No Atur Posisi Waktu memboran Menyambung Road

1 65.3 228.2 28.5


2 38.9 204.2 28.5
3 60 157.4 30
4 60.9 218.4 34.4
5 140.3 178.2 40.4
6 140.3 247.2 30.9
7 29.5 188.9 35.1
8 41.5 178.3 28.6
9 31.3 187 34.5
10 44.2 150.5 38.47
11 53.4 135.5 73.5
12 31.3 127.52 56.6
13 59.7 141.9 36.7
14 64.3 238.2 32.4
15 32.5 220.3 28.3
16 67.4 217.4 30.1
17 54.3 193.6 32.2
18 120.6 202.1 38.5
19 68.3 212.3 30.9
20 34.2 240.1 35.1
21 39.6 185.1 53.2
22 32.4 197.6 32.2
23 39.1 168.9 38.47
24 54.5 184.4 43.6
25 29.6 145.6 56.9
26 63.2 141.9 34.5
27 41.2 187.8 32.6
28 54.2 167.5 36.3
29 32.4 242.8 46.7
30 47.6 206.5 38.6

H= 6
Burden = 3.1
Spasi = 3.2
Subdrilling 0.1
Target Produksi 4,000,000
hari kerja 300
bobot isi 1.98
H+J 6.1
drillabiltas faktor 1.77
avaibiliti faktor 84.99%
0.85
Data Rekapan Jam Kerja Alat (JAM)
no Hari/Tanggal HM Awal HM Akhir
1 5/1/2019 0 0
2 5/2/2019 3225.1 3235.4
3 5/3/2019 3235.4 3244.9
4 5/4/2019 3244.9 3255.2
5 5/5/2019 3255.2 3264.9
6 5/6/2019 3264.9 3274
7 5/7/2019 3274 3280.1
8 5/8/2019 0 0
9 5/9/2019 3280.1 3289.6
10 5/10/2019 3289.6 3299.7
11 5/11/2019 3299.7 3309.5
12 5/12/2019 3309.5 3314.6
13 5/13/2019 3314.6 3319.1
14 5/14/2019 3319.1 3329.4
15 5/15/2019 0 0
16 5/16/2019 3329.4 3339.6
17 5/17/2019 3339.6 3350.3
18 5/18/2019 3350.3 3361.2
19 5/19/2019 3361.2 3371.5
20 5/20/2019 3371.5 3380.9
21 5/21/2019 3380.9 3390.6
22 5/22/2019 0 0
23 5/23/2019 3390.6 3401.1
24 5/24/2019 3401.1 3410.1
25 5/25/2019 3410.1 3420
26 5/26/2019 3420 3427.6
27 5/27/2019 3427.6 3436.5
28 5/28/2019 3436.5 3446
29 5/29/2019 0 0
30 5/30/2019 3446 3454.8
31 5/31/2019 3454.8 3465.2
32 6/1/2019 3465.2 3475.4
33 6/2/2019 3475.4 3484.7
34 6/3/2019 3484.7 3494.6
35 6/4/2019 3494.6 3502.3
36 6/5/2019 0 0
37 6/6/2019 3502.3 3512.4
38 6/7/2019 3511.4 3522.2
39 6/8/2019 3521.2 3530.4
40 6/9/2019 3530.4 3539.4
41 6/10/2019 3539.9 3549.6
42 6/11/2019 3549.6 3557.4
43 6/12/2019 0 0
44 6/13/2019 3557.4 3565.9
45 6/14/2019 3565.9 3575.7
46 6/15/2019 3575.7 3585.3
47 6/16/2019 3585.3 3594.1
48 6/17/2019 3594.1 3603.2
49 6/18/2019 3603.4 3612.9
50 6/19/2019 0 0
51 6/20/2019 3612.9 3623.3
52 6/21/2019 3623.3 3632.7
53 6/22/2019 3632.7 3642.6
54 6/23/2019 3642.6 3652.2
55 6/24/2019 3652.2 3662.3
56 6/25/2019 3661.3 3672.2
57 6/26/2019 0 0
58 6/27/2019 3671.2 3679.1
59 6/28/2019 3679.1 3688.3
60 6/29/2019 3688.3 3697.9
61 6/30/2019 3697.9 3707.2

Data Penggunaan Bahan Bakar


no Hari/Tanggal Bahan Bakar (Liter)
1 5/1/2016 0
2 5/2/2016 665
3 5/3/2016 645
4 5/4/2016 645
5 5/5/2016 645
6 5/6/2016 645
7 5/7/2016 645
8 5/8/2016 0
9 5/9/2016 425
10 5/10/2016 645
11 5/11/2016 625
12 5/12/2016 525
13 5/13/2016 225
14 5/14/2016 725
15 5/15/2016 0
16 5/16/2016 645
17 5/17/2016 745
18 5/18/2016 645
19 5/19/2016 695
20 5/20/2016 615
21 5/21/2016 625
22 5/22/2016 0
23 5/23/2016 725
24 5/24/2016 605
25 5/25/2016 555
26 5/26/2016 725
27 5/27/2016 225
28 5/28/2016 655
29 5/29/2016 0
30 5/30/2016 505
31 5/31/2016 735
32 6/1/2016 705
33 6/2/2016 705
34 6/3/2016 425
35 6/4/2016 695
36 6/5/2016 0
37 6/6/2016 425
38 6/7/2016 625
39 6/8/2016 625
40 6/9/2016 645
41 6/10/2016 625
42 6/11/2016 625
43 6/12/2016 0
44 6/13/2016 445
45 6/14/2016 645
46 6/15/2016 545
47 6/16/2016 445
48 6/17/2016 605
49 6/18/2016 645
50 6/19/2016 0
51 6/20/2016 745
52 6/21/2016 625
53 6/22/2016 625
54 6/23/2016 625
55 6/24/2016 625
56 6/25/2016 625
57 6/26/2016 0
58 6/27/2016 425
59 6/28/2016 645
60 6/29/2016 645
61 6/30/2016 635
Waktu Membor Cabut Road Mengatasi Hambatan Dtr 1b. Ctr
101.1 43.2 60.3 1.005 8.777
239.6 84.2 0 0 9.923
210 100.6 0 0 9.300
111.2 53 112.9 1.882 9.847
240 76.3 0 0 11.253
240 62.3 0 0 12.012
244.1 67.3 0 0 9.415
154.6 43.5 103.7 1.728 9.170
223.6 64.2 0 0 9.010
360.45 34.6 0 0 10.470
254.3 39.4 70.5 1.175 10.443
224.6 76.5 0 0 8.609
113.9 43.3 0 0 6.592
196.3 43.2 0 0 9.573
239.6 84.2 55.3 0.922 11.003
265.4 64.3 0 0 10.743
224.7 43.3 0 0 9.135
235.3 76.3 0 0 11.213
221.3 62.3 220.5 3.675 13.593
244.1 67.3 0 0 10.347
223.4 53.7 50.6 0.843 10.093
242.7 64.2 0 0 9.485
360.6 76.4 0 0 11.391
234.1 57.3 0 0 9.565
221.1 64.2 115.7 1.928 10.552
225.4 48.6 0 0 8.560
223.6 62.1 0 0 9.122
242.4 38.7 200.3 3.338 12.323
218.3 41.3 0 0 9.692
267.4 68.6 0 0 10.478

10.056
0
10.3
9.5
10.3
9.7
9.1
6.1
0
9.5
10.1
9.8
5.1
4.5
10.3
0
10.2
10.7
10.9
10.3
9.4
9.7
0
10.5
9
9.9
7.6
8.9
9.5
0
8.8
10.4
10.2
9.3
9.9
7.7
0
10.1
10.8
9.2
9
9.7
7.8
0
8.5
9.8
9.6
8.8
9.1
9.5
0
10.4
9.4
9.9
9.6
10.1
10.9
0
7.9
9.2
9.6
9.3

average = 9.335
jam kerja x hari kerja = 2800.385
1a. Ct-Dtr 2a. DRr 2b. GDr
7.772 0.631 0.597
9.923
9.300
7.965
11.253
12.012
9.415
7.442
9.010
10.470 8. jumlah alat bor (unit)
9.268 a. drr
8.609 1
6.592 b. gdr
9.573 1
10.082
10.743
9.135
11.213
9.918
10.347
9.250
9.485
11.391
9.565
8.623
8.560
9.122
8.985
9.692
10.478

9.506
3. Target Produksi (m3/tahun) 4. Produksi setiap lubang (m2)
2020202.020 9.920
m3/jam
721.402

9. menghitung produsi berdasarkan volume 10. menghitung total kedalaman lubang


a. vol setara 60.512
9.757
b. efisiensi
0.857
c. laju produksi ( DRr )
316.673
d. laju produksi ( Gdr)
299.357
5. Kec Pemboran (m3/jam) 6. koreksi kec pemboran 7. laju produksi berdasarkan
72.722 a. % > tinggi jenjang a. drr
m/menit 0.017 0.950
0.070 b. laju penembusan sebenarnya (DRr) b. gdr
0.642 0.898
b. laju penembusan sebenarnya (GDr)
0.607

11. menghitung lubang (jam)


11.922
aju produksi berdasarkan kecepatan pemboran

0.950

0.898