OBRA: "MEJORAMIENTO DEL SERVICIO DE PROTECCION DE LA INFRAESTRUCTURA DE RIEGO DEL CANAL PRINCIPAL EN EL TRAMO (PROG. 7+780 - 8+500 K
S/. 990.41
S/. 11,994.30
S/. 4,383.75
S/. 7,000.00
S/. 3,500.00 S/. 3,500.00
S/. 2,500.00 S/. 2,500.00 S/. 2,500.00 S/. 2,500.00
S/. 3,000.00
S/. 700.00
S/. 3,000.00
S/. 10,620.00
S/. 4,670.00
S/. 1,550.00
S/. 750.00 S/. 750.00 S/. 750.00 S/. 750.00
S/. 1,925.00 S/. 1,925.00 S/. 1,925.00 S/. 1,925.00
S/. 4,655.00
S/. 2,105.20
S/. 887.30 S/. 887.30 S/. 887.30 S/. 887.30
S/. 2,049.60 S/. 2,049.60 S/. 1,024.80
S/. 3,451.89 S/. 3,451.89 S/. 1,725.94
S/. 2,941.70 S/. 2,941.70 S/. 1,470.85
S/. 20,130.80 S/. 20,130.80 S/. 10,065.40
S/. 595.00
S/. 4,481.28
S/. 22,374.38
S/. 31,500.00 S/. 22,319.65
S/. 15,650.00 S/. 11,686.79
S/. 9,062.22 S/. 9,062.22
S/. 5,837.71 S/. 5,837.71
S/. 3,274.08
S/. 29,146.99
S/. 45,778.04
S/. 43,829.35
S/. 80,731.38
S/. 40,845.24
S/. 9,472.38
S/. 4,825.63
S/. 3,544.14
S/. 1,372.00
S/. 1,206.80
S/. 747.20
S/. 26,191.97
S/. 2,049.60
S/. 37,375.03
S/. 18,240.29
S/. 11,930.21
S/. 63,000.00
S/. 27,000.00
S/. 14,743.80
S/. 5,872.80
S/. 76,495.32
S/. 18,033.84
S/. 42,710.40
S/. 16,407.00
S/. 1,516.80
S/. 4,581.00
S/. 4,413.00
S/. 5,581.00
S/. 5,413.00
S/. 281,422.69 S/. 308,356.26 S/. 290,045.08 S/. 462,631.09 S/. 10,994.00
S/. 33,770.72 S/. 37,002.75 S/. 34,805.41 S/. 55,515.73 S/. 1,319.28
S/. 315,193.41 S/. 345,359.01 S/. 324,850.49 S/. 518,146.81 S/. 12,313.28
20.79% 22.78% 21.43% 34.18% 0.81%
20.79% 43.58% 65.01% 99.19% 100.00%
Programación de Obra Canal
OBRA: MEJORAMIENTO DEL SERVICIO DE PROTECCION DE LA INFRAESTRUCTURA DE RIEGO DEL CANAL
AGOSTO SETIEMBRE
ITEM DESCRIPCIÓN UNIDAD METRADO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3
01.00 COMPONENTE I: INFRAESTRUCTURA DE PROTECCIÓN
01.04.03.01 CANAL
DIAS LABORABLES
DOMINGOS
FERIADOS CALENDARIO
DEL CANAL PRINCIPAL EN EL TRAMO (PROG. 7+780 - 8+500 KM) EN EL DISTRITO DE ITE - JORGE BASADR
OCTUBRE NOVIEMBRE DICIEMBRE
JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
MESES
ITEM DESCRIPCIÓN
1
01 COMPONENTE I: INFRAESTRUCTURA DE PROTECCIÓN
01.01 OBRAS PROVISIONALES S/. 30,368.46
01.02 INSTALACIONES PROVISIONALES S/. 700.00
01.03 SEGURIDAD, SALUD Y MEDIO AMBIENTE S/. 22,515.00
01.04 MEJORAMIENTO DE TRAMOS DEL CANAL
01.04.01 TRABAJOS PRELIMINARES S/. 8,242.50
01.04.02 MOVIMIENTO DE TIERRAS S/. 0.00
01.04.03 OBRAS DE CONCRETO ARMADO
01.04.03.01 CANAL S/. 0.00
01.04.03.02 TAPAS DE CANAL S/. 0.00
01.04.03.03 EMPALME DE TRANSICIÓN S/. 0.00
01.04.04 REVOQUES ENLUCIDOS Y MOLDURAS S/. 0.00
01.04.05 JUNTAS S/. 0.00
01.04.06 VARIOS S/. 0.00
01.05 MURO DE GAVIONES S/. 3,326.00
01.05.01 TRABAJOS PRELIMINARES
01.05.02 MOVIMIENTO DE TIERRAS S/. 28,241.57
01.05.03 GAVIONES TIPO CAJA S/. 184,529.16
01.05.04 SUMINISTRO E INSTALACION DE TUBERIAS S/. 0.00
01.06 PLAN DE MONITOREO ARQUEOLÓGICO S/. 3,500.00
02 COMPONENTE II: CAPACITACIÓN
02.01 PREVENCIÓN DE RIESGOS: IDENTIFICACIÓN DE P S/. 0.00
02.02 TIPOS Y SISTEMAS DE PROTECCIÓN DE UNIDADE S/. 0.00