblies
− Multiple blast capability − Never connect the blast until all the charging
operations have been completed
− Synchronisation capability
− Ensure that the detonator is in intimate contact with
BENEFITS the explosive column for reliable initiation
PRODUCT INFORMATION
DIGISHOT® DETONATOR
Dynamic Shock Resistance ≤15954.15 Psi/110 MPa
ESD Resistance >1 Joule Energy @ 30 KV
RF Immunity Passes CEN TS 13763-27
Detonator Shell Copper: l: 93.75 mm-94.25 mm, OD: 7.49 mm-7.54 mm
SANS 1717-1: The South African National Standard for: The design approval of EDD
Applicable Standards initiation systems for use in mining and civil blasting applications. CEN TS13763-27:
European CEN-testing specification for Explosives civil use-Detonators and relays.
Detonator Strength 8
Base Charge PETN
Net Explosives Quantity (NEQ) 1g/detonator
Timing Programmable
Wire Rugged, red, over extruded
Connector Rugged, water resistant
Elongation Steel wire Copper wire
(Tested @ 21 ˚C) <3% >25 %
Tensile Strength Steel Wire Copper Wire
(Tested @ 21 ˚C) > 500 N > 200 N
Abrasion Strength Passes CEN TS 13763-27
Dangerous-Blasting Cap-Explosive
Detonator Shell Marking
Danger-Detonateur-Explosif
A maximum of 7 days (when tested in 100 % diesel, 500 Kpa pressure and starting
In-Hole Sleep time
temperature of 60 °C/140 °F-end temperature of (25 °C/177 °F)
Accuracy ± 1 ms for blast durations of less than 5 seconds
Detonator Temperature Limits
* Detonator is suitable for hot -40 °C to +80 °C
emulsion application
ELECTRONIC
DETONATOR
Digishot® Plus
DigiShot® Plus is the flagship system in electronic SAFETY BENEFITS
detonators. It is an easy-to-use, reliable, electronic
initiating system with remote firing capability and DigiShot® Plus detonator assemblies cannot be
initiated by:
can be extended to fire very large blasts.
− Radio transmissions
The user can link several systems together
through an RF link to fire multiple large benches − Radiations
in a synchronised or offset manner. The detonator
connector system has been improved over several − Stray currents
years of continuous use and offers a truly reliable − Static discharge
and robust connection mechanism.
− Conventional initiation units (e.g. shot exploders)
APPEARANCE
INITIATION
The detonator shell is copper with 2 wires covered in a
robust green polymer with an extremely high breaking DigiShot® Plus detonator assemblies can be
strain. Deployment is via the proven heat-shrink coil system. programmed/initiated by any of the following dedicated
DigiShot® Plus systems:
APPLICATION
− CE4 Tagger
DigiShot® Plus system is used:
− V8 Tagger
− Surface: for use in quarries, opencast/open pit large
scale blasting − DigiShot® Blaster
− Bench Box synchronisation capability for expanded − Never pull the wires off the assemblies.
blast patterns or multiple bench blasting
− Never connect the blast until all the charging
BENEFITS operations have been completed
PRODUCT INFORMATION
Electronic-
Equipment
INTELLISHOT™ SYSTEM
APPEARANCE
− Up to 10 Commanders can be deployed for a single − The blast is initiated with contactless NFC
blast using long distance RF communication from a (Near Field Communication) Blast Cards
blasting point
− On bench fault detection simplified with the GPS
− It has four channels that can connect to 400 location of the detonator hole position in the Tagger
detonators, giving a total capacity of 1600 detonators
per Commander™
SPECIAL INSTRUCTIONS
− IntelliShot™ system should only be used by users − IntelliShot™ control equipment batteries should be
who have completed both product specific training kept in a charged state. If the equipment is to be stored
successfully and who comply with the applicable local for extended periods, the batteries may need to be
regulatory requirements removed or replaced
− IntelliShot™ control equipment and detonators are − All equipment in the field must be returned to AEL or
ONLY suitable for use within other IntelliShot™ its repair centres for service in the following intervals:
components as a system-no other equipment should
be connected to IntelliShot™ detonators and no Handheld equipment (Taggers, etc.): 18 months
IntelliShot™ equipment should be connected to a non- Other equipment (excl. accessories): 24 months
IntelliShot™ detonator of any type
PRODUCT INFORMATION
INTELLISHOT™
SANS 1717-1: The South African National Standard for: The design of
detonator initiation systems for use in mining and civil blasting applications
Part 1: Electronic initiation systems
Applicable Standards
CEN/TS13763-27: European CEN-technical specification for Explosives
for civil uses-Detonators and relays-Part 27: Definitions, methods and
requirements for electronic initiation systems
Temperature Limits (Operational)
-10 °C to +50 °C
(Tagger LCD when exposed for 1 hr)
Battery-Internal, not field replaceable 3.7 V Lithium Polymer
Weight Approximately 2.0 kg
Display (Active LCD area with backlight) 200 pixels x 96 pixels/45,80mm x 21,98mm
Keypad Tactile touch pad with numeric soft-keys
External Connections 4 sets of terminals to connect to 2 wire detonator harnesses
Operating Time from a Fully Approximately 8 hrs at 25 °C. Operating time is influenced by detonator load,
Charged Battery backlight setting and operating temperature
Water/Dust Resistance IP 57
Regulatory FCC-15.247
SYSTEM LIMITS
Maximum Total Delay Time 20 000 ms
1600 Single Commander mode
Maximum Number of Detonators
16000 Multiple Commander linked mode
Maximum Surface Harness Should not exceed 2500 m
Maximum Number of synchronized
11 total–1 Base 10 Bench
IntelliShot™ Commanders, RF mode
Maximum Wi-Fi distance from tagger to
10 m
the Commander™
Electronic-
Detonator
INTELLISHOT™
IntelliShot™ is an easy-to-use, reliable, electronic SAFETY BENEFITS
initiating system for use primarily in smaller
blasting operations that demand accurate timing. IntelliShot™ detonator assemblies cannot be initiated by:
Examples include environmentally sensitive
− Radio transmissions
operations such as quarrying, tunnelling operations
and smaller civil blasts. The IntelliShot™ electronic − Radiations
initiation system represents an innovative advance
in technology which enables users to achieve the − Stray currents
accurate timing benefits of electronic initiation − Static discharge
systems with robust all-weather downlines and
surface connectors. As an added benefit, the − Conventional initiation units (e.g. shot exploders)
ability to blast wirelessly has now been included in
this system. INITIATION
− IntelliShot™ Commanders
APPLICATION
SPECIAL PRECAUTIONS
IntelliShot™ system is used:
Underground: Massive, tunneling − Handle with care; damage to connector clip, wire or
Surface: opencast, open pit, quarrying, construction detonator could lead to misfires
− Commander™ synchronisation capability for expanded − Ensure that the detonator is in intimate contact with the
blast patterns or multiple bench blasting explosive column for reliable initiation
BENEFITS STORAGE
− High accuracy − The shelf life of the product is 36 months from the date
of manufacture
− Minimal on-bench components to simplify use
− Store in moderate temperatures and dry conditions in a
− Automatic or programmable delay timing well-ventilated magazine
− Full functionality testing at safe voltage − Abide by the legal storage requirements for the region
− Electronic logs of every interaction on the equipment − Temperatures above 90 °C may result in
are kept, which provides a useful tool to the manager spontaneous explosion
to monitor and investigate blast history
− Always rotate stock (first in, first out)
PRODUCT INFORMATION
INTELLISHOT™ DETONATOR
Dynamic Shock Resistance ≤ 15954.15 Psi/110 MPa
ESD Resistance >1 Joule Energy @ 30 KV
RF Immunity Passes CEN TS 13763-27
Detonator Shell Copper: l: 93.75 mm-94.25 mm, OD: 7.49 mm-7.54 mm
SANS 1717-1: The South African National Standard for: The design approval of EDD
Applicable Standards initiation systems for use in mining and civil blasting applications. CEN TS13763-27:
European CEN-testing specification for Explosives civil use-Detonators and relays
Detonator Strength 8
Base Charge PETN
Net Explosives Quantity (NEQ) 1g/detonator
Timing Programmable 0-20 000 ms
Wire Rugged, black with orange stripe, over extruded
Connector Rugged, water resistant
Elongation (Tested @ 21 ˚C) Minimum of 20 % @ 21˚C
Tensile Strength
Not less than 400 N
(Tested @ 21 ˚C)
Abrasion Strength Passes CEN TS 13763-27
Dangerous–Blasting Cap-Explosive
Detonator Shell Marking
Danger–Detonateur-Explosif
21 days (when tested in 100 % diesel, 1000 Kpa pressure at a temperature of
In-Hole Sleep time
25 °C (177 °F)
Accuracy ± 1ms for blast durations of less than 5 seconds
Detonator Temperature Limits
* Detonator is suitable for hot -40 °C to +80 °C
emulsion application
NetShock™
ELECTRONIC INITIATORS
− Radiations − The shelf life of the product is 36 months from the date
of manufacture
− Stray currents
− Store in moderate temperatures and dry conditions in
a well-ventilated magazine
− Static discharge
− Abide by the legal storage requirements for the region
− Conventional initiation units (e.g. shot exploders)
− Temperatures above 90 °C may result in
spontaneous explosion
PRODUCT SERIES
INTELLISHOT™ DETONATOR
Dynamic Shock Resistance N/A
SANS 1717-1: The South African National Standard for: The design
approval of EDD initiation systems for use in mining and civil
Applicable Standards
blasting applications. CEN TS13763-27: European CEN-testing
specification for Explosives civil use-Detonators and relays
Detonator Strength 8
Elongation
<3%
(Tested @ 21 ˚C)
Tensile Strength
Not less than 500 N
(Tested @ 21 ˚C)
CE 4 Tagger
ELECTRONIC EQUIPMENT
− All areas of electronic detonator use - Handheld equipment (Taggers, etc.): 18 months
PRODUCT SERIES
CE4 TAGGER
SANS 1717-1: The South African National Standard for: The design of
detonator initiation systems for use in mining and civil blasting applications
Part 1: Electronic initiation systems
Applicable Standards
CEN/TS13763-27: European CEN-technical specification for Explosives
for civil uses–Detonators and relays–Part 27: Definitions, methods and
requirements for electronic initiation systems
Temperature Limits (Operational)
-30 °C to +60 °C
(Tagger LCD when exposed for 1 hr)
Display (Active LCD area with backlight) 128 pixels x 128 pixels/44.78 mm x 44.78 mm
Software Upgrades Software upgrade is via USB connector on the Tagger and a flash drive
Water Resistance IP 57
− AC Charger, DC charger and various plug connectors − PC Application for screen captures
− USB Type A to mini USB charger/data cable − Tickets to reset forgotten passwords and selected
factory settings
OPTIONAL ITEMS NOT SUPPLIED
(ORDER SEPARATELY)
ViewShot™
ELECTRONIC DETONATOR BLAST TIMING SOFTWARE
VIEWSHOT™ 3D
ELECTRONIC DETONATOR
BLAST TIMING SOFTWARE
The new ViewShot™ 3D blast software facilitates
the planning, design and simulation of a blast
through a flexible and feature-rich user interface.
Efficient blasting practices is now further
enhanced with ViewShot™ 3D’s ability to optimise
blast outcomes with advanced modelling and
simulation features. ViewShot™ 3D seamlessly
integrates with third party mine planning and
reporting software. ViewShot™ 3D interfaces with BENEFITS
DigiShot® and DigiShot® Plus and IntelliShot™.
− Allows fast and convenient upload of detonator timing
APPEARANCE to your pre-loaded blast
− All areas of electronic detonator use − Allows viewing of the blast firing sequence on a PC and
changing of blast timing to optimise blast outcomes
− Applicable to all AEL series of electronic detonators
− Blast optimization regarding delay, explosives charge,
fragmentation and cost
FEATURES
- Positioning of decks and detonators in the hole − Design a blast using a template, actual survey data or a
detonator list from a Tagger
− Calculate the Energy Map distribution
− It provides a flexible Hole Configuration tool that
- Horizontal Section supports various combinations of decking and charging
− Optimization of delays − The user may design delays for each deck separately by
targeting specific decks in chevron patterns, in manual
- Time of arrival at monitoring points or semi-automated mode
- Signature hole analysis
− The ViewShot™ 3D interface may be customised to fit
− Fragmentation prediction the user layout requirements
− Enhanced blast optimisation with an Energy Map − Blast design parameters include hole diameters,
explosives material, rock type and more
− The software is now capable of 3D visualisation on:
− Formulate timing designs based on actual
- Deck composition hole positions
BlastWeb™
SPECIAL INSTRUCTIONS
− BlastWeb® should only be used by users who − BlastWeb® control equipment batteries should
have completed both product specific training be kept in a charged state. If the equipment is to be
successfully and who comply with the applicable stored for long periods the batteries may need to be
local regulatory requirements removed or replaced
− BlastWeb® control equipment and detonators − All equipment in the field must be returned to AEL or
are ONLY suitable for use within other DigiShot® its repair centres for service in the following intervals:
components as a system-no other equipment should
be connected to BlastWeb® detonators and no Handheld equipment (Taggers, etc.): 18 months
BlastWeb® equipment should be connected to a non- Other equipment (excl. accessories): 24 months
BlastWeb® detonator of any type
PRODUCT SERIES
Weight Approximately 50 kg
COMMUNICATION NETWORK
1.8mm2 x2 Core individually screened armoured cable or Ethernet fibre backbone used between Surface Controller and BCU.
Keypad 634 g
Weight Approximately 50 kg
Weight ±21.3 kg
Weight ±140 g
− Harness Wire-0.71mm twisted pair copper wire with PVC or Polyethylene insulation available in 305 m spools. Connects
to the terminators to the relevant detonator type being used
− SmartKeys (additional or replacement)-For safety purposes the system is activated through a pre-programmed
personal identification of the blaster and a unique password (PIN). The system deploys two types of SmartKeys that
are identified by a Yellow or Red colour. Insert the Yellow SmartKey (must be paired with matching red SmartKey)
on the BCU after completion of connecting and testing of the blast installation (and the mine has been cleared of all
personnel) to place the BCU in a waiting blast command state. Insert the Red SmartKey at the Surface Blast Controller
(SBC), or at the BCU during a local blast to perform the arm and fire commands)
Notes
Notes
Electric
INITIATORS
AEL offers 2 different types of electric detonators, The Electric Shock Tube starter consists of an
the Instantaneous Electric detonator (IED) and aluminium IED encased in a green REEFMASTER®
the Electric shock tube starter. It is a low cost yet connector block.
reliable initiator of primary blasts by firing lines
The Electric Shock tube starter has a reduced base
of shock tube, detonating cord, black powder and
charge, with enough Lead azide and PETN to ensure
secondary blasts. reliable initiation of shock tube but not enough for the
reliable initiation of packaged explosives and other cap
An Instantaneous Electric Detonator (IED) normally
sensitive explosives.
detonates without delay on application of the electric
firing current and is used in conjunction with a shot
The incorporation of the REEFMASTER® allows for
exploder and blasting cable.
initiation of up to 6 shock tube at a time.
FUSEHEAD ASSEMBLY
Instantaneous
ELECTRIC DETONATOR (IED)
An instantaneous electric detonator (IED), which − Keep away from sources of heat and other forms of
nominally detonates without delay on application of ignition (e.g. RF transmitters, friction, impact, static
the electric firing current. The copper detonator is and heat)
fitted with a Type S fusehead to which two insulated − Never pull the wires off the assemblies
leg wires are welded.
− Temperatures above 90 °C may result in
APPEARANCE spontaneous explosion
A copper detonator fitted with a Type S fusehead with two − The stripped end of the wires should be kept twisted
wires of diameter 0.5 mm pass through a moulded plug (short circuited) together until unit is ready for
which is crimped into the open end of a copper detonator connection to the blast (Safety precaution against Static
tube. The colours of the insulated wires are usually white and stray charges)
and red and bared at the ends and covered with a protective
white sleeve. The wire is wound in a figure of eight with tape − Always connect wires to the lead wires (twisted-short
holding it together. circuited at other end) to the initiation unit before
connecting detonator to the blast
APPLICATION
− Never connect the blast until all the charging operations
ELECTRIC–IED is used to initiate blasts by firing lines of have been completed
shock tube, detonating cord, blasting gun powder and
secondary blasts.
STORAGE
− The shelf life of the product is 36 months from the date
FEATURES of manufacture
− Available with tangle-free wire, in various length
− Store in moderate temperatures and dry conditions in a
− Instantaneous firing well-ventilated magazine
− Figure eight wire winding, 160 mm from loop to loop − Abide by the legal storage requirements for the region
− Low cost, yet reliable and predictable initiation 3.5 100 8 800 0.8
− Never carry an IED by holding onto the detonator. All-fire Impulse ≥ 3.0 mJ/Ω
− Always keep detonators pointing away from you Transport (UN Classification)
Standard Packaging: Class 1.1B, UN no. 0030, DETONATORS ELECTRIC
for blasting
− Severe impact on the detonator can result in an explosion
Electric
FUSEHEAD ASSEMBLY
− Instantaneous firing − Abide by the legal storage requirements for the region
− Figure eight wire winding, 160 mm from loop to loop − A temperatures range of -35 to +60 °C recommended
for safe handling and functioning
− Tin plated copper wires with PVC insulation, diameter
0.6/1.3mm − Always rotate stock (first in, first out)
BENEFITS
PACKAGING (7 kg GROSS)
− Easy to use, versatile and reliable method of initiating
LENGTH UNIT PER INNER
blackpowder/pyrotechnic compositions.
(m) INNER CARTON CARTONS
CASE
PER
− Circuit can be easily tested 1.0 1000 0.05
− Lead wire insulation is stripped on ends for 3.5 100 8
quick connection
Electric
SHOCK TUBE STARTER
APPEARANCE BENEFITS
The unit is fitted with a fuse head to which two insulated − Easy to use, versatile and reliable method of initiating
copper wires of 1.3 mm diameter are welded. The wires shock tubing
pass through a plug which is crimped into the open end
of the tube. The colour of the insulated wires is white − Initiates all shock tube initiating system assemblies
and yellow. The wires are 1.0 m long and are stripped
at the ends. The detonator is fitted into a red or green − Excellent water resistance provided by moulded plugs
REEFMASTER® connector. and crimp
− The Shock Tube Starter is a low cost yet reliable − Lead wire insulation is stripped on ends for quick
initiator of primary blasts by firing lines of shock tube connection
− The Shock Tube Starter is used in tunnelling, stoping, − Reliable and predictable initiation of blasts
open pit and quarrying
SAFETY BENEFITS
FEATURES
− REEFMASTER® does not create shrapnel that could
− Available with short tangle-free wire, 1.0 m in length cut off shock tube in the vicinity
− Green/Red 51 mm REEFMASTER® type block capable − Is resistant to accidental initiation by stray currents
of holding and initiating up to 6 shock tube lines
INITIATION
− Instantaneous firing
Shock Tube Starter assemblies are initiated by:
− Low explosive charges, 150 mg Lead Azide,
40 mg PETN − A shot exploder
− Figure eight wire winding, 160 mm from loop to loop − Centralised blasting system
− Tin plated copper wires with PVC insulation, diameter − Blast initiation timer
0.6/1.3 mm
SPECIAL PRECAUTIONS
− Handle with care. Damage to the block or wires could − Handle with care-detonators are explosive
lead to misfires
− Do not attempt to initiate detonating cord with this
− Never carry a Shock Tube Starter assembly by holding product
onto the detonator block
STORAGE
− Always keep detonators pointing away from you
− The shelf life of the product is 36 months from the
− Severe impact on the detonator can result in an date of manufacture
explosion
− Store in moderate temperatures and dry conditions in
− Keep away from sources of heat and other forms of a well-ventilated magazine
ignition (e.g. RF transmitters)
− Abide by the legal storage requirements for the region
− Never pull the wires
− Temperatures above 90 °C may result in
− Never connect the blast until all the charging spontaneous explosion
operations have been completed
− Always rotate stock (first in, first out)
− Ensure that the shock tube lines are properly inserted
in the block for reliable application
PACKAGING (7 kg GROSS)
LENGTH (m) UNIT PER INNER INNER CARTONS UNITS PER CASE NEQ (kg)
CARTON PER CASE
1.0 30 8 240 0.05
PRODUCT INFORMATION
ELECTRIC - SHOCK TUBE STARTER PRODUCT
Bridge Resistance 0.6 ± 0.2 Ω
Notes
Notes
ACCESSORIES
Accessories
Detonating cords are high velocity flexible cords, filled A purpose manufactured detonating cord cutter
with PETN which detonates at 7000 m per second. This designed to be employed for the safe cutting of
product is waterproof with a continuous covering of detonating cords. The device has an internal blade that
orange, blue, yellow or red plastic. The colour depicts reduces the risk of operator self-injury.
the different strength available.
General
Specifications
DETONATING PENTOLITE
TECHNICAL PROPERTIES
CORDS PRIMERS
SPECIAL PRECAUTIONS
Detonating Cords
POWERCORD®
APPEARANCE
− Relatively insensitive to detonation by heat,
Powercord® detonating cords shall have a bright uniform electrostatic discharge or other forms of electricity
PVC sheathing with blue, orange, red or yellow in colour.
The cord is coiled with length of 30 m without reels and on − Excellent resistance to side penetration by oil or water
reels with a length of 350 m or 500 m.
− Flexible
APPLICATION
− Uniform core load
Detonating cords are used to detonate explosive
charges, including dogbone relays, in various blasting − High tensile strength
and mining applications.
− Easy to handle and tie knots
Powercord® 8 Premium is suitable for use in wet
conditions as it have enhanced waterproof properties. SAFETY BENEFITS
− Temperatures over 90 °C may result in − Store in a segregated, approved, cool, well ventilated,
spontaneous explosion dry and labelled area
BENEFITS
122 AEL Intelligent Blasting
ACCESSORIES
PACKAGING
Powercord® 8
8 Red and Black stripe > 80 3.4-5.0
Premium
Pentolite
PRIMERS
The cast explosive shall be free from cracks, large − Virgin grade TNT used
cavities and visible defects or impurities. The plastic
shell should be filled to within 2 mm of the open end with − Highly visible colours
Pentolite explosive.
− Excellent shelf life
− Optimum diameter to length ratio for effective loading − High density helps to resist floating in emulsion
and initiation of explosives explosives and keeps the primer located in the toe of
a vertically loaded blast hole
− Completely waterproof
SAFETY BENEFITS
− Cylindrical shape ensures easy loading with no
bridging of bulk explosives in the hole − Relatively insensitive to detonation by impact, friction,
heat and electrostatic discharge
− Readily initiated by detonating cords ≥ 8 g/m or
electronic-, electric-, shock tube- and capped − Detonator fully protected
fuse detonators
INITIATION STORAGE
− Pentolite primers are initiated by detonating cords or − The shelf life of the product is 60 months from the
detonators and amplifies the detonation output from date of manufacture
these to reliable fire a variety of explosives
− Store in a segregated, approved, cool, well-ventilated,
SPECIAL PRECAUTIONS dry and labelled area
− Handle with care; Damage to the product could lead − Keep packaging tightly closed and sealed until ready
to misfires for use
− Keep away from all sources of ignition − Abide by the legal storage requirements for the region
in which you operate
− Temperatures over 80 °C will lead to the pentolite
formulation melting. Prolonged exposure to − Always rotate stock (first in, first out)
temperatures above 90 °C can lead to a
premature detonation
PACKAGING
PENTOLITE MASS (g) UNITS PER CASE BOX DIMENSIONS (mm) GROSS WEIGHT (kg)
60 g Pentolite Primer 240 435x360x295 23
150 g Pentolite
Red 38 8.4 7.9- >6.2
Primer
250 g Pentolite
Purple 46 8.4 7.8- >6.2
Primer
400 g Pentolite
Blue 53 8.4 7.8- >6.2
Primer
800 g Pentolite
Orange Special Order
Primer
Detonating
CORD CUTTER
APPEARANCE
− Detonating Cord can be cut easily and with − When cutting of detonating cord becomes difficult, the
minimum effort
blade is blunt and the cutter should be replaced
− Attachment ring provided to help prevent loss
of device
STORAGE
Compatibility Matrix
INITIATING SYSTEMS
AEL Primers
AEL Shock Tube
AEL Primers
Mantis
APPEARANCE
APPLICATION STORAGE
For use in blast holes up to 45 mm in diameters in − Product is non-explosive and can be stored in any
stopping and development in conjunction with emulsion. storage location
The device can be used in inclined holes up to 20 degrees
− Infinite shelf-life
FEATURES
PACKAGING
− Detonator mounted to ensure full coupling with
the explosive − Packed in plastic bags
− Soft plastic body for ease of use − 200 units per bag
− Clip to securely fasten the detonator − 5 bags per 1000 unit outer bag
BENEFITS
− Ease of use
Hot-Hole
Monitor
− Reactive ground conditions − Product Shelf Life Dependant of battery life and
storage temperature (12-18 months)
FEATURES
HOT-HOLE MONITOR
− Monitors blast-hole temperatures to warn blasting
crew of temperature changes within the blast-hole Water
Excellent
Resistance
− Alerts operators with a sounding alarm of increasing Temperature
55 °C - 80 °C
temperatures and the risk of possible premature Range
detonation of a charged blast-hole when the Measurement
Generally booster position
temperature starts to exceed 80 ºC Point
Cable Length 30 m
− Early warning safety device to improve on-bench
safety when performing blasting in hot-holes
PACKAGING (10 kg GROSS)
− Easy to use wire-deployment-system
DIAMETER LENGTH UNIT COUNT
(mm) (mm) PER CASE
51 250 30
Notes
Notes
Industrial
PRODUCTS
AEL’s industrial product series is supplied into The reliable supply of high quality industrial products
South African, African and selected international forms an integral part to any mining or chemical process
markets. With direct access to AEL's large team operation. AEL's policy is to provide to explosives
of leading engineers and scientists, the industrial divisions first.
products division is able to offer a broader series
of highly versatile industrial solutions, which
perform well against strict quality parameters.
Innovations such as curing before bagging, allow
for the enhanced structural integrity of the porous
prill which ensures its superior performance
from the point of production to where the product
is used down the hole.
Industrial Products
Nitrogen
35 % 35 % 30 % N/A 20 % N/A
Content (% N)
50 % solution
at 60 °C, pH
Reaction Tested for pH Tested for pH to lie within N/A N/A N/A
the range 3.3
to 3.9
The pH
must remain
above 2
Bulk product
can be stored
in silos for
up to1 week
but should Recommended
6 months
ideally be that ANS be
Shelf Life for bagged 5 years 6 months N/A
used as soon used as soon
product
as possible. as possible.
6 months
for bagged
product
Ammonium Nitrate
TECHNICAL GRADE (TGAN)
TECHNICAL SPECIFICATIONS
BENEFITS
APPLICATION
− Pumped Emulsions
− Heavy ANFO’s
Ammonium Nitrate
EMULSION GRADE (HDAN)
TECHNICAL SPECIFICATIONS
BENEFITS
SPECIAL PRECAUTIONS
PACKAGING
Nitric Acid
Aqueous Ammonia
− Demineralised water used in the production process − Care must be exercised when opening the valves
− Avoid ingestion
− Refrigerant Grade. Contaminants are water, less than − Manufacture of other chemicals
0.05 % m/m and oil, less than 0.001 % m/m.
Ammonia 100-R
BENEFITS
− Refrigeration liquid
− Product supply facility conveniently situated in the
industrial hub of Gauteng, South Africa SPECIAL PRECAUTIONS
− Unique logistics solution − Care must be exercised when opening the valves
Notes
Notes
AEL's Blast Consult team is a division of R & D houses a dedicated team of scientists and
highly skilled engineers who assist explosive technicians who all offer vast and varied backgrounds
customers to ensure that blasting is conducted in chemistry, physics, chemical and mechanical
efficiently and cost-effectively. Blast Consult engineering. This team incorporates a growing
spectrum of scientific approaches to explosives and
delivers data, expertise, systems, software
initiating systems.
and support in a way that will help customers
meet and exceed their production targets. The department exists to explore cutting edge research
while offering field and plant support on all new and
existing developed technologies. The team also ensures
that the group maintains a firm grasp on the anticipated
changes and developments in the world of explosives. To
further its efforts, the team attends many conferences
across all disciplines-including the National Institute
of Explosives Technology, the South African Society
of Rheology, the International Society of Explosives
Engineers, the International Pyrotechnics Society, SAFEX
and the European Federation of Explosives Engineers.
Blast Consult
AEL Blast Consult continues to underpin the technical The Blast Consult structure consists of a central pool
knowledge for mining and blasting, measurement, of specialists and experts supporting the regional
analysis, technical training and the information wealth technical professionals based in the frontline team. AEL
base. AEL will conduct various checks to ensure that continuously develops expert technical and blasting
blasted rock suits and complements the design of science training and “best practice” material for
equipment and plant. These checks include the following: the various blasting applications encountered at the
various customer sites AEL services. In addition focus
− Face velocity measurement is being given in developing customer training courses
through various educational institutions to meet the
− 3D blast face survey new regulatory requirements for training on equipment,
blasting techniques and technical issues. The AEL
− High speed videography
best practice material revolves around a “continuous
improvement” process.
− Rock mass motion study
− Fragmentation analysis
− Blast modelling
Predictive Software
Predictive Software looks at the mining operation HYBRID STRESS BLASTING MODEL (HSBM)
holistically to ensure that the benefits are derived
from improved efficiencies in equipment, plant and HSBM is a high-level blast modelling research tool.
beneficiation.
AEL DESIGNER (SABREX)
This is supported by AEL’s sophisticated
blasting software: Predictive blast modelling, fragmentation (Kuz-Ram),
Blast damage, Muck pile profile (Throw) software.
WINPROF AEL
AEL INTELLIHUB
Survey and Blast layout software.
Enables real time information pertaining to blasting
AEL TIE-UP parameters, i.e.: condition of blast-hole, types of
explosives loaded, quantity of explosives loaded, etc. This
Blast timing design for electronic and pyrotechnic information is stored in a database for future analysis,
initiating systems, analysis of the timing sequence, comparison and fine tuning of blast inputs and results. A
direction of movement, scatter, control of ground strong focus on geological domain information.
vibration and single hole firing.
AEL TUNNEL
AEL RING
Skills Enhancement
AEL Software
A key feature is AEL Tie-up’s capability to perform The ability to predict the outcome of a given blast design
a Monte Carlo simulation illustrating the effects of is important in determining the suitability of a specific
the timing scatter experienced with pyrotechnic and blast design. With this in mind AEL is building a blast
electronic detonators. prediction program, AEL Designer. The goal of this
program is to be able to predict what the outcome will be
In the mining industry a key word is “large data”, for a given set of blast parameters.
this encompasses all aspects of the mining practice
including geological, drilling, blasting, loading and
hauling data. The ability to display the data in a way
that is informative is imperative. AEL IntelliHub was
developed to address this need.
The current suite of Software allows for a blast to be ViewShot™ 3D is a blast delay design tool that interfaces
planned, recorded, modeled and predicted from start to with the “Shot” (Digi-, Intelli-) series of initiating
end with proven techniques based on experience and the systems. This software allows the user to design the
latest in mathematical modeling. blast delays from an imported survey file. The software
suite has the capability to accommodate multiple bench
In keeping with company values and reducing the blasts up to 16 000 detonators. It also offers a decking
amount of paper used on a blast, AEL Blast Consult option with multi-layer functionality while also providing
extended the Going Green value to its publications. a blast initiation simulation feature. A myriad of key
design tool options allows the user to optimise to the full
potential of electronic initiating systems.
https://play.google.com/store/apps/details?id=com.
embarcadero.AEL
https://itunes.apple.com/za/app/ael-surface-blasting-
handbook/id920768937?mt=8
SOFTWARE PACKAGES
AEL APPS:
Field Services
Notes
Notes
Equipment Services
− Technical support
− Training
The Modular Emulsion Manufacturing Plant consists of − Independent electronic pump protection system
the process equipment to mix and emulsify the different monitoring and controlling operating pressures and
products used. The modular concept was adopted to temperatures on critical pumps
place plants relatively quickly and easily where it’s
needed. Plant size, raw material storage and operational − Mechanical pump protection devices installed on all
facilities are directly dependent on the customer’s needs. critical pumps
This can be built on a comparatively small footprint.
− Bursting discs are fitted to emulsion pumps
APPLICATION
− Emergency stops are situated at critical locations
Used in Opencast and underground mining operations throughout the plant
with a requirement for bulk emulsions.
− Thermal oil Heating Units used for heat generation (
BENEFITS system is open to atmosphere)
− Proven reliability
TECHNICAL SPECIFICATIONS
− Integrated control systems, which guarantee constant
delivery of requested product quality and quantity
MODULAR EMULSION PLANTS
FEATURES
Production Pumping
180 to 300 kg/min
− Pump protection-guarding against dead-heading and Rates
dry-running scenarios
Emulsion Storage
− Strainers on the bin to prevent ingress of
foreign objects
20’ ISO-Tainers 28 t
− Siemens PLC control
Used for charging bulk emulsion in surface mining − Inspection hoods fitted on all auger couplings
operations by pumping and angering.
− Electronic pressure switches to monitor pressure in
BENEFITS the pipes.
SCANIA 6X4
Other
ASTRA 6X4
R Series
MPU R10T
− Reverse buzzer
APPLICATION
− Four Emergency E-stops around the MPU
Used for charging bulk emulsion in surface mining
operations by pumping.
− Electronic pressure switches to monitor pressure in
the pipes
BENEFITS
− Temperature probes to monitor product and hydraulic
− Proven on-bench reliability
oil temperature
− Integrated control systems, which guarantee constant
delivery of requested product quality and quantity TECHNICAL SPECIFICATIONS
− Varying pumping rates to suit bench hole diameters R SERIES MPU R10T
and conditions
Mobile Charging
Unit Jumbo 2T,
3T and 4T
PRODUCT DESCRIPTION
All MCU’s are designed to operate in the demanding
environments encountered during normal mining
− Emergency stops situated at critical locations
operations.
− Up-hole charging from a safe distance via remote
Design parameters include all necessary safety control
control pendent
systems, as well as ease of operation, maintenance and
reliability. Units are of modular design and are able to be
− Units have a meltable sight–glass on emulsion
mounted on all utility vehicles supplied or preferred by
tank, which melts when exposed to excessive heat
the customer.
eliminating the dangers associated with confinement
PRODUCT DESCRIPTION
All MCU’s are designed to operate in the demanding
environments encountered during normal
mining operations.
APPLICATION
TECHNICAL SPECIFICATIONS
Underground Development and can be used for short up-
holes if piston pump is replaced with PC pump as well as MCU 0.9T LANDCRUISER UNIT
small scale surface operations.
DESCRIPTION DETAILS
BENEFITS
To enhance the AEL offering, use is made of a rapid re-loading system whereby tankers of prill and
emulsion are parked at strategically sited re-loading bays between the storage silos and the bench.
MPU’s requiring refilling make use of either the prill tanker, the emulsion tanker or both to refill and
hence reduce the turnaround time of the MPU returning to the bench for further charging.
AEL pioneered the RRS (Rapid Reloading System) which was designed and approved locally for the benefit of the industry
at large. The RRS is now widely used across South Africa in various operations and effectively reduces the loading cycle
time and enables enhanced on-bench efficiency in a safe, responsible manner. This innovation allows for maximum
uptime of MPU’s on the bench by reducing the need for them to go off bench to a remote, static reload area.
The dual tanker design and patent resides with AEL and its service provider. This innovative idea allows for both products
to be transported simultaneously in order to improve economics, orders management, and aids production by reducing off-
loading times. The tanker has the ability to carry 20 tonnes of emulsion and 10 tonnes of prill in a single load. The design
and implementation of the Dual Tanker has been approved by the CIE and is currently servicing the Witbank coal market.
Three different pumps are available for standard − Easy to use and maintain. Equipment
and low compressed air pressure as well as hydropower. maintained in-situ
PCU010
PNEUMATIC HIGH PRESSURE
APPLICATION
PCU010
PNEUMATIC LOW PRESSURE
APPLICATION
PCU010
HYDRO
APPLICATION
− Hydro Power
BENEFITS
− Easy to operate
− Portable − Fixed ratio of emulsion to sensitiser creates a
− Robust and reliable constant delivery of the required quality/quantity
− Allows the application of emulsion explosives in − Flexible hose/lance configuration for use in
narrow reef and development environments confined spaces
− Suitable for the application of emulsion explosives in − Fixed delivery mass
short and small diameter holes in narrow reef stoping
(Eliminating the necessity to use package explosives) SAFETY FEATURES
− Sensitised pumped emulsion is cap sensitive
− 40 bar bursting disc
− Gassed pumped emulsion only becomes an explosive
− Pump is fully contained within an enclosed case
once it has been pumped into the blast-hole
Caution:* Changing the configuration as laid out, will Pumping Distance 5 m-10 m
impact on sensitisation quality, sensitivity in the blast- 16 Mpa (nominal)
hole and emulsion blast performance Hydro Power Requirement
(where applicable) 14 to 18 Mpa
Operating range
PCU011
PNEUMATIC
APPLICATION
PCU011
HYDRO
APPLICATION
− Gassed pumped emulsion only becomes an explosive − Pump is fully contained within an enclosed case
once it has been pumped into the blast-hole
TECHNICAL SPECIFICATIONS
BENEFITS OF MIXER CONFIGURATION
PCU011 (HYDRO)
− Better mixing
MCU
SHAFT SINKING UNIT
PRODUCT DESCRIPTION
The shaft sinking unit consists of multiple PCU pumps
(without the casing) mounted under the emulsion tank.
− Significant increase in the lifecycle of assets used Maximum Number of Drops As required
for charging