Technical

Publications

5192968--100
Revision 10

Definium 5000 TM

Installation Manual - Mechanical


Installation
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

This page intentionally left blank.

2
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

LEGAL NOTES

TRADEMARKS
Definiumt 5000 is a trademark of GE Healthcare. All other products and their brandnames are the
(registered) trademarks of their respective holders.

COPYRIGHTS
All Material, Copyright E 2007 by General Electric Company, Inc. All rights reserved. The material presented
and contained herein may not be reproduced, in any form or manner, without the written permission of General
Electric Company, Inc.

3
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

IMPORTANT PRECAUTIONS
LANGUAGE

4
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

5
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

6
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

7
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

8
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

DAMAGE IN TRANSPORTATION
All packages should be closely examined at time of delivery. If damage is apparent, have notation “damage
in shipment” written on all copies of the freight or express bill before delivery is accepted or “signed for“ by
a General Electric representative or a hospital receiving agent. Whether noted or concealed, damage MUST
be reported to the carrier immediately upon discovery, or in any event, within 14 days after receipt, and the
contents and containers held for inspection by the carrier. A transportation company will not pay a claim for
damage if an inspection is not requested within this 14 day period.

To file a report:
G Call 1--800--548--3366 and use option 8.
G Fill out a report on http://us44hdd21/sctq/InstallFulfill/InstalFulfillment.htm
G Contact your local service coordinator for more information on this process.
Rev. Jan. 5, 2005

CERTIFIED ELECTRICAL CONTRACTOR STATEMENT


All electrical Installations that are preliminary to the positioning of the equipment at the site prepared for the
equipment shall be performed by licensed electrical contractors. In addition, electrical feeds into the Power
Distribution Unit shall be performed by licensed electrical contractors. Other connections between pieces of
electrical equipment, calibrations and testing shall be performed by qualified GE Healthcare personnel. The
products involved (and the accompanying electrical installations) are highly sophisticated, and special
engineering competence is required. In performing all electrical work on these products, GE will use its own
specially trained field engineers. All of GE’s electrical work on these products will comply with the
requirements of the applicable electrical codes.
The purchaser of GE equipment shall only utilize qualified personnel (i.e., GE’s field engineers, personnel of
third--party service companies with equivalent training, or licensed electricians) to perform electrical servicing
on the equipment.

IMPORTANT...X--RAY PROTECTION
X--ray equipment if not properly used may cause injury. Accordingly, the instructions herein contained should
be thoroughly read and understood by everyone who will use the equipment before you attempt to place this
equipment in operation. The General Electric Company, Healthcare Group, will be glad to assist and
cooperate in placing this equipment in use.
Although this apparatus incorporates a high degree of protection against x--radiation other than the useful
beam, no practical design of equipment can provide complete protection. Nor can any practical design compel
the operator to take adequate precautions to prevent the possibility of any persons carelessly exposing
themselves or others to radiation.
It is important that anyone having anything to do with X--radiation be properly trained and fully acquainted with
the recommendations of the National Council on Radiation Protection and Measurements as published in
NCRP Reports available from NCRP Publications, 7910 Woodmont Avenue, Room 1016, Bethesda,
Maryland 20814, and of the International Commission on Radiation Protection, and take adequate steps to
protect against injury.
The equipment is sold with the understanding that the General Electric Company, Healthcare Group, its
agents, and representatives have no responsibility for injury or damage which may result from improper use
of the equipment.
Various protective materials and devices are available. It is urged that such materials or devices be used.

9
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

OMISSIONS & ERRORS


Customers, please contact your GE Sales or Service representatives.
GE personnel, please use the GEHC iTrak (issue tracking) process to report all omissions, errors, and defects
in this publication.

The product contains the following Medical Devices. Product installation, service maintenance, repair or field replacement
of these Medical Devices should follow the applicable reporting requirements of the regulation.

Component / Description FDA Medical Device Classification


Definium 5000 480V Base System Class II
Collimator FRU for Definium 5000 Class II
6693-50FGE Automatic collimator customized Class II
for GE eith spectral filters
D5000 FIXED TABLE WITH LAMINATED TOP Class II
D5000 FIXED TABLE WITH CF TOP Class II
Weight Bearing Rolling Stand Class II

ENVIRONMENTAL STATEMENT
ON THE LIFE CYCLE OF THE EQUIPMENT OR SYSTEM
This equipment or system contains environmentally dangerous components and materials (such as PCB‘s,
electronic components, used dielectric oil, lead, batteries, etc.) which, once the life-cycle of the equipment or
system comes to an end, becomes dangerous and needs to be considered as harmful waste according to the
international, domestic and local regulations.
The manufacturer recommends to contact an authorized representative of the manufacturer or an authorized
waste management company once the life-cycle of the equipment or system comes to an end to remove this
equipment or system.

--- MEDICAL EQUIPMENT ---

WITH RESPECT TO ELECTRIC SHOCK,

FIRE AND MECHANICAL HAZARDS

ONLY IN ACCORDANCE WITH

UL 60601 ---1, CAN/CSA C22.2 NO.601.1 <14NN>

10
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

REVISION HISTORY

REV DATE REASON FOR CHANGE

1 AUG 09, 2007 First edition

4 JAN 15, 2008 Cable connections and new pictures.

5 FEB 08, 2008 New images and product specifications.

6 AUG 13, 2008 General Revision.

7 NOV 10, 2010 Installation procedures with foldable crane.

8 APR 20, 2011 Specified torque to retain collimator and x--ray tube assembly.

9 FEB 07, 2012 New Magic PC.

10 MAY 13, 2016 General update.

This Document is the English original version, edited and supplied by the manufacturer.

11
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

ADVISORY SYMBOLS

The following advisory symbols will be used throughout this manual.


Their application and meaning are described below.

DANGERS ADVISE OF CONDITIONS OR SITUATIONS THAT,


IF NOT HEEDED OR AVOIDED, WILL CAUSE SERIOUS
PERSONAL INJURY OR DEATH.

WARNINGS ADVISE OF CONDITIONS OR SITUATIONS THAT,


IF NOT HEEDED OR AVOIDED, COULD CAUSE SERIOUS
PERSONAL INJURY, OR CATASTROPHIC DAMAGE OF
EQUIPMENT OR DATA.

Cautions advise of conditions or situations that, if not heeded


or avoided, could cause personal injury or damage to
equipment or data.

Note . Notes alert readers to pertinent facts and conditions. Notes


represent information that is important to know but which do not
necessarily relate to possible injury or damage to equipment.

12
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

SAFETY SYMBOLS
The following safety symbols may appear in the equipment.

Their meaning are described below.

Caution. Consult accompanying documents.

Safety Symbol. Follow instructions for use, especially those


instructions identified with Advisory Symbols to avoid any
risk for the Patient or Operator.
(Only applies to IEC 60601--1 Standard -- Third edition)

General Mandatory action.

Type B applied part.

IPX0 Protection against harmful ingress of water or particulate matter.


IP Classification: Ordinary.

Ionizing radiation.

Non-ionizing electromagnetic radiation.

Radiation of Laser apparatus.


Do not stare into beam.
(Only applicable to equipment with Laser Pointer)

13
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

Dangerous voltage.

General warning, caution, risk of danger.

Warning: Ionizing radiation.

Warning: Non-ionizing radiation.

Warning: Laser beam.

Warning: Dangerous voltage.

Warning: Do not place fingers between mobile and fixed parts of the equipment, it
may cause serious injuries to patient or operator.
As well, make sure the patient extremities are correctly positioned into limit areas
during operation, movement of parts may cause serious damages to patient.

Electrostatic sensitive devices.

No pushing.

14
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

No sitting.

No stepping on surface.

Stop (of action).

Emergency stop.

“ON” power.

“OFF” power.

“ON” / “OFF” (push-push).


Each position, “ON” or “OFF”, is a stable position.

Alternating current.

Three-phase alternating current.

Three-phase alternating current with neutral conductor.

15
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

N Connection point for the neutral conductor on Permanently Installed equipment.

Direct current.

Both direct and alternating current.

Protective Earth (Ground).

Earth (Ground).

This symbol according to the European Directive indicates that the Waste of
Electrical and Electronic Equipment (WEEE) must not be disposed of as unsorted
municipal waste and must be collected separately. Please contact an authorized
representative of the manufacturer or an authorized waste management company
for information concerning the decommissioning of your equipment.

This separate collection symbol is affixed to a battery or its packing, to advise that
the battery must be recycled or disposed of in accordance with local or country
laws. The letters below the symbol indicate whether certain elements (Li=Lithium,
PB=Lead, CD=Cadmium, Hg=Mercury) are contained in the battery. All batteries
removed from the equipment must be properly recycled or disposed. Please contact
an authorized representative of the manufacturer or an authorized waste
Li/Pb/Cd/Hg management company for information concerning the decommissioning of your
equipment.

Pollution Control. (Only applicable to People’s Republic of China (PRC)).


This symbol indicates the product contains hazardous materials in excess of the
limits established by the Chinese Standards. It must not be disposed of as unsorted
municipal waste and must be collected separately. Please contact an authorized
representative of the manufacturer or an authorized waste management company
for information concerning the decommissioning of your equipment.

16
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

TABLE OF CONTENTS

Section Page

1 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

2 OBJECTIVE AND SCOPE OF THIS MANUAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

2.1 Pre-Installation Check . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

2.2 Unpacking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

2.3 Interconnection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

2.4 Tools required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

3 SYSTEM COMPONENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

4 INSTALLATION PROCESS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

5 SYSTEM INSTALLATION GUIDES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33

6 MECHANICAL INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35

7 INSTALLATION HANDOFF CHECKLISTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37

7.1 Pre-Installation Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37

7.2 MI ==> FE Handoff Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39

8 SAFETY AND SERVICE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41

8.1 Lock-Out / Tag-Out (LOTO) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41


8.1.1 System Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
8.1.2 LOTO Procedure for System Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42

17
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

Section Page
8.2 Applying System Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
8.2.1 System Preparation for Energizing Power . . . . . . . . . . . . . . . . . . . . . . . 43
8.2.2 Energizing System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
8.3 De-Energizing System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45

8.4 Equipment Safety -- Electrostatic Discharge (ESD) . . . . . . . . . . . . . . . . . . . . . . 46


8.4.1 Generating Static . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
8.4.2 Personal Grounding Methods and Equipment . . . . . . . . . . . . . . . . . . . . 47
8.4.3 Grounding the Work Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
8.4.4 Recommended Materials and Equipment . . . . . . . . . . . . . . . . . . . . . . . . 48

9 UNPACKING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49

9.1 Positioner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50

9.2 System Cabinet and Dolly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51

9.3 Boxes with the Magic PC, Flat Panel Display . . . . . . . . . . . . . . . . . . . . . . . . . . . 53

9.4 Optional Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53

10 MECHANICAL INSTALLATION AND CABLE CONNECTION . . . . . . . . . . . . . . . . . 55

10.1 Mechanical Installation of Positioner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56


10.1.1 Floor-Ceiling Installation Option . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
10.2 Mechanical Installation of System Cabinet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
10.2.1 System Cabinet Floor Anchored . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88

10.3 Electrical Interconnection Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89


10.3.1 General Cautions for the Generator . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92
10.4 Tube, Collimator and HV Cables Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93

10.5 Internal Radiation Measuring System (DAP) (Optional) . . . . . . . . . . . . . . . . . . . 103

10.6 Generator Cabinet Cable Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105


10.6.1 Cable Routing inside Generator Cabinet . . . . . . . . . . . . . . . . . . . . . . . . 105
10.6.2 HV Cables and Stator Cable Connection . . . . . . . . . . . . . . . . . . . . . . . . 109
10.6.3 AEC Cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114
10.6.4 Door Interlock Signal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 116
10.6.5 Warning Light Signal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 116

18
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

Section Page
10.7 Control Box Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 117
10.7.1 Cable Routing and Tie Wraps inside Control Box . . . . . . . . . . . . . . . . . 120
10.8 Cable Connection in Magic PC, Flat Panel Display, and CRIB . . . . . . . . . . . . . 121

10.9 Power Line Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125


10.9.1 Power Line . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125
10.10 Installation of Top of Column and Foot Covers . . . . . . . . . . . . . . . . . . . . . . . . . . 129

10.11 Laminated and Carbon Fiber Table Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . 130


10.11.1 Laminated Table Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 130
10.11.2 Carbon Fiber Table Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 132

11 SYSTEM INTERCONNECTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 135

11.1 System Interconnection Signals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 135

11.2 System Interconnection Maps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 136

APPENDIX A CEILING SUPPORT HARDWARE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1

19
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

This page intentionally left blank.

20
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

SECTION 1 INTRODUCTION

Installation of a Definium 5000 system consists of 3 steps:

1. Site readiness (Pre-installation)

2. Mechanical Installation

3. Electrical Installation

Use Section 5 “System Installation Guides” in this manual to guide the


mechanical portion of the installation. Direction 5224647--100 “Definium 5000
Installation Manual -- Electrical Integration and Steering Guide” covers the GE
Field Service Engineer’s installation tasks.

21
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

This page intentionally left blank.

22
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

SECTION 2 OBJECTIVE AND SCOPE OF THIS MANUAL

1. The sequential process for mechanically installing a Definium 5000


System is contained in this manual. Following the instructions in
sequence results in an orderly, effective and efficient installation. In
addition, following instructions helps prevent future problems that may
not be discovered until the system is used.

2. Check the equipment according to the packing list for your system
against the main catalog numbers in the GON/FDO (Global Order
Number/Field Delivery Order). For shipping purposes, the packing list is
attached to the outside of the Positioner Crate. Refer to Section 9
“Unpacking” for specifics on package contents and unpacking methods.

3. Verify that all Definium 5000 documentation has been received:

G System Installation -- Mechanical Installation [paper]

G System Installation -- Electrical Integration & Steering Guide


[paper]

G Service Documentation Disc

G Operator Manual Disc

2.1 PRE-INSTALLATION CHECK

Pre-installation planning should be complete. Inspect the pre-installation


“checklist”, found in GEHC document 5192967--100 “Definium 5000
Pre-Installation”, and verify that the tasks specified have been completed.
Immediately arrange for completion of any tasks still not completed.

Locate the equipment positions. Mark the exact position/location where


components are to be placed on the floor, wall and/or ceiling.

2.2 UNPACKING

Read the DAMAGE IN TRANSPORTATION statement located at the front of


this document. Unpack only what is necessary to inspect for possible shipping
damage. Shortage claims on small parts may be avoided if packing material,
envelopes, packages, etc., are carefully examined. Do not discard any of these
packing materials until all items have been located.

Refer to Section 9 “Unpacking” for specifics on package contents and


unpacking methods.

23
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

2.3 INTERCONNECTION

The MIS (Master Interconnect Schematic) Map document comes with your
system. Interconnection of products by furnished cables or contractor supplied
wiring is indicated by numbered MIS runs in the installation sections. Run
interconnect charts are available, which describe the connection and function
of each wire.

Refer to Section 11 “System Interconnections” for interconnect information.

2.4 TOOLS REQUIRED

The following hand tools and products are required for the Installation:

 Standard service engineers tool kit.


 Electric drill and assorted bits
 Hammer drill
 Step ladder (Two [2] if installing the Floor--Ceiling mounting option)
 Gloves
 Hearing protection
 Digital Protractor 360 degrees resolution = 0.1 degrees, or equivalent
(GE part number 46--325479P1)
 Silicone Insulating Grease (proofing compound) (included in the X-ray
Tube package)
 HV Oil (included in the HV Cables package)
 Alcohol cleaning agent
 Non-abrasive Mat (recommended for assembly of Laminated or Carbon
Fiber Table)

24
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

SECTION 3 SYSTEM COMPONENTS

Refer to Section 9 “Unpacking” for more information on system components


and packaging.

Illustration 1
Definium 5000 System Component Identification

3 4

6
5

25
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

The Definium 5000 System is divided into three basic sub-systems (refer
Illustration 1, Table 1, Table 2 and Table 3):

 Positioner

 X-ray/Positioner Controls sub-system (System Cabinet)

 Control Console (Magic PC, CRIB, Touch-Screen Monitor, Keyboard,


Mouse)

The touch screen is the operator interface to the computer controls of the X-ray
system. It is designed to be user-friendly. Because it is the computer interface
for the system and the image display, the customer always uses it during X-ray
procedures. It is one of the most critical pieces of equipment in the X-ray system.

Table 1
Required Selections for Definium 5000

The Definium 5000 System will include one of the following free-standing components:

ITEM PRODUCT NAME PART NUMBER

1&2 Definium 5000 400V System 5220493

1&2 Definium 5000 480V System 5220493--2

1&2 Definium 5000 400V System with DAP 5220493 / 5220728

1&2 Definium 5000 480V System with DAP 5220493--2 / 5220728

2 Spectral Filter Collimator 5220500

2 Non Spectral Filter Collimator 5220499

6 English keyboard 5143798--7

26
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

Table 2
Standard Items for Definium 5000

The Definium 5000 System will include each of the following free-standing components:

ITEM PRODUCT NAME PART NUMBER

6 Magic PC collector 5220498

6 Aurora monitor 5177196

N/A Definium 5000 software 5220720

2 TRAD detector 5147707

N/A Flat Field Phantom and Dose Probe Holder Kit 5220721

N/A Definium 5000 Tech Pubs Kit 5220730

6 English keyboard 5143798--7

Table 3
Options for Definium 5000

The Definium 5000 System may include any of the following free-standing optional components:

ITEM PRODUCT NAME PART NUMBER

N/A Spanish keyboard 5143798--10

N/A Italian keyboard 5143798--11

N/A French keyboard 5143798--8

N/A German keyboard 5143798--9

N/A D5000 IR Remote 5220722

N/A Ceiling support 5220723

5 Elevating Table 5220724

3 Laminated Table 5220725

4 Carbon Fiber Table 5220726

N/A Image Paste Software Option 5220727

N/A Image Paste Barrier 5134183--20

N/A Bar Code Reader 2399877

N/A DAP meter 5220728

N/A Weight Bearing Rolling Stand 5220729

N/A Government Accounts Tech Pub Kit 5220730

27
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

This page intentionally left blank.

28
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

SECTION 4 INSTALLATION PROCESS


See Illustration 2, Illustration 3 and Illustration 4 for an overview of the
Definium 5000 installation process.

Illustration 2
Definium 5000 Installation Flow Chart -- Mechanical

Service Manuals
5192967--100 Pre-Installation Manual
5224647--100 Installation Manual -- Electrical
5192968--100 Installation Manual -- Mechanical
5192970--100 System Manual
5192971--100 Generator Manual
5192972--100 Positioner Manual

Move to an area with sufficient space to


Note . assemble Crane (~5m, ~16 ft), preferably in the
exam room where it is to be installed.

29
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

Illustration 3
Definium 5000 Installation Flow Chart (cont’d) -- Cabling

Service Manuals
5192967--100 Pre-Installation Manual
5224647--100 Installation Manual -- Electrical
5192968--100 Installation Manual -- Mechanical
5192970--100 System Manual
5192971--100 Generator Manual
5192972--100 Positioner Manual

Note . Mark Anode and Cathode at both ends of HV


cables based on tube connections made.

Note . DO NOT ROTATE TUBE CLOCKWISE.


SYSTEM DAMAGE WILL OCCUR

Note . Refer to the MIS MAPs for connection details.

Note . This is the final group of tasks for the Mechanical


Installation. Deliver completed Checklist to the
GEHC Field Service Engineer.

30
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

Illustration 4
Definium 5000 Installation Flow Chart (cont’d) -- Electrical

This and the remaining procedures are to be


Note . completed by a qualified GEHC Field Service
Engineer.

Be sure to record alignment results in HHS data


Note . sheets, Direction 5224647--100, Regulatory
Tests.

Be sure to record alignment results in HHS data


Note . sheets, Direction 5224647--100, Regulatory
Tests.

Service Manuals
5192967--100 Pre-Installation Manual
5224647--100 Installation Manual -- Electrical
5192968--100 Installation Manual -- Mechanical
5192970--100 System Manual
5192971--100 Generator Manual
5192972--100 Positioner Manual

31
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

This page intentionally left blank.

32
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

SECTION 5 SYSTEM INSTALLATION GUIDES

Installation is broken into two primary tasks: mechanical and electrical.


Mechanical Installation tasks are performed by the mechanical installers (MI)
and focus on the physical aspects of hardware assembly, equipment
positioning, and cabling. All of the tasks that will be required of the Mechanical
Installers are contained in this document.

Electrical tasks, including the installation of the detector and the optional Image
Paste Barrier, are done by the local field engineer (FE) and are performed when
system power is applied. These tasks are contained in multiple pieces of service
documentation and are directed through Direction 5224647--100 “System
Installation -- Electrical Integration and Steering Guide”.

Keep this section and Section 4 “Installation Process” handy as


execution of the installation progresses.

Table 4
Service Manual Application to Installation

SERVICE MANUAL Used in MI or FE


Installation

5192967--100 Pre--Installation Manual Not Directly Both

5192968--100 Installation Manual -- Mechanical Yes MI

5224647--100 System Installation -- Electrical Integration Yes FE

5192970--100 System Manual Yes FE

5192971--100 Generator Manual Yes FE

5192972--100 Positioner Manual Yes FE

The primary tasks are designed to be performed in sequence. Follow the


sequence of tasks described for each primary task in the sections (Section 6
and Section 7) that follow.

33
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

This page intentionally left blank.

34
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

SECTION 6 MECHANICAL INSTALLATION

1 Complete Pre-Installation Checklist People Required: 1 Hours to Complete: 0.5

j Fill out the Pre-Installation Checklist to confirm completion of pre-install activities before beginning the
installation process. See Section 7.1 “Pre-Installation Checklist”.

2 Receive and Inventory System People Required: 2 Hours to Complete: 1.0

j Inventory equipment & report discrepancies immediately. See Section 9 “Unpacking”.

j Collect Product Locator Cards and store in a secure location.

j Plan route and transport equipment to room.

j Schedule electrician to coincide with System Cabinet installation.

3 Install Positioner People Required: 2 Hours to Complete: 6.0

j Remove Positioner from shipping container. See Section 9 “Unpacking”.

j Mount Tube/Collimator support and using the Transport Dolly move the Positioner to exam room. See Section 10
“Mechanical Installation and Cable Connection”.

j Raise Positioner using the Crane and mount to floor and wall (ceiling mount in place of the wall mount is optional)
according to site plans and drawings. Utilize appropriate mounting hardware based on local code requirements. See
Section 10 “Mechanical Installation and Cable Connection”

4 Install System Cabinet People Required: 2 Hours to Complete: 2.0

j Remove System Cabinet from shipping container. See Section 10 “Mechanical Installation and Cable Connection”

j Using the Transport Dolly move the System Cabinet to exam room. Position System Cabinet according to site plans &
drawings. See Section 10 “Mechanical Installation and Cable Connection”

j If local code requires it, mount the System Cabinet to the floor. See Section 10 “Mechanical Installation and Cable
Connection”

5 Install Operator Console (Workstation) People Required: 1 Hours to Complete: 0.5

j Position Workstation computer, monitor, CRIB and accessories in the control room including any purchased options
related to the console (e. g., Bar Code Reader).

6 Install Tube / Pull MIS Cables People Required: 2 Hours to Complete: 6.0

j Install X-ray Tube, Collimator, HV cables and Stator cable. See Section 10 “Mechanical Installation and Cable
Connection”
DURING INSTALLATION OF TUBE/COLLIMATOR, TUBE MUST NOT BE ROTATED CLOCKWISE!

j Pull remaining MIS cables between sub--systems and connect. See Section 10 “Mechanical Installation and Cable
Connection”

7 Install DAP (Optional) People Required: 1 Hours to Complete: 0.5

j Install DAP and run cables. See Section 10 “Mechanical Installation and Cable Connection”

35
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

9 Install Table (Optional) People Required: 1 Hours to Complete: 1.0

j Install elevating, laminated or carbon fiber table. See Section 10 “Mechanical Installation and Cable Connection” and any
materials provided with the tables for assembly direction.

10 Connect Power & Set Tap People Required: 2 Hours to Complete: 0.5

j Connect main power and set transformer taps. See Section 10 “Mechanical Installation and Cable Connection”

11 Clean Up Site People Required: 2 Hours to Complete: 1.0

j Remove all dispose of shipping materials properly.

12 Complete MI ==> FE Handoff Checklist People Required: 1 Hours to Complete: 0.5

j Mechanical installer to fill out MI ==> FE handoff checklist and deliber it to the local FE for review at completion of
mechanical installation. See Section 7.2 “MI ==> FE Handoff Checklist”.

j Mechanical installer to deliver the completed Pre-Installation checklist to the local FE for review. See Section 7.1
“Pre-Installatin Checklist”.

36
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

SECTION 7 INSTALLATION HANDOFF CHECKLISTS

7.1 PRE-INSTALLATION CHECKLIST

Delivery Date: Sales Person:

Customer: GNO / FDO No.:

Room #

Equipment:

PHYSICAL REQUIREMENTS OF SITE COMPLETED

1. Room size adequate for intended equipment configuration? j


2. Floor, wall, and ceiling are strong enough for intended equipment and mounting methods approved -- j
seismic regulatory codes considered?

3. Delivery route accommodates all intended equipment? j


4. Radiation physicist consulted? j
5. Necessary alterations made to circumvent obstructions? j
6. Modifications to room finished? j
7. Supports, platforms, wall -- ceiling materials have been provided? j
8. Support structures installed for floor, ceiling, and wall mounted equipment? j
9. Wall -- ceiling supports leveled? j
10. Has floor been modified for cable ducts? j
11. Electrical service in place -- at the ratings specified in Pre-Installation documentation? j
12. Power available to operate power tools? j
13. All non-electrical lines (air, water, oxygen, vacuum) installed? j

INTERCONNECTIONS COMPLETED

1. Signal cable, power, and grounding plans produced? j


2. Necessary interconnection hardware, such as junction boxes, conduit or raceways, and fittings, provided? j
3. Interconnection hardware installed? j
4. Flexible, stranded wire provided for System input power connection? j
5. System “feeder” power cables pulled and sufficient length available at disconnect box for connections? j
6. Interconnecting cables continuity checked, and labeled? j
7. All high voltage cable lengths verified? j
8. Interface information available for equipment? j

37
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

GENERAL COMPLETED

1. Ceiling, walls, and floor clear of all obstructions? j


2. Walls finished? j
3. Finished floor installed? j
4. Room lights installed? j
5. Dust-creating work completed? j
6. Old equipment within room removed? j
7. Component positions clearly marked on floor? j
8. Space available to store equipment? j
9. Lock on door, or locked room available? j
10. Room IP Addresses for DICOM and Broadband identified? j
11. Broadband connection provided for InSite connection? j
OR
If Broadband connection will not be used, is dedicated inbound ”dialup” phone line provided for InSite
connection?

12. Voice phone line connection provided? j


13. Have all fire/safety inspections for occupancy been completed? j
14. Send completed checklist to the GE Healthcare installation team. j

COMMENTS

INSPECTION DATE(S)

INSTALLATION PROJECT MANAGER SIGNATURE

38
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

7.2 MI ==> FE HANDOFF CHECKLIST

Purpose:
The Mechanical Installer to Field Engineer Handoff Checklist is used to confirm
that all critical installation steps have been completed. Upon completion of the
mechanical installation of the system, the Mechanical Installer must fill out this
checklist and review with the local Field Engineer.

ITEM # ITEM SIGN OFF

1.) Power and ground cables connected and tightened:

j Power cables (3--phase power and ground into System Cabinet)

j Ground cables (System Cabinet buss bar, Positioner to System Cabinet)

2.) All signal cables connected and tightened.

3.) All mounting bolts installed and tightened (floor, wall and ceiling (optional in place of wall)).

4.) Positioner Column leveled and plum.

5.) Control room and Positioner cables properly dressed.

6.) Correct language decal applied to CRIB.

7.) All system documentation (cat. no. A7998MD) turned over.

8.) All covers installed.

9.) Room cleaned.

10.) Product locator cards collected.

11.) Missing components and/or options:


________________________________________________________________________________

12.) List of any installation drawing deviations (all deviations should be signed by customer and reviewed
by the installation specialist).

13.) Packing materials disposed of.

____________________________________________ _____________________________________________
Mechanical Installer Signature Field Engineer Signature

39
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

This page intentionally left blank.

40
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

SECTION 8 SAFETY AND SERVICE

8.1 LOCK-OUT / TAG-OUT (LOTO)

8.1.1 SYSTEM POWER

Name Of Equipment: Definium 5000 System (Workstation, System Cabinet,


Positioner U-arm).

Number Of Locks: One per person, working on the system.

Title(s) of Employees Authorized to Perform LOTO: Those trained in


Lock-out / Tag-out (LOTO).

Title(s) of Affected Employees and How to Notify: Hospital Personnel;


notified by verbal communication.

Energy Source Yes No Location of Energy Isolating Means Magnitude of Energy

Electrical X System’s Main “A1” Power Disconnect 320 -- 480VAC, 3 Phase

Pneumatic X
Hydraulic X
Gas/Water/Steam X
Chemical X
Mechanical Motion X
Gravity X
Springs X
Thermal X
Stored Energy X
Air Under Pressure X
Oil Under Pressure X
Water Under Pressure X
Gas Under Pressure X
Steam X
Other X

Type(s) of Equipment and/or Method(s) Selected to Dissipate or Isolate


Stored Energy: Allow three (3) minutes for stored energy to dissipate.

Type(s) of Equipment and/or Method(s) Used to Ensure Disconnection‘s:


One Lock & Tag for Main “A1” Disconnect.

41
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

8.1.2 LOTO PROCEDURE FOR SYSTEM POWER

Name of Equipment: Definium 5000 System (Workstation, System Cabinet,


Positioner U--arm)

1. Prepare for equipment shutdown by notifying the affected personnel


working in the area where Lock-Out / Tag-Out is being performed.

2. Bring the system software down (refer to Section 8.3), then return to Step
3.

3. Locate the main power supply (Service) disconnect feeding the system
cabinet.

4. Lock Out / Tag Out the main power disconnect.

5. With an insulated voltmeter measure the incoming power connection to


the system cabinet at the main line power fuses (F3, F4, and F5).

6. If no voltage is present at the system cabinet’s main line power fuses,


check that the high voltage inverter’s capacitors have bled off their
residual charge by observing that the LEDs on the Charge-Discharge
Monitor Boards are extinguished. This takes approximately three (3)
minutes after power is shut off.

7. If the LEDs on the Charge-Discharge Monitor Boards are not lit, proceed
to service the equipment as required.

8. After service has been performed, notify the affected personnel that the
equipment will be re-energized and the LOTO devices are being
removed.

9. Assure the safety of the area and that all safety devices and guards have
been replaced.

10. Return the system functions to a preset state.

11. Remove the Lock-Out / Tag-Out equipment from the main disconnect.

12. Locate the main power supply (Service) disconnect feeding system
cabinet and re--apply power.

13. Perform system start-up. (Refer to Section 8.2.2, “Energizing System.”)

42
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

8.2 APPLYING SYSTEM POWER

8.2.1 SYSTEM PREPARATION FOR ENERGIZING POWER

POTENTIAL ELECTRICAL SHOCK. PERFORM LOTO


BEFORE PERFORMING SERVICE OF ANY KIND. (REFER TO
SECTION 8.1.)

Follow the steps below to ensure that your system powers up safely, properly,
and reliably.

Potential for Equipment Damage. PDU tap settings must


match input voltage. There is potential for equipment
damage.

1. Refer to Pre-Installation Manual -- Direction 5192967--100, Section 4.5,


“Safety Devices,” for information on proper tap settings.

2. Disengage all facility (i. e., hospital) E-Stops.

3. Disengage the detector and CRIB E--Stop buttons. Turn them 1/4 turn
clockwise to release button. They will pop out.

CRIB E-Stop

Detector E-Stop

Warning Label

43
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

8.2.2 ENERGIZING SYSTEM

The system power--up is controlled by both the hardware and software. When
power is applied, power is switched “ON” to each of the subsystems through the
hardware. Software in the subsystems boot and begin loading their operating
systems and applications. A complete system start-up takes approximately five
(5) minutes.

1. Prepare the system for energizing, if required. (Refer to Section 8.2.1.)

2. Remove tag and lock from facility power. (Refer to Section 8.1.2.)

3. Press the POWER ON (I) button on the CRIB to initiate a system start-up.

POWER ON

4. System start-up is complete when the applications log--in screen


displays on the workstation computer.

44
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

8.3 DE-ENERGIZING SYSTEM

Shut down is controlled by both software and hardware. When a shutdown is


initiated, the application and the operating software execution is terminated.
While this takes place, signals are sent to the PDU to shut--off system hardware.
Complete shutdown takes approximately two (2) minutes.

1. From the application interface, using the mouse, click on the tools icon.
This selects the Service User Interface.

Tools icon

2. Now click on Shut Down.

3. Now lock out and tag out the facility power to the system, if you wish to
perform service. (Refer to Section 8.1.2.)

45
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

8.4 EQUIPMENT SAFETY -- ELECTROSTATIC DISCHARGE (ESD)

A sudden discharge of static electricity from your finger or other conductor can
destroy static--sensitive devices or microcircuitry. Often the spark is neither felt
nor heard, but damage occurs. An electronic device exposed to electrostatic
discharge (ESD) might not appear to be affected at all and can work perfectly
throughout a normal cycle. The device can function normally for a while, but it
has been degraded in the internal layers, reducing its life expectancy.

Networks built into many integrated circuits provide some protection, but in
many cases the discharge contains enough power to alter device parameters
or melt silicon junctions.

8.4.1 GENERATING STATIC

The following table shows that:

 Different activities generate different amounts of static electricity.

 Static electricity increases as humidity decreases.

Relative Humidity

Event 55% 40% 10%

Walking across carpet 7,500 V 15,000 V 35,000 V

Motions of bench worker 400 V 800 V 6,000 V

Removing bubble pack from PCB 7,000 V 20,000 V 26,500 V

Packing PCBs in foam--lined box 5,000 V 11,000 V 21,000 V

Many electronic components are sensitive to ESD. Circuitry design and


structure determine the degree of sensitivity. The following packaging and
grounding precautions are necessary to prevent damage to electric
components and accessories.

 Transport products in static-safe containers, such as tubes, bags, or


boxes, to avoid hand contact.

 Protect all electrostatic parts and assemblies with conductive or


approved containers or packaging.

 Keep electrostatic sensitive parts in their containers until they arrive at


static-free stations.

 Place items on a grounded surface before removing them from their


container.

46
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

 When handling or touching a sensitive component or assembly, ground


yourself by touching the chassis.

 Avoid contact with pins, leads, or circuitry.

 Place reusable electrostatic-sensitive parts from assemblies in


protective packaging or conductive foam.

8.4.2 PERSONAL GROUNDING METHODS AND EQUIPMENT

Use the following equipment to prevent static electricity damage to equipment:

 Wrist straps are flexible straps with a maximum of one--megohm (±10%)


resistance in the ground cords. To provide a proper ground, wear the
strap against the bare skin. The ground cord must be connected and fit
snugly into the banana plug connector on the grounding mat or
workstation.

 Heel straps, toe straps, and boot straps can be used at standing
workstations and are compatible with most types of shoes or boots. On
conductive floors or dissipative floor mats, use them on both feet with a
maximum of one--megohm (±10%) resistance between the operator and
ground.

Static Shielding Protection Levels

Method Voltage

Antistatic plastic 1,500

Carbon--loaded plastic 7,500

Metallized laminate 15,000

8.4.3 GROUNDING THE WORK AREA

To prevent static damage of components and parts in the work area:

 Cover the work surface with approved static--dissipative material.


Provide a wrist strap connected to the work surface and properly
grounded tools and equipment.

 Use static-dissipative mats, foot straps, or air ionizers to give added


protection.

 Handle electrostatic sensitive components, parts, and assemblies by the


case or PCB laminate.

 Handle components only at static--free work areas.

47
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

 Turn the power and input signals OFF before inserting and removing
connectors or test equipment.

 Use fixtures made of static-safe materials when fixtures must directly


contact dissipative surfaces.

 Keep work area free of non-conductive materials, such as ordinary


plastic assembly aids and Styrofoam.

8.4.4 RECOMMENDED MATERIALS AND EQUIPMENT

Materials and equipment that are recommended for use in preventing static
electricity include:

 Antistatic tape, smocks, aprons, or sleeve protectors.

 Conductive bins, foam, tabletop workstations with ground cord of


one--megohm (±10%) resistance, and other assembly or soldering aids.

 Static--dissipative table or floor mats with hard tie to ground.

 ESD Field service kits.

 Static awareness labels.

 Wrist straps and footwear straps providing one-megohm (±10%)


resistance.

 Material handling packages:

G Conductive plastic bags, plastic tubes and tote boxes.

G Opaque shielding bags.

G Transparent metallized shielding bags and shielding tubes.

48
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

SECTION 9 UNPACKING

The whole system is shipped in several crates and boxes to facilitate transport
and installation. Upon receipt of the X-ray unit and associated equipment,
inspect all crates and boxes for signs of damage. If damage is found, notify the
carrier or his agent immediately.

SOME CABLES AND PARTS ARE CONCEALED IN BUBBLE


WRAP. REMOVE THE WRAPPING CAREFULLY. A CUTTER
MAY PRODUCE DAMAGE ON PAINTED SURFACES OR
CABLES.

Note . Component unpacking must be performed in the order indicated


in this document. First unpack the Positioner and then the System
Cabinet. Finally, unpack the Magic PC, Flat Panel Monitor, and the
Table crate.

Note . The Detector is to be unpacked only by the GE Field Engineer.

To remove the system cabinet and positioner from their respective crates, it is
necessary to use a Foldable Crane and Transportation Dolly. (Refer to
Section 10, “Mechanical Installation and Cable Connection”).

Keep in mind that when the positioner is lifted by the crane, it will need at least
5 m (16 ft.) of clearance. (Refer to Pre-Installation Manual -- Direction
5192967--100, Section 2.2.2, “Door Size Requirements.”)

Nuts and bolts used to fasten materials to the pallets is usually 13 mm.

49
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

9.1 POSITIONER

Note . The pictures and tables in this section are for reference only. The
contents and placement are subject to change.

(Refer to Illustration 1)

1. Place the shipping pallet at the pre-defined place. (Refer to


Pre-Installation Manual -- Direction 5192967--100.) Keep in mind the
dimensions of the Positioner once it is placed on the Transport Dolly.

Illustration 5
Crate #1 -- Positioner and other components

CRATE #1
14 8 11
5 13
9 1

1 1
7
4
6

2 1 3
12 10

1.-- Positioner 6.-- Base (cover) 11.-- White Sleeves (HV Cables)
2.-- X-Ray Tube 7.-- H.V. Cables 12.-- Hardware Kit
3.-- Dosimeter (optional) 8.-- Stator Cables 13.-- Grid package with test (no grids inside)
4.-- Crib 9.-- Detector Assembly (Grids Included) 14.-- Wall Support
5.-- Head / Tube Cover 10.-- Top Cap

GROSS NET
CRATE #1 HEIGHT LENGTH WIDTH
WEIGHT WEIGHT

Positioner, X-Ray Tube,


105 cm 230 cm 87 cm 584 Kg 501 Kg
Collimator, Detector Assembly
(41”) (90.5”) (34”) (1287 lb) (1104 lb)
and other components

50
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

2. Remove all crate sides and do not discard any packing material such as
envelopes, boxes, or bags until all parts are accounted for as listed on
the packing list.

3. Remove all the components from the crate, except the Positioner which
will be removed later as described in Section 10.1, “Mechanical
Installation of Positioner.”

4. When the equipment is unpacked verify that all items on the customer
order are present. Check the part numbers / serial numbers of each
component with its identification labels and inspect all pieces for visible
damage. If any damaged parts are found, repair or order replacements
to prevent unnecessary delay in installation. (If needed, contact GEHC
Service / Field Engineers.)

5. Leave a working area around the equipment / pallet until its final
installation is complete. (Refer to Section Section 10.1, “Mechanical
Installation of Positioner.”)

9.2 SYSTEM CABINET

(Refer to Illustration 2)

1. Place the shipping pallet at the pre-defined place. (Refer to


Pre-Installation Manual -- Direction 5192967--100.) Keep in mind the
dimensions of the System Cabinet once it is placed on the Transport
Dolly.

2. Remove all crate sides and do not discard any packing material until all
parts are accounted for as listed on the packing list.

3. Do not remove any part / component from the shipping pallet until
indicated in Section 10.2, “Mechanical Installation of System Cabinet”.

4. When the equipment is unpacked, verify that all items on the customer
order are present. Check the part numbers / serial numbers of each
component with its identification labels, and inspect all pieces for visible
damage. If any damaged parts are found, repair or order replacements
to prevent unnecessary delay in installation. (If needed, contact to GEHC
Service / Field Engineers.)

5. Leave a working area around the equipment / pallet until its final
installation is complete. (Refer to Section 10.2, “Mechanical Installation
of System Cabinet”.)

51
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

Illustration 6
Crate #2 -- System Cabinet and Dolly

CRATE #2
1.-- System Cabinet
2.-- Ferrites Kit

GROSS NET
CRATE #2 HEIGHT LENGTH WIDTH
WEIGHT WEIGHT

190 cm 112 cm 82 cm 239 Kg 172.5 Kg


System Cabinet
(75”) (44”) (32”) (526.9 lb) (380.2 lb)

52
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

9.3 BOXES WITH THE MAGIC PC, FLAT PANEL DISPLAY

Note . The Detector is to be unpacked only by the GE Field Engineer.

1. Open the respective box and pick up the components. Do not discard any
packing material such as envelopes, boxes, or bags inside the boxes.

2. When the equipment is unpacked verify that all items on the customer
order are present.

3. Check the part numbers / serial numbers of each component with its
identification labels and inspect all pieces for visible damage. If any
damaged parts are found, repair or order replacements to prevent
unnecessary delay in installation. (If needed, contact GEHC Service /
Field Engineers.)

9.4 OPTIONAL COMPONENTS

Note . This Section refers to the Optional Components such as Tables


(Laminated, Carbon Fiber, or Elevating Table) and Image Pasting
Barrier. Remote Control, DAP, and Ceiling Support are optional
and they are inside Crate #1.

1. Place the shipping pallet at the pre-defined place.

2. Remove all crate sides and do not discard any packing material such as
envelopes and bags until all parts are accounted for as listed on the
packing list.

3. In the case of the laminated or carbon fiber table, remove all table parts
from the crate and assemble as described in Section 10.11, “Laminated
and Carbon Fiber Table Assembly.”

Note . For the Elevating Mobile Table’s assembly instructions, refer to the
manufacturer’s instructions contained in its shipping package.

The Image Pasting Barrier is to be installed by a qualified GEHC


Field Engineer.

For the Image Paste Barrier’s assembly instructions, refer to


Direction 5224647--100, “Definiumt 5000 System Installation --
Electrical Integration and Steering Guide.”

53
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

4. Check the part number / serial number with its identification label, and
inspect all pieces for visible damage. If any damaged parts are found
repair or order replacements to prevent unnecessary delay in installation.
(If needed, contact GEHC Service / Field Engineers.)

GROSS NET
OPTIONAL CRATE HEIGHT LENGTH WIDTH
WEIGHT WEIGHT

13 cm 228.5 cm 88.5 cm 74.5 kg 40 kg


Laminated Mobile Table
(5.1”) (90”) (34.6”) (164 lb) (88 lb)

23 cm 230 cm 77 cm 70 kg 32 kg
Carbon Fiber Mobile Table
(9”) (90.5”) (30”) (154 lb) (70.5 lb)

97 cm 241 cm 86 cm 240 kg 129 kg


Elevating Mobile Table
(38.2”) (94.9”) (33.8”) (540 lb) (284.4 lb)

127 cm 244 cm 94 cm 282 kg 90.7 kg


Image Pasting Barrier
(50”) (96”) (37”) (625 lb) (200 lb)

109 cm 208 cm 91 cm 104 kg 55.8 kg


Weight Bearing Stand
(43”) (82”) (36”) (231 lb) (123 lb)

54
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

SECTION 10 MECHANICAL INSTALLATION AND CABLE


CONNECTION

Note . The following procedures for mechanical installation are perfomed


with the Foldable Crane (P/N 5233599) and its accessories (refer
to Crane Instructions -- Direction 5368144--1EN).

Illustration 7
Crane Kit

Crane

Coupling Plate and


Transport Dolly Screws (M10 and M12)

Two (2) Slings

DO NOT SUPPLY THE MAIN POWER OR TURN ON THE


POSITIONER OR SYSTEM CABINET UNTIL SPECIFICALLY
INSTRUCTED IN THIS DOCUMENT.

55
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10.1 MECHANICAL INSTALLATION OF POSITIONER

At least two people are required to perform the following


operations.

1. Remove the packaging, head and foot shipping plates and all the
components included, keeping the Lateral Positioner on the pallet.

Lateral Positioner

Positioner Foot

Safety Locking Rod (Central Carriage)

Positioner Head

Pallet

DO NOT REMOVE THE SAFETY LOCKING ROD FROM THE


CENTRAL CARRIAGE OF THE POSITIONER (COLUMN)
UNTIL SPECIFICALLY INSTRUCTED IN THIS DOCUMENT.

Once the Shipping Head Plate is removed, re-install the four


(4) hex screws and washers in the Lateral Positioner.

2. Remove the Front Screw of the Top Cover at the head part of the Lateral
Positioner.

Front Screw

56
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

3. Mount the Coupling Plate with the four (4) Fixing Screws.

Coupling Plate

4 Fixing Screws

4. Unfold the Crane following the instructions described in the Crane


Instructions (refer to Direction 5368144--1EN).

5. With the Arm horizontally, place the Arm Extension in the position of
700 kg (1543 lb) and insert the Safety Pin with its Hairpin Cotter.

Nº 3:
700 kg

The Safety Pin have to be placed in position of 700 kg


(1543 lb) for operating with the Lateral Positioner due to its
dimensions.

6. Place the Crane Legs under the pallet as shown in the picture below,
using the Hand Grips to drive the Crane.

57
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

7. Place the Slings around the Lateral Positioner as shown below, crossing
over the Steel Cable.

Hang the Slings on the Hook and tighten them operating the Lifting Lever,
ensuring the Lateral Positioner is firmly held.

Sling

Steel Cable

Do not lift the system by the carriage or potentiometer.

8. Unscrew the Tube-Collimator Support from the pallet and place it at the
other side on the floor, as close as possible of the Lateral Positioner.

Tube--Collimator Support

58
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

9. Lift the equipment until it reaches the required position, then remove the
pallet.

10. Place the Wooden Supports of the pallet on the Transport Dolly and
position it under the Lateral Positioner as shown in the illustration below.

Positioner Foot

Wooden Supports
Position

Positioner Head

59
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

11. Lower the Lateral Positioner slowly opening the Safety Valve until it is
placed on the Transport Dolly, ensuring not to trap the Steel Cable nor
Electric Cables.

12. Once the Lateral Positioner is on the Transport Dolly remove the Slings
and move the Crane away.

13. Carefully remove the wrapping from the tube-collimator support. This
part includes the positioner control.

Unpacking of Tube-Collimator Support

60
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

14. Install the tube-collimator support to the upper carriage of the swivel arm
using the four (4) safety screws pre-attached to the upper carriage
(torque 20 Nm / 177 Lbf.in).

Note . As you bring the Positioner Control (Touch Screen Panel), Tube
and Collimator mount up to the U-Arm be sure to route the cable
on the same side as the other cables.

Do not remove the Protective Foam on the Touch Screen until


the mechanical installation of the Positioner is completed.

Positioner Control

Tube-Collimator Support

Safety Screws

Upper Carriage

Correct cable routing

61
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

15. Move the equipment on the Transport Dolly to the installation area.

THE CRANE IS NOT A TRANSPORTATION DEVICE.


WHEN IT IS NECESSARY TO MOVE THE EQUIPMENT, USE
THE TRANSPORT DOLLY INCLUDED IN THE KIT,
MONITORING MOVEMENTS CAREFULLY.

TO AVOID PERSONAL INJURY OR DAMAGE TO THE


EQUIPMENT, AT LEAST TWO PEOPLE ARE REQUIRED TO
DRIVE IT BETWEEN DIFFERENT LEVEL SURFACES
(ELEVATORS, ETC.), IN SUCH A WAY THAT THE WHEELS
SHOULD CROSS ONE BY ONE, AS SHOWN IN THE PICTURE
BELOW.

AT LEAST THREE PEOPLE ARE REQUIRED TO DRIVE THE


EQUIPMENT OVER RAMPS. THEY SHOULD HANDLE THE
EQUIPMENT CAREFULLY, AS SHOWN BELOW DRIVING IT
DOWN THE RAMP. FOR SAFETY REASONS, TRAVELLING
SURFACES MUST NOT EXCEED 5o INCLINATION.

62
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

16. Once the equipment is in the installation area, place it perpendicular to


the wall, with the base at a minimum distance of 1.5 meters (60”).

Insert the Crane Hook into the eyebolt of the Coupling Plate.

1.5 m.

Note . Before lifting the Lateral Positioner, the Steering Wheels Foot Lock
have to be released to allow that the Crane approaches the Lateral
Positioner when lifting.

17. Place a Floor Protection (piece of cloth, blanket or wood plate) below
Column Base and a Wooden Block 3.5 cm between floor and Column
Foot to protect the cables which exit the column from being crushed when
lifting the positioner.

Start lifting the Lateral Positioner pulling the Lifting Lever. Once the base
of Lateral Positioner is on the floor, move the Transport Dolly away.

Floor Protection

Wooden Block

63
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

18. Continue pulling the Lifting Lever with short and continuous movements
until the Lateral Positioner is suspended in the air, while the other person
holds it to avoid it turns around strongly.

Then turn the Lateral Positioner as shown in the picture below.

64
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

19. The following illustration shows the recommended final location of the
positioner and system cabinet in the exam room. Refer to the GE Final
Installation Drawings for the exact location of the system components to
reference the exact positioner installation location.

2116mm* (83.3”)
935mm* (36.8”)

310mm*
(12.2”)

188.5mm
(7.4”)
POSITIONER SYSTEM
CABINET

100mm* (3.9”) 414mm*


(16.2”)

* NOTE: Minimum distances from walls


to System Cabinet and Positioner.

Note . For more information about Room Layouts and Seismic


requirements, refer to the “Pre-Installation Manual” (Direction
5192967--100).

Note . If the Positioner has to be Floor--Ceiling anchored, follow with the


procedure described in Section 10.1.1, “Floor--Ceiling Installation
Option.”

65
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

20. Use a ladder to access the upper column area. Install the column support
on the column top (torque 20 Nm / 177 Lbf.in). Then assemble the wall
support under the column support (torque 20 Nm / 177 Lbf.in).

Note . Do not firmly tighten these screws until secure the wall support to
the wall.

Column Support Column

Wall Support

Wall Support

21. Move the Lateral Positioner closer to the installation point, leaning it on
the wall and the base on the floor by slightly opening the Safety Valve of
the Crane. Lock the Steering Wheels of the Crane.

22. Level the Lateral Positioner and tighten the three short leveling screws
(supplied with the floor anchoring hardware) until they touch the floor.
Mark the anchoring points on the wall and floor, then move the Lateral
Positioner away and prepare the anchoring points (refer to Illustration 8).

Levelling Screws at Column Base

66
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

Illustration 8
Drill Diagram

Six (6) Wall Drilling Holes for M8 (5/16”) screws

170 mm (6.7”)
2129 mm (83.8”)

POSITIONER

Four (4) Floor Drilling Holes for 1/2” screws

67
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

If anchoring the column with the hardware supplied, do not


place the anchors in the floor holes separate from the bolts.
Insert the anchors in the floor after the placement of the
positioner.

Note . For more information about floor and wall anchoring requirements,
refer to Section 2, “Room Requirements” of the “Pre-Installation
Manual” (Direction 5192967--100).

23. Place the Lateral Positioner in its final position in the exam room so the
bottom of the column foot plate flush with the floor.

24. Insert the four floor anchors into the holes and tighten them embedding
at least 2 1/4” in the floor.

Leveling screws

Rear Floor Anchors

Anchor the column to the floor using the anchoring hardware


supplied (1/2 ” x 3 3/4 ” anchors). This hardware will be firmly
tightened in step 27.

STANDARD ANCHORING
SEISMIC ANCHORING
(included in package)

FLOOR FLOOR
1/ 3/
Anchor used 2” x 3 4” (95 mm) For seismic anchoring refer to the
Expansion anchors (
“Pre-Installation Manual” (Direction
5192967 -100)
5192967- 100) -- A
Appendix
di A
Torque applied 54 Nm / 478 lbf.in (40 lbf.ft) “Requirements for Seismic Areas.”

68
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

25. Check with a standard level the vertical / horizontal position of the
column. Perform the leveling adjustments on the column base with the
leveling screws and, if necessary, place the required leveling shims
around the floor anchors under the column base. Make sure that the
column is correctly leveled.

Note . The leveling shims are supplied with the floor anchors.

Levels

Floor Anchors

Leveling Shims

26. Anchor the wall support to the wall.

Wall Support

STANDARD ANCHORING
SEISMIC ANCHORING
(included in package)

WALL WALL

M6 x 60 mm For seismic anchoring refer to the


Anchor used
Expansion anchors (
“Pre-Installation Manual” (Direction
5192967 -100)
5192967- 100) -- A
Appendix
di A
Torque applied 20 Nm / 177 lbf.in (14.7 lbf.ft) “Requirements for Seismic Areas.”

69
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

27. Check with a standard level the vertical / horizontal position of the
column. Make sure that the column is correctly leveled and then firmly
tighten the column to the floor, and the screws that assemble the wall
support to the column support.

Levels

STANDARD ANCHORING
SEISMIC ANCHORING
(included in package)

FLOOR WALL FLOOR and WALL

1/ 3
2” x 3 /4” (95 mm) M6 x 60 mm For seismic anchoring refer to
Anchor used the “Pre-Installation Manual”
Expansion anchors Expansion anchors
(Direction 5192967--100) --
Appendix A “Requirements for
Torque applied 54 Nm / 478 lbf.in (40 lbf.ft) 20 Nm / 177 lbf.in (14.7 lbf.ft) Seismic Areas.”

70
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

28. Once the Lateral Positioner has been anchored to the wall and floor,
remove the Coupling Plate from the upper column without unhooking it
from the Crane.

29. Re-install the Front Screw of the Top Cover at the head part of the Lateral
Positioner (removed at the begining of the procedure).

Front Screw

30. Move the Crane away, unhook the Coupling Plate, fold the Crane and
keep the Crane Kit, including the two (2) Wooden Supports for future
services.

The Wooden Blocks are included


in the positioner package Crane

(4) Angle Brackets and Screws


included in the Cabinet package

Coupling Plate and


Transport Dolly Screws (M10 and M12)

Two (2) Slings

71
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10.1.1 FLOOR-CEILING INSTALLATION OPTION

Note . The minimum ceiling height required is 2750 mm (108.27”) and the
maximum ceiling height is 2950 mm (116.14”).

Note . The Floor--Ceiling installation requires two (2) people and two (2)
ladders to complete.

Note . The floor--ceiling mounting option is not approved for use in areas
covered by seismic regulations. Consult local regulations before
using the floor--ceiling mounting option.

1. Mark the ceiling support anchoring holes at the ceiling, placing the rows
of 3 screws of this support parallel to positioner. These anchoring holes
can be marked using Part 16476--02 of the ceiling support or with the
following illustration. Drill the anchoring holes at the ceiling.

16476--02

333mm
177.5mm 177.5mm
(13.11”)
(6.99”) (6.99”)
177.5mm

16471--02
(6.99”)
177.5mm
(6.99”)

16474--02

 14mm
16473--02 (0.55”)

2. Anchor Part 16476--02 of the ceiling support to the ceiling using the
supplied bolts “C2.” Ensure that Part 16476-02 is level, using the twenty
(20) shims provided (hardware “C4”) if necessary, then tighten the piece
firmly to the ceiling applying a torque of 25 Nm / 221 Lbf.in. (This
hardware is included in the “Ceiling Support Kit”; refer to Appendix B,
“Ceiling Support Hardware”.)

Note . The bolts provided with the Ceiling Support option are for concrete
applications only. If an Unistrut system is used, obtain appropriate
anchors (bolts or another system) locally.

72
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

3. Assemble Parts 16471--02 and 16476--02 using the provided nuts and
washers (hardware “C1”) (torque 30 Nm / 265.5 Lbf.in). Both parts must
be assembled placing the part 16471--02 onto 16476--02 in the centre of
its gap so the part 16471--02 can be adjusted during the installation
process. (Refer to Appendix B, “Ceiling Support Hardware.”)

4. At this moment, general procedure for “Mechanical Installation of


Positioner” (Section 10.1) had to be carried out until step 19.

5. Use a ladder to access the upper column area. Assemble Part 16473--02
of the ceiling support to the column top (back side) (torque 20 Nm /
177 Lbf.in) using the screws removed from the Shipping Head Plate (4
hex screws M8x25 (DIN 933) + 4 washers 8.4 (DIN 125)).

Part 16473--02

4 screws M8x25 with washers

6. Move the Lateral Positioner to the final position in the room until the
ceiling support part assembled to the column top is in contact with Part
16471--02 and the base is in contact with the floor, for that slightly open
the Safety Valve of the Crane. Lock the Steering Wheels of the Crane.

7. Fix the ceiling support by tightening at least 2 screws (use hardware “C3”
and Part 16474--02).

8. Level the Lateral Positioner and tighten the three short leveling screws
(supplied with the floor anchoring hardware) until they touch the floor.
Mark the anchoring points on the floor, then move the Lateral Positioner
away and prepare the anchoring points.

Four (4) Floor Drilling Holes for 1/2” screws

Levelling Screws at Column Base

73
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

If anchoring the column with the hardware supplied, do not


place the anchors in the floor holes separate from the bolts.
Insert the anchors in the floor after the placement of the
positioner.

Note . For more information about floor and ceiling anchoring


requirements, refer to Section 2, “Room Requirements” of the
“Pre-Installation Manual” (Direction 5192967--100).

9. Place the Lateral Positioner in its final position in the exam room so the
bottom of the column foot plate flush with the floor and the ceiling support
part assembled to the column top must contact Part 16471--02.

Anchor the column to the ceiling support, that is, fix both parts using the
hardware and Part 16474--02 (not shown; goes behind Part 16471--02)
provided with the ceiling support. This hardware will be firmly tightened
in step 12.

Part 16471--02

Part 16473--02

74
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10. Insert the four floor anchors into the holes and tighten them embedding
at least 2 1/4” in the floor.

Leveling screws

Rear Floor Anchors

Anchor the column to the floor using the anchoring hardware


supplied (1/2 ” x 3 3/4 ” anchors). This hardware will be firmly
tightened in step 12.

STANDARD ANCHORING
SEISMIC ANCHORING
(included in package)

FLOOR FLOOR
1/ 3/
Anchor used 2” x 3 4” (95 mm) For seismic anchoring refer to the
Expansion anchors (
“Pre-Installation Manual” (Direction
5192967 -100)
5192967- 100) -- A
Appendix
di A
Torque applied 54 Nm / 478 lbf.in (40 lbf.ft) “Requirements for Seismic Areas.”

75
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

11. Check with a standard level the vertical / horizontal position of the
column. Perform the leveling adjustments on the column base with the
leveling screws and, if necessary, place the required leveling shims
around the floor anchors under the column base and/or modify the
position of the column with the screws that fix the ceiling support parts.

Note . The leveling shims are supplied with the floor anchors.

Levels

Floor Anchors

Leveling Shims

12. Make sure that the column is correctly leveled and firmly tighten the
column to the floor and ceiling support using the following hardware.

STANDARD ANCHORING
(included in package)

FLOOR CEILING
1/ 3
Anchor used 2” x 3 /4” (95 mm) Screws “C3” of the Ceiling Support kit
Expansion anchors (refer to Appendix B, “Ceiling Support Hardware.”)

Torque applied 54 Nm / 478 lbf.in (40 lbf.ft) 20 Nm / 177 lbf.in (14.7 lbf.ft)

13. Once the Lateral Positioner has been anchored to the floor and ceiling,
remove the Coupling Plate from the upper column without unhooking it
from the Crane.

76
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

14. Re-install the Front Screw of the Top Cover at the head part of the Lateral
Positioner (removed at the begining of the procedure).

Front Screw

15. Move the Crane away, unhook the Coupling Plate, fold the Crane and
keep the Crane Kit, including the two (2) Wooden Supports for future
services.

The Wooden Blocks are included


in the positioner package Crane

(4) Angle Brackets and Screws


included in the Cabinet package

Coupling Plate and


Transport Dolly Screws (M10 and M12)

Two (2) Slings

77
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10.2 MECHANICAL INSTALLATION OF SYSTEM CABINET

At least two people are required to perform the following


operations.

1. Remove the packaging and all the components included, keeping the
System Cabinet on the pallet, without removing the bubble wrap of the
upper side. Four (4) Angle Brackets with Screws are provided for using
with the Transport Dolly of the Crane Kit.

2. Unscrew the six (6) Screws that fix the Front Cover and the four (4)
Screws that fix the Back Cover of the Generator Support, then remove
both covers.

Bubble Wrap

Front Cover Screws (6)

Generator Support

Pallet

(4) Angle Brackets and Screws (M8)

78
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

3. Pass the Slings through the Generator Support, one of them crossing
over the Transformer, and place them at both ends around the Generator,
as shown below.

Slings

Transformer

4. Unfold the Crane following the Crane Instructions (Direction


5368144--1EN).

5. With the Arm horizontally, place the Arm Extension in the position of
700 kg (1543 lb) and insert the Safety Pin with its Hairpin Cotter.

Nº 3:
700 kg

The Safety Pin have to be placed in position of 700 kg


(1543 lb) for operating with the System Cabinet, due to its
dimensions.

79
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

6. Drive the Crane close to the pallet using the Hand Grips, placing the right
leg under it (as shown in the picture below) so the Crane Hook is
positioned as close as possible to the center of gravity of the equipment,
then lock the Steering Wheels .

Steering Wheel Lock

7. Engage the Slings in the Hook and tighten them operating the Lifting
Lever, ensuring the System Cabinet is firmly held. Do not lift the System
Cabinet yet.

Hook

8. Place the four (4) Angle Brackets on the Transport Dolly and fix them with
the four (4) Screws included in the System Cabinet packaging.

Angle Bracket

Fixing Screw

80
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

9. Unscrew the four (4) Screws of the two (2) Steel Supports that fix the
System Cabinet to the pallet.

Steel Support

10. Lift the equipment slowly and remove the pallet.

Note . If the final position in the room is close and easily accessed, drive
the Crane with the equipment to that point and install it following
steps 15. to 21.

In case it is needed to transport the equipment, continue with the


next step.

81
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

11. Position the Transport Dolly under the System Cabinet, note that the
holes of the Steel Supports must coincide with the holes on the Angle
Brackets.

12. Lower the System Cabinet slightly opening the Safety Valve until it is
placed on the Transport Dolly. Fix the two (2) Steel Supports to the Angle
Brackets with the fixing Screws.

13. Once the System Cabinet is secured on the Transport Dolly, remove the
Slings and move the Crane away.

14. Move the equipment on the Transport Dolly to the installation area.

82
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

THE CRANE IS NOT A TRANSPORTATION DEVICE.


WHEN IT IS NECESSARY TO MOVE THE EQUIPMENT, USE
THE TRANSPORT DOLLY INCLUDED IN THE KIT,
MONITORING MOVEMENTS CAREFULLY.

TO AVOID PERSONAL INJURY OR DAMAGE TO THE


EQUIPMENT, AT LEAST TWO PEOPLE ARE REQUIRED TO
DRIVE IT BETWEEN DIFFERENT LEVEL SURFACES
(ELEVATORS, ETC.), IN SUCH A WAY THAT THE WHEELS
SHOULD CROSS ONE BY ONE, AS SHOWN IN THE
PICTURES BELOW.

AS WELL, AT LEAST TWO PEOPLE ARE REQUIRED TO


DRIVE THE EQUIPMENT OVER RAMPS. THEY SHOULD
HANDLE THE EQUIPMENT CAREFULLY, AS SHOWN BELOW
DRIVING IT DOWN THE RAMP. FOR SAFETY REASONS,
TRAVELLING SURFACES MUST NOT EXCEED 5o
INCLINATION.

83
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

15. Once in the Installation Area, drive the Crane there and place the Slings
again as explained in steps 3. and 7.

16. Open the Control Box door, remove the four (4) Screws that fix the
Control Box to the Steel Supports, and lift the System Cabinet. Then,
move the Transport Dolly away.

Control Box door

17. Install the four (4) legs at the bottom of the system cabinet. Check that
all four (4) legs share the same height. If necessary later, level the system
cabinet with these legs.

If the system cabinet has to be floor anchored, adjust the leveling legs
such that they are slightly longer than the overall length of the spacers
(provided for anchoring purposes).

Spacer

Adjustable Leveling Legs

84
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

18. The following illustration shows the recommended final location of the
positioner and system cabinet in the exam room. Refer to the GE Final
Installation Drawings for the exact location of the system components to
reference the exact positioner installation location.

2116mm* (83.3”)
935mm* (36.8”)

310mm*
(12.2”)

188.5mm
(7.4”)
POSITIONER SYSTEM
CABINET

100mm* (3.9”) 414mm*


(16.2”)

* NOTE: Minimum distances from walls


to System Cabinet and Positioner.

Note . For more information about Room Layouts and Seismic


requirements, refer to the “Pre-Installation Manual” (Direction
5192967--100).

Seismic areas require the system cabinet to be secured to the


floor. For that the cabinet is provided with four (4) mounting holes
on the side bottom.

85
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

If the positioner has been floor--ceiling anchored, determine the final


position of the system cabinet keeping in mind:

G the length of the column harness (Run #1) (5 m of usable cable


length) that goes from the positioner hanger to the top of the
system cabinet,

G the length of the column harness (Run #2) (1.4 m of usable cable
length) that goes from the base of the positioner to the base of the
system cabinet,

G the swivel arm movements.

RUN #1 (5 m) (16.4 ft)

POSITIONER

SYSTEM
CABINET

RUN #2 (1.4 m) (4.6 ft)

Note . If the system cabinet has to be floor anchored (seismic areas),


follow the procedure described in Section 10.2.1, “System Cabinet
Floor Anchored.”

86
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

19. Place the System Cabinet at the final position in the room by slightly
opening the Safety Valve of the Crane.

20. Once on the floor, level the System Cabinet with its Levelling Legs.

Note . If the unit does not have to be anchored to the floor, proceed to
Section 10.3, “Electrical Interconnection Overview.”

21. Move the Crane away, fold it and keep the Crane Kit in a safe place,
including the two (2) Steel Supports and the Angle Brackets for future
services.

The Wooden Blocks are included


in the positioner package Crane

(4) Angle Brackets and Screws


included in the Cabinet package

Coupling Plate and


Transport Dolly Screws (M10 and M12)

Two (2) Slings

87
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10.2.1 SYSTEM CABINET FLOOR ANCHORED

Perform this Section only when the system cabinet has to be


anchored to the floor (seismic areas).

1. Mark and drill the anchoring holes on the floor according to the following
illustration.

99.5mm BASE OF CONTROL BOX


(3.9”)

89mm
(3.5”)

21mm (0.8”)
441mm (17.4”)

R 9mm (R 0.35”)

213mm (8.4”)
234mm (9.2”)

21mm (0.8”)
Anchoring Holes

530mm (20.9”)

2. Place the System Cabinet at the final position in the room by slightly
opening the Safety Valve of the Crane.

3. Once on the floor, level the System Cabinet with its Levelling Legs.

Spacer

Adjustable Leveling Legs

4. Anchor the system cabinet to the floor using the floor anchoring hardware
supplied.

5. With a standard level check the vertical / horizontal position of the system
cabinet. Make sure that the system cabinet is correctly leveled and then
firmly tighten the cabinet to the floor.

Note . For hardware and torque specifications refer to the


“Pre-Installation Manual” (Direction 5192967--100) -- Appendix A,
“Requirements for Seismic Areas.”

88
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10.3 ELECTRICAL INTERCONNECTION OVERVIEW

Note . If any cable connections are not shown in the tables or photos
please refer to the MIS MAPs at the end of this manual. Individual
wires are labeled to match corresponding connections by either
number or signal abbreviation.

RUN CABLE CODE TOTAL USABLE CABLE


CABLE CABLE DESCRIPTION FROM TO CONNECTOR TYPE * CHECK OFF
# (Mfg. Ref.) DIAM
LENGTH LENGTH

A7659--02 12 m 8 mm Cable AEC AEC Preamplifier IC J1 AEC Sub D 9V


(39.4 ft) Adaptation

6680--09 9m 17 mm Anode Cable X-ray Tube HV Transformer Federal Connector


(29.5 ft)
5m
6680--09 9m (16.4 ft) 17 mm Cathode Cable X-ray Tube HV Transformer Federal Connector
1 (29.5 ft) between
components

A7014--03 12 m 12 mm Stator Cable X-ray Tube 11TS2 in Faston


(39.4 ft) Generator

55902024 15 m 5.5 mm DAP Cable DAP in Positioner DAP RS232 IC1 Sub D 9V
(49.2 ft)

A8131--04 6.7 m 10 mm Rot Motor Cable J6 Motor J1 Panel (Control Molex 6V


(22 ft) Box)

A8129--04 7m 10 mm SID Motor Cable J1 Motor J2 Panel (Control Molex 6V


(23 ft) Box)

A8160--05 3.7 m 10 mm Brake--H Motor J7 Motor J3 Panel (Control Molex 6V


(12 ft) Cable Box)

A8199--01 8.9 m 6 mm Detector Motor J5 Detector J3 Interface Weidmuller Zepo 4V


(29.2 ft) Cable Rotation Motor (Control Box)

8.5 m J11 Interface


A8168--03 5 mm Fan Cable TS10 Tube Cover Board (Control Weidmuller Zepo 4V
(27.9 ft)
Box)

A8188--03 6.75 m 6 mm I/F Can Cable J11 Control Board J8 Interface Board Weidmuller Zepo--P 3V
(22.2 ft) (Control Box)

A8190--03 6.8 m 10 mm Supply Cable J4 Control Board J6 Interface Board Sub D 25V
(22.3 ft) (Control Box)
1.4
1 4m
2 9.6 m (4.6 ft) PW Touch PW Power PC
A9608--03 between 6 mm PC Supply Cable Molex P 4V
(31.5 ft) Console (Control Box)
components

55001084 10 m 8 mm VGA Cable VGA Touch VGA PC (Control Sub D 15V


(32.8 ft) Console Box)

A9610--01 10 m 6 mm TS R232 Cable COM Touch COM2 PC (Control RJ 45


(32.8 ft) Console Box)

A9689--01 10 m 6 mm Collimator RS232 PC Control Collimator RJ 45


(32.8 ft) Cable

A9688--04 8.8 m 8 mm Collimator Power TS3 Control Box Collimator Faston


(28.9 ft) Cable

A6383--05 4m 4 mm GND Cable TDI Control Box TDI GND Round Terminal
(13.1 ft) Detector

A9684--04 4m 7 mm Power Cable TDI TB2 PDU Control PW TDI Female Connector
(13.1 ft) Detector Cabinet

A6383--42 2.7 m 4 mm GND Cable Column Chassis GND Tab in Round Terminal
(8.86 ft) Control Box

89
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

RUN CABLE CODE TOTAL USABLE CABLE


CABLE CABLE DESCRIPTION FROM TO CONNECTOR TYPE * CHECK OFF
# (Mfg. Ref.) DIAM
LENGTH LENGTH

A9681--02 15 m 9 mm CRIB Cable J2 CRIB J2 Panel Sub D 25V


(49.2 ft) (Control Box)

A9684--02 15 m 7 mm Power Cable TB3 PDU Control PW Magic PC Female Connector


(49.2 ft) 14 m Magic PC Cabinet
3 (46 ft)
between
A9684--02 15 m components 7 mm Power Cable, TB4 PDU Control PW Monitor PC Female Connector
(49.2 ft) Monitor Cabinet

A9679--03 15 m 5 mm Cross--over Control Cabinet PC Magic PC RJ45


(49.2 ft) Ethernet Cable

Cables length and size depends Room Electrical


4 -- on the position of the Power Line Input Line Fuses --
(3 Ph + GND) Cabinet at Generator
Room Electrical Cabinet (Main Disconnect)
(Main Disconnect) in the Room

A9685--05 25 m 10 mm CAN Cable CAN Open TDI CAN Open Magic Sub D 9V
(82 ft) 24 m Detector PC
5 (78.8
(78 8 ft)
between
A9686--05 25 m components 5 mm Ethernet Cable Tether (TRAD Ethernet Magic PC RJ 45
(82 ft) Detector)

A9682--01 2m -- 8 mm CRIB RS232 J3 CRIB RS232 Magic PC Sub D 9V


(6.6 ft) Cable

2m -- 7 mm DVI--A Video Cable Video -- Monitor Video -- Magic PC VGA / Video


other (6.6 ft)

2m -- 6 mm USB Cable USB -- Monitor USB -- Magic PC USB


(6.6 ft)

* NOTE: -- Refer to Illustration 9 “Harness Runs”.


-- Refer to Table 5 for “Dimensions of the Connector Type”.
-- Refer to Section 11 for “System Interconnections”.

Illustration 9
Harness Runs
RUN #5 (24 m) (79.2 ft)

Need cable conduit or raceway

RUN #1 (5 m) (16.4 ft) RUN #4 (variable length) ROOM


ELECTRICAL
Power Line (3Ph+ GND) CABINET
In cable sleeve

Field Supplied
Need cable conduit or raceway

POSITIONER

GENERATOR
Other Cables

MONITOR
MAGIC PC
GENERATOR CRIB
SUPPORT

CONTROL BOX
In cable sleeve Need cable conduit or raceway

RUN #2 (1.4 m) (4.6 ft) RUN #3 (14 m) (46 ft)

90
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

Table 5
Dimensions of the Connector Type

CONNECTOR TYPE DIMENSIONS (mm)

Faston 7 x 10 x 3

Female Connector 30 x 60 x 15

Molex 6V 15 x 10 x 35

Molex P 4V 15 x 10 x 25

Round Terminal 10 x 15 x 6

RJ 45 10 x 15 x 20

Sub D 9V 30 x 50 x 15

Sub D 15V 35 x 60 x 15

Sub D 25V 55 x 60 x 15

USB 12 x 22 x 8

VGA / Video 30 x 45 x 12

Weidmuller Zepo 4V 20 x 30 x 15

Weidmuller Zepo P 3V 10 x 20 x 15

91
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10.3.1 GENERAL CAUTIONS FOR THE GENERATOR

Keep in mind the following cautions during the generator installation.

MAKE SURE THAT THE MAIN STORAGE CAPACITORS OF


THE HIGH VOLTAGE INVERTER DO NOT CONTAIN ANY
RESIDUAL CHARGE. WAIT UNTIL THE LIGHT EMITTING
DIODES ON THE CHARGE-DISCHARGE MONITOR BOARDS
ARE OFF, APPROXIMATELY THREE (3) MINUTES AFTER THE
UNIT IS TURNED OFF.

TO AVOID ELECTRIC SHOCK, DO NOT TOUCH ANY


HEATSINK ON ANY CIRCUIT BOARD EVEN IF THE
GENERATOR IS TURNED OFF. PRIOR TO DISASSEMBLY OF
ANY BOARD, REMOVE ALL CONNECTORS PLUGGED IN TO
IT.

THIS GENERATOR IS PERMANENTLY CONNECTED TO THE


POWER LINE, AND POWERED ON UNLESS THE SAFETY
SWITCH INSTALLED IN THE ROOM ELECTRICAL CABINET
(MAIN DISCONNECT) IS OFF. WHEN THE GENERATOR IS
POWERED, THE NEON LAMP (GREEN) LOCATED ON THE
TRANSFORMER 6T2 (GENERATOR CABINET) IS ON.

INTERNAL PARTS OF THE GENERATOR (ALL FUSES, LINE


CONTACTOR (6K5), INPUT TRANSFORMER (6T2), ON/OFF
RELAY (3K3), AND LV-DRAC MODULE) ARE PERMANENTLY
POWERED ON THROUGH POWER LINE ALTHOUGH THE
CONTROL CONSOLE IS OFF. BE SURE THAT THE SAFETY
SWITCH IS OFF BEFORE HANDLING ANY INTERNAL PART
OF THE EQUIPMENT (LOCK-OUT / TAG-OUT).

ALWAYS HAVE THE “IPM DRIVER BOARD” CONNECTED IN


THE GENERATOR PRIOR TO APPLYING POWER. IF THE “IPM
DRIVER BOARD” IS NOT CONNECTED PERMANENT
DAMAGE WILL OCCUR TO THE IGBTS.

DO NOT CONNECT ITEMS WHICH ARE NOT SPECIFIED AS


PART OF THE SYSTEM.

92
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10.4 TUBE, COLLIMATOR, AND HV CABLES INSTALLATION

DO NOT ROTATE THE TUBE COLLIMATOR SUPPORT 180O


CLOCKWISE. THE ZERO DETENT BLOCK WILL COLLIDE
WITH THE MOUNTING FOR THE LEVER SPRING AS SHOWN
IN THE PHOTO BELOW. ONLY ROTATE THE TUBE
COLLIMATOR SUPPORT COUNTER--CLOCKWISE. ASSURE
THERE IS ENOUGH SLACK IN THE HV AND STATOR CABLES
FOR A 180O COUNTER--CLOCKWISE ROTATION.

Note . For further details refer to Collimator Installation Manual (Part #


CN--21--002, Rev B) located inside the collimator box.

1. Loosen the bolts from both sides of the back panel of the tube collimator
support and tilt it back to accommodate placement of the X--ray tube.

Note . Do not tighten until the tube cover has been installed. Tie wrap the
cables together.

Loosen Bolts
from both sides

Outside Inside
Tie Wraps

93
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

2. Connect the numbered wires to the corresponding numbered slot in


TS10 in the collimator support.

Note . For cable A9767--01, connect the wires to terminals TS10--6 and
TS10--8, not to TS10- 9.

Connect the ground wires to the ground stud in the collimator support.

3. Position the X-ray tube on the tube-collimator support and fix the X-ray
tube to the support of the collimator adaptation ring.

94
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

4. After starting each of the four screws (M6x20 12.9 ISO7380), apply even
force to both sides of Tube to ensure even seating. Tighten the four
screws applying a torque of 12.45 Nm.

Note . This part is located in the Collimator Box and it is attached to


the Collimator window.

Note . Do not use spacers!

X-Ray Tube Positioner Control

Collimator Adaptation Ring Tube-Collimator Support Collimator Adaptation Ring Fixing Screws
Located in collimator box Torque 12.45 Nm

DO NOT ROTATE THE TUBE COLLIMATOR SUPPORT 180O


CLOCKWISE. THE ZERO DETENT BLOCK WILL COLLIDE
WITH THE MOUNTING FOR THE LEVER SPRING AS SHOWN
IN THE PHOTO BELOW. ONLY ROTATE THE TUBE
COLLIMATOR SUPPORT COUNTER-CLOCKWISE. ASSURE
THERE IS ENOUGH SLACK IN THE HV AND STATOR CABLES
FOR A 180O COUNTER-CLOCKWISE ROTATION.

95
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

5. Pull the lever of the tube-collimator assembly and carefully turn the
tube-collimator assembly counterclockwise up side down (180o). This
facilitates the collimator installation.

6. Place the round bracket around the collimator adaptation ring, check
the correct position of the Pin as showed in the photo below. Place the
collimator on the Collimator Adaptation Ring and tighten the screw of the
Round Bracket with its special wrench included in the collimator
package.

MAKE SURE THAT THE COLLIMATOR IS FIRMLY HELD ON


THE COLLIMATOR ADAPTATION RING (FOR FURTHER
INFORMATION REFER TO THE COLLIMATOR MANUAL).

Collimator Link Part


Detachable Protector
Pin to slot

Special Wrench

Round Bracket

Slot

Round Bracket in correct position

96
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

Note . Connection of the Collimator Power cable and the Collimator Can
Cable is explained in Run #2 cable connection. Refer to Section
10.7 Control Box Connections (Cable Connections outside the
Control Box).

7. Pull the lever to turn the tube-collimator assembly back to its operating
position.

8. Connect the HV cables in the X-ray tube.

The Terminal Pins of the High Voltage cables are extremely


delicate and easily damaged. They therefore must be handled
carefully. Make sure that they are straight and that the splits
in the pins are open (parallel to the sides).

Note . Mark the anode and cathode ends of the HV Cable connections
to ensure proper connection at the X-ray Tube and HV
Transformer.

a. The mounting accessories of each termination plug are factory


assembled. For extended information refer to the HV Cable
manufacturer’s instructions located inside the HV cable package.

Do not install the Silicone washer supplied with the HV


Cables.

b. Screw out the grub screw of the ring nut. (Refer to the Illustration
below.)

Ring Nut
Nipple
Contact Pins

Silicone Grease

Termination Plug
Grub Screw
Contact

97
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

c. Prepare the high voltage terminals that will be installed in the X-ray
tube receptacles. Completely coat the end of the termination plug
such a thick layer of silicone grease covers the end and extends
up past the top of the pins. (Refer to the previous Illustration.)

Note . Two silicone grease tubes are provided in the X-ray tube package.

Silicone Grease Tubes

d. Carefully insert the anode and cathode termination plug into the
respective receptacle socket. Watch the nipple on the plug to
ensure correct positioning of the contact pins.

e. Hand tighten the ring nut. It must be secure.

f. Tighten the grub screw.

98
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

9. Route the Stator Thermostat/Cables with the Anode HV Cable. Connect


the stator/thermostat cables in the X--ray tube.

a. Remove the side cover of the X-ray tube.

b. Connect the stator cable to the X-ray tube as shown in the


illustration below. Refer to the X-ray tube manual located inside
the tube package for extended information.

c. Re-install the side cover of the X-ray tube.

Common (1)

Main (2)

Aux (3)

Earth Terminal (E)

Thermostat Common

Thermostat Signal

99
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10. Route the cables connected to the X-ray tube to the generator (Run #1).

Note . For DAP cable connection refer to Section 10.5, “Internal


Radiation Measuring System (DAP) (optional).”

For AEC cable connection refer to Section 10.6.3, “AEC Cable.”

DAP

RUN #1 (5 m) (16.4 ft)

In cable sleeve

POSITIONER

GENERATOR

GENERATOR
SUPPORT

CONTROL BOX

RUN CABLE CODE TOTAL USABLE CABLE CHECK


CABLE CABLE DESCRIPTION FROM TO CONNECTOR TYPE *
# (Mfg. Ref.) DIAM OFF
LENGTH LENGTH

A7659--02 12 m 8 mm Cable AEC AEC Preamplifier IC J1 AEC Sub D 9V


(39.4 ft) Adaptation

6680--09 9m 17 mm Anode Cable X-ray Tube HV Transformer Federal Connector


(29.5 ft)
5m
6680--09 9m (16.4 ft) 17 mm Cathode Cable X-ray Tube HV Transformer Federal Connector
1 (29.5 ft) between
components

A7014--03 12 m 12 mm Stator Cable X-ray Tube 11TS2 in Generator Faston


(39.4 ft)

55902024 15 m 5.5 mm DAP Cable DAP in Positioner DAP RS232 IC1 Sub D 9V
(49.2 ft)

100
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

11. Fasten the stator and HV cables to upper carriage of the swivel arm with
the clamp at its lateral side. Give the cable length enough to enable
movements of the swivel arm (at least 220 cm (86.5”) and fasten them
again to the cable support at the upper lateral side of the column.

Note . Allow enough slack in the cable to allow for tube rotation.

Note . If your system has the DAP option, route the DAP with the HV
cables. Refer to Section 10.5, “Internal Radiation Measuring
System (DAP) (Optional).”

Cable Support at the Upper Lateral Side

Clamp for HV and Stator Cables

Slack between Clamp and Cable Support


must be at least 228 cm (90”)
Slack should also allow for rotation of
the tube assembly.

HV and Stator Cable Slack


Run #1

The cable white sleeves should be installed


at the end of the installation process

Note . The photo below shows how the cables are seated within the white
sleeves that are installed at the end of the installation process.

101
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

12. Connect J11 and the Molex to the positioner.

J11
Molex

13. After the cover is attached, tighten the bolts on the back side of the tube
collimator support.

102
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10.5 INTERNAL RADIATION MEASURING SYSTEM (DAP) (OPTIONAL)

The Radiation Measuring System consists of an Ionization Chamber installed


beneath the Collimator and a Radiation Meter Board installed into the
Generator Cabinet.

Installation of the Radiation Measuring System must be made


with all power supplies turned off. The system is factory
calibrated and tested.

Note . Verify that the size and characteristics of the supplied Ionization
Chamber is suitable for the rail-guides located on the bottom of the
collimator (147 x 168 [5.79” x 6.61”] or 177 x 178 mm [6.97” x
7.01”]).

1. Unpack the system and check that all components are present and have
not physical damage.

2. To facilitate the DAP (dose area product) Ionization Chamber installation,


carefully rotate the tube-collimator assembly 90 degrees (90o)
counter--clockwise by releasing the lever as shown.

103
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

3. Insert the DAP inside the rails of the collimator (factory installed).
Connect and route the DAP cable along the HV cables to the generator
(Run#1).

Note . Some tests, like QAP, require that the DAP Ion Chamber be
removed from the X--ray beam path. To facilitate this removal, do
not use tie wraps between the connector and the DAP Ion
Chamber.

Rail

DAP Cable

HV Cables

4. Connect the DAP Ion Chamber cable to the DAP RS232 IC1 and Jack
connectors on the Generator Front Panel (Mod. 3).

Generator Front Panel


Radiation Meter Board

JACK Terminal

DAP RS232 IC1

RUN #1 (5 m) (16.4 ft)

POSITIONER GENERATOR

RUN CABLE CODE TOTAL CABLE USABLE CABLE CABLE DESCRIPTION FROM TO CONNECTOR CHECK
# (Mfg. Ref.) LENGTH LENGTH DIAM TYPE OFF

1 55902024 15 m (49.2 ft) 5 m (16.4 ft) 5.5 mm DAP Cable DAP in Positioner DAP RS232 Sub D 9V
between components IC1

104
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10.6 GENERATOR CABINET CABLE CONNECTIONS

This section provides the information necessary to connect the generator


cables with the system and options.

Note . For more information about electrical requirements and cable


connections, refer to “Pre-Installation Manual” -- Direction
5192967--100 and Section 11, “System Interconnections,” at the
end of this document.

Some safety devices such as the Safety Switch / Emergency Switch (Lock-out/
Tag-out), Warning Light, and Door Interlock Switch are supplied and installed
by the customer. Verify that safety devices have been properly installed and
routed during the Pre-Installation procedure.

10.6.1 CABLE ROUTING INSIDE GENERATOR CABINET

1. Before connecting the interconnection cables within the generator


cabinet, cables must be first connected to each component in the room
and routed through the raceways. Remove the ferrite blocks of the cables
(factory clamped) when it is required to carry out a correct routing, then
re-install the ferrite blocks where they originally were around cables.

2. Customer-provided cabling to be connected to the generator cabinet,


such as the door interlock or warning light, must be routed through the
cable access of the generator support (between the generator and
control box) and along the back side of the generator cabinet. This allows
them to be clamped at the fastening bar at the top of the generator
cabinet.

Power line and stator cables enter into the generator through the cable
outlet on the upper side of the rear cover of the generator cabinet. (Refer
to Illustration 10.)

3. Route each cable through the generator support. The remaining excess
portion of cable that is not used for generator connections should be
taken out and individually folded and fastened. Route the other end of the
cable through the generator support and the rear cover of the generator
cabinet to complete its connection inside the generator. The generator
support will be used to store the remaining portion of cables. (Refer to
Illustration 10.)

105
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

Illustration 10
Cable Routing and Outlets
Fastening Bar Upper Cables Outlet Fastening Bar

Cabinet Top Cabinet Top

Generator Cover Generator Cover

Rear Cover of Generator Cabinet


Rear Cover of Generator Cabinet
NOTE: The illustrations offer a
side--view of the cabinet.

Cabinet Frame Cabinet Frame

YES NO
Tie--wraps Tie--wraps

Generator Support Generator Support

Cabinet Bottom Cabinet Bottom


Lower Cables Outlet

INTERNAL CABLE ROUTING INTERNAL CABLE ROUTING


FROM UPPER CABLES OUTLET FROM LOWER CABLES OUTLET

Cables Entrance (upper side of Rear Cover)

Cables Routing from Cabinet


to Base Support (rear view)

Cables Entrance (back side of Rear Cover)

106
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

4. Inside the generator cabinet, all interconnection cables must be routed


over the fastening bar (upper rear bar) of the cabinet frame minding the
upper cable outlet at the rear side of the cabinet cover. (Refer to
Illustration 11.)

5. Stator and interconnection cables have to be routed internally through


the cabinet close to the HV transformer.

6. All the folded cables should be put into the generator support. Install the
front cover of the generator support.

In order to avoid signal interferences, it is strongly


recommended to fold and fasten the remaining portion of
cables, as indicated in Illustration 10, before putting them
inside the Base Support. Never wrap them in circles.

YES NO

7. Secure all cables to the fastening bar using cable ties after all cable / wire
connections are complete.

107
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

Illustration 11
Cable Routing in Compact Generator
Stator & Interconnections
Cables Outlet (upper side)

Fastening Bar

Cable Ties

Rear Cover

Rear cover removed for clarity, do not remove the rear cover.

Stator & Interconnections


Cables Entrance
Cable Ties

Fastening Bar

Input Transformer
Power Line Cables

Ground Terminals HV Cables

Input Line Fuses Stator & Interconnections Cables

Power Line
Cable Entrance

Rear cover removed for clarity, do not remove the rear cover.

Right side

Input Transformer

Stator & Interconnections


Cable Entrance

Power Line Cable Entrance

Input Line Fuses

108
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10.6.2 HV CABLES AND STATOR CABLE CONNECTION

HV CABLES

Connect the HV Cables in the HV Transformer (Generator).

These cables must enter into the generator through the cable outlet on the
upper side of the cabinet and then attached to the fastening bar (upper rear bar)
of the cabinet frame minding the upper cable outlet at the rear side of the cabinet
cover.

The Terminal Pins of the High Voltage cables are extremely


delicate and easily damaged. Therefore they must be handled
carefully. Make sure that they are straight and that the splits
in the pins are open (parallel to sides).

1. The mounting accessories of each termination plug are factory


assembled. For extended information refer to the HV cable
manufacturer’s instructions located inside the HV cable package.

Do not install the Silicone washer supplied with the HV


Cables.

2. Unscrew the grub screw of the ring nut. (Refer to the illustration below.)

Contact Pins Nipple Ring Nut

Termination Plug Grub Screw

Contact

3. Prepare the high voltage terminals that will be installed in the HV


transformer. Put approximately 1 cm (0.5”) of HV Oil in the HV
transformer receptacles (included in the HV cables package).

If HV oil is not available to fill the receptacles to a depth of 1cm


(0.5”) do not connect the HV cables. Advise the Field
Engineer to add the HV oil and make the connection.

109
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

4. Carefully insert the anode and cathode termination plug into the
respective receptacle socket (watch the nipple on the plug to ensure
correct positioning of the contact pins).

Be certain that the Anode and Cathode high voltage


connections match those made at the X- Ray Tube.
Catastrophic system damage will result if these cables are
reversed.

5. Hand tighten the ring nut. It must be secure.

6. Tighten the grub screw.

STATOR CABLE

RUN #1 (5 m) (16.4 ft)

In cable sleeve

POSITIONER

GENERATOR

GENERATOR
SUPPORT

CONTROL BOX

RUN CABLE CODE TOTAL CABLE USABLE CABLE CABLE DESCRIPTION FROM TO CONNECTOR CHECK
# (Mfg. Ref.) LENGTH LENGTH DIAM TYPE OFF

5m
1 A7014--03 12 m (16.4 ft) 12 mm Stator Cable X-ray Tube 11TS2 in Faston
(39.4 ft) between Generator
components

110
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

THE LV-DRAC OUTPUT CAN BE AS HIGH AS 1000 VRMS.


FOR SAFETY REASONS (TO AVOID ELECTRIC SHOCKS),
THE STATOR CABLE MUST BE SHIELDED AND BOTH ENDS
OF THE SHIELD MUST BE CONNECTED TO GROUND.

DUE TO ELECTROMAGNETIC INTERFERENCE (EMC)


PROBLEMS, THE IGBT’S HEATSINK IS NOT GROUNDED. IT
IS CONNECTED TO THE NEGATIVE TERMINAL OF THE
INPUT RECTIFIER. TO AVOID ELECTRIC SHOCK, BE SURE
THAT THE INPUT LINE IS DISCONNECTED AND THE
CAPACITOR BANK IS PROPERLY DISCHARGED BEFORE
MANIPULATING THE LV-DRAC.

MAKE SURE THAT THE STATOR WIRES ARE PROPERLY


CONNECTED. BEFORE MAKING ANY EXPOSURE, CHECK
THAT THE ANODE ROTATES CORRECTLY.

Route the stator cable together with the HV cables to the generator cabinet.
Connect the stator cable terminals to the indicated Terminal Block TS2:

Terminal Block TS2

TERMINAL 11TS2
STATOR WIRES
TUBE-1
MAIN 11TS2-1
AUX (SHIFT) 11TS2-2
COMMON 11TS2-3

111
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

THERMOSTAT OR PRESSURE SWITCH SIGNAL

The two (2) safety thermostat wires should be routed to the Terminal Block TS2
in the generator cabinet and connected to the following terminals.

TERMINAL 11TS2
THERMOSTAT WIRES
TUBE-1
THERMOSTAT SIGNAL 11TS2-4
THERMOSTAT COMMON 11TS2-5

112
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

GND AND/OR SHIELD

The connection of the GND and/or shield wire of the stator cables is made to
terminal 11TS2--8 (for Tube-1).

Cable Support at the Upper Lateral Side

Clamp for HV and Stator Cables

Slack between Clamp and Cable Support


must be at least 228 cm (90”)
Slack should also allow for rotation of
the tube assembly.

HV and Stator Cable Slack


Run #1

The cable white sleeves should be installed


at the end of the installation process

Note . Allow enough slack in the cable to allow for tube rotation.

113
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10.6.3 AEC CABLE

Connect the AEC Cable A7659-02 from the positioner (Run #1) to connector IC
J1 in the AEC Adaptation Board (A3263-03) located in the top of the generator.

RUN #1 (5 m) (16.4 ft)

In cable sleeve

POSITIONER

GENERATOR

GENERATOR
SUPPORT

CONTROL BOX

RUN CABLE CODE TOTAL USABLE CABLE CHECK


CABLE CABLE DESCRIPTION FROM TO CONNECTOR TYPE *
# (Mfg. Ref.) DIAM OFF
LENGTH LENGTH

5m
1 A7659--02 12 m (16.4 ft) 8 mm Cable AEC AEC Preamplifier IC J1 AEC Sub D 9V
(39.4 ft) between Adaptation
components

114
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

Cable Support at the Upper Lateral Side

Clamp for HV and Stator Cables

Slack between Clamp and Cable Support


must be at least 228 cm (90”)
Slack should also allow for rotation of
the tube assembly.

HV and Stator Cable Slack


Run #1

The cable white sleeves should be installed


at the end of the installation process

Note . Allow enough slack in the cable to allow for tube rotation.

115
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10.6.4 DOOR INTERLOCK SIGNAL

Connect the two (2) wires from the room door interlock switch(es) to Terminal
Block 3TS1-22 (Door signal) and 3TS1-23 (Door Rtn - GND). If the X-ray Room
is not provided with a door signal, place a jumper between both connections in
Terminal Block 3TS1.

Terminal Block 3TS1

10.6.5 WARNING LIGHT SIGNAL

Room warning lamp(s) can be externally powered, or internally powered by


Terminal Block 3TS1. Room lamp(s) must be connected through Terminal Block
3TS1-47 and 3TS1-48 (internal relay on Interface Control Board) to enable the
generator ON/OFF switches to control the room warning lamps. (Refer to
Section 11.2, “I/F-008.”)

Terminal Block 3TS1

116
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10.7 CONTROL BOX CONNECTIONS

Note . Carefully review all illustrations in this section prior to starting the
work.
Install the lateral access cover of the control cabinet. Perform the corresponding
connections from the positioner (“Run #2”) to the control box as per the next
table and illustrations. At the end of this manual (section 5.2) refer to schematics
54302101.

POSITIONER

GENERATOR

GENERATOR
SUPPORT

CONTROL BOX
In cable sleeve

RUN #2 (1.4 m) (4.6 ft)

RUN CABLE CODE TOTAL USABLE CABLE CHECH


CABLE CABLE DESCRIPTION FROM TO CONNECTOR TYPE *
#2 (Mfg. Ref.) DIAM OFF
LENGTH LENGTH

2--A A8131--04 6.7 m 10 mm Rot Motor Cable J6 Motor J1 Panel (Control Molex 6V
(22 ft) Box)

2--B A8129--04 7m 10 mm SID Motor Cable J1 Motor J2 Panel (Control Molex 6V


(23 ft) Box)

2--C A8160--05 3.7 m 10 mm Brake--H Motor J7 Motor J3 Panel (Control Molex 6V


(12 ft) Cable Box)

2--D A8199--01 8.9 m 6 mm Detector Motor J5 Detector J3 Interface Weidmuller Zepo 4V


(29.2 ft) Cable Rotation Motor (Control Box)

2--E A8168--03 8.5 m 5 mm Fan Cable TS10 Tube Cover J11 Interface Board Weidmuller Zepo 4V
(27.9 ft) (Control Box)

2--F A8188--03 6.75 m 6 mm I/F Can Cable J11 Control Board J8 Interface Board Weidmuller Zepo--P 3V
(22.2 ft) (Control Box)

2--G A8190--03 6.8 m 10 mm Supply Cable J4 Control Board J6 Interface Board Sub D 25V
(22.3 ft) (Control Box)
1.4 m
2--H A9608--03 9.6 m (4.6 ft) 6 mm TPC Supply Cable PW Touch Console Display Supply Molex P 4V
(31.5 ft) between (Control Box)
components

2--I 55001084 10 m 8 mm VGA Cable VGA Touch VGA (Control Box) Sub D 15V
(32.8 ft) Console

2--J A9610--01 10 m 6 mm TS R232 Cable COM Touch COM2 - PC Control RJ 45 (Green)


(32.8 ft) Console (Control Box)

2--K A9689--01 10 m 6 mm Collimator RS232 Collimator COM 3 - PC Control RJ 45 (Yellow)


(32.8 ft) Cable (Control Box)

2--L A9688--04 8.8 m 8 mm Collimator Power Collimator TS3 Control Box Faston
(28.9 ft) Cable

2--M A6383--05 4m 4 mm GND Cable TDI Control Box TDI GND Round Terminal
(13.1 ft) Detector

2--N A9684--04 4m 7 mm Power Cable TDI TB2 PDU Control PW TDI Female Connector
(13.1 ft) Detector Cabinet

2--O A6383-42 2.7 m 4 mm GND Cable Column Chassis GND Tab in Control Round Terminal
(8.86 ft) Box

117
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

CABLE CONNECTIONS OF RUN#2


INSIDE THE CONTROL BOX

RUN #2
Lateral Access Cover

2-D 2-E
2-M

GROUND CONNECTIONS
2-G

2-F

2-H
2-J COM2
2-K COM3

2-L

2-N
2-C 2-B 2-A

2-I
VGA
2-O

118
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

CABLE CONNECTIONS OF RUN#2 INSIDE THE CONTROL BOX

2-H

2-J COM2

2-I (VGA) 3-D (LAN)


2-K COM3

BOTTOM SIDE OF EMBEDDED PC FRONT SIDE OF EMBEDDED PC

Perform the touch screen and collimator cable connections in the


tube-collimator assembly.

CABLE CONNECTIONS OF RUN #2


OUTSIDE THE CONTROL BOX

HV Cables
RUN #1

2-J
COM2

DAP Cable
RUN #1

2-L

2-K

119
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10.7.1 CABLE ROUTING AND TIE WRAPS INSIDE CONTROL BOX

Cables to Control Box PC

RUN #2 Cable entrance

Cables to Interface PCB

Cables for Motor supply

Routing of cables inside Control Box

End

Start

120
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10.8 CABLE CONNECTION IN MAGIC PC, FLAT PANEL DISPLAY, AND CRIB

Note . Carefully review all illustrations in this section prior to starting any
work.
Perform the corresponding connections between the components indicated in
the table below (“Run #3,” “Run #5,” and “other”) as per the illustrations and
schematics. The schematics are found at the end of this manual in Section 11.2
(schematics 54302101).

RUN CABLE CODE TOTAL USABLE CABLE CHECK


CABLE CABLE DESCRIPTION FROM TO CONNECTOR TYPE *
# (Mfg. Ref.) DIAM OFF
LENGTH LENGTH

3-A A9681--02 15 m 9 mm CRIB Cable J2 CRIB J2 Panel (Control Sub D 25V


(49.2 ft) Box)

3-B A9684--02 15 m 7 mm Power Cable Magic TB3 PDU Control PW Magic PC Female Connector
(49.2 ft) 14 m PC Cabinet
(46 ft)
between
3-C A9684--02 15 m components 7 mm Power Cable TB4 PDU Control PW Monitor PC Female Connector
(49.2 ft) Monitor Cabinet

3-D A9679--03 15 m 5 mm Cross--over Control Cabinet PC Magic PC RJ45


(49.2 ft) Ethernet Cable

5-A A9685--05 25 m 10 mm CAN Cable CAN Open TDI CAN Open Magic Sub D 9V
(82 ft) 24 m Detector PC
(78.8
(78 8 ft)
between
5-B A9686--05 25 m components 5 mm Ethernet Cable Tether (TRAD Ethernet Magic PC RJ 45
(82 ft) Detector)

other-A A9682--01 2m -- 8 mm CRIB RS232 Cable J3 CRIB RS232 Magic PC Sub D 9V


(6.6 ft)

other-B Provided with 2m -- 7 mm DVI--A Video Cable Video -- Monitor Video -- Magic PC VGA / Video
Monitor (6.6 ft)

other-C ---------- 2m -- 6 mm USB Cable USB -- Monitor USB -- Magic PC USB


(6.6 ft)

other-D -- -- 6 mm USB Keyboard Keyboard USB -- Magic PC USB

other-E -- -- 6 mm USB Mouse Mouse USB -- Magic PC USB

other-F -- -- 6 mm USB Bar Code Bar Code Reader USB -- Magic PC USB
Reader

RUN #5 (24 m) (79.2 ft)

Need cable conduit or raceway

POSITIONER

GENERATOR
Other Cables

MONITOR
MAGIC PC
GENERATOR
SUPPORT CRIB

CONTROL BOX
Need cable conduit or raceway

RUN #3 (14 m) (46 ft)

121
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

BACK SIDE OF THE MAGIC PC

POWER

USB: KEYBOARD, MOUSE,


TOUCH SCREEN, BARCODE
READER

eth1 eth0
J4 PC ETHERNET J5 DETECTOR ETHERNET

VIDEO WITH SPLITTER -- MONITOR


eth2
eth3 J6 J7 HOSPITAL NETWORK

J1 CAN CABLE J2

CRIB B RS 232

GROUND

NOTE: See next page for further details.

122
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

BACK SIDE OF THE FLAT PANEL DISPLAY NOTE: See next page for further details.
BACK SIDE OF THE MAGIC PC

3-B
3-C other-C other-B

DETECTOR

5-A

CONTROL BOX

other-C, D, E, F

5-B

other-B
3-A
BACK SIDE OF THE CRIB

5-A

other-A

other-A Handswitch

3-D

BOTTOM SIDE OF 3-D (LAN)


EMBEDDED PC
(AT CONTROL BOX) BACK SIDE OF THE MAGIC PC

123
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

BACK SIDE OF THE MAGIC PC

Cable A9686--05
Cable A9679--03 to to Detector
Control Cabinet PC

Cable A9685--05 to TDI Detector Power Supply


(Cable connector may be labeled as J41,
connects to CAN Card /J1/CAN 0 on Magic PC.)

NOTE: Do not use the two (2) lower USB ports


for the mouse, keyboard, or monitor.

Use the DVI splitter cable that comes with the Magic PC
to connect to the touch screen monitor via VGA.

124
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10.9 POWER LINE CONNECTION

10.9.1 POWER LINE

1. Verify that the Main Disconnect is off, locked out, and tagged out. See
Section 2.1, “Lock--Out / Tag--Out (LOTO).”

2. Remove the generator cover.

Cable Access to the Generator Cabinet


(Power Line Cables, HV Cables, Stator, ...)

Generator Input Transformer 6T2


and Input Line Fuses

Cable Access to the Control Box (Positioner)

3. The power supply line should conform with the generator specifications
defined in the Pre-Installation Manual (Direction 5192967--100). Wire
sizes indicated in that document are relative to the power supply line and
wire length. Verify that the power line voltage and phase of the generator
coincides with the one for the Room Electrical Cabinet (Main
Disconnect).

400 VAC, 480 VAC,


Three-Phase, 50 / 60 Hz Three-Phase, 50 / 60 Hz

Power Line
Line voltage automatic compensation: ±10%.

Maximum line regulation for maximum kVA demand: 5%.

Note . As indicated in the Pre-Installation document, wire size to be used


from the Room Electrical Cabinet (Main Disconnect) to the
Generator Cabinet should be consistent with the wires used from
the Distribution Transformer. The maximum wire size that can be
connected to the Generator Cabinet (Input Line Fuse Holder) is
35 mm 2 (AWG 2).

125
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

4. Cut the cables to the appropriate length and remove insulation from both
ends of the power and ground wires. Connect them to the respective
terminals in the Room Electrical Cabinet (Main Disconnect). Route these
cables in “Run #4” as indicated in the next illustration.

5. Route the power line cables to the ground terminal and input line fuses.
These cables can be secured to the fastening bar of the cabinet and
routed internally along the rear side of the cabinet (always apply Local
Codes for cable routing). (Refer to the illustration below.)

RUN #4 (variable length) ROOM


ELECTRICAL
Power Line (3Ph+ GND) CABINET

Field Supplied

Need cable conduit or raceway

GENERATOR

GENERATOR
SUPPORT

CONTROL BOX

RUN CABLE CODE TOTAL USABLE CABLE CHECK


CABLE CABLE DESCRIPTION FROM TO
# (Mfg. Ref.) DIAM OFF
LENGTH LENGTH

Cables length and size depends


4 -- on the position of the Power Line Room Electrical Cabinet Input Line Fuses
Room Electrical Cabinet (3 Ph + GND) (Main Disconnect) at Generator
(Main Disconnect) in the Room

126
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

6. Connect the power wires L1, L2, and L3 to the fuse holders of F3, F4, and
F5 (right side of the cabinet), and the Ground wire to the Ground studs
in the cabinet frame (located above these fuses or close to the right side
of the HV Transformer). (Refer to the illustration below.)

Input Transf. 6T2

GND Stud

L1 Input Line

L2 Input Line

L3 Input Line

GND Studs

127
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

7. According to the nominal voltage of the line (customer electrician


should provide this information), verify or connect the wire marked as “:”
to the indicated terminal (TB) of Transformer 6T2. This wire is factory
connected to 400 VAC (for 3-Phase). (Refer to the illustration below.)

Note . For 380 VAC power line, connect the wire marked as “:” to the
400 VAC terminals.

POWER INPUT TRANSFORMER


6T2

44 530 VAC 240 VAC 20

Wire marked as “:”, 10 480 VAC


connect it according with
the input line. 9 440 VAC
115 VAC 18
7 415 VAC

8 400 VAC
0 VAC 17
5 230 VAC

4 21 VAC 15

6T2 Terminal Strip

0 VAC 14

40 110 VAC

11 VAC 12

0 VAC 11

28 VAC 35
26 VAC 34
24 VAC 16
POWER INPUT TRANSFORMER 3 60 VAC 22 VAC 33

6T2 20 VAC
16 VAC
32
31
2 14 VAC 30
12 VAC 19
1 0 VAC 0 VAC 13

Shield Stud

128
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10.10 INSTALLATION OF TOP OF COLUMN AND FOOT COVERS

The Definium 5000 X--ray is designed with beauty and aesthetics. To finish off
the decorous aspect of this system attach the provided covers to the top and
to the foot of the Positioner.

1. Attach the cover for the positioner assembly at the head of the assembly.

2. Attach the protective foot cover at the bottom of the positioner assembly.

129
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10.11 LAMINATED AND CARBON FIBER TABLE ASSEMBLY

Ensure the locking screw is not over tightened. The wheel


may crack from undue pressure.

Note . It is recommended to use a non-abrasive mat. Since the table must


be upside down (inverted) when installing the legs, it is
recommended to use a cardboard or soft non-abrasive mat (or
equivalent) to place underneath the tabletop to prevent
scratching.

10.11.1 LAMINATED TABLE ASSEMBLY

Support Beam Right Leg

Left Leg
Laminated

Caster

This assembly is comprised of the laminated tabletop, left and right legs with two
(2) casters (one blocking and the other free-rolling) on each leg, the support
beam, and ten (10) Allen screws with ten (10) plastic caps.

1. Remove the laminated tabletop and place it face-down on a mat or other


non-abrasive material.

2. Remove the legs from the packing crate and place them aside.

3. Line the support beam holes up with the inner holes, securing them with
the four (4) Allen screws (torque 10 Nm / 88 Lbf.in).

4. Place the assembled support beam--legs onto the underside of the table
and fix it by securing the base holes to the table with the six (6) remaining
Allen screws (torque 10 Nm / 88 Lbf.in).

130
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

5. Place the table upright and check that it rolls smoothly, ensuring that the
corresponding casters lock correctly.

Base Holes

Allen Screws Outer Holes (Large) Inner Holes (Small)

Base Holes

6. Insert the plastic caps into the open holes. They are easily removed with
a flathead screwdriver.

Plastic Caps
(inserted)

131
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

10.11.2 CARBON FIBER TABLE ASSEMBLY

Leg

Carbon Fiber

This assembly is comprised of the tabletop, two (2) equal legs with two (2)
casters (one blocking and the other free-rolling) on each leg and twelve (12)
Allen screws.

1. Remove the carbon fiber table and place it face-down on a mat or other
non-abrasive material.

2. Remove the legs from the packing crate and place them aside.

3. Fix the two (2) leg plates to the bottom of the tabletop with the twelve (12)
Allen screws provided (torque 15 Nm / 132 Lbf.in). The two (2) legs are
identical.

132
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

4. Once fixed, place the tabletop in an upright position and ensure that it is
fixed correctly and that the casters are rolling and can be locked.

Leg Plates

Allen Screws

133
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

This page intentionally left blank.

134
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

SECTION 11 SYSTEM INTERCONNECTIONS

11.1 SYSTEM INTERCONNECTION SIGNALS

All input signals are active low. This means the inputs must be pulled to ground
(chassis ground of the generator) by relay contacts, a transistor, or another
switching device. The current requirement of the switch is less than 10 mA.

Do not apply 115 / 220 VAC logic signals to any of the logic
inputs. If 115 / 220 VAC logic signals are used in the X-ray
table (i.e. fluoro command), these signals must be converted
to a contact closure by a relay.

The output signals from the generator to subsystem devices are usually active
low (switched to chassis ground of the generator). The outputs are controlled
by open collector transistor drivers with a maximum current of 0.5 Amperes.

Table 6
System Interconnection Signals

SIGNAL NAME SIGNAL DESCRIPTION

C--HT CLK Serial data clock to the HT Control PCB. This clock synchronizes the C--HT DATA signal.

C--HT DATA Serial data to the HT Control PCB. This data is synchronous with the C--HT CLK signal.

This low signal indicates that NO EXPOSURE HOLD condition exists at the Collimator. This input is read only when the
--COLLIMATOR
Radiographic Tube is selected.

--DOOR This low signal is the interlock for the Door of the X-ray room.

--DSI SEL This low going signal from a DSI device indicates that the DSI has been selected and will be used for the next exposure.

Low going Expose signal to the HT Control PCB. If --PREP is low then a Spot Film or RAD exposure is made, else a Fluoro
--EXP
exposure is made.

--FLD1 DR A low signal to select the right field in the Ion Chamber.

--FLD2 DR A low signal to select the left field in the Ion Chamber.

--FLD3 DR A low signal to select the center field in the Ion Chamber.

--FT SW CMD This low going signal indicates the Fluoro exposure command. It is needed for Pulsed Fluoro at variable rate.

HT--C CLK Serial data clock from the HT Control PCB. This clock synchronizes the HT--C DATA signal.

HT--C DAT Serial data from the HT Control PCB. This data is synchronous with the HT--C CLK signal.

This signal is low when the switch in the high voltage transformer is in the RAD position. This is a safety interlock which
--HT INL
prevents an exposure if the high voltage switch (in the HV Transformer) is in the wrong position.

135
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

Table 6 (cont.)
System Interconnection Signals

SIGNAL NAME SIGNAL DESCRIPTION

This analogic signal controls the output of the HV Power Supply on the Interface Control PCB. This signal originates on the
HV PT CRL optional AEC Control PCB. Plus 5 volts programs the output to be 0 volts, and 0 volts programs the output to approximately
--1200 volts.

IC GND GND for the IC SPLY.

IC1 INPUT This input is the output of the Ion Chamber.

IC SPLY Power supply for the Ion Chamber. This output should be within the range of 500 to 800 volts.

--LINE CONT A low signal energizes the main line contactor K5 in the Power Module.

Command to the HT Control PCB to boost X-ray Tub Filament to the value of mA selected and to start the X-ray Tube Rotor is
--PREP
RAD Tube is selected.

This low going signal indicates the system is ready to make an exposure (Prep cycle completed). This signal is used to
--READY
interface to some Film Changers, etc.

This low going signal indicates the X-ray preparation or exposure. This signal is used to interface to the Room X-ray warning
--ROOM LIGHT
light.

--STRT DR A low signal to indicate the start of an exposure to the Ion Chamber.

--THERMOSTAT-1 This signal from X-ray Tube indicates the overheat of the Tube-1.

11.2 SYSTEM INTERCONNECTION MAPS

Refer to the following maps for details of the wire connections.

SYSTEM INTERCONNECTION TO POSITIONER / CONTROL CABINET

 Magma System Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . 54302101

 Sedecal X-Plus LP Plus . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54302084

 CRIB Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54302083

 PDU . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A9636--01

 Emergency & 24 V Adaptation . . . . . . . . . . . . . . . . . . . . . . I/F--201

 XPC--Plus with Huestis Auto Collimator . . . . . . . . . . . . . . . I/M--371

 Tilting Detector Interface with Servo & Grid . . . . . . . . . . . . I/M--380

136
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

SYSTEM INTERCONNECTION TO GENERATOR CABINET

 Compact / Compact-ESM Generators.


System Interconnection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54301045

 Serial Communication to Generator.


System Interconnection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54301052

 RS-232/422/485 Serial Communication . . . . . . . . . . . . . . . A6188--03

 Earthing Diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I/F-103

ROOM LAMPS

 Room Warning Light Interface . . . . . . . . . . . . . . . . . . . . . . . I/F-008

AEC -- ION CHAMBERS

 AEC Adaptation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A3263--03

 AID Ion Chamber adaptation . . . . . . . . . . . . . . . . . . . . . . . . I/M--375

INTERNAL RADIATION MEASURING SYSTEM FOR TPC

 Radiation Meter Interconnection for U--Arm . . . . . . . . . . . . A9447--09

 Radiation Meter Board . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A3170-01

137
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

This page intentionally left blank.

138
A B C D E

Monitor External Ethernet Hospital Network


DVI-A DVI-A Video Cable DVI-A
Video Video
USB Bar Code Reader
USB USB Cable USB
USB Mouse
4 230 VAC Power & GND 230 VAC Power & GND X-Plus LP Plus 4

USB
(Device)
Keyboard

Magic PC Ethernet Ethernet Cable (A9686-05)

CAN Cable (A9685-05)


CAN Open

RS232 Cross Ethernet


TRAD
Handswitch Detector
(A6805-02) 1 Tether Cable
Control CRIB
(46-316719)

Room CRIB RS232 Cable


(A9682-01)
Vicinity J3 J2 J1

Power Extension
Cable (A9687-01)
3 3

Power Cable

Power Cable
(A9684-02)

(A9684-02)
TDI Detector
Power Supply

Generator Support DC Power


(Transformer) CAN Open
TB4 TB3 Power Cable (A9684-04)
PDU Cable (A9680-05) TB2 230 VAC & GND
2 PH 230 VAC TB1
PDU

Room Power Cable (A9696-07) Cross Ethernet Cable (A9679-03)


PC Ethernet
Collimator RS232 Cable (A9689-01)
COM3
TS3 Collimator Power Cable (A9688-04) Collimator

2
System Interface 2
Panel
X-Plus LP Plus
(Control Cabinet) GENERATOR
(J1)
CONSOLE
(J2)

CRIB Cable
(A9681-02)
Interface
Interface Box Cable
E-Stop
Panel (A3352-04)
J5

Room AEC Preamplifier


AEC Adaptation AEC Cable (A7659-02)
Power IC (J1) PREA (Ion Chamber)
Contactor
DAP RS232 IC1 DAP Cable (55902024)
DAP
ANODE CABLE (6680-09)
MAINS CATHODE CABLE (6680-09)
X-Ray X-Ray Tube
3 PH LINE CABLE STATOR CABLE (A7014-03)
Generator
1 1

3 PH 3 PH

D CN 07/279 F. García 13/08/08 NAME DATE SHEET / OF


C CN 07/190 F. García 25/09/07 DRAWING F.GARCIA 28/05/06 54302101
1/3
Bb4 A9687-01 version F. García 19/03/07 REVISED A.DIAZ 10 /10 /06 D C Bb4 Bb3 Bb2 Bb1 Ab2 REV
Bb3 New interface F. García 14/03/07
Bb2 New interface F. García 13/03/07
Bb1 New interface F. García 03/03/07 SEDECAL MAGMA System Interface
REV DESCRIPTION ISSUED BY DATE
A B C D E
A B C D E

DAP Cable 55902024 (15 m)


X-Ray DAP
Generator Anode Cable 6680-09 (9 m)
Cathode Cable 6680-09 (9 m) X-Ray
Stator Cable A7014-03 (12 m) Tube

4
Collimator 4

3PH AEC Cable A7659-02 (12 m) AEC Preamplifier


GND ( Ion Chamber )

Interface Box Cable


A3352-04 (2 m)
X-Plus Interface ROT Motor Cable A8131-04 (6.7 m)
LP Plus Panel SID Motor Cable A8129-04 (7 m)
Motors
(Control Brake-H Motor Cable A8160-05 (3.7 m) & Fan
Cabinet) CRIB Cable A9681-02 (15 m)
Room Power Cable A9696-07 (1 m)

Detector Motor Cable A8199-01 (8.9 m)


Fan Cable A8168-03 (8.5 m)
Interface
Board I/F CAN Cable A8188-03 (6,75 m)
Control
Supply Cable A8190-03 (6,8 m) Board
GND Cable A6383-41 (1 m)

3 3

PC Supply Cable A9608-03 (9,6 m)


VGA Cable 55001084 (10 m) Touch
PC Console
TS RS232 Cable A9610-01 (10 m)
&
P.S. Collimator RS232 Cable A9689-01 (10 m)
Cross Ethernet Cable A9679-03 (15 m)

TS3
Collimator Power Cable A9688-04 (8.8 m)

GND TDI Detector


Power Cable A9684-04 (4 m)
PDU TB2 VAC Power
Power Cable A9684-02 (15 m) CAN Cable A9685-05 (24 m) Supply
TB3 CAN
Power Cable A9684-02 (15 m)
TB4
TB1 1 Tether Cable
Ethernet Cable
GND A9686-05 (24 m) (46- 316719) TRAD
2
Detector 2

GND Cable A6383-41 (1 m)


Generator Support PDU Cable A9680-05 (1 m)
GND Cable A6383-05 (4 m)
GND Cable A6383-42 (2.7 m)
GND

USB Cable (2 m) X-Plus LP Plus


Location 1 DVI-A Video Cable (2 m) (Device)
CRIB RS232 Cable
A9682-01 (2 m)

VAC USB DVI-A J2 J3 RS232 DVI-A USB VAC Cross CAN Ethernet
Location 2
Video Video Ethernet
Location 3 TV
Monitor CRIB Magic PC
1 1

D CN 07/279 F.García 13/08/08 NAME DATE SHEET / OF


C CN 07/190 F. García 25/09/07 DRAWING F.GARCIA 28/05/06 54302101
2/3
Bb4 A9687-01 version F. García 19/03/07 REVISED A.DIAZ 10 /10 /06 D C Bb4 Bb3 Bb2 Bb1 Ab2 REV

Bb3 New interface F. García 14/03/07


Bb2 New interface F. García 13/03/07
Bb1 New interface F. García 03/03/07 SEDECAL MAGMA System Interface
REV DESCRIPTION ISSUED BY DATE
A B C D E
A B C D E

4
X-Ray 4

Generator

GND GND Cable


Stud (A6383-41)
X-Plus LP Plus
(Device)

Room
Power
Contactor GND
Stud Generator
Support
GND PLATE
TDI Detector
GND GND Cable GND Power Supply
Stud GND Cable (A6383-42) Stud
3 3

GND Cable GND


(A6383-05) Stud

TB2 Power Cable


(A9684-04)
GND GND Cable GND 230 VAC & GND
Stud (A6383-41)

TB3 Power Cable


(A9684-02)
GND 230 VAC & GND
PDU Harness
(A6343-58) Magic PC
TB5
GND

2
Monitor 2

TB4 Power Cable


(A9684-02)
230 VAC & GND
PDU GND

X-Plus LP Plus
(Control Cabinet)

1 1

D CN 07/279 F. García 13/08/08 NAME DATE SHEET / OF


C CN 07/190 F. García 25/09/07 DRAWING F.GARCIA 28/05/06 54302101
3/3
Bb4 A9687-01 version F. García 19/03/07 REVISED A.DIAZ 10 /10 /06 D C Bb4 Bb3 Bb2 Bb1 Ab2 REV

Bb3 New interface F. García 14/03/07


Bb2 New interface F. García 13/03/07
Bb1 New interface F. García 03/03/07 SEDECAL MAGMA System Interface
REV DESCRIPTION ISSUED BY DATE
A B C D E
8 7 6 5 4 3 2 1

D D

X-Plus LP Plus X-Plus LP Plus


IR Remote
(Device) IR
RECEPTOR Control
(Control Cabinet)

IR RECEIVER CABLE (A9609-XX)

J2
PC
Power
PC SUPPLY CABLE (A9608-XX) POWER Supply
IR POWER
TOUCH
XPC-Plus
CONSOLE
VGA CABLE (55001084) VGA
VGA
CAN1 TS RS-232 CABLE (A9610-XX) COM2 PC
COM

CAN1

PC CAN Cable (A8189-XX)


Receiver CAN Cable (A9607-01)

XPC CONTROL BOARD


C (A8185-04) C

J15

J12 J9
XPC
I/F CAN CABLE (A8188-XX) INTERFACE
J11 J8
BOARD
(A8186-02/03)
SUPPLY CABLE (A8190-XX)
J4 J6

Detector
J5 DETECTOR MOTOR CABLE (A8199-XX)
Rotation J3
Motor

TS10 FAN CABLE (A8168-XX)


J11
Tube Fan

SID SID MOTOR CABLE (A8129-XX) J2 PDU


Motor
System
Interface
B Panel B
Height BRAKE-H MOTOR CABLE (A8160-XX) J3
Motor

from

TB1 PDU CABLE (A9680-XX) VAC


Rotation ROT MOTOR CABLE (A8131-XX) J1 LINE
Motor

COLLIMATOR
See specific IM-XX documentation
for the Collimator interface

X-RAY TUBE

See specific documentation for the System Interface

A A

K CN 14/0427 M.Cappiello 17/12/14 NAME DATE SHEET / OF

17/12/14 54302084
J CN 10/284 F.Garcìa 25/06/10 DRAWING
MC
1 /4
I CN 09/230 F.Garcìa 09/09/09 REVISED
FD 17/12/14 K J I H G F
REV

H CN 09/027 F.Garcìa 02/02/09

G CN 07/318 F.Garcìa 23/10/08


SEDECAL Sedecal X-Plus LP Plus
F CN 08/009 F.Dìaz 12/01/08
REV DESCRIPTION ISSUED BY DATE

8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1

D INV 1 SID-Motor Cable D


J2
SID INVERTER (A8129-XX)
XPC Interface Board
(A8186-02/03) S1 T1 1
Supply Cable S2 T2 2 M
XPC J4
(A8190-XX) J6
+12V T3 3
Control S3
+24 VDC
Board 1 1 S4 GND 4
(A8185 04) 2
+24 VDC
2 XPC Harness (A6343-56) GND Stud
Shield
+9V UNR J12
3 3 L1 RA
+9V UNR
4 4 L3 RB
5
GND
5 19 MOTOR INCREASE SID (I1.3)
6
GND
6 18
MOTOR DECREASE SID (I1.4)
GND MOTOR SID COMMON (I1.5) SID RELAY (I2.1)
7 7 11
8
GND
8 13
MOTOR SID SPEED SELECT_1 (I1.6)
INV 3
ROT-Motor Cable
+9V UNR MOTOR SID SPEED SELECT_2 (I1.7) J1
(A8131-XX) J6
9 9 12 ROT INVERTER
MOV STOP SID RELAY (I2.2)
10 10 1
EMERGENCY MOTOR ROTATE CW (I3.3)
11 11 17 S1 T1 1 1
SID RELAY MOTOR ROTATE CCW (I3.4) M
12 12 16 S2 T2 2 2
ROTATE RELAY MOTOR ROTATE COMMON (I3.5)
13 13 10 +12V T3 3 3
HEIGHT RELAY MOTOR ROTATE SPEED SELECT_1 (I3.6)
14 14 7 S3
KEY REMOTE MOTOR ROTATE SPEED SELECT_2 (I3.7)
15 15 6 S4 GND 4 4
TUBE CW EN ROTATE RELAY (I3.2) Shield
16 16 2 GND Stud
TUBE CCW EN MOTOR HEIGHT DWN (I2.3)
17 17 15 L1 RA
DET CW EN MOTOR HEIGHT UP (I2.4)
18 18 14 L3 RB
DET CCW EN MOTOR HEIGHT COMMON (I2.5)
19 19 9
20
INCREASE SID EN
20 5 MOTOR HEIGHT SPEED SELECT_1 (I2.6)
DECREASE SID EN MOTOR HEIGHT SPEED SELECT_2 (I2.7) ROTATE RELAY (I3.1)
21 21 4
ROTATE CW EN HEIGHT RELAY (I2.2) BRAKE H-Motor Cable
22 22 3 INV 2
ROTATE CCW EN RELAY COMMON J3
(A8160-XX) J7
23 23 20

8
HEIGHT INVERTER
HEIGHT UP EN
24 24
HEIGHT DWN EN
25 25 S1 T1 1 1
Shield M
S2 T2 2 2
+12V T3 3 3
S3
S4 GND 4 4
Detector Motor Cable AGND 5 5
Detector Assy. (A8199-XX) L1 RA 6 6
J5 J3 A1 K2 Shield
L3 RB GND Stud
C DET CW MOTOR C
1 1
M DET CCW MOTOR A2 HEIGHT RELAY (I2.1)
2 2
DET BRAKE
3 3
4
GND
4
11 14 System
Shield Interface
Panel
F6, 400mA F5, T8A
Fan Cable
Tube Fan
(A8168-XX) J11 J4
D1
TS10 F4, T4A
1N4007
+24V PWR H-BRAKE A1 K1
9 1 5
10
11
GND PWR
Shield
2
5
6
8
GND
EMERGENCY F3, T3A X-Plus LP Plus
A2
12 7
10
INVERTERS OFF
(Control Cabinet)
4
9
4
7 TS2 (A9601-21/31)
3
24V PowerCable 2 1
(A9693-01) 6
1
J13 9
2
TS4
1 3
+24V PWR
9 2
24V for
Power
10
GND PWR
see CRIB Interface
(sch. 54302083)
3 4 FA PC
11 4
12 5 5 L1
6
Detector Area 7 6 L2/N
8

TR1
Cable
(A9697-01) 8V 240V
0 6
PDU
B 5 B
Emergency Connect (A9636-01)
Stop Button according to
8V
the input line

19V 230V
0 4 TB6 TB1 PDU Cable (A9680-XX)
230 VAC
19V 1 L1
208V
8 3 0 VAC/Neutral from VAC LINE
22V F7, 400mA 3 L2/N
GND
2 GND
22V
TS3
26V
to collimator 24V
supply 1
2 F8, T8A GND Stud GND Cable GND Stud
2 FAN
0V 0V
0 1 of the Column
GND Stud

A A

K CN 14/0427 M.Cappiello 17/12/14 NAME DATE SHEET / OF

17/12/14 54302084
J CN 10/284 F.Garcìa 25/06/10 DRAWING
MC
2 /4
I CN 09/230 F.Garcìa 09/09/09 REVISED
FD 17/12/14 K J I H G F
REV

H CN 09/027 F.Garcìa 02/02/09

G CN 07/318 F.Garcìa 23/10/08


SEDECAL Sedecal X-Plus LP Plus
F CN 08/009 F.Dìaz 12/01/08
REV DESCRIPTION ISSUED BY DATE

8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1

Note.- See specific documentation


D for the Detector connection to TS9 D
Emergency Cable
Sensor Cable (A8191-02) J2 J6 (A8197-02) TS9
+5 VDC +5 VDC
TS1 V INCL 1 1 1 CW Limit
DET CW LIMIT
+V1e 2 2 5 Grid 100
DET CCW LIMIT
PHOTOCEL +V (brown) +V1r 3 3 6 TS4
CCW Limit
Detector 1 1 +V2e 4 4 Grid 180
PHOTOCEL (black) GRID 1 SEL
0V (blue)
2 +V2r 5 5 7 4
GRID 2 SEL
3 PHOTOCEL1 6 6 8 3 Grid In
GRID IN
PHOTOCEL2 7 7 2 7 Emergency
SAFETY 1 Motors Stop
SID POS 8 8 9 2
Button
0V 9 9
TS2 DET ROT
0V 10 10 4
GND
PHOTOCEL 11 11 3
+V (brown)
Emitter 1 1 ROT POS 12 12 8
0V (blue) EMERGENCY
2 GND 13 13 11 5
+24 VDC
TS3 GND 14 14 12 6
GND
15 15 10 1
Shield
TS5
1
2
PHOTOCEL 3
+V (brown)
Detector 2 1
PHOTOCEL (black)
2
0V (blue)
3 Keyboard Cable HEAD OVERLAY
J3
(A9765-01) J1
R2
POT w CABLE SID XPC HEIGHT UP
SID POT
(A9673-02) J20 Control 1
HEIGHT UP
1
TS6 Board HEIGHT DWN
2 2 HEIGHT DOWN
INCREASED SID
PHOTOCEL 1 (A8185-04) 3 4
+V (brown) DECREASE SID
Emitter 2 1 2 4 5
0V (blue) ROTATE CW
2 Shield 3 5 6 INCREASE SID
ROTATE CCW
6 10
DET CW
7 7
DET CCW
8 9 DECREASE SID
AUTO
9 8
GND
10 3
Carriage 11
Shield
Anti Crushing J3 Harness J4 Carriage Cable (A8138-02)
J1
SW Cable (A8192-01) J5
12
ROTATE CW
C Board C
+5 VDC 13

15
(A3531-11) 1 1 1 LIMIT INHIBIT 1 14 ROTATE CCW
3 2 2 GAUGE 2
4 3 3 3
J2 2 4 4
LIMIT
4 Display Cable
GND DET CW
8 19 5 J1 (A8195-03) J1
XPC
1 +Vcc
2 +Vin 1 6 DISPLAY
J4 CS9
Gauge 3 Filter -Vin 2 GND 7 1
CS10
1 (A8187-02) DET CCW
4 GND 3 9 8 BROKEN 8 2 2
CS11
4 1 10 9 GND 9 3 3
CS12
2 5 16 HEIGHT UPPER LIMIT 10 4 4 AUTO
CS13
6 17 HEIGHT LOWER LIMIT 11 5 5
J2 CS14
7 18 ARM CW LIMIT 12 6 6
MODE
SW7 13 ARM CCW LIMIT 13 7 7
PB0
1 12 14 8 8
{
broken GND PB1
to program 2 11 Shield 15 9 9
PB2
3 SW5 10 10
PB3
4 11 11
+120º PB4
12 12
PB5
13 13
PB6
SW6 14 14 BUCKY HANDLE OVERLAY
PB7
15 15
COLUMN SW4 -30º

CARRIAGE UPPER LOCK

ROT CARRIAGE J8 J2 HEIGHT UP


SW3 +5 VDC
1 GND 1
LOWER LOCK
2 2 HEIGHT DOWN

INCREASE SID
Push-Button Cable
( A8196-01) Overlay Cable
J7 J2 A8121-02 J1
R1
POT w CABLE H DECREASE SID
HEIGHT POT H-Pot. Cable (A8194-01) GND
(A9673-01) J3 J10 15 1 1
HEIGHT UP
1 2 2 ROTATE CW
+5 VDC HEIGHT DWN
1 1 2 3 3
HEIGHT POS INCREASE SID
2 2 3 4 4
B GND DECREASE SID B
Shield 3 3 4 5 5 ROTATE CCW
Shield ROTATE CW
5 6 6
ROTATE CCW
6 7 7
UNDERTABLE
9 8 8 UNDERTABLE
THORAX
SID ARM 10 9 9
LOW SPEED
11 10 10
UNLOCK
12 11 11 THORAX
DET CW
SW2 7 12 12
TS10 SID Cable (A8193-02) DET CCW
J9 8 13 13
SID 180 13 14 LOW SPEED
+5 VDC
SW1 1 1 14
TUBE ROT
2 2
SID 100 GND
3 3 UNLOCK
SID MAX LIMIT
4 4
SID MIN LIMIT
SW8 5 5
GND
6 6 DET CW IN
Collimator Intlk
7
COLLIMATOR INTLK
SW10 7 8
TUBE INTLK
8 9 DET CCW IN
Tube Intlk Shield

A A

K CN 14/0427 M.Cappiello 17/12/14 NAME DATE SHEET / OF

17/12/14 54302084
J CN 10/284 F.Garcìa 25/06/10 DRAWING
MC
3 /4
I CN 09/230 F.Garcìa 09/09/09 REVISED
FD 17/12/14 K J I H G F
REV

H CN 09/027 F.Garcìa 02/02/09

G CN 07/318 F.Garcìa 23/10/08


SEDECAL Sedecal X-Plus LP Plus
F CN 08/009 F.Dìaz 12/01/08
REV DESCRIPTION ISSUED BY DATE

8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1

D D

X-Plus LP Plus (Device) X-Plus LP Plus (Control Cabinet)

FA PC
TOUCH XPC-Plus
CONSOLE PC

SERIAL
VGA Cable (55001084) +5 Vsb L1 230 VAC
VGA VGA
OSD GND L2/N 0 VAC } from PDU
PS_ON

TS RS-232 Cable (A9610-XX)


TxD
CAN2 COM2 RxD COM2
GND
ON-OFF XPLUS
(A3179-07)

C C
J1

CAN1 J2
PC SUPPLY Cable (A9608-XX) 1
+5 Vsb
2
+12 VDC
POWER 3 1
GND POWER PS_ON 4 2
5

Receiver GND
CAN Cable ON
(A9607-01)

XPC Control Board


(A8185-04)

J13

BKGD
1
J15 GND
2 XPC Interface Board
3 for debugging (A8186-02/03)
IR REMOTE \RESET
1 4
GND
2 5
+5 VDC
6

J12 J14 PC CAN Cable J9 J7


GND (A8189-XX)
3 1 1
GND CAN1 CAN H TxD
1 1 7 2 2
CAN H TxD CAN L RxD
2 2 for RS232-PROG 2 3 3 for RS232-PROG
CAN L RxD GND
3 3 4
GND
4
B B
J11 J10
I/F CAN Cable (A8188-XX)
INCL CAN Cable J17 J8 BKGD
J3 1
(A9768-01) GND GND
1 1 2
GND CAN H
2 1 2 2 3 for debugging
CAN H CAN L \RESET
3 2 3 3 4
Inclinometer CAN L
board 4 3 5
+5 VDC
(A7804-01) 6

INCL SUPPLY Cable J16


J1 (A9769-01)
+24 VDC
1 1
GND
2 2

A A

K CN 14/0427 M.Cappiello 17/12/14 NAME DATE SHEET / OF

17/12/14 54302084
J CN 10/284 F. García 25/06/10 DRAWING
MC
4 /4
I CN 09/230 F. García 09/09/09 REVISED
FD 17/12/14 K J I H G F
REV

H CN 09/027 F. García 02/02/09

G CN 07/318 F. García 23/10/08


SEDECAL Sedecal X-Plus LP Plus
F CN 08/009 F. Díaz 12/01/08
REV DESCRIPTION ISSUED BY DATE

8 7 6 5 4 3 2 1
5 4 3 2 1

X-Plus LP Plus (Control Cabinet)


(A9601-21/31) PC
CRIB (A9637-01)
TxD
3
RxD
2 COM1
LOGIC GND
5
D D

CONTROL
GND-CAN
3 CRIB Board
CAN H
CAN L 7
2
CAN1 (A3600-01)

J5 J1 Handswitch
LOGIC GND
X-Ray Generator RxD 5
2 COM4 1 1
COLLIMATOR (A6805-02)
TxD +5V
3 2 2
(Interface Panel) Panel/PC Cable Kit 3 3
EXP ORDER
PREP/EXP COMM
(A9692-01) 4 4 PREP ORDER
5 5 PREP/EXP COMM
6 6
7 7
8 8

COM4
COM1

CAN1
3
2
5

3
7
2

5
2
3
ATP Interface Box Cable CRIB Cable
Console (A3352-XX) (A9681-XX)
J5 Generator Console J2 J6
Board
C
1 RxD 1 1 RxD 1 1 C
2 TxD 2 2 TxD 2 3
3 3 3 3 5
4 SHUTDOWN RQST 4 4 GND 4 7
J13-7 5 5 5 5 9
GND
6 LOGIC GND 6 6 CAN H 6 11
7 7 7 CAN L 7 13
8 8 8 GND-CAN 8 15
9 9 9 9 17 Magic PC
10 10 10 10 19
11
ALOE
PWR GND 11 11
ALOE
PWR GND 11 21 (Wall Box)
12 PWR GND 12 12 PWR GND 12 23
13 13 13 13 25 CRIB RS232 Cable
PREP/EXP COMM PREP/EXP COMM
14 EXP ORDER 14 14 EXP ORDER 14 2
J7 J3 (A9682-01) RS232
15 PREP ORDER 15 15 PREP ORDER 15 4
16 PWR COMM 16 16 PWR COMM 16 6
17 PWR OFF 17 17 PWR OFF 17 8 1 1 RxD 1
18 PWR ON 18 18 PWR ON 18 10 3 2 TxD 2
19 19 19 REMOTE EMERGENCY OUT 19 12 5 3 3
20 20 20 REMOTE EMERGENCY IN 20 14 7 4 GND 4
21 21 21 KEY REMOTE 21 16 9 5 5
22 22 22 REMOTE INV OFF 22 18 2 6 Shield 6
23 +24 VDC UNR 23 23 +24 VDC UNR 23 20 4 7 7
24 +24 VDC UNR 24 24 +24 VDC UNR 24 22 6 8 8
25 25 25 25 24 8 9 9
Shield Shield 26 10

J5
B
J4 5
B

+24 VDC UNR 6


PWR GND 1 7
2 8
9

System Interface Panel


(A6343-57)

PDU Contactor Cable CRIB/Interface Cable


(A9690-01) (A9691-01)

XPC Interface
PDU Board J13
(A9636-01) (A8186-02/03) 1
GND
REMOTE INV OFF
2 KEY REMOTE
3 REMOTE EMERGENCY IN
4 REMOTE EMERGENCY OUT
} to contactor 5
A 6 A
7
8

NAME DATE SHEET / OF


DRAWING F.GARCIA 28/05/06 54302083
1/1
REVISED A.DIAZ 29/09/06 D C B Ab1 REV

D new RS232 interface F. García 29/07/10


C CAN1 instead of CAN2 F. García 29/05/09
B CN07/010 & 020 F. García 02/02/07 SEDECAL CRIB INTERFACE
REV DESCRIPTION ISSUED BY DATE
5 4 3 2 1
A B C D E

1 1

POWER LAMP
LP1

SERVICE ON/OFF
SW1 EMI Filter LP Board (A9502-03)
1 2

TB1 C1 C2 RV3 TB2 LF1 TB6


F1,T10A
Line Input F1 & F2 4 5
3 1 to power supply
} input
L1 L1 1
of the
480 V 12 Amp. L2/N L2/N 4 2 3 X-Plus LP Plus
400 V 15 Amp. F2,T10A/N
2
RV1 RV2 SYSTEM C1 C2
GND GND GND
100nF 100nF
Stud Stud Stud
GND Cable
Generator Support GENERAL
(A6383-41) GND Cable GND
(A6383-41) Stud

GND PLATE
2
PDU Harness 2

(A6343-58) TB2
L1
Connect to power supply
480V L2/N of the Detector
X-Ray according
Generator to Line GND
Input 400V
F3,T15A PDU Cable TB1 7 8 TB3
230V
(A9680-05) 5 6
L1 L1
F4,T15A 3 4
to power supply
GND L2/N L2/N of the System
See Table 0V
1 2 GND PC
F1
Room Power Cable K1
PH1
(A9696-07) ON/OFF CONTACTOR TB4
0V
PH2 A1+ A2-
F2 Transformer L1
PH3 to power supply
L2/N
of the Monitor
N
GND
GND Cable
D1
from
1N4007
TB5
3
Line Cable Room
3

Power L1 power supply


Contactor (spare)
+24 VDC UNR L2/N
to J4 of the System
Interface Panel { PWR GND GND

GND STUD

PDU

4 4

NAME DATE SHEET / OF


DRAWING F.GARCIA 28/05/06
1/1
A9636-01
REVISED A.DIAZ 29/09/06 C Bb3 Ab1 REV

C CN 07/260
Bb3 Transformer Box
F. García
F. García
30/11/07
07/07/07 SEDECAL PDU
REV DESCRIPTION ISSUED BY DATE
A B C D E
A B C D E

Grid 100

Grid 180
4 4

Grid IN

TS4 Adaptation Cable (A9734-01) J11 Safety Device


Emergency
1
Motors Stop
GRID 1 SEL Button
4
GRID 2 SEL 2
3
GRID IN 5
7
GND 6
1
SAFETY 1
2
EMERGENCY
5
from 24V Power Supply Cable
and Emergency Cable +24 VDC
6
+24V PWR
9
3 3
10
GND PWR
11
FANS ASSEMBLY
12
J12
+24V PWR

GND PWR } +24V SPARE 1


+24V PWR

2
GND PWR + FAN 1
3

4
_

+ FAN 2

2 2

+ FAN 3

+ FAN 4

SEDECAL X-Plus _

LP Plus Device

1 1

NAME DATE SHEET / OF


DRAWING F.GARCIA 29/09/06
1/1
IF - 201
REVISED A.DIAZ 29/09/06 A REV

A New interface F.Garcia 30/03/07 SEDECAL Emergency & 24V Adaptation


REV DESCRIPTION ISSUED BY DATE
A B C D E
A B C D E

4 4

XPC-Plus Device XPC-Plus Unit

COLLIMATOR
Huestis PC

COLLIMATOR RS-232 CABLE (A9689-XX)

3 TxD 1 3
2
Control RxD
3 COM3
GND
4
Shield

TR1
19V-1 240V 6

5
Note.- Connect F8 to 26V output 0V-1
230V 4
o f the transformer TR1 when the 19V-2
voltage supply to the collimator
input is lower than 208V 3
requirements. 0V-2

COLLIMATOR POWER CABLE (A9688-XX) TS3 26V


F8, T6A
24 VAC LAMP 24V
1
Power 0 VAC LAMP
2 2
GND
2
0V 0V 1
2

GND Stud

1 1

NAME DATE SHEET / OF


DRAWING F.GARCIA 11/11/05 IM - 371
1/1
REVISED A.DIAZ 09/09/06 A REV

SEDECAL
XPC-Plus Interface with
REV DESCRIPTION ISSUED BY DATE
Auto Collimator Huestis
A B C D E
A B C D E

Detector Assembly
EMERGENCY Cable
XPC CONTROL Board (A8197-02)
(A8185-xx) J6 TS9
+5 VDC
1 1
DET CW LIMIT CW Limit
2 5
4 4
DET CCW LIMIT CCW Limit
3 6

4 TS4
GRID 1 SEL Grid 1
5 7 4
GRID 2 SEL Grid 2
6 8 3
GRID IN Grid In
7 2 7
Safety 1
SAFETY 1
8 9 2
Bumper
9
DET ROT
10 4 R1 Emergency
11
GND
3 8
Motors Stop
Button
ROT. POT
12
EMERGENCY
13 11 5
+24 VDC
14 12 6
GND
15 10 1
Shield

3 3

X-Plus LP Plus (Control Cabinet)

Servo Power Cable XPC INTERFACE Board


Servoamplifier (A9615-01) J2 (A8186-02/03)
+Motor DET CW MOTOR
1 1
Power -Motor DET CCW MOTOR
2 2
+24V PWR Detector Motor Cable
+Vcc 4 3
GND PWR (A8199-XX)
Power Gnd 5 4
J3 J5
Earth 3 DET CW MOTOR black
1 1
DET CCW MOTOR red ROT
2 2
2
Motor 2

Servo Signal Cable DET BRAKE red


3 3
(A9616-01) GND blue
J5 4 4
DET CCW Shield
+Set Value 1 1
Signal DET CW
-Set Value 2 2
GND PWR
Gnd 4 3
+12 VDC
+12V/12mA OUT 10 4
ENABLE Set jumpers for
Enable 3 5
Servo operation
Shield
GND 12

+Tacho Input 5

-Tacho Input 6

Monitor n 7

Monitor I 8

Ready 9
See Note 1.- Configurate switches as IxR mode:
Note 1 -12V/12mA OUT
1
11
SW1-OFF, SW2-ON, SW3-ON, SW4-OFF, SW5-OFF, and SW6-OFF 1

(see documentation of the Servoamplifier)

NAME DATE SHEET / OF


DRAWING F.GARCIA 03/03/07
1/1
IM - 380
REVISED A.DIAZ 03/03/07 A REV

Tilting Detector Interface


SEDECAL
REV DESCRIPTION ISSUED BY DATE
(with Servo and Grid)
A B C D E
FLUORO CPU BOARD CONNECTOR J1 / J10 TERMINAL BLOCK 3TS1
COMPACT GENERATOR CABINET
SIGNAL I/O PIN PIN I/O SIGNAL
--4 IN SEL O 1 1 O SUPPLY (BUCKY 1)
--9 IN SEL O 2 2 O BUCKY SPLY 1 FOR GENERATORS
CONNECTOR J4 +12 VDC O 3 3 O 0 VAC (BUCKY 1) LINE POWERED
V SYNC I 4 4 O BUCKY 1 DR
SIGNAL I/O PIN TO LINE
} VOLTAGE
--FT SW CMD I 5 5 I --BUCKY 1 MOT L1
C--FL DAT I 1 L2/N
FL START O 6 6 I BUCKY 1 MOT RTN
GND I/O 2 BREAKER
--CAM FL EXP O 3 --CAM FL EXP O 7 FLUORO CABLE 7 O GND L3
N.U. 8 8 O SUPPLY (BUCKY 2)
C--FL CLK I 4 ADAPTATIONS 9 O BUCKY SPLY 2
GND TO EARTH GROUND
FL--C DAT O 5 --ABS O 9
GND I/O 6 --6 IN SEL O 10 BOARDS 10 O 0 VAC (BUCKY 2) L3 only for Three Phase
BEEP O 11 11 O BUCKY 2 DR
FL--C CLK O 7
GND O 12 12 I --BUCKY 2 MOT
CAM SYNC O 8
--MEM EN O 13 13 I BUCKY 2 MOT RTN
+12V ISO I 9 FOR GENERATORS
--MEM GATE O 14 14 O GND
N.U. 10 BATTERIES POWERED
N.U. 15 15 O +12V
16 O --12V 1TB1--LINE
17 O +24V UNR
L
} (Line
18 O GND 1
22 I --DOOR N 2
TO SOCKET
ATP CONSOLE BOARD 23 O DOOR RTN GND 3 Voltage)
24 O --ROOM LIGHT
26 O 220 VAC SW
FLUORO A.E.C.
27 O 115 VAC SW
AEC CABLE 36 O --SF PREP
CONNECTOR J4 CONNECTOR J5 NOTE.-- For Generator with DRAC :
37 O --FL EXP
SIGNAL I/O PIN SIGNAL I/O PIN 39 O PT SPLY The ROTOR TUBE connections
C--FL DAT O 1 IC1 INPUT I 1 42 O IC GND are made to TS2 on the DRAC
--CAM FL EXP I 2 IC3 INPUT I 2 47 O ROOM LIGHT SUP
FL--C DAT I 3 --FLD1 DR O 3 TERMINAL BLOCK
48 O ROOM LIGHT SW 4TS2 / 10TS2 / 11TS2
FL--C CLK I 4 --FLD3 DR O 4 51 I PT INPUT
SIGNAL I/O PIN TO ROTOR TUBE
+12V ISO I 5 GND O 5 52 O --ALOE
GND I/O 6 IC2 INPUT I 6 MAIN T1 O 1
53 O --READY
C--FL CLK I 7 IC4 INPUT I 7 AUX T1 O 2
54 O 220 VAC SPLY COM T1 O 3
GND I/O 8 --FLD2 DR O 8
CAM SYNC O 9 --STRT DR O 9 --THERMOSTAT 1 I 4
THERMOST. COMM. I 5
FAN 1 O 6
TOMO CABLE
0 VAC O 7
TERMINAL BLOCK 4TS3 GND O 8
NOTE : PIN I/O SIGNAL MAIN T2 O 9
TOMO INTERFACE Signal for Thermostats go to 4TS3 1 I --THERMOSTAT 1 AUX T2 O 10
and then to TS2 or go directly to TS2 2 I --THERMOSTAT 2 COM T2 O 11
CONNECTOR J13 CONNECTOR J2 depending on Generator model 3 I THERM. COMM --THERMOSTAT 2 I 12
SIGNAL I/O PIN SIGNAL I/O PIN 5 I TABLE ERROR 13
THERMOST. COMM. I
TIME1 I 1 --GEN OK O 1 7 I --SFC (--PT SEL) FAN 2 O 14
TIME2 I 2 --SFD SEL O 2 8 O ALOE 0 VAC O 15
TIME3 I 3 --THERMOSTAT 1 I 3
10 O --GEN OK GND O 16
TIME4 I 4 --SF PREP I 4
--PS (DSI) SEL I 5 GND (THERM. COM) I/O 5 11 O --SFD SEL
--CINE (DSA) SEL I 6 --COLLIMATOR I 6 12 O --DIRECT SEL NOTE :
--HCF SEL I 7 TABLE ERR(COMP) I 7 15 O EXP OK TS2--6 is GND when
SPARE IN I 8 --ROOM LIGHT O 8 16 O --ACT EXP TS2 only has 6 terminals.
--TOMO PREP O 9 --READY O 9 17 O --AUTO OFF
--TOMO EXP O 10 EXP OK O 10 18 I ABC OUT / --LEFT
TOMO ON O 11 ABC OUT/--LEFT O 11 19 I EXT SYNC(FL DSI)
EXT REF I 12 --DIRECT SEL O 12 20 I --COLLIMATOR
GND I/O 13 PT INPUT I 13
INTERFACE CABLE A I Foot Switch Cmd.
EXP STOP I 14 EXT SYNC (FL DSI) I 14 B GND CONNECTOR 6J2
--FS O 15 SPARE IN2 I 15 C O Prep/Rdy Acq Rad
--SFC (--PT SEL) I 16 PIN I/O SIGNAL
D I Boost Fluoro
1 O GND
--FL EXP I 17 E I Digital Exposure
2 O +12V UNR
GND (DOOR RTN) I/O 18
I 19 3 O +12VDC
--DOOR
--THERMOSTAT 2 I 20 4 I --PWR OFF
--AUTO OFF O 21 5 I --PWR ON
6 O GND
SPARE IN1 I 22
ALOE O 23 7 O GND
--ALOE O 24 8 O +12V UNR
--ACT EXP O 25 POWER CABLE 9 O --12VDC

CONNECTOR 6J3
NOTE -- For Serial Cabinet :
POWER COMMUNICATION PIN I/O SIGNAL -- the Interface cable connections are factory
1 O --EXP made to 3TS1, TS2 and 4TS3 terminal blocks.
CONNECTOR J1 CONNECTOR J3 2 O C--HT DAT -- 6J2 is not supplied, Power cable is directly
3 I HT--C DAT connected in factory to J1 of the ATP Console.
SIGNAL I/O PIN SIGNAL I/O PIN 4 O --PREP
GND UNR 1 -- 6J3 is not supplied, Power cable is directly
I --EXP O 1 5 O C--HT CLK
I 2 connected in factory to J3 of the ATP Console.
+12V UNR C--HT DAT O 2 6 I HT--C CLK
+12VDC I 3 HT--C DAT I 3
COMMUNICATION CABLE 7 O HV PT CRL
--PWR OFF O 4 --PREP O 4 8 O --KV DWN LOCKS BOARD
--PWR ON O 5 C--HT CLK O 5 9 I LINE SYNC TERMINAL BLOCK TB7
GND UNR I 6 HT--C CLK I 6 SIGNAL I/O PIN
10 O --LINE CONT
GND I 7 HV PT CRL O 7 24 VAC LAMP O 3
11 O --BUCKY 2 DR CMD
+12V UNR I 8 --KV DWN O 8 12 I --BUCKY EXP 0 VAC LAMP O 4 } COLLIMATOR LAMP
--12VDC I 9 LINE SYNC I 9 13 I --HT INL +24 VDC LOCKS O 5
--LINE CONT O 10
GND 14 O --BUCKY 1 DR CMD 0 VDC LOCKS O 6 LOCKS
--BUCKY 2 DR CMD O 11 15 O --KV UP
--BUCKY EXP I 12 GND CABLE STUD +24 VDC LOCKS O 7 (Table & Tube Stand)
16 O GND 0 VDC LOCKS O 8
--HT INL I 13
--BUCKY 1 DR CMD O 14
--KV UP O 15

F F. GARCIA 01/09/06 NAME DATE SHEET / OF


54301045
HAND--SWITCH (or VET PEDAL SWITCH) Adaptation Boards DWG:
CONNECTOR J15 E CN 04/032 F. GARCIA 26/04/04 DRAWING F. GARCIA 04/04/99
SIGNAL I/O PIN HAND--SWITCH 1/2
COM O 1 (or VET PEDAL SWITCH) D New interface F. GARCIA 08/01/02 REVISED A. DIAZ 28/01/00 F E D C B A REV
PREP I 2
EXP I 3
C New interface F. GARCIA 02/02/01
N.U. 4 GND
B CN 00/211 F. GARCIA 04/01/01
STUD
COMPACT / COMPACT-ESM GENERATORS
A New interface F. GARCIA 05/05/00 SEDECAL
SYSTEM INTERCONNECTION
REV DESCRIPTION ISSUED BY DATE
NOTE.-- The Adaptation Boards are optional

GENERATOR CABINET
AEC
GENERATOR CABINET ADAPTATION BOARD
AEC
ADAPTATION BOARD (A3263--03)
(A3263--03) to J5 of ATP Console Board J4

3TS1
J1 to Ion Chamber #1
HIGH VOLTAGE SUPPLY (if required)
to J5 of ATP Console Board J4 39
J1 to Ion Chamber #1

3TS1 TB1 J2 to Ion Chamber #2

16
--12V 2 RF ADAPTATION BOARD J2 to Ion Chamber #2
+12V (A3514--04) TB1
15 3
J3 to Ion Chamber #3 TB1
+24V UNR 9
17 4
--12V
3 2 J3 to Ion Chamber #3
18 GND 10
4 +12V 3
J5 to Ion Chamber #4
+24V UNR
5 4
J5 to Ion Chamber #4
NOTE 2 GND 10
Depending on the Ion Chamber,
make jumpers configuration and NOTE
interface as specific schematic IM-xxx
Depending on the Ion Chamber,
make jumpers configuration and
interface as specific schematic IM-xxx

TOMO / BUCKY
ADAPTATION BOARD
(A3261--03/05) TOMO / BUCKY
ADAPTATION BOARD
TB1 (A3261--03/05)
12 TB1

13
12

13

NOTE
Depending on the Tomo Device,
make jumpers configuration and NOTE
interface as specific schematic IM-xxx
Depending on the Tomo Device,
make jumpers configuration and
interface as specific schematic IM-xxx

Interconnection of Adaptation Boards Interconnection of Adaptation Boards


for a Generator without RF Adaptation Board for a Generator with RF Adaptation Board

F F. GARCIA 01/09/06 NAME DATE SHEET / OF


54301045
Adaptation Boards DWG:
E CN 04/032 F. GARCIA 26/04/04 DRAWING F. GARCIA 04/04/99
2/2
D New interface F. GARCIA 08/01/02 REVISED A. DIAZ 28/01/00 F E D C B A REV
C New interface F. GARCIA 02/02/01
B CN 00/211 F. GARCIA 04/01/01
SEDECAL COMPACT GENERATORS
A New interface F. GARCIA 05/05/00
SYSTEM INTERCONNECTION
REV DESCRIPTION ISSUED BY DATE
SERIAL OPERATOR CONSOLE

Board
GENERATOR CABINET
J1
J1
+24 VDC UNR
1 1
3 PWR GND
CHASSIS GND 2
5
SPARE
3 NOTE: FOR GENERAL INTERCONNECTIONS REFER TO SCHEMATIC
7 4
9 RXD
5 54301045 (COMPACT / COMPACT-ESM GENERATORS)
11 PREP/EXP COMM
EXP ORDER 6
13 7
POWER ON
15 8
9
10
11
12
13
2 +24 VDC UNR
14
4 PWR GND
15
6 CHASSIS GND 16 SERIAL INTERCONNECTION CABLE FOR SERIAL CONSOLE (A7066--xx or A3149--01) CONNECTOR J5
8 SPARE 17 PIN I/O SIGNAL
TXD 1 I CTS ( RXD-- )
10 18
PREP ORDER 2 I RXD ( RXD+ )
12 19
14 POWER COMM 3 O TXD ( TXD+ )
POWER OFF 20
16 21 4 O RTS ( TXD-- )
22 5 SPARE PIN 5
23 6 O ACT EXP
24 7 O LOGIC GND
25 8 O CHASSIS GND
9 O CHASSIS GND
NOTES: 10 +12 VDC
RXD ON GENERATOR IS CONNECTED TO TXD ON SERIAL OPERATOR CONSOLE 11 --ALOE NOTE: REFER TO SCHEMATIC A6188--02 FOR
TXD ON GENERATOR IS CONNECTED TO RXD ON SERIAL OPERATOR CONSOLE 12 O PWR GND RS--232/422/485 SERIAL COMMUNICATION
13 O PWR GND
14 O PREP/EXP COMM
15 I EXP ORDER
TPC or PC INTERFACE BOX 16 I PREP ORDER
17 I/O POWER COMM
18 I POWER OFF
CONNECTOR J1 19 I POWER ON
SIGNAL I/O PIN 20 SPARE PIN 20
CTS ( RXD-- ) I 1 21 SPARE PIN 21
RXD ( RXD+ ) I 2 22 DOOR
TXD ( TXD+ ) O 3 23 DOOR RTN
RTS ( TXD-- ) O 4 24 O +24 VDC UNR
SPARE PIN 5 5 25 O +24 VDC UNR
ACT EXP O 6
LOGIC GND O 7 SERIAL INTERCONNECTION CABLE FOR TPC (A7067--xx or A3352--01)
CHASSIS GND O 8
CHASSIS GND O 9 SERIAL INTERCONNECTION CABLE FOR INTERFACE BOX (A3352--01)
+12 VDC 10
--ALOE 11
PWR GND O 12
PWR GND O 13
PREP/EXP COMM O 14
EXP ORDER I 15
PREP ORDER I 16
POWER COMM I/O 17
POWER OFF I 18
POWER ON I 19
SPARE PIN 20 20
SPARE PIN 21 21
DOOR 22
DOOR RTN 23
+24 VDC UNR O 24
+24 VDC UNR O 25

NOTES:

RXD AND TXD ARE INTERNALLY REVERSED IN TPC OR PC INTERFACE BOX


REFER TO SCHEMATICS I/F--036 FOR OTHER PC INTERFACE BOX CONNECTIONS

NAME DATE SHEET / OF


DRAWING F. GARCIA 07/07/99
DWG:
54301052
1/1
REVISED A. DIAZ 24/01/00 C B A REV
C NC 03 / 050 F. GARCIA 08/03/03
B New schematic F. GARCIA 08/01/02
SEDECAL SERIAL COMMUNICATION TO GENERATOR
A Connections F. GARCIA 02/02/01
SYSTEM INTERCONNECTION
REV DESCRIPTION ISSUED BY DATE
ATP CONSOLE BD. ( Multilayer )
J5 HARNESS
J14 J5

J2 J1 1 14 PREP/EXP COMM
POWER CABLE PREP/EXP COMM
2 16
1 1 PREP ORDER PREP ORDER
GND GND 3 15
2 2 EXP ORDER EXP ORDER
+12V UNR +12V UNR 4 18
3 3 POWER OFF POWER OFF
+12V +12V 5 19 POWER ON
4 4 POWER ON
OFF OFF 6 17
5 5 POWER COMM POWER COMM
ON ON
6 6
GND GND
7 7 TS1
GND GND
8 8
+12V UNR +12V UNR 15 10
+12 VDC
9 9
--12V --12V 52 11 -- ALOE
12 PWR GND
COMMUNICATION 18 13
J3 CABLE J3 GND PWR GND
17 24 +24 VDC UNR
+24V UNR
--EXP 1 1 --EXP 25 +24 VDC UNR
C--HT DAT 2 2 C--HT DAT 22 22
DOOR
HT--C DAT 3 3 HT--C DAT RS--xxx 23 23 DOOR RTN
--PREP 4 4 --PREP J8 51 21
5 5 PT INPUT
C--HT CLK C--HT CLK
1 6
6 6 ACT EXP ACT EXP
HT--C CLK HT--C CLK 2
RXD+ 2 RXD+ ( RXD )
HV PT CRL 7 7 HV PT CRL 3 3 See Note
8 8 TXD+ TXD+ ( TXD )
--KV DWN --KV DWN 4 20
9 9 +5V
LINE SYNC LINE SYNC 5 7 LOGIC GND
10 10 GND
--LINE CONT --LINE CONT
6 5
11 11 --BUCKY 2 DR CMD
--BUCKY 2 DR CMD 7 4
12 12 TXD-- TXD--
--BUCKY EXP --BUCKY EXP 8 1
13 13 RXD-- RXD--
--HT INL --HT INL 9 8
14 14 CHASSIS GND
--BUCKY 1 DR CMD --BUCKY 1 DR CMD
9
15 15 CHASSIS GND
--KV UP --KV UP
/////
RS--232
J7
Note.-- Signals between ( ) when RS--232 Serial Communication
1
ACT EXP
2
RXD
3
TXD
4
DTR
5
GND
6
7
8
9

NAME DATE SHEET / OF


DRAWING F. GARCIA 04/04/04
DWG:
A6188--03
1/1
REVISED A. DIAZ 04/04/04 A REV

A CN 04/148 F. GARCIA 09/09/04 SEDECAL RS--232/422/485 SERIAL COMMUNICATION


REV DESCRIPTION ISSUED BY DATE
GENERATOR CABINET

(1) Central Ground


(5) (2) GND Stud
(6) (4)
(3) Cabinet Cover GND

ROOM (4) Back Panel GND


ELECTRICAL (7) (3)
CABINET (5) Front Panel GND

(6) Filter LF1 Cover GND

(7) Adaptations Panel GND

(8) Console GND (Bottom Panel)

(9) Console Support GND

(1) (10) Pedestal Tube GND


GND cable
(2)
( yellow/green, AWG #10 ) (11) Pedestal Cover GND

(12) GND STUD

(12) Note.-- (9) applicable only


GND for metallical Box Console
OPERATOR CONSOLE

HV TANK
GND cable
( yellow/green, AWG #10 )
See Note (8)
(9)

PEDESTAL
(Option)

(10)
(11)

NAME DATE SHEET / OF


DRAWING F. GARCIA 30/06/04
I/F--103
1/1
REVISED A. DIAZ 30/06/04 REV

SEDECAL EARTHING DIAGRAM


REV DESCRIPTION ISSUED BY DATE
Interconnection 1.-- For Generator Interface with control relay and externally powered

POWER TS1 X--RAY ROOM


MODULE
47
}
ROOM LIGHT SUP
115 / 220 VAC

48
ROOM LIGHT SW
ROOM
WARNING
LIGHT

Interconnection 2.-- For Generator Interface with control relay and internally powered

POWER TS1
MODULE X--RAY ROOM
115 or 220 VAC SW
*
add jumper
ROOM
47 WARNING
ROOM LIGHT SUP LIGHT
48
ROOM LIGHT SW

0 VAC
(in TS1-3 or TS1-10) *

* Select the power supply on TS1 according to the lamp voltage.


Add jumper to TS1-26 for 220 VAC or to TS1-27 for 115 VAC.

Interconnection 3,-- Additional option to meet some Local Electrical Codes

POWER
MODULE TS1
ROOM LIGHT SUP 47

Contact 7A 1/6HP
125, 250 V AC
3A 30 V DC
48
ROOM LIGHT SW

NAME DATE SHEET / OF


E I/F update F. GARCIA 20/06/04 DRAWING F. GARCIA 04/19/95
I/F--008
1/1
D I/F update F. GARCIA 02/02/02 REVISED A. DIAZ 04/19/95 E D C B A REV
C I/F changing F. GARCIA 05/05/99
B ROOM WARNING LIGHT INTERFACE
SEDECAL
TS1 changing F. GARCIA 24/05/96
A EMC F. GARCIA 29/03/96 INTERFAZ LAMPARA RAYOS--X SALA
REV DESCRIPTION ISSUED BY DATE
A B C D E

TB1 J1

COMM 1 1 COMM
-12 VDC 2 7 -12 VDC
+12 VDC 3 8 +12 VDC
+24 VDC 4 9 GND
RELAY 4 8 IC1 OUT 5 IC1 OUTPUT
4 RELAY 3 5 FL2-IC1 3 CENTER AREA 4

RELAY 2 6 FL1-IC1 2 LEFT AREA


RELAY 1 7 FL3-IC1 6 RIGHT AREA
+12 VDC +12 VDC +12 VDC +12 VDC -RESET
9 STRT-IC1 4
R6 3K01 R5 1K R12 3K01 R11 1K R7 3K01 R8 1K R1 3K01 R2 1K
GND 10 TP6 TP1 TP2 TP4
RP1 10K RP2 10K RP4 10K RP3 10K RP4 10K RP3 10K RP1 10K RP2 10K +12 VDC
IC4 5 6 6 5 IC1 5 6 6 5 IC2 1 2 2 1 IC3 1 2 2 1

R4 1K 6 R10 1K 9 R9 1K 13 R3 1K 2
7 RP1 10K 8 RP4 10K 14 RP4 10K 1 RP1 10K TP5
5 7 8 10 7 8 12 3 4 3 3 4 GND J2
C8 U1B C10 U1C C9 U1D C7 U1A
J4 100nF LF347 RP2 10K 100nF LF347 RP3 10K 100nF LF347 RP3 10K 100nF LF347 RP2 10K
7 8 7 8 3 4 3 4 COMM
JP12 JP9 JP10 JP11 1
GND 5 7 -12 VDC
B A IC4 OUT B A IC1 OUT B A IC2 OUT B A IC3 OUT
IC4 INPUT 7 8 +12 VDC
-12 VDC
IC1 INPUT 1 9 GND
IC2 OUT
IC2 INPUT 6 5 IC2 OUTPUT
FLD2-IC2
IC3 INPUT 2 3 CENTER AREA
3 3
FLD1-IC2
-FLD 2 DR 8 2 LEFT AREA
FLD3-IC2
-FLD 1 DR 3 6 RIGHT AREA
STRT-IC2
-FLD 3 DR 4 4 -RESET
-STRT DR 9
J3
K10 JP8 K6 JP6 K2 JP14 K15
6 1 6 1 6 1 6 1 1 COMM
A A A
B B B 7 -12 VDC
CR2
1N4148 +12 VDC
FLD2-IC1 FLD2-IC2 FLD2-IC3 8
13 8 13 8 13 8 13 8
C5 C6 GND
9
IC3 OUT
100nF 100uF IC3 OUTPUT
35V 5
FLD2-IC3
K11 JP4 K7 JP2 K3 JP16 K14 CENTER AREA
3
6 1 6 1 6 1 6 1 FLD1-IC3
A A A
2 LEFT AREA
B B B FLD3-IC3
CR3 RIGHT AREA
1N4148 6
FLD1-IC1 FLD1-IC2 FLD1-IC3 STRT-IC3
13 8 13 8 13 8 13 8 4 -RESET
2 2

K12 JP7 K8 JP5 K4 JP15 K13 J5


6 1 6 1 6 1 6 1
A A A
B B B 1 COMM
CR4
1N4148 -12 VDC
FLD3-IC1 FLD3-IC2 FLD3-IC3 7
13 8 13 8 13 8 13 8
TP3 +12 VDC
8
ST GND
9
IC4 OUT
K9 JP3 K5 JP1 K1 JP13 K16 IC4 OUTPUT
R13 5
6 1 6 1 6 1 6 1
A A A
3 CENTER AREA
10K
CR1 B B B
2 LEFT AREA
1N4148
STRT-IC1 STRT-IC2 STRT-IC3
13 8 13 8 13 8 13 8 6 RIGHT AREA

4 -RESET
JUMPERS JP9, JP10, JP11, JP12
+12 VDC
POS. A.- NO OFFSET ADJUSTMENT
POS. B.- OFFSET ADJUSTMENT C1 C3
1 1
4

100nF 100uF
Ion Chamber Jumpers Jumpers Jumpers 35V
U1A
+ Note.- Version 03 as CN 99/45
Type JP3, JP4, JP7, JP8 JP1, JP2, JP5, JP6 JP13, JP14, JP15, JP16
LF347
- NAME DATE SHEET / OF
IC1=IC2=IC3=IC4 B B B DRAWING F. GARCIA 07-07-99 A3263-03
1/1
11

IC1=IC2=IC3 B B A REVISED A. DIAZ 07-07-99 REV

C2 C4
IC1=IC2 B A A
100nF 100uF SEDECAL AEC ADAPTATION
IC1=IC2=IC3=IC4
/ / / A A A -12 VDC 35V
REV DESCRIPTION ISSUED BY DATE
ADAPTACION AEC
A B C D E
A B C D E

4
X-Ray Generator X-Plus LP Plus (Device) 4

Cabinet
DETECTOR ASSEMBLY

ION CHAMBER
PREAMPLIFIER
AEC ADAPTATION Board See Ion Chamber
Documentation

3
ION CHAMBER CABLE (A7659-02) 3
IC PREA

Connector IC could be J1, J2, 1 1


ION CHAMBER
J3or J5 depending on the Ion FLD1 DR (LEFT) (AID INX-247)
2 2
Chamber selected.
FLD2 DR (CENTER)
3 3
IC OUTPUT
5 4
STRT DR (START INTEGRATE)
4 5
FLD3 DR (RIGHT)
6 6
-12 VDC
7 7
+12 VDC
8 8
GND
9 9
Shield

2 2

1 1

NAME DATE SHEET / OF


DRAWING F.GARCIA 30/11/06 IM - 375
REVISED A.DIAZ 03/03/07 1/1 A REV

SEDECAL
X-Plus LP Plus
REV DESCRIPTION ISSUED BY DATE
(AID Ion Chamber Adaptation)
A B C D E
5 4 3 2 1

GENERATOR CABINET
D D

HT CONTROL BOARD
RADIATION METER POWER Radiation meter
CABLE A3356-02 board
J1 ION CHAMBER #1
TUBE 2 SCL (A3170-01) VacuDAP 158 00 13
J1-12 1
P2
Radiation meter cable A7264-XX
+ 24 V
2 9 Ion chamber cable
GND Ion chamber cable
3 1 + 23 V
+

3 GND
-
TS1
2
17

5 IC1
18

1
RxD
2
VacuDAP
C
TxD interface
C

3
cable RS232
4
GND
5

RADIATION METER
CONTROL CABLE
A3355-03 1
J7 P3 RxD
RxD 2 VacuDAP
2 3
TxD interface
TxD 3 cable RS232
3 2
GND 4
5 5
Shield GND
P1 5 ION CHAMBER #2
3 VacuDAP 158 00 13
ATP-Console IC2
2
+ 23 V
5 +
GND
9 -
J8
Ion chamber cable
2 1 Ion chamber cable
B B

3
Radiation meter cable A7264-XX
5

INTERCONNECTION
CABLE A9622-02

J5 (D-TYPE 25 PIN connector)

U-Arm (Control Cabinet)


SERIAL CABLE
System A7067-XX or A3352-XX
Interface
A Panel GENERATOR A

(D-TYPE 25 PIN connector)


NAME DATE SHEET / OF
DRAWING M.A. Glez 21/02/07 A9447-09
1/1
REVISED A.DIAZ 21/02/07 B A REV

B update NC 07/069 M.A. Gonzalez 26/03/07 RADIATION METER for U-ARM 1T


A First release M.A. Gonzalez 21/02/07 SEDECAL (Connection through ATP-Console)
REV DESCRIPTION ISSUED BY DATE
5 4 3 2 1
A B C D E

+23V
P1
5
1 9 1
4
8
3
7
2 P3
6
1 9 5
13 9
4
11 8
3
7
2
8 6
4 1
6

+24V
+24V K1 J1
2 2
1 16
+23V 1
2
P2 3
5
9
4
8 D1 1N4007
3
7
2
6 U1
1 LM317HV
+23V
VOUT VIN

R1 ADJ

3 C1 221 C2 3
10uF R2 10uF
35V 35V
3K83

4 NAME DATE SHEET / OF 4

DRAWING F. Díaz 05/04/00


A3170-01
1/1
REVISED F. Díaz 05/04/00 A REV

A NC 00/166 F. Díaz 18/07/00 SEDECAL RADIATION METER


REV DESCRIPTION ISSUED BY DATE
A B C D E
333 ±20 C4
16476--02
REV 10

177,5 177,5 (6.99”)


GE Healthcare

177,5
APPENDIX A

C2

177,5

)
16471--02

0
--0.4”
C1
14 (0.55”)

(95.76”
0
--10
C3

2432.5
)
0
16474--02

A-1
--0.4”
(116.43”
16473--02

0
--10
2957.5
TORQUE
Ab2 Origen 08/06/07
CEILING SUPPORT HARDWARE

KIT CONTENTS
N. m / Lbf.in REV DESCRIPCION FECHA/DATE
FECHA/DATE REV DESCRIPCION
. 6 NUTS M10 (DIN 982) TOLERANCIAS DE FABRICACION TRATAMIENTO SUP.:
C1 . 6 WASHERS 10.5 (DIN 9021) 30 / 265.5 SIN INDICACION EN EL DIBUJO. DIN 7168 -- m DUREZA:

MATERIAL: PROTECCION SUP.:


. 8 EXPANDING BOLTS M8x60 WITH
C2 WASHERS 8.4 DIN 9021. 25 / 221 FECHA/DATE NOMBRE/NAME ESC./SCALE TITULO/TITLE
(ONLY FOR CONCRETE) DIB./DRAW BY 08/06/07 J.Fernández
1:1 CEILING SUPPORT HARDWARE
. 6 HEX SCREWS M8x25 (DIN 933) 20 / 177 REV./REV. BY ” ” I.Moreno
C3 . 6 WASHERS 8.4 (DIN 9021)
NUMERO DE ARTICULO/DRAWING NO. HOJA/SHEET
. 6 WASHERS 8.4 (AET)
. 20 SPECIAL SHIMS 1/1
C4 ( USED ONLY IF IT IS NECESSARY FOR 15158--02
TO LEVEL THE PART 16476--02).
SEDECAL
Ab2 REV.
5192968--100
Definium 5000 Installation Manual
GE Healthcare Definium 5000 Installation Manual
REV 10 5192968--100

This page intentionally left blank.