Item Particular Qty. Rate Unit Amount
No.
1 Cutting & clearance of jungle, bushes, shrubs, Ankra / Ipomoea,
Julieflora typna etc. on canals and bunds in dry/ moist /slushy
conditions including disposal as per instructions of the Engineer-in-
charge. Cost of wood has been deducted from rates and thus will be
property of contractor after cutting. (Rate as per BSR-2011WR Zone
Kota Ch-XII Item No.1 (a) Page No.42)
dk;Z dk uke %& पपाटन बपाब्रांच चचेन 745 सचे गपाम अड़ड़ीलपा मचेग पा हपाईवचे तक डड चेन खख द पाई कपारर्य
Item
No. Particular Rate Unite
1 Cutting & clearance of jungle, bushes, shrubs, Ankra / Ipomoea, Julieflora typna etc. on canals
and bunds in dry/ moist /slushy conditions including disposal as per instructions of the Engineer-
in-charge. Cost of wood has been deducted from rates and thus will be property of contractor
after cutting.
Ordinary
Rate as per BSR-2011WR Zone Kota Ch-XII Item No.1 (a) Page No.42 0.50 Sqm
2 Removal of silt /soil/earth ,sand,pebbles,Malba, debries,rubbish stone pebbles & obstrution
deposited in canal bed up to design line grade and section having design due to erosion
/scour/slips in canal banks /silting with or without busches and weeds etc. in dry or moist
condition from canal bed including dewatering loading unloading and disposal at suitable place
as directed by Engineer in charge with initial lead of 50m and lift up to 1.5m with proper dressing
on canal bed complete in all respect