1. Preparation of 1.1Failure of special tools and test Assigned 1.1.1Damaged tools and equipment shall be
tools and equipment. workers, Sub- immediately removed from the site and 2 1 2
equipment prior contractors, returned to designated department for
to start of work. Third Party immediate repair and condemnation.
1.1.2 Inspection test for the manifold shall be
made available at the site.
1.1.3 All special tools and test instruments to
be used shall bear a valid calibration
certificates/sticker indicating the
calibration validity.
EEI CORPORATION
EEI CORPORATION
JG SUMMIT NAPHTHA CRACKER PLANT PROJECT
JOB NO. 7105
SAFETY, HEALTH, ENVIRONMENT AND SECURITY DEPARTMENT
2. Erection and use 2.1 Failure of Scaffold Structure Workers, Sub- 2.1.1 Scaffold platforms shall not use as 2 3 6
of scaffold contractors, staging area for fabricated and pre-
structure for Client fabricated pipes for installation.
elevated works. 2.1.2 Scaffold railings shall not be used as
temporary support for pipe/s being
erected.
2.1.3 Only trained and experienced scaffold
craftsmen shall be allowed to erect,
alter and/or dismantle scaffold
structures.
2.1.4 Inspection/s shall be conducted by a
Scaffold Inspector or both depending
on the type of scaffold to be use prior
to start of work. Re-inspection of
erected scaffold shall be done every
one (1) weeks.
2.2 Falls from elevated platforms Workers, Sub- 2.2.1 Over-reaching or transferring from
contractors, different levels without using the 2 2 4
EEI CORPORATION
EEI CORPORATION
JG SUMMIT NAPHTHA CRACKER PLANT PROJECT
JOB NO. 7105
SAFETY, HEALTH, ENVIRONMENT AND SECURITY DEPARTMENT
2.3 Struck by falling object from Workers, Sub- 2.3.1 Secure all tools and equipment being
elevated platforms. contractors, used on elevated platforms by 3 3 9
Client retaining strings.
2.3.2 Avoid passing of tools from different
level while working on elevated
platforms.
2.3.3 All work activities shall be properly
coordinated to prevent parallel
activities.
2.3.4 Install barricades and warning signs
below the scaffold structures to
prevent unauthorized entry.
2.4 Electric shock Workers, sub- 2.4.1 Layout of temporary electrical cables 2 3 6
contractors, and service extension cords shall only
Client be allowed to pass on the outer
EEI CORPORATION
EEI CORPORATION
JG SUMMIT NAPHTHA CRACKER PLANT PROJECT
JOB NO. 7105
SAFETY, HEALTH, ENVIRONMENT AND SECURITY DEPARTMENT
3. Compress gas / 3.1 Contact with sharp edges of tools Assigned 3.1.1 Removed damaged tools and
air application and equipment. workers, Sub- equipment. 3 3 9
activity. contractors, 3.1.2 Provide guards to sharp edges of all
Third Party equipment.
3.1.3 Secure a work permit prior to start of
the activity.
3.1.4 Provide proper personal protective
equipment to all employees assigned
for the activity.
3.2 Struck by high pressure air due to 3.2.1 Make sure all openings are closed,
hose disconnection. plugged, copped or blinded. 3 3 9
3.2.2 Provide whiplash arrestor to all hose
connection.
3.2.3 Correct size of relief valve/s shall be
provided during the testing. No testing
shall commence if incorrect size or no
relief valve/s is available during the
testing.
3.2.4 Rapid increase of pressure shall not be
permitted.
3.2.5 Bleed valve shall be always be in place.
3.2.6 Striking or working on equipment
EEI CORPORATION
EEI CORPORATION
JG SUMMIT NAPHTHA CRACKER PLANT PROJECT
JOB NO. 7105
SAFETY, HEALTH, ENVIRONMENT AND SECURITY DEPARTMENT
EEI CORPORATION
EEI CORPORATION
JG SUMMIT NAPHTHA CRACKER PLANT PROJECT
JOB NO. 7105
SAFETY, HEALTH, ENVIRONMENT AND SECURITY DEPARTMENT
EEI CORPORATION