Project 3 MLD Sewage Treatment Plant Based on C-Tech Technology At MDU Rohtak Prepared by SC

Client Maharshi Dayanand University Rohtak, Haryana. Checked by PM


Contractor M/s Abhiram Infra Projects Pvt. Ltd. Approved by MD
Technology Provider M/s SFC Enviromental Technologies Pvt. Ltd. Revision No. 0
Document Description Capacitor Sizing Calculation Date:
Document No.
Required 
RUNNING KW  REQUIRED 
SR. NO. EQUIPMENT NAME TAG KW Load Factor BKW FEEDER TYPE DUTY  (C/I)  EFF PF DIVERSITY  NOS. OF UNITS INITIAL itanØ Intial Reactive Power  Capacitor 
KWcl rtanØ
FACTOR Rating Remarks
(A) (B) ( C ) (D) ( E ) (F) (G) (H) (I) J=A*G at initial PF at Required PF KVAr
WORKING STANDBY TOTAL iQ=KWcl  X  itanØ rQ=KWcl  X  rtanØ iQ‐Rq
1 Raw Sewage Pumps‐1 ( RSPS‐1) 30 0.85 25.5 Star‐Delta C 0.93 0.89 1 1 1 2 30 0.51 0.33 15.37 9.86 5.51
2 Raw Sewage Pumps‐2 ( RSPS‐2) 15 0.85 12.75 Star‐Delta C 0.9 0.85 1 1 0 1 15 0.62 0.33 9.30 4.93 4.37
3 EOT 2.2 0.85 1.87 MCB I 0.82 0.82 1 1 0 1 2.2 0.70 0.33 1.54 0.72 0.81
4 Mechanical Fine Bar Screen 1.5 0.85 1.275 DOL I 0.8 0.81 1 1 0 1 1.5 0.72 0.33 1.09 0.49 0.59
5 Flat Belt Conveyor 1.5 0.85 1.275 DOL I 0.8 0.81 1 1 0 1 1.5 0.72 0.33 1.09 0.49 0.59
6 Grit Collection Mechanism 0.75 0.85 0.6375 DOL C 0.77 0.78 1 1 1 2 0.75 0.80 0.33 0.60 0.25 0.36
7 Grit Washing/Classifier Mechanism 1.5 0.85 1.275 DOL C 0.8 0.81 1 1 1 2 1.5 0.72 0.33 1.09 0.49 0.59
8 Organic Return Pumps 0.75 0.85 0.6375 DOL C 0.77 0.78 1 1 1 2 0.75 0.80 0.33 0.60 0.25 0.36
9 C‐Tech Air Blowers  30 0.85 25.5 VFD C 0.92 0.89 1 1 0 1 30 0.51 0.33 0.00 0.00 0.00
10 C‐Tech Air Blowers  30 0.85 25.5 SS I 0.92 0.89 1 1 1 2 30 0.51 0.33 15.37 9.86 5.51
11 RAS Pumps  2.2 0.85 1.87 DOL I 0.82 0.82 1 2 0 2 4.4 0.70 0.33 3.07 1.45 1.63
12 Decanters 0.55 0.85 0.4675 VFD I 0.73 0.73 1 2 0 2 1.1 0.94 0.33 0.00 0.00 0.00
13 SAS Pumps  2.2 0.85 1.87 DOL I 0.82 0.82 1 2 0 2 4.4 0.70 0.33 3.07 1.45 1.63
14 Auto Valves/Sluice Gates 0.75 0.85 0.6375 RDOL I 0.77 0.78 1 6 0 6 4.5 0.80 0.33 3.61 1.48 2.13
15 Booster Pumps 2.2 0.85 1.87 DOL I 0.82 0.82 1 1 1 2 2.2 0.70 0.33 1.54 0.72 0.81
16 NaoH‐ pump 2.2 0.85 1.87 DOL I 0.82 0.82 1 1 0 1 2.2 0.70 0.33 1.54 0.72 0.81
17 Air Blower for leak Absorption 2.2 0.85 1.87 DOL I 0.82 0.82 1 1 0 1 2.2 0.70 0.33 1.54 0.72 0.81
18 Sludge Sump Agitators 1.5 0.85 1.275 DOL C 0.8 0.81 1 2 0 2 3 0.72 0.33 2.17 0.99 1.19
19 Centrifuges 11 0.85 9.35 Star‐Delta I 0.89 0.82 1 1 1 2 11 0.70 0.33 7.68 3.62 4.06
20 Centrifuge Feed Pumps 3.7 0.85 3.145 DOL I 0.85 0.82 1 1 1 2 3.7 0.70 0.33 2.58 1.22 1.37
21 Agitators for Dosing Tanks 0.37 0.85 0.3145 DOL C 0.71 0.65 1 1 1 2 0.37 1.17 0.33 0.43 0.12 0.31
22 Dosing Pumps 0.75 0.85 0.6375 DOL I 0.77 0.78 1 1 1 2 0.75 0.80 0.33 0.60 0.25 0.36
23 Service Water Pumps 3.7 0.85 3.145 DOL I 0.85 0.82 1 1 1 2 3.7 0.70 0.33 2.58 1.22 1.37
24 EOT 2.2 0.85 1.87 MCB I 0.82 0.82 1 3 0 3 6.6 0.70 0.33 4.61 2.17 2.44
25 Plant Area Lighting 15 1 15 MCCB I 0.9 0.9 1 1 0 1 15 0.48 0.33 7.26 4.93 2.33
178.32 TOTAL KW TOTAL KVAr 39.9239012

Calculation considerations:

Required Power Factor                 rcosØ 0.95

Value of                                          rtanØ 0.33

Hence Capacitor bank of 50kVAr is installed on bus of PCC panel
Steps = 20 KVAr ‐ 1 No
10 KVAr ‐ 2 Nos
5 KVAr ‐ 2 Nos  