You are on page 1of 5

PIP ING TO CHECK

POSSIBILITY TO PUT
VERTICAL BRACING
ALONG THE
STRUCTURE ( AS
TRUSS DESIGN)
1. PIP ING TO CHECK
POSSIBILITY TO PUT
HORIZONTAL BRACING
BRACING ALONG THE LINE
SUPPORT STRUCTURE )
2. PIP TO CHECK IF BEAM
UNDER HEADER LINE
ANCHOR POINT IS
ACCEPTABLE
ING TO CHECK
BILITY TO PUT
ONTAL BRACING
NG ALONG THE LINE
ORT STRUCTURE )
TO CHECK IF BEAM
R HEADER LINE
OR POINT IS
PTABLE

You might also like