You are on page 1of 2

ANALISIS DE COSTO UNITARIO

PARTIDA Nº:

CUADRILLA: 0.1 Cap + 1 Op+ 2 Of + 8 Pe

Rendimiento 25.00 m3/día


Unidad m3

DESCRIPCION UND CUADRILLA CANTIDAD


MATERIALES
m3 0.5136
bls 3.1000
m3 0.8900
Gln 0.0800
m3 0.1070

COSTO MATERIALES S/.


MANO DE OBRA
CAPATAZ HH 0.1000 0.0320
OPERARIO HH 1.0000 0.3200
OFICIAL HH 0.0000 0.0000
PEON HH 8.0000 2.5600

COSTO MANO DE OBRA S/.


EQUIPO Y HERRAMIENTAS
HERRAMIENTAS MANUALES(3%) %MO 0.030
MEZCLADORA DE CONCRETO TAMBOR 18HM 1.000 0.3200
HM 0.0000
HM 0.0000
HM 0.0000
HM 0.0000
HM 0.0000
HM 0.0000
COSTO EQUIPO Y HERRAMIENTAS S/.
TOTAL S/.
UNITARIO

P.UNIT PARCIAL TOTAL


0
31.93 16.4
14.12 43.76
25.21 22.44
11.02 0.88
5.00 0.54
0
0
0
COSTO MATERIALES S/. 84.02

14.27 0.46
11.89 3.80
10.64 0
9.61 24.6

COSTO MANO DE OBRA S/. 28.86

28.860.87
17.005.44
0.00
0.00
0.00
0.00
0.00
0.00
OSTO EQUIPO Y HERRAMIENTAS S/. 6.31
TOTAL S/. 119.19