Professional Documents
Culture Documents
A Building Permit is required before construction can commence along with its Ancillary
Permits, such as Electrical Permits, Sanitary/Plumbing Permits, Mechanical Permits,
Electronics Permits
Requirement/s •
• Duly accomplished application form signed and
sealed by the Designer and Construction In-Charge
• Five (5) sets of the following:
- Building Plans signed and sealed by the
registered architect or civil engineer
- Bill of Materials (signed and sealed)
- Specifications (signed and sealed)
- Structural Design Computation
- Soil Boring Test (3-storey and above)
• Site Development Plan signed and sealed by a
registered Geodetic Engineer
• Transfer Certificate of Title (certified copy from the
Registry of Deeds)
If applicable, photocopies of the following:
- Extrajudicial Settlement
- Affidavit of Heirship
- Deed of Absolute Sale
- Certification/Authorization from the lot owner
- Board Resolution or Secretary's Certificate or
Authority for the signatories in the application
• Certified True Copies of the following documents:
- Tax Declaration of lot
- Current Tax Receipt
Ar. Ma.Concepcion
A. Alcantara
Engr. Terence V.
Agusan
Engr. Edwinilo G.
Nave
If compliant 15 minutes
Mr. Leo Embate
with the City Building (residential)
standards set Office
by the
National 20 minutes
Building (commercial)
Code, record
in the logbook
Approval of 8 hours
the different
technical
personnel:
- Line & Grade Engr. Liane A.
Officer Magto/Engr. Rico G.
Lorono
Engr. Rosanna D.
Rodriguez/Engr.
Terence Agusan/Ms.
Jean R. Neri
- Structural
Engr. Terence
Officer Agusan/Engr. Edgar
Patriana
- Sanitary &
Engr. Edwinilo Nave
Plumbing
Officer