Professional Documents
Culture Documents
H= 6
Burden = 3.1
Spasi = 3.2
Subdrilling 0.1
Target Produksi 4,000,000
hari kerja 300
bobot isi 1.98
H+J 6.1
drillabiltas faktor 1.77
avaibiliti faktor 84.99%
0.85
Data Rekapan Jam Kerja Alat (JAM)
no Hari/Tanggal HM Awal HM Akhir
1 5/1/2019 0 0
2 5/2/2019 3225.1 3235.4
3 5/3/2019 3235.4 3244.9
4 5/4/2019 3244.9 3255.2
5 5/5/2019 3255.2 3264.9
6 5/6/2019 3264.9 3274
7 5/7/2019 3274 3280.1
8 5/8/2019 0 0
9 5/9/2019 3280.1 3289.6
10 5/10/2019 3289.6 3299.7
11 5/11/2019 3299.7 3309.5
12 5/12/2019 3309.5 3314.6
13 5/13/2019 3314.6 3319.1
14 5/14/2019 3319.1 3329.4
15 5/15/2019 0 0
16 5/16/2019 3329.4 3339.6
17 5/17/2019 3339.6 3350.3
18 5/18/2019 3350.3 3361.2
19 5/19/2019 3361.2 3371.5
20 5/20/2019 3371.5 3380.9
21 5/21/2019 3380.9 3390.6
22 5/22/2019 0 0
23 5/23/2019 3390.6 3401.1
24 5/24/2019 3401.1 3410.1
25 5/25/2019 3410.1 3420
26 5/26/2019 3420 3427.6
27 5/27/2019 3427.6 3436.5
28 5/28/2019 3436.5 3446
29 5/29/2019 0 0
30 5/30/2019 3446 3454.8
31 5/31/2019 3454.8 3465.2
32 6/1/2019 3465.2 3475.4
33 6/2/2019 3475.4 3484.7
34 6/3/2019 3484.7 3494.6
35 6/4/2019 3494.6 3502.3
36 6/5/2019 0 0
37 6/6/2019 3502.3 3512.4
38 6/7/2019 3511.4 3522.2
39 6/8/2019 3521.2 3530.4
40 6/9/2019 3530.4 3539.4
41 6/10/2019 3539.9 3549.6
42 6/11/2019 3549.6 3557.4
43 6/12/2019 0 0
44 6/13/2019 3557.4 3565.9
45 6/14/2019 3565.9 3575.7
46 6/15/2019 3575.7 3585.3
47 6/16/2019 3585.3 3594.1
48 6/17/2019 3594.1 3603.2
49 6/18/2019 3603.4 3612.9
50 6/19/2019 0 0
51 6/20/2019 3612.9 3623.3
52 6/21/2019 3623.3 3632.7
53 6/22/2019 3632.7 3642.6
54 6/23/2019 3642.6 3652.2
55 6/24/2019 3652.2 3662.3
56 6/25/2019 3661.3 3672.2
57 6/26/2019 0 0
58 6/27/2019 3671.2 3679.1
59 6/28/2019 3679.1 3688.3
60 6/29/2019 3688.3 3697.9
61 6/30/2019 3697.9 3707.2
10.056
0
10.3
9.5
10.3
9.7
9.1
6.1
0
9.5
10.1
9.8
5.1
4.5
10.3
0
10.2
10.7
10.9
10.3
9.4
9.7
0
10.5
9
9.9
7.6
8.9
9.5
0
8.8
10.4
10.2
9.3
9.9
7.7
0
10.1
10.8
9.2
9
9.7
7.8
0
8.5
9.8
9.6
8.8
9.1
9.5
0
10.4
9.4
9.9
9.6
10.1
10.9
0
7.9
9.2
9.6
9.3
average = 9.335
jam kerja x hari kerja = 2800.385
1a. Ct-Dtr 2a. DRr 2b. GDr
7.772 0.631 0.597
9.923
9.300
7.965
11.253
12.012
9.415
7.442
9.010
10.470 8. jumlah alat bor (unit)
9.268 a. drr
8.609 1
6.592 b. gdr
9.573 1
10.082
10.743
9.135
11.213
9.918
10.347
9.250
9.485
11.391
9.565
8.623
8.560
9.122
8.985
9.692
10.478
9.506
3. Target Produksi (m3/tahun) 4. Produksi setiap lubang (m2)
2020202.020 9.920
m3/jam
721.402
0.950
0.898