CRONOGR

"REPARACION DE VIAS VECINALES, EN EL(LA) TRAMO 1 AL 1942 DEL PUENTE COLGANTE UCH

ITEM PARTIDA UNIDAD

01 OBRAS PRELIMINARES
01.01 CARTEL DE OBRA 2.5 x 4.0 m glb
01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS glb
01.03 CAMPAMENTO PROVISIONAL DE OBRA glb
02 SEGURIDAD Y SALUD
02.01 SEGURIDAD Y SALUD EN OBRA glb
02.02 EQUIPO DE SEGURIDAD glb
03 IMPACTO AMBIENTAL
03.01 PROGRAMA DE MONITOREO AMBIENTAL ETAPA DE CONSTRUCCION glb
04 PAVIMENTO RIGIDO
04.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL m2
04.01.02 TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE OBRA m2
04.02 MOVIMIENTO DE TIERRAS
04.02.01 CORTE CON EQUIPO AL NIVEL DE SUBRASANTE m3
04.02.02 RELLENO CON MATERIAL PROPIO m3
04.02.03 ELIMINACION DE MATERIAL EXEDENTE m3
04.03 LOSAS DE CONCRETO
04.03.01 MOVIMIENTO DE TIERRAS
04.03.01.01 PERFILADO Y COMPACTACION DE LA SUBRASANTE CON EQUIPO m2
04.03.01.02 BASE GRANULAR (AFIRMADO) m3
04.03.02 OBRAS DE CONCRETO
04.03.02.01 ENCOFRADO Y DESENCOFRADO NORMAL EN PAVIMENTOS RIGIDOS m2
04.03.02.02 CONCRETO f´c=210kg/cm2, PARA LOSA DE PAVIMENTO m3
04.03.02.03 CURADO DE CONCRETO m2
04.03.03 JUNTAS ASFALTICAS
04.03.03.01 JUNTA DE DILATACION LONGITUDINAL DE ASFALTO e=1" m
04.03.03.02 JUNTA DE DILATACION TRANSVERSAL DE ASFALTO e=1" m
04.03.03.03 JUNTA DE SEPARACION ASFALTICA e=1" m
04.03.03.04 JUNTA DE CONSTRUCCION ASFALTICA m
04.04 PASADORES
04.04.01 PASADORES TRANSVERSALES CON ACERO LISO D=3/4" m
04.04.02 BARRA DE AMARRE CON ACERO CORRUGADO D=3/4" m
04.05 VEREDAS DE CONCRETO
04.05.01 MOVIMIENTO DE TIERRAS
04.05.01.01 NIVELACION INTERIOR APISONADO CON PLANCHA COMPACTADORA m2
04.05.01.02 BASE CON MATERIAL DE AFIRMADO DE VEREDAS e= 0.2 m m2
04.05.02 CONCRETO SIMPLE
04.05.02.01 ENCOFRADO Y DESENCOFRADO NORMAL DE VEREDAS m2
04.05.02.02 CONCRETO f´c=175kg/cm2 - EN VEREDA e=0 m m3
04.05.02.03 ACABADO SEMIPULIDO Y BRUÑADO DE VEREDAS m2
04.05.02.04 CURADO, PROTECCION Y SECADO DE CONCRETO m2
04.05.03 JUNTAS ASFALTICAS
04.05.03.01 JUNTAS DE DILATACION TRANSVERSAL CON MORTERO ASFALTICO e=1" m
04.06 CUNETAS DE CONCRETO
04.06.01 MOVIMIENTO DE TIERRAS
04.06.01.01 REFINE Y NIVELACION DE SUPERFICIE DE CUNETAS m2
04.06.02 CONCRETO SIMPLE
04.06.02.01 ENCOFRADO Y DESENCOFRADO CARAVISTA m2
04.06.02.02 CONCRETO f´c=175kg/cm2 EN CUNETAS m3
04.06.02.03 CURADO, PROTECCION Y SECADO DE CONCRETO m2
04.06.03 JUNTAS
04.06.03.01 JUNTAS DE CONTRACCION CON MORTERO ASFALTICO e=1" m
04.07 PINTURAS Y SEÑALIZACION VIAL
04.07.01 MARCAS EN BORDES DE VEREDEAS m
05 DEFENSA RIBEREÑA , L=100 m
05.01 OBRAS PRELIMINARES
05.01.01 TRAZO, NIVELACION Y REPLANTEO m
05.02 GAVIONES
05.02.01 MOVIMIENTO DE TIERRAS
05.02.01.01 EXCAVACION PARA COLOCACION DE CAJAS DE GAVIONES m3
05.02.01.02 EXCAVACION PARA EL COLCHON RENO m3
05.02.01.03 ELIMINACION DE MATERIAL EXCEDENTE m3
05.02.02 ENROCADO EN EL PILAR, ESTRIBOS Y LATERALES
05.02.02.01 EXTRACCION, SELECCION Y ACOPIO DE PIEDRA EN CANTERA (D=0.2 m) m3
05.02.02.02 CARGUIO Y TRANSPORTE DE PIEDRAS LIMPIAS m3
05.02.02.03 COLOCACION Y ACOMODO DE PIEDRAS EN GAVIONES TIPO CAJA m3
05.02.02.04 COLOCACION Y ACOMODO DE PIEDRAS EN COLCHON TIPO RENO m3
05.02.02.05 COLOCACION DEL GEOTEXTIL P/FILTRO m2
05.02.02.06 RELLENO CON MATERIAL PROPIO m3
06 MANTENIMIENTO DEL PUENTE COLGANTE
06.01 OBRAS PRELIMINARES
06.01.01 DESMONTAJE DEL PUENTE COLGANTE glb
06.01.02 TRAZO, NIVELACION Y REPLANTEO m
06.02 CAMARA DE ANCLAJE
06.02.01 GRAPAS DE 1 3/8" EN CABLE PRINCIPAL und
06.02.02 TEMPLADORES DE CABLE PRINCIPAL und
06.02.03 CABLE PRINCIPAL DE ANCLAJE DE 1 3/8" m
06.02.04 GUARDACABOS und
06.03 CAMARA SECUNDARIA
06.03.01 SOLADO E=4" m2
06.03.02 CONCRETO f´c=140kg/cm2 + 30 % P.M. m3
06.03.03 ENCOFRADO Y DESENCOFRADO NORMAL m2
06.03.04 ACERO LISO DE 5/8" und
06.03.05 GRAPAS DE 5/8" und
06.03.06 TAPA PREFABRICADA PARA INSPECCION DE 0.6x1.5m glb
06.04 MANTENIMIENTO DE LOS ESTRIBOS
06.04.01 COLOCACION DE CARROS DE DILATACION CON RODILLOS glb
06.04.02 LIJADO Y PREPARACION DE ESTRIBOS m2
06.04.03 PINTURA LATEX PARA TORRES DE SUSPENSION m2
06.04.04 PROTECCION EN LA CIMENTACION DE LOS ESTRIBOS m3
06.05 SUPERESTRUCTURA
06.05.01 CABLE PRINCIPAL DE ACERO TIPO BOA DE 1 3/8" m
06.05.02 ACCESORIO ANTIDESLIZANTE 1 3/8" und
06.05.03 PENDOLAS FIERRO LISO DE 5/8" m
06.05.04 GRAPAS DE 5/8" und
06.05.05 CABLE TENSOR DE ESTABILIDAD TIPO BOA DE 1/2" m
06.05.06 ACCESORIO ANTIDESLIZANTE und
06.05.07 GRAPAS DE 1/2" EN CABLE DE ESTABILIDAD und
06.05.08 AJUSTE DE GRAPAS CON TORQUIMETRO glb
06.05.09 ABRAZADERAS PARA DURMIENTES und
06.05.10 ABRAZADERAS SUJECION DE CABLE und
06.05.11 PROTECCION DE CABLE CON PETROLEO m
06.06 ESTRUCTURAS DE MADERA Y ACERO
06.06.01 ENTABLADO DE MADERA 1" x 8" x 2.1m und
06.06.02 LARGUEROS DE MADERA 4" x 6" x 2.1m und
06.06.03 VIGUETA DE SECCION TUBULAR LAC 6x4x3/8", L= 2.7 m und
06.06.04 SISTEMA VIGA - CABLE DE REVERSA und
06.06.05 PROTECCION DE TABLERO CON PETROLEO m2
06.07 BARANDAS
06.07.01 BARANDAS DE MALLA METALICA m
06.07.02 PINTURA EN BARANDAS m2
07 FLETE
07.01 FLETE DE MATERIALES DE OBRA glb

PROGRAM
ACUMUL
PROGRAMADO
PROGRA
ACUMUL
EJECUT
ACUMUL
EJECUTADO
AVAN
ACUMUL
CRONOGRAMA VALORIZADO DE OBRA

DEL PUENTE COLGANTE UCHIPAMPA EN LA LOCALIDAD DE RECUAY, DISTRITO DE RECUAY , PROVINCIA DE RECUAY, DEPARTAMENTO ANCASH"

DISTRIBUCIÓN DE TIEMPO EN MESES


METRADO PRECIO S/. PARCIAL S/.
M1 M2 M3

1.00 403.46 403.46 S/. 403.46


1.00 2,072.26 2,072.26 S/. 2,072.26
1.00 1,208.17 1,208.17 S/. 1,208.17

1.00 1,500.00 1,500.00 S/. 1,500.00


1.00 8,329.23 8,329.23 S/. 8,329.23

1.00 1,500.00 1,500.00 S/. 1,500.00

500.00 1.87 935.00 S/. 935.00


4,550.00 2.47 11,238.50 S/. 11,238.50

1,708.20 7.18 12,264.88 S/. 12,264.88


258.31 5.13 1,325.13 S/. 1,325.13
1,449.89 9.97 14,455.40 S/. 14,455.40

3,850.00 5.74 22,099.00 S/. 22,099.00


900.00 41.14 37,026.00 S/. 37,026.00

359.00 42.00 15,078.00 S/. 8,777.25 S/. 6,300.75


720.00 412.86 297,259.20 S/. 228,806.95 S/. 60,413.37
3,600.00 1.86 6,696.00 S/. 0.00 S/. 3,386.32

500.00 11.82 5,910.00 S/. 4,553.80 S/. 1,356.20


597.00 11.82 7,056.54 S/. 5,328.34 S/. 1,728.20
1,000.00 11.82 11,820.00 S/. 8,697.17 S/. 3,122.83
295.20 11.82 3,489.26 S/. 2,903.96 S/. 585.30
892.80 21.71 19,382.69 S/. 19,382.69
500.00 10.05 5,025.00 S/. 5,025.00

400.00 6.96 2,784.00 S/. 2,157.60 S/. 626.40


50.00 41.82 2,091.00 S/. 0.00 S/. 2,091.00

256.56 42.00 10,775.52 S/. 10,775.52


90.00 313.70 28,233.00 S/. 28,233.00
400.00 16.43 6,572.00 S/. 1,936.03 S/. 4,635.97
400.00 1.40 560.00 S/. 560.00

99.20 7.88 781.70 S/. 781.70

695.00 3.71 2,578.45 S/. 2,578.45

55.74 59.14 3,296.46 S/. 3,296.46


70.00 298.56 20,899.20 S/. 20,899.20
680.00 1.40 952.00 S/. 952.00

168.00 8.02 1,347.36 S/. 1,347.36

500.00 3.63 1,815.00 S/. 1,815.00

100.00 2.12 212.00 S/. 212.00

255.00 10.51 2,680.05 S/. 2,680.05


195.50 13.89 2,715.50 S/. 2,715.50
450.50 11.01 4,960.01 S/. 4,960.01

654.00 45.51 29,763.54 S/. 29,763.54


654.00 10.10 6,605.40 S/. 6,605.40
600.00 120.49 72,294.00 S/. 72,294.00
69.00 124.64 8,600.16 S/. 5,693.68 S/. 2,906.48
480.00 22.54 10,819.20 S/. 10,819.20
235.95 5.13 1,210.42 S/. 1,059.12 S/. 151.30

1.00 1,581.22 1,581.22 S/. 1,581.22


100.00 2.12 212.00 S/. 212.00

64.00 39.24 2,511.36 S/. 2,511.36


8.00 254.45 2,035.60 S/. 2,035.60
10.08 27.09 273.07 S/. 273.07
4.00 67.17 268.68 S/. 268.68

1.60 27.54 44.06 S/. 44.06


24.00 293.57 7,045.68 S/. 6,977.73 S/. 67.95
48.00 42.00 2,016.00 S/. 2,016.00 S/. 0.00
4.00 9.44 37.76 S/. 37.76
32.00 12.82 410.24 S/. 410.24
4.00 16.94 67.76 S/. 67.76

4.00 629.32 2,517.28 S/. 2,517.28


23.20 1.54 35.73 S/. 35.73
23.20 13.40 310.88 S/. 310.88
16.00 82.65 1,322.40 S/. 1,322.40

1,430.52 41.80 59,795.74 S/. 45,663.36 S/. 14,132.38


196.00 1.80 352.80 S/. 352.80
574.99 14.10 8,107.36 S/. 2,470.21
196.00 12.82 2,512.72
608.23 26.84 16,324.89
98.00 1.80 176.40
392.00 13.01 5,099.92
1.00 228.81 228.81
196.00 41.82 8,196.72
196.00 33.55 6,575.80
2,298.00 5.90 13,558.20

494.00 29.14 14,395.16


222.00 64.09 14,227.98
49.00 171.29 8,393.21
98.00 115.75 11,343.50
140.80 18.31 2,578.05

200.00 168.89 33,778.00


200.00 26.98 5,396.00

1.00 25,582.58 25,582.58 S/. 25,582.58

PROGRAMADO S/. 219,424.36 493,061.24 93,676.58


ACUMULADO S/. 219,424.36 712,485.60 806,162.18
PROGRAMADO % 22.72% 51.05% 9.70%
ACUMULADO % 22.72% 73.76% 83.46%
EJECUTADO S/.
ACUMULADO S/.
AVANCE %
ACUMULADO %
H"

PO EN MESES
TOTAL
M4 M5

S/. 403.46
S/. 2,072.26
S/. 1,208.17
S/. 0.00
S/. 1,500.00
S/. 8,329.23

S/. 1,500.00

S/. 935.00
S/. 11,238.50
S/. 0.00
S/. 12,264.88
S/. 1,325.13
S/. 14,455.40

S/. 22,099.00
S/. 37,026.00

S/. 15,078.00
S/. 8,038.88 S/. 297,259.20
S/. 3,309.68 S/. 6,696.00

S/. 5,910.00
S/. 7,056.54
S/. 11,820.00
S/. 3,489.26
S/. 19,382.69
S/. 5,025.00

S/. 2,784.00
S/. 2,091.00

S/. 10,775.52
S/. 28,233.00
S/. 6,572.00
S/. 560.00

S/. 781.70

S/. 2,578.45

S/. 3,296.46
S/. 20,899.20
S/. 952.00

S/. 1,347.36

S/. 1,815.00

S/. 212.00

S/. 2,680.05
S/. 2,715.50
S/. 4,960.01

S/. 29,763.54
S/. 6,605.40
S/. 72,294.00
S/. 8,600.16
S/. 10,819.20
S/. 1,210.42

S/. 1,581.22
S/. 212.00

S/. 2,511.36
S/. 2,035.60
S/. 273.07
S/. 268.68

S/. 44.06
S/. 7,045.68
S/. 2,016.00
S/. 37.76
S/. 410.24
S/. 67.76

S/. 2,517.28
S/. 35.73
S/. 310.88
S/. 1,322.40

S/. 59,795.74
S/. 352.80
S/. 5,637.15 S/. 8,107.36
S/. 2,512.72 S/. 2,512.72
S/. 9,161.07 S/. 7,163.82 S/. 16,324.89
S/. 176.40 S/. 176.40
S/. 5,099.92 S/. 5,099.92
S/. 228.81 S/. 228.81
S/. 8,196.72 S/. 8,196.72
S/. 6,575.80 S/. 6,575.80
S/. 13,558.20 S/. 13,558.20

S/. 14,395.16 S/. 14,395.16


S/. 14,227.98 S/. 14,227.98
S/. 8,393.21 S/. 8,393.21
S/. 11,343.50 S/. 11,343.50
S/. 1,920.69 S/. 657.36 S/. 2,578.05

S/. 19,606.61 S/. 14,171.39 S/. 33,778.00


S/. 5,396.00 S/. 5,396.00
S/. 0.00
S/. 25,582.58

113,319.17 46,451.90
919,481.35 965,933.25
965,933.25
11.73% 4.81%
95.19% 100.00%