You are on page 1of 12

INSUMOS CANT P.

U
ladrillo 44.0028 2.75 121.008 68.97 8345.90 8763 S/. 0.50
cemento 50 S/. 19.49
arena 10 S/. 29.66

METRADO P.U. INC TOTAL


122 88.5 S/. 10,797.00

DINERO SIN IGV


PRECIO UNITARIO SIN IGV

OPERARIO DIAS SALARIO PARCIAL


1er asentado 6 2 120 S/. 1,440.00
8 2 85 S/. 1,360.00
2do asentado 2 2 120 S/. 480.00
4 2 85 S/. 680.00

DIFERENCIA (1)-(2) S/. 311.89


SUB TOTAL
S/. 4,381.60
S/. 974.58
S/. 400.00
S/. 5,756.17
S/. 47.18

S/. 4,271.89 A USAR (1)


S/. 35.02

S/. 27.82

S/. 3,960.00 (-2) S/. 32.46


ANALISIS DE COSTO UNITARIO

PARTIDA Nº: Tarrajeo de cielo raso e=1.5cm

CUADRILLA:

Rendimiento 20.00 m2/día


Unidad m2

DESCRIPCION UND CUADRILLA CANTIDAD P.UNIT


MATERIALES

CEMENTO PORTLAND TIPO I (42.5 kg) bls 0.2570 22.50


ARENA FINA m3 0.0330 45.00

COSTO MATERIALES
MANO DE OBRA
OPERARIO HH 1.0000 0.4000 11.89
OFICIAL HH 0.0000 0.0000 10.64
PEON HH 0.5000 0.2000 9.61
PEON ACARREO HH 2.0000 0.8000 9.61

COSTO MANO DE OBRA S/.


EQUIPO Y HERRAMIENTAS
HERRAMIENTAS MANUALES(3%) %MO 0.03 14.37
MEZA UND 6.00 0.81
0.0000
COSTO EQUIPO Y HERRAMIENTAS S/.
TOTAL S/.
RIO

METRADO P.U TOTAL


AREA 587.547 S/. 26.95 S/. 15,834.39

PARCIAL TOTAL
0

S/. 5.78
S/. 1.49
0
COSTO MATERIALES S/. 7.27

S/. 4.76
S/. -
S/. 1.92
S/. 7.69

COSTO MANO DE OBRA S/. 14.37

S/.0.43
S/.4.88
0.00
UIPO Y HERRAMIENTAS S/. 5.31
TOTAL S/. 26.95
ANALISIS DE COSTO UNITARIO

PARTIDA Nº: Tarrajeo de muros interiores y exteriores e=1.5cm mezcla 1:5

CUADRILLA:

Rendimiento 18.00 m2/día


Unidad m2

DESCRIPCION UND CUADRILLA CANTIDAD P.UNIT


MATERIALES

CEMENTO PORTLAND TIPO I (42.5 kg) bls 0.1170 22.50


ARENA FINA m3 0.0160 45.00

COSTO MATERIALES
MANO DE OBRA
OPERARIO HH 1.0000 0.4444 11.89
OFICIAL HH 0.0000 0.0000 10.64
PEON HH 0.5000 0.2222 9.61
PEON ACARREO HH 2.0000 0.8889 9.61

COSTO MANO DE OBRA S/.


EQUIPO Y HERRAMIENTAS
HERRAMIENTAS MANUALES(3%) %MO 0.03 15.96
ANDAMIOS UND 2.00 0.81
0.0000
COSTO EQUIPO Y HERRAMIENTAS S/.
TOTAL S/.
ARIO

iores y exteriores e=1.5cm mezcla 1:5


METRADO P.U TOTAL
MUROS INT Y EXTE 82.6059 S/. 21.42 S/. 1,769.42

PARCIAL TOTAL
0

S/. 2.63
S/. 0.72
0
COSTO MATERIALES S/. 3.35

S/. 5.28
S/. -
S/. 2.14
S/. 8.54

COSTO MANO DE OBRA S/. 15.96

S/.
0.48
S/.
1.63
0.00
UIPO Y HERRAMIENTAS S/. 2.11
TOTAL S/. 21.42
ANALISIS DE COSTO UNITARIO

PARTIDA Nº: Tarrajeo de VIGAS Y COLUMNAS e=1.5cm mezcla 1:5

CUADRILLA:

Rendimiento 15.00 m/día


Unidad m

DESCRIPCION UND CUADRILLA CANTIDAD P.UNIT


MATERIALES

CEMENTO PORTLAND TIPO I (42.5 kg) bls 0.1170 22.50


ARENA FINA m3 0.0160 45.00

COSTO MATERIALES
MANO DE OBRA
OPERARIO HH 1.0000 0.5333 11.89
OFICIAL HH 0.0000 0.0000 10.64
PEON HH 0.5000 0.2667 9.61
PEON ACARREO HH 2.0000 1.0667 9.61

COSTO MANO DE OBRA S/.


EQUIPO Y HERRAMIENTAS
HERRAMIENTAS MANUALES(3%) %MO 0.03 19.15
ANDAMIOS UND 1.00 0.81
0.0000
COSTO EQUIPO Y HERRAMIENTAS S/.
TOTAL S/.
IO

COLUMNAS e=1.5cm mezcla 1:5


UND METRADO P.U TOTAL
VIGAS m 157.7093 S/. 23.88 S/. 3,766.10
COLUMNAS m 93.10 S/. 23.88 S/. 2,223.23

PARCIAL TOTAL
0

S/. 2.63
S/. 0.72
0
COSTO MATERIALES S/. 3.35

S/. 6.34
S/. -
S/. 2.56
S/. 10.25

COSTO MANO DE OBRA S/. 19.15

S/. 0.57
S/. 0.81
0.00
UIPO Y HERRAMIENTAS S/. 1.38
TOTAL S/. 23.88
ANALISIS DE COSTO UNITARIO

PARTIDA Nº: Tarrajeo de VIGAS Y COLUMNAS e=1.5cm mezcla 1:5

CUADRILLA:

Rendimiento 15.00 m/día


Unidad m

DESCRIPCION UND CUADRILLA CANTIDAD P.UNIT


MATERIALES

CEMENTO PORTLAND TIPO I (42.5 kg) bls 0.1286 22.50


ARENA GRUESA m3 0.0291 40.00

COSTO MATERIALES
MANO DE OBRA
OPERARIO HH 1.0000 0.5333 11.89
OFICIAL HH 1.0000 0.5333 10.64
PEON HH 0.5000 0.2667 9.61
PEON ACARREO HH 2.0000 1.0667 9.61

COSTO MANO DE OBRA S/.


EQUIPO Y HERRAMIENTAS
HERRAMIENTAS MANUALES(3%) %MO 0.03 24.82
0.0000
COSTO EQUIPO Y HERRAMIENTAS S/.
TOTAL S/.
IO

COLUMNAS e=1.5cm mezcla 1:5


UND METRADO P.U TOTAL
LOSETA m2 287.395 S/. 29.62 S/. 8,512.64

F 360 12
PARCIAL TOTAL G 390 12
0

S/. 2.89
S/. 1.17
0
COSTO MATERIALES S/. 4.06

S/. 6.34
S/. 5.67
S/. 2.56
S/. 10.25

COSTO MANO DE OBRA S/. 24.82

S/. 0.74
0.00
UIPO Y HERRAMIENTAS S/. 0.74
TOTAL S/. 29.62
30 35.4
32.5 38.35
METRADO EN BLOQUES: m2 1
DESPERDICIO: % 5%

LOSETA VENECIANA Und 12

7.18

METRADO EN MORTEROS m3 1 40 0.128625


DESPERDICIO: % 5%

CEMENTO (bls) ARENA (m3) AGUA (lt)


MORTERO 1:8 5.15 1.17 281.40
INSUMOS UNITARIOS 0.13 0.03 7.04