You are on page 1of 2

INTERNAL VERIFICATION – ASSESSMENT DECISIONS

Qualification Pearson BTEC Level 3 Extended Diploma in mechanical engineering (Y2)


Assessor’s Name Malek Internal Verifier Sherif Hassan
Learning Outcome(s) Unit Electro, pneumatic and
4 15 Unit title :
Number Number hydraulic Systems and devices
Assignment Number: 2 Assignment Title: Carrying out fluid maintenance
Assignment Type Sub. ( ) Re-Sub. ( √ ) Retake ( ) Repeat ( )
Which criteria has the assessor awarded? Inaccurate
IV Agree?
Student’s name Decisions/
Pass Merit Distinction Y/N
Grades
1 ABDELMONEM MOHAMED P8,P9 M2 D1,D2 Y
2 SHADY OMAR BAKHIT P8,P9 M2 D1,D2 Y
Do the criteria awarded match those targeted by the
assignment brief? Y
Is the Pass/Merit/Distinction grade awarded justified Y
by the assessor’s comments on the student work?

Has the work been assessed accurately? Y

Is the feedback to the learner:


● Link to relevant assessment criteria Y
● Justify each assessment criterion awarded
● Provide appropriate guidance to the learner
without giving specific actions for improvement
In case of : after resubmissions
( end of assessment) only: Y
Is the feedback to the learner:
• Identifying opportunities for improved
performance?
• Agreeing actions?
Has every learner and the Assessor confirmed the Y
authenticity of the evidence?

Is there evidence of collusion or plagiarism? N

Does the grading decision need amending? N

Action Required:

Assessor signature Date 20-1-2019

Internal Verifier signature Date 20-1-2019


Programme Leader / HoD
Date
signature (if required)

General comment or recommendations ( If Appropriate ):

AITEC - QA 2017
Internal Verification of Assignment Decision. V.1
Essential Action Required
Any actions required must be reviewed across the whole cohort.

Target Date for


Action Required
Completion

1-

2-

3-

Confirm action completed


Any actions required must be reviewed across the whole cohort.

I confirm that the assessment decisions are accurate, there is no evidence of


assessment malpractice and any action points have been addressed and
completed in respect of the whole cohort.

Internal Verifier signature Date

Assessor signature Date

Programme Leader / HoD


Date
signature (if required)

AITEC - QA 2017
Internal Verification of Assignment Decision. V.1

You might also like