You are on page 1of 6

URAIAN ANALISAALAT BIAYA

No. URAIAN KODE HP KAP. HARGA SEWA KET.


ALAT ALAT/JAM
No. U RAI AN KODE KOEF. SATUAN KET. (di luar PPN)

1 ASPHALT MIXING PLANT E01 294.0 60.0 T/Jam 2,500,000,000 3,974,296.64


A. URAIAN PERALATAN 2 ASPHALT FINISHER E02 72.4 10.0 Ton 600,000,000 237,448.64
1. Jenis Peralatan ASPHALT MIXING PLANT E01 3 ASPHALT SPRAYER E03 4.0 850.0 Liter 200,000,000 88,019.55
2. Tenaga Pw 294.0 HP 4 BULLDOZER 100-150 HP E04 155.0 1,711,500,000 709,254.26
3. Kapasitas Cp 60.0 T/Jam 5 COMPRESSOR 4000-6500 L/M E05 60.0 5,000.0 L/M 100,000,000 118,263.58
4. Alat a. Umur Ekonomis A 10.0 Tahun 6 CONCRETE MIXER 0,3-0,6 M3 E06 20.0 500.0 Liter 15,000,000 59,992.86
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam 7 DUMPTRUCK 3 - 4 M3 E07 130.0 3.5 Ton 365,000,000 303,968.73
c. Harga Alat B 2,500,000,000.0 Rupiah 8 DUMPTRUCK 10 TON E08 190.0 10.0 Ton 425,000,000 358,054.92
9 EXCAVATOR 80-140 HP E09 148.0 0.9 M3 898,065,000 306,677.16 898065000
1 10 GENERATOR SET E10 180.0 135.0 KVA 450,000,000 312,188.36
11 MOTOR GRADER >100 HP E11 135.0 10,800.0 1,100,000,000 405,721.47
5 Kapastas tangki aspal Ca 60,000.00 liter 12 WHEEL LOADER 1.0-1.6 M3 E12 96.0 1.5 M3 1,100,000,000 368,193.76
13 TANDEM ROLLER 6-8 T. E12 82.0 8.1 Ton 450,000,000 214,800.86
B. BIAYA PASTI PER JAM KERJA 14 P.TIRE ROLLER 8-10 T. E14 100.5 9.0 Ton 500,000,000 205,817.88
1. Nilai Sisa Alat = 10 % x B C 250,000,000 Rupiah 15 VIBRATORY ROLLER 5-8 T. E15 82.0 7.1 Ton 650,000,000 257,717.91
16 WATER TANKER 3000-4500 L. E16 100.0 4,000.0 Liter 235,000,000 196,689.40
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.23852 - 17 STONE CRUSHER E17 220.0 60.0 T/Jam 1,800,000,000 732,022.56
(1 + i)^A - 1 18 SHEEP FOOT ROLLER E18 975,000,000 297,855.69
3. Biaya Pasti per Jam : 19 BLENDING EQUIPMENT E52 50.0 30.0 Ton 500,000,000 218,172.03
a. Biaya Pengembalian Modal = (B-C)xD E 357,784.14 Rupiah 20 CONCRETE VIBRATOR E20 5.5 25.0 75,000,000 #REF!
W 21 TRUCK MIXER (AGITATOR) E49 220.0 5.0 M3 750,000,000 558,500.65
22 CONCRETE PAN MIXER E43 134.0 600.0 Liter 1,000,000,000 548,425.65
b. Asuransi, dll = 0.002 x B F 3,333.33 Rupiah
W

Biaya Pasti per Jam = (E+ F) G 361,117.47 Rupiah

C. BIAYA OPERASI PER JAM KERJA


1. Bahan Bakar = (0.125 -0.175) x Pw x Ms H1 189,262.50 Rupiah
Bahan Bakar Pemanasan Material 12x 0,7 Cp x Ms H2 2,595,600.00 Rupiah Khusus AMP
dan aspal (Oil Heater)
Bahan Bakar Pemanas Aspal = 1/1000 *Ca*Ms H3 309,000.00

2. Pelumas = (0.01 - 0.02) x Pw x Mp I 102,900.00 Rupiah

3. Biaya bengkel (6.25% dan 8.75%) x B J 145,833


W
4. Biaya perbaikan (12,5 % - 17,5 %) x B K 208,333.33 Rupiah
W
5 Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah
6 Pembantu Operator = ( 3 Orang / Jam ) x U2 M 38,250.00 Rupiah

Biaya Operasi per Jam = (H+I+J+K+L+M) P 3,613,179.17 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P ) T 3,974,296.64 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,550.00 Liter
5. Bahan Bakar Solar Ms 5,150.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter

7 PPN diperhitungkan pada lembar Rekapitulasi


Biaya Pekerjaan
8 Bahan bakar Batubara

URAIAN ANALISAALAT

No. U RAI AN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT FINISHER E02
2. Tenaga Pw 72.4 HP
3. Kapasitas Cp 10.0 Ton
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 600,000,000 Rupiah
5.

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 60,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.23852 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 64,401.14 Rupiah
W

b. Asuransi, dll = 0.002 x B F 600.00 Rupiah


W

Biaya Pasti per Jam = (E+ F) G 65,001.14 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125 - 0.175) x Pw x Ms H 46,607.50 Rupiah

2. Pelumas = (0.01 - 0.02) x Pw x Mp I 25,340.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 26,250.00


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 37,500.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,750.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 172,447.50 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P) S 237,448.64 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,550.00 Liter
5. Bahan Bakar Solar Ms 5,150.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISAALAT

No. U RAI AN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT SPRAYER E03
2. Tenaga Pw 4.0 HP
3. Kapasitas Cp 850.0 Liter
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 200,000,000 Rupiah

5 Kapastas tangki aspal Ca 850 Liter

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 20,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.23852 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 21,467.05 Rupiah
W

b. Asuransi, dll = 0.002 x B F 200.00 Rupiah


W

Biaya Pasti per Jam = (E+ F) G 21,667.05 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125 - 0.175) x Pw x Ms H 2,575.00 Rupiah


Bahan Bakar Pemanas Aspal = 1/1000 *Ca*Ms H3 4,377.50 Rupiah

2. Pelumas = (0.01 - 0.02) x Pw x Mp I 1,400.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 8,750.00 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 12,500.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,750.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 66,352.50 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P) S 88,019.55 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,550.00 Liter
5. Bahan Bakar Solar Ms 5,150.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

No. U RAI AN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan E04 BULLDOZER E04
2. Tenaga Pw 155.0 HP
3. Kapasitas Cp 5.4 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,711,500,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 171,150,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.33438 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 257,530.89 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,711.50 Rupiah


W

Biaya Pasti per Jam = (E+ F) G 259,242.39 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = 12% x Pw x Ms H 95,790.00 Rupiah

2. Pelumas = 2.5% x Pw x Mp I 135,625.00 Rupiah

Biaya bengkel 6.25% x B J 74,878


W

3. Perawatan dan 12,5 % x B K 106,968.75 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,750.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 450,011.88 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P) S 709,254.26 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,550.00 Liter
5. Bahan Bakar Solar Ms 5,150.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

No. U RAI AN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan COMPRESSOR 4000-6500 L\M E05
2. Tenaga Pw 60.0 HP
3. Kapasitas Cp 5,000.0 CPM/(L/m)
4. Alat Baru : a. Umur Ekonomis A 9.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 100,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 10,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.24808 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 11,163.58 Rupiah
W

b. Asuransi, dll = 0.002 x B F 100.00 Rupiah


W

Biaya Pasti per Jam = (E+ F) G 11,263.58 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125 - 0.175) x Pw x Ms H 38,625.00 Rupiah

2. Pelumas = (0.01 - 0.02) x Pw x Mp I 21,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 4,375.00 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 6,250.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,750.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 107,000.00 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P) S 118,263.58 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,550.00 Liter
5. Bahan Bakar Solar Ms 5,150.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

No. U RAI AN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3 E06
2. Tenaga Pw 20.0 HP
3. Kapasitas Cp 500.0 Liter
4. Alat Baru : a. Umur Ekonomis A 8.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 15,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 1,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26061 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 1,759.11 Rupiah
W

b. Asuransi, dll = 0.002 x B F 15.00 Rupiah


W

Biaya Pasti per Jam = (E+ F) G 1,774.11 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125 - 0.175) x Pw x Ms H 12,875.00 Rupiah

2. Pelumas = (0.01 - 0.02) x Pw x Mp I 7,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 656.25 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 937.50 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,750.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 58,218.75 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P) S 59,992.86 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,550.00 Liter
5. Bahan Bakar Solar Ms 5,150.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

No. U RAI AN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 3-4 Ton E07
2. Tenaga Pw 130.0 HP
3. Kapasitas Cp 3.5 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,600.0 Jam
c. Harga Alat B 365,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 36,500,000 Rupiah
2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -
(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 54,160.92 Rupiah
W

b. Asuransi, dll = 0.002 x B F 456.25 Rupiah


W

Biaya Pasti per Jam = (E+ F) G 54,617.17 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125 - 0.175) x Pw x Ms H 118,625.00 Rupiah

2. Pelumas = (0.01 - 0.02) x Pw x Mp I 45,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 19,960.94 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 28,515.63 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,750.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 249,351.56 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P) S 303,968.73 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir / Mekanik U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 7,500.00 Liter
5. Bahan Bakar Solar Ms 7,300.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

No. U RAI AN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 10 TON E08
2. Tenaga Pw 190.0 HP
3. Kapasitas Cp 10.0 Ton
4. Alat Baru : a. Umur Ekonomis A 8.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 425,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 42,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.18744 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 35,848.67 Rupiah
W

b. Asuransi, dll = 0.002 x B F 425.00 Rupiah


W

Biaya Pasti per Jam = (E+ F) G 36,273.67 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125 - 0.175) x Pw x Ms H 173,375.00 Rupiah

2. Pelumas = (0.01 - 0.02) x Pw x Mp I 66,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 18,594 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 26,562.50 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,750.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 321,781.25 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P) S 358,054.92 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir / Mekanik U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 7,500.00 Liter
5. Bahan Bakar Solar Ms 7,300.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

No. U RAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR 80-140 HP E09
2. Tenaga Pw 148.0 HP
3. Kapasitas Cp 0.93 M3
4. Alat Baru : a. Umur Ekonomis A 8.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 64,000.0 Jam
c. Harga Alat B 898,065,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 89,806,500 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.18744 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 2,367.24 Rupiah
W

b. Asuransi, dll = 0.002 x B F 28.06 Rupiah


W

Biaya Pasti per Jam = (E +F) G 2,395.30 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125 - 0.175) x Pw x Ms H 135,050.00 Rupiah

2. Pelumas = (0.025 - 0.03) x Pw x Mp I 129,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 1,228 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 1,754.03 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,750.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 304,281.86 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G +P) S 306,677.16 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 7,500.00 Liter
5. Bahan Bakar Solar Ms 7,300.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

No. U RAI AN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan GENERATOR SET E10
2. Tenaga Pw 180.0 HP
3. Kapasitas Cp 135.0 KVA
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 450,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 45,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.23852 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 48,300.86 Rupiah
W

b. Asuransi, dll = 0.002 x B F 450.00 Rupiah


W

Biaya Pasti per Jam = (E+ F) G 48,750.86 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 115,875.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 63,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 19,688 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 28,125.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,750.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 263,437.50 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P) S 312,188.36 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,550.00 Liter
5. Bahan Bakar Solar Ms 5,150.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

No. U RAI AN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan MOTOR GRADER >100 HP E10
2. Tenaga Pw 135.0 HP
3. Kapasitas Cp 10,800.0 Kg
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,100,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 110,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.16275 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 80,558.97 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,100.00 Rupiah


W

Biaya Pasti per Jam = (E+ F) G 81,658.97 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125 - 0.175) x Pw x Ms H 123,187.50 Rupiah

2. Pelumas = (0.01 - 0.02) x Pw x Mp I 47,250.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 48,125.00 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 68,750.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,750.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 324,062.50 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P) S 405,721.47 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 7,500.00 Liter
5. Bahan Bakar Solar Ms 7,300.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

No. U RAI AN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WHEEL LOADER 1.0-1.6 M3 E11
2. Tenaga Pw 96.0 HP
3. Kapasitas Cp 1.5 M3
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,100,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 110,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.23852 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 118,068.76 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,100.00 Rupiah


W

Biaya Pasti per Jam = (E+ F) G 119,168.76 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125 - 0.175) x Pw x Ms H 61,800.00 Rupiah

2. Pelumas = (0.01 - 0.02) x Pw x Mp I 33,600.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 48,125.00 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 68,750.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,750.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 249,025.00 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P) S 368,193.76 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,550.00 Liter
5. Bahan Bakar Solar Ms 5,150.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

No. U RAI AN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TANDEM ROLLER 6-8 T. E12
2. Tenaga Pw 82.0 HP
3. Kapasitas Cp 8.1 Ton
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 450,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 45,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.23852 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 48,300.86 Rupiah
W

b. Asuransi, dll = 0.002 x B F 450.00 Rupiah


W

Biaya Pasti per Jam = (E+ F) G 48,750.86 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125 - 0.175) x Pw x Ms H 52,787.50 Rupiah

2. Pelumas = (0.01 - 0.02) x Pw x Mp I 28,700.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 19,687.50 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 28,125.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,750.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 166,050.00 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P) S 214,800.86 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,550.00 Liter
5. Bahan Bakar Solar Ms 5,150.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

No. U RAI AN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan P.TIRE ROLLER 8-10 T. E13
2. Tenaga Pw 60.0 HP
3. Kapasitas Cp 100.5 Ton
4. Alat Baru : a. Umur Ekonomis A 9.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 500,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 50,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.24808 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 55,817.88 Rupiah
W

b. Asuransi, dll = 0.002 x B F 500.00 Rupiah


W

Biaya Pasti per Jam = (E+ F) G 56,317.88 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125 - 0.175) x Pw x Ms H 38,625.00 Rupiah

2. Pelumas = 0.01 - 0.02) x Pw x Mp I 21,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 21,875.00 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 31,250.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,750.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 149,500.00 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P) S 205,817.88 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,550.00 Liter
5. Bahan Bakar Solar Ms 5,150.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

URAIAN ANALISAALAT

No. U RAI AN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATORY ROLLER 5-8 T. E14
2. Tenaga Pw 82.0 HP
3. Kapasitas Cp 7.1 Ton
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 650,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 65,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.23852 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 69,767.91 Rupiah
W

b. Asuransi, dll = 0.002 x B F 650.00 Rupiah


W

Biaya Pasti per Jam = (E+ F) G 70,417.91 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125 - 0.175) x Pw x Ms H 52,787.50 Rupiah

2. Pelumas = (0.01 - 0.02) x Pw x Mp I 28,700.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 28,438 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 40,625.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,750.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 187,300.00 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P) S 257,717.91 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,550.00 Liter
5. Bahan Bakar Solar Ms 5,150.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

No. U RAI AN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WATER TANKER 3000-4500 L E16
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 4,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 235,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 23,500,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.33438 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 35,360.65 Rupiah
W

b. Asuransi, dll = 0.002 x B F 235.00 Rupiah


W

Biaya Pasti per Jam = (E+ F) G 35,595.65 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = 12% x Pw x Ms H 64,375.00 Rupiah

2. Pelumas = 2.5% x Pw x Mp I 35,000.00 Rupiah

Biaya bengkel 6.25% x B J 10,281 Rupiah


W

3. Perawatan dan 12,5 % x B K 14,687.50 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,750.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 161,093.75 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P) S 196,689.40 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,550.00 Liter
5. Bahan Bakar Solar Ms 5,150.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

No. U RAI AN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan STONE CRUSHER E16
2. Tenaga Pw 220.0 HP
3. Kapasitas Cp 60.0 T/Jam
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,800,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 180,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.33438 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 270,847.56 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,800.00 Rupiah


W

Biaya Pasti per Jam = (E+ F) G 272,647.56 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125 - 0.175) x Pw x Ms H 141,625.00 Rupiah

2. Pelumas = (0.01 - 0.02) x Pw x Mp I 77,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 78,750 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 112,500.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah


5. Pembantu Operator = ( 2 Orang / Jam ) x U2 M 25,500.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 459,375.00 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P) S 732,022.56 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,550.00 Liter
5. Bahan Bakar Solar Ms 5,150.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

No. U RAI AN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan SHEEP FOOT ROLLER E18
2. Tenaga Pw 90.0 HP
3. Kapasitas Cp 10.0 Ton
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 800,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 80,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.23852 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 85,868.19 Rupiah
W

b. Asuransi, dll = 0.002 x B F 800.00 Rupiah


W

Biaya Pasti per Jam = (E+ F) G 86,668.19 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125 - 0.175) x Pw x Ms H 57,937.50 Rupiah

2. Pelumas = (0.01 - 0.02) x Pw x Mp I 31,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 35,000 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 50,000.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,750.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 211,187.50 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P) S 297,855.69 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,550.00 Liter
5. Bahan Bakar Solar Ms 5,150.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

No. U RAI AN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan BLENDING EQUIPMENT E52
2. Tenaga Pw 50.0 HP
3. Kapasitas Cp 30.0 Ton
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,600.0 Jam
c. Harga Alat B 500,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam
c. Harga Alat (*) B' 500,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 50,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.23852 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 67,084.53 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 625.00 Rupiah


W'

Biaya Pa sti per J am = ( E+ F ) G 67,709.53 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.12-0.15 Ltr/HP/Jam) x Pw x Ms H 30,900.00 Rupiah

2. Pelumas = (0.025-0.03 Ltr/HP/Jam) x Pw x Mp I 43,750.00 Rupiah

3. Perawatan dan perbaikan = (12,5 % - 17,5 %) x B K 39,062.50 Rupiah


W'

4. Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,750.00 Rupiah

Biaya Opera si per Jam = (H+I+K+L +M) P 150,462.50 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P) S 218,172.03 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,550.00 Liter
5. Bahan Bakar Solar Ms 5,150.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

No. U RAI AN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE VIBRATOR #REF!
2. Tenaga Pw #REF! HP
3. Kapasitas Cp #REF! M3/jam
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B #REF! Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C #REF! Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.38629 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E #REF! Rupiah
W

b. Asuransi, dll = 0.002 x B F #REF! Rupiah


W

Biaya Pasti per Jam = (E+ F) G #REF! Rupiah


C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = 12% x Pw x Ms H #REF! Rupiah

2. Pelumas = 2.5% x Pw x Mp I #REF! Rupiah

Biaya bengkel 6.25% x B J #REF! Rupiah


W

3. Perawatan dan 12,5 % x B K #REF! Rupiah


perbaikan = W

4. Pekerja = ( 1 Orang / Jam ) x U1 L 12,750.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P #REF! Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P) S #REF! Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Pekerja U1 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,550.00 Liter
5. Bahan Bakar Solar Ms 5,150.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

No. U RAI AN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TRUCK MIXER (AGITATOR) E49
2. Tenaga Pw 220 HP
3. Kapasitas Cp 5.00 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 750,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 75,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.33438 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 112,853.15 Rupiah
W

b. Asuransi, dll = 0.002 x B F 750.00 Rupiah


W

Biaya Pasti per Jam = (E+ F) G 113,603.15 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = 12% x Pw x Ms H 135,960.00 Rupiah

2. Pelumas = 2.5% x Pw x Mp I 192,500.00 Rupiah

Biaya bengkel 6.25% x B J 32,813 Rupiah


W

3. Perawatan dan 12,5 % x B K 46,875.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,750.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 444,897.50 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P ) T 558,500.65 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,550.00 Liter
5. Bahan Bakar Solar Ms 5,150.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

No. U RAI AN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE PAN MIXER E43
2. Tenaga Pw 134 HP
3. Kapasitas Cp 600.00 Liter
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 1,000,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 100,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.23852 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 143,113.65 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,333.33 Rupiah


W

Biaya Pasti per Jam = (E+ F) G 144,446.99 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = 12% x Pw x Ms H 82,812.00 Rupiah

2. Pelumas = 2.5% x Pw x Mp I 117,250.00 Rupiah

Biaya bengkel 6.25% x B J 58,333 Rupiah


W

3. Perawatan dan 12,5 % x B K 83,333.33 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 24,000.00 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 38,250.00 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 403,978.67 Rupiah

D. TOTAL BIAYA SEWAALAT / JAM = ( G + P ) T 548,425.65 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 24,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,750.00 Rp./Jam
4. Bahan Bakar Bensin Mb 6,550.00 Liter
5. Bahan Bakar Solar Ms 5,150.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Code Activity Predecessor Durasi
1 DIVISI 1. UMUM
2 Mobilisasi #REF!
3 Demobilisasi 22 #REF!
4 Manajemen dan Keselamatan Lalu Lintas #REF!
5 DIVISI 2. DRAINASE
6 Galian Drainase U-Ditch 2 #REF!
7 Galian Drainase Tipe DS-4 2 #REF!
8 Pekerjaan Drainase Tipe DS-8
9 - Beton Kelas E 2 #REF!
10 DIVISI 3. PEKERJAAN TANAH
11 Galian Biasa 4 #REF!
12 Timbunan 2 #REF!
13 DIVISI 4. PEKERJAAN BAHU JALAN
14 Lapis Pondasi Agregat Kelas A 18 #REF!
15 Lapis Pondasi AC-Base (ATB) 20 #REF!
16 DIVISI 5. PEKERJAAN PEKERJAAN BERBUTIR
17 Lapis Pondasi Agregat Kelas A 18 #REF!
18 Lapis Pondasi Agregat Kelas B 12 #REF!
19 DIVISI 7. PERKERASAN ASPAL
20 Bitumen Lapis Resap Pengikat (Prime Coat) 17 #REF!
21 Bitumen Lapis Resap Perekat (Tack Coat) 23 #REF!
22 Asphalt Concrete Wearing Course (AC-WC) 21 #REF!
23 Asphalt Concrete Binder Course (AC-BC) 20 #REF!
24 Asphalt Concrete Base (AC-Base) 20 #REF!
25 DIVISI 9. PEKERJAAN STRUKTUR
26 Concrete Barrier
27 - Beton Kelas B-1 15 #REF!
Biaya

#REF!
#REF!
#REF!

#REF!
#REF!

#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

You might also like