CUADRO DE COLUMNAS Y PLACAS DEL BLOQUE 01

TIPO
NIVEL C-04 C-05 C-13 C-03 PL - 01 PL - 02 PL - 03 PL - 11 PL - 12
DIRECCIÓN GENERAL
EJES EJE1/EJE F EJE2/EJE F, EJE3/EJE F EJE 2/ EJE E,EJE 3/ EJE E EJE2/EJE D, EJE 3 / EJED EJE1 / EJE D EJE5 / EJE D EJE5 / EJE F EJE1 / EJE E EJE5 / EJE E
DE INFRAESTRUCTURA
bxt C-04( 0.25x0.50X0.50) C-05(0.25x0.50) C-13(0.25x0.50) C-03 (0.25x0.50) PL-01(0.25X1.25x1.50) PL-02(0.25X1.50x0.50) PL-03 (0.25X1.50x0.50) PL-11(0.25X1.00) PL-12(0.25X0.80)
PRIMER DIRECTOR GENERAL DE INFRAESTRUCTURA:
Ø 14 Ø 5/8" 10 Ø 3/4"+2 Ø 5/8" 12 Ø 5/8" 16 Ø 3/4"+2 Ø 5/8" 40Ø 5/8" 26Ø 5/8" 30Ø 5/8" 18Ø 5/8" 16Ø 5/8"
PISO

2 Ø 3/8" 1@.05, 6@.10, 2@.15 2 Ø 3/8" 1@.05, 6@.10, 2@.15 2 Ø 3/8" 1@.05, 6@.10, 2@.15 2 Ø 3/8" 1@.05, 6@.10, 2@.15
4 Ø 3/8" 1@.05, 6@.10, 2@.15 c/extremo Rto. @ .25 3 Ø 3/8" 1@.05, 6@.10, 2@.15 c/extremo Rto. @ .25 3 Ø 3/8" 1@.05, 6@.10, 2@.15 c/extremo Rto. @ .25
3 Ø 3/8" 1@.05, 6@.10, 2@.15 c/extremo Rto. @ .25 3 Ø 3/8" 1@.05, 6@.10, 2@.15 c/extremo Rto. @ .25
Ing. Juan Carlos Sánchez Lazo
4 Ø 1/2" : 1@.05, c/extremo Rto. @ .20 2 Ø 1/2" : 1@.05, c/extremo Rto. @ .20 2 Ø 1/2" : 1@.05, c/extremo Rto. @ .20
c/extremo Rto. @ .25 c/extremo Rto. @ .25 c/extremo Rto. @ .25 c/extremo Rto. @ .25 2 Ø 1/2" : 1@.05, c/extremo Rto. @ .20 2 Ø 1/2" : 1@.05, c/extremo Rto. @ .15
3 Ø 3/8" 1@.05, c/extremo Rto. @ .20 2 Ø 3/8" 1@.05, c/extremo Rto. @ .20 2 Ø 3/8" 1@.05, c/extremo Rto. @ .20 DIRECTOR DE ESTUDIOS:

Arq. Gabriel Enrique Calderón Ponce

EXPEDE
I NTETÉCNC
I ODELPP
I VA
I BLE

“EXPEDIENTE TÉCNICO "MEJORAMIENTO DE LOS


SERVICIOS POLICIALES DE LA COMISARIA PNP CATACAOS
DISTRITO DE CATACAOS - PROVINCIA DE CATACAOS -
CORTE
DEPARTAMENTO DE CATACAOS"
SC: 1/25
CÓDG
I OSNP
I: 350209

Región: PIURA - Provincia: PIURA - Distrito: CATACAOS

PLANO LLAVE

PROLONG
. AV. CAYET
C-05 C-13 C-03

ANO HERE
bxt C-04 PL-04 C-04 C-04 PL - 11 PL - 12

DIA
SEGUNDO C-03(0.25x0.50)
Ø C -05(0.25x0.50) CL-04(0.25x0.50X50)
PISO C-04 (0.25x0.50X50) C-13(0.25x0.50) C-04(0.25x0.50X50) CL-04(0.25x0.50X50) PL-11(0.25X1.00) PL-12(0.25X0.80)
B-G
14 Ø 5/8" 10 Ø 3/4"+2 Ø 5/8" 12 Ø 5/8" 16 Ø 3/4"+2 Ø 5/8" 24Ø 5/8" 14 Ø 5/8" 14 Ø 5/8" 18Ø 5/8" 16Ø 5/8"
2 Ø 3/8" 1@.05, 5@.10, 2@.15 2 Ø 3/8" 1@.05, 6@.10, 2@.15 3 Ø 3/8" 1@.05, 5@.10, 2@.15 c/extremo Rto. @ .25 2 Ø 3/8" 1@.05, 5@.10, 2@.15 2 Ø 3/8" 1@.05, 5@.10, 2@.15 3 Ø 3/8" 1@.05, 6@.10, 2@.15 c/extremo Rto. @ .25 3 Ø 3/8" 1@.05, 6@.10, 2@.15 c/extremo Rto. @ .25
2 Ø 3/8" 1@.05, 5@.10, 2@.15 2 Ø 3/8" 1@.05, 5@.10, 2@.15 2 Ø 1/2" : 1@.05, c/extremo Rto. @ .20
c/extremo Rto. @ .25 c/extremo Rto. @ .25 c/extremo Rto. @ .25 c/extremo Rto. @ .25 c/extremo Rto. @ .25 c/extremo Rto. @ .25 2 Ø 1/2" : 1@.05, c/extremo Rto. @ .20 2 Ø 1/2" : 1@.05, c/extremo Rto. @ .15
1 Ø 3/8" 1@.05, c/extremo Rto. @ .20

RESPONSABLES DEL PROYECTO:


COORDINADOR DEL PROYECTO:
Arqº YULINA VENEGAS LOPEZ CAP 9595
RESPONSABLE DEL DISEÑO ARQUITECTONICO:
Arqº JOSE TURPO RAMOS CAP 9381
RESPONSABLE DEL DISEÑO ESTRUCTURAL:
Ingº JAIME FLORES QUINCHO CIP 111819
CORTE RESPONSABLE DE INSTALACIONES SANITARIAS
SC: 1/25 Ingº LUIS A. DE LA CRUZ MARTINEZ CIP 137691

RESPONSABLE DE INSTALACIONES ELECTRICAS


Ingº MARCO NIETO HUAYCUCH CIP 117905
RESPONSABLE DE EQUIPAMIENTO
Arqº LILIANA ROSPLIGIOSI ALVAREZ CAP 16756
RESPONSABLE DE SISTEMA DE GAS
Ing° MIGUEL ANGEL SERRANO COSIO CIP 158997
RESPONSABLE DE SEGURIDAD Y SEÑALIZACION
Arqº VERONICA PANDURO RUIZ CAP 16549

EQUIPO TECNICO
Bach. ARQ° ELIZABETH PEREZ ALVAREZ
Bach. ING° MILCA PALACIN GRIJALVA
Bach. Ing. Sanit. JAIME ALEXANDER ROJAS LAZO
CADISTA MARIA SORIANO VILLACORTA

COORDINADOR DEL PROYECTO:

CUADRO DE COLUMNAS Y PLACAS DEL BLOQUE 02


ESPECIALISTA:
TIPO
NIVEL C-08 C-02 PL-04 PL15 PL - 5 PL - 16 C-02 PL - 06 PL-13
EJE 8 / EJEC, EJE 8 / EJEB EJE 11 / EJEC, EJE 11 / EJEB EJE 9/EJE A' ,EJE 11/ EJE A'
EJES EJE 6 / EJEC EJE 13 / EJEC EJE 6 / EJEB EJE 6 / EJEB EJE 12 / EJEA' EJE 9/EJE A
EJE 9/EJE A ,EJE 11/ EJE A, EJE 12/ EJE A
bxt C-08( 0.25x0.50X50) C-02(0.25x0.50) PL-04( 0.25x0.50x1.25) PL-15(0.25x0.50x1.00) CL-05( 0.25X0.50X1.25) PL-16(0.25X0.50X0.75) C-02 (0.25x0.50) PL -06(0.25X0.05x0.75) PL-13(0.25x1.00)
PRIMER
Ø 14 Ø 5/8" 8 Ø 5/8" 28Ø 5/8" 27Ø 5/8" 30Ø 5/8" 24Ø 5/8" 8 Ø 5/8" 10 Ø 5/8"+ 10 Ø 1/2" 8 Ø 5/8" + 6 Ø 1/2"
PISO
3 Ø 3/8" 1@.05, 6@.10, 2@.15 c/ext Rto. @ .25 3 Ø 3/8" 1@.05, 6@.10, 2@.15 c/extremo Rto. @ .25 3 Ø 3/8" 1@.05, 6@.10, 2@.15 2 Ø 3/8" 1@.05, 6@.10, 2@.15 c/extremo Rto. @ .25 2 Ø 3/8" 1@.05, 6@.10, 2@.15 COORDINADOR DE EVALUACIÓN:
2 Ø 3/8" 1@.05, 6@.10, 2@.15 2 Ø 3/8" 1@.05, 6@.10, 2@.15 3 Ø 3/8" 1@.05, 6@.10, 2@.15 c/ext Rto. @ .25 2 Ø 3/8" 1@.05, 6@.10, 2@.15
2 Ø 1/2" : 1@.05, c/extremo Rto. @ .15 2 Ø 1/2" : 1@.05, c/extremo Rto. @ .15 c/extremo Rto. @ .25 2 Ø 3/8" : 1@.05, c/extremo Rto. @ .20 c/extremo Rto. @ .25
c/extremo Rto. @ .25 c/extremo Rto. @ .25 2 Ø 1/2" : 1@.05, c/extremo Rto. @ .15 2 Ø 1/2" : 1@.05, c/extremo Rto. @ .15 c/extremo Rto. @ .25 2 Ø 3/8" : 1@.05, c/extremo Rto. @ .20
1 Ø 3/8" 1@.05, c/extremo Rto. @ .20 1 Ø 3/8" 1@.05, c/extremo Rto. @ .20 1 Ø 3/8" 1@.05, c/extremo Rto. @ .20 2 Ø 3/8" 1@.05, c/extremo Rto. @ .20 1 Ø 3/8" 1@.05, c/extremo Rto. @ .20

EVALUADOR:
CORTE
SC: 1/25

ESPECIALIDAD:

ESTRUCTURA
bxt C-08 C-02 C-08 C-08
SEGUNDO
Ø C-08 (0.25x0.50X50) C-02(0.25x0.50) C-08(0.25x0.50X50) C-08 (0.25x0.50X50)
PISO NOMBRE DEL PLANO:
14 Ø 5/8" 8 Ø 5/8" 14 Ø 5/8" 14 Ø 5/8"
2 Ø 3/8" 1@.05, 7@.10, 2@.15 2 Ø 3/8" 1@.05, 6@.10, 2@.15 2 Ø 3/8" 1@.05, 5@.10, 2@.15 2 Ø 3/8" 1@.05, 7@.10, 2@.15
c/extremo Rto. @ .25 c/extremo Rto. @ .25 c/extremo Rto. @ .25 c/extremo Rto. @ .25
CIMENTACION

CARACTERÍSTICA (S):

CORTE
SC: 1/25 CUADRO DE COLUMNAS Y
PLACAS

LÁMINA:

16005-CIM-3-002

REVISIÓN FECHA ESCALA:


REV 0
REV B 1/25
REV A
CUADRO DE COLUMNAS Y PLACAS DEL BLOQUE 03
TIPO
NIVEL PL - 7 C-02 PL - 8 PL - 9 C-01 C-02 C-19 C-13 C-02
ejes EJE 6 / EJE D EJE 8/EJE D EJE 11 / EJE D EJE 6 / EJE E EJE8/EJE E EJE11/EJE E EJE 6 / EJE G EJE 8 / EJE G EJE11/EJE G

bxt PL-7(0.25X0.50X1.75) C-02(0.25x0.50) PL-8(0.25X1.25X1.75) PL-9(0.25X0.50X1.25) C-01(0.25x0.50) C-02 (0.25x0.50) C-19(0.25x0.50) C-13(0.25x0.50) C-02(0.25x0.50)
PRIMER
Ø 34Ø 5/8" 8 Ø 5/8" 40Ø 5/8" 22 Ø 5/8" 10 Ø 5/8" 8 Ø 5/8" 4 Ø 3/4"+8 Ø 5/8" 12 Ø 5/8" 8 Ø 5/8"
DIRECCIÓN GENERAL
PISO
3 Ø 3/8" 1@.05, 6@.10, 2@.15 c/extremo Rto. @ .25 4 Ø 3/8" 1@.05, 6@.10, 2@.15 c/extremo Rto. @ .25 3 Ø 3/8" 1@.05, 6@.10, 2@.15 c/extremo Rto. @ .25
DE INFRAESTRUCTURA
2 Ø 1/2" : 1@.05, c/extremo Rto. @ .20 2 Ø 3/8" 1@.05, 6@.10, 2@.15 2 Ø 3/8" : 1@.05, c/extremo Rto. @ .20 2 Ø 1/2 : 1@.05, c/extremo Rto. @ .20 2 Ø 3/8" 1@.05, 6@.10, 2@.15 2 Ø 3/8" 1@.05, 6@.10, 2@.15 2 Ø 3/8" 1@.05, c/extremo Rto. 2 Ø 3/8" 1@.05, 6@.10, 2@.15 2 Ø 3/8" 1@.05, 6@.10, 2@.15
c/extremo Rto. @ .25 2 Ø 1/2" : 1@.05, c/extremo Rto. @ .20 c/extremo Rto. @ .25 c/extremo Rto. @ .25 @ .10 c/extremo Rto. @ .25 c/extremo Rto. @ .25 DIRECTOR GENERAL DE INFRAESTRUCTURA:
3 Ø 3/8" 1@.05, c/extremo Rto. @ .20 3 Ø 3/8" 1@.05, c/extremo Rto. @ .20 2 Ø 3/8" 1@.05, c/extremo Rto. @ .20

Ing. Juan Carlos Sánchez Lazo

DIRECTOR DE ESTUDIOS:

Arq. Gabriel Enrique Calderón Ponce


CORTE
Ø 1/2"
SC: 1/25
EXPEDE
I NTETÉCNC
I ODELPP
I VA
I BLE
Ø 3/8"
“EXPEDIENTE TÉCNICO "MEJORAMIENTO DE LOS
SERVICIOS POLICIALES DE LA COMISARIA PNP CATACAOS
DISTRITO DE CATACAOS - PROVINCIA DE CATACAOS -
DEPARTAMENTO DE CATACAOS"

CÓDG
I OSNP
I:
CUADRO DE COLUMNAS BLOQUE 04 350209

Región: PIURA - Provincia: PIURA - Distrito: CATACAOS

TIPO
NIVEL C-16 PL-14
EJE K/EJE 8, EJE K / EJE 11 PLANO LLAVE
EJE M/EJE 8, EJE M / EJE 11
ejes EJE L/EJE 8, EJE L / EJE 11

bxt C-16( 0.25x0.40) PL-14(0.25x0.50)

PROLONG
PRIMER
bxt C-15 C-02 C-01 PL - 9 C-02 C-02 C-19 C-02 C-02 PISO
Ø 6 Ø 5/8" 12 Ø 5/8"

. AV. CAYET
SEGUNDO C-15(0.25x0.50X50) PL-9(0.25X0.50X1.25)
Ø C-02(0.25x0.50) C-01(0.25x0.50) C-02( 0.25x0.50) C-02(0.25x0.50) C-19(0.25x0.50) C-02(0.25x0.50) C-02 (0.25x0.50) 1 Ø 3/8" 1@.05,7@.10, 2@.15
22 Ø 5/8" 1 Ø 3/8" 1@.05, 5@.10, 2@.15

ANO HERE
PISO 12 Ø 5/8"
c/extremo Rto. @ .25
8 Ø 5/8" 10 Ø 5/8" 8 Ø 5/8" 8 Ø 5/8" 4 Ø 3/4"+8 Ø 5/8" 8 Ø 5/8" 8 Ø 5/8" c/extremo Rto. @ .25
3 Ø 3/8" 1@.05, 5@.10, 2@.15 c/extremo Rto. @ .25 4 Ø 3/8" : 1@.05, c/extremo Rto. @ .20

DIA
2 Ø 3/8" 1@.05, 7@.10, 2@.15 2 Ø 3/8" 1@.05, 6@.10, 2@.15 2 Ø 3/8" 1@.05, 5@.10, 2@.15 2 Ø 3/8" 1@.05, 5@.10, 2@.15 2 Ø 3/8" 1@.05, 5@.10, 2@.15 2 Ø 3/8" 1@.05, c/extremo Rto. 2 Ø 3/8" 1@.05, 5@.10, 2@.15 2 Ø 3/8" 1@.05, 5@.10, 2@.15
c/extremo Rto. @ .25 c/extremo Rto. @ .25 c/extremo Rto. @ .25
2 Ø 1/2" : 1@.05, c/extremo Rto. @ .20
c/extremo Rto. @ .25 c/extremo Rto. @ .25 @ .10 c/extremo Rto. @ .25 c/extremo Rto. @ .25
B-G
2 Ø 3/8" 1@.05, c/extremo Rto. @ .20

CORTE
RESPONSABLES DEL PROYECTO:
CORTE SC: 1/25 COORDINADOR DEL PROYECTO:
Arqº YULINA VENEGAS LOPEZ CAP 9595
SC: 1/25
RESPONSABLE DEL DISEÑO ARQUITECTONICO:
Arqº JOSE TURPO RAMOS CAP 9381
RESPONSABLE DEL DISEÑO ESTRUCTURAL:
Ingº JAIME FLORES QUINCHO CIP 111819

RESPONSABLE DE INSTALACIONES SANITARIAS


bxt C-12 C-12 C-12 C-12 C-12' C-12 Ingº LUIS A. DE LA CRUZ MARTINEZ CIP 137691
TERCER
Ø C-12(0.25x0.40) C-12 (0.25x0.40) C-12 (0.25x0.40) C-12( 0.25x0.40) C-12´( 0.25x0.40) C-12(0.25x0.40) RESPONSABLE DE INSTALACIONES ELECTRICAS
PISO
Ingº MARCO NIETO HUAYCUCH CIP 117905
6 Ø 5/8" 6 Ø 5/8" 6 Ø 5/8" 6 Ø 5/8" 8 Ø 5/8" 6 Ø 5/8"
1 Ø 3/8" 1@.05, 4@.10, 2@.15 1 Ø 3/8" 1@.05, 4@.10, 2@.15 1 Ø 3/8" 1@.05, 5@.10, 2@.15 1 Ø 3/8" 1@.05, 4@.10, 2@.15 1 Ø 3/8" 1@.05, 4@.10, 2@.15 1 Ø 3/8" 1@.05, 4@.10, 2@.15 RESPONSABLE DE EQUIPAMIENTO
c/extremo Rto. @ .25 c/extremo Rto. @ .25 c/extremo Rto. @ .25 c/extremo Rto. @ .25 c/extremo Rto. @ .25 c/extremo Rto. @ .25 Arqº LILIANA ROSPLIGIOSI ALVAREZ CAP 16756
RESPONSABLE DE SISTEMA DE GAS
Ing° MIGUEL ANGEL SERRANO COSIO CIP 158997
RESPONSABLE DE SEGURIDAD Y SEÑALIZACION
Arqº VERONICA PANDURO RUIZ CAP 16549

EQUIPO TECNICO
Bach. ARQ° ELIZABETH PEREZ ALVAREZ
CORTE Bach. ING° MILCA PALACIN GRIJALVA
Bach. Ing. Sanit. JAIME ALEXANDER ROJAS LAZO
SC: 1/25 CADISTA MARIA SORIANO VILLACORTA

COORDINADOR DEL PROYECTO:

CUADRO DE COLUMNAS Y PLACAS DEL BLOQUE 03 ESPECIALISTA:

TIPO
NIVEL C-02 C-02 C-14 PL - 10 C-15
ejes EJE6/EJE H, EJE11/EJE H EJE 8/EJE H EJE 6 / EJE J EJE 11 / EJE J
EJE 8 / EJE J
EJE6/EJE I, EJE 11/EJE I EJE 8/EJE I
bxt C-02(0.25x0.50) C-02(0.25x0.50) C-14( 0.25x0.50X50) PL-10(0.25X0.50X1.50) C-15( 0.25x0.50X50)
PRIMER
Ø 8 Ø 5/8" 8 Ø 5/8" 12 Ø 5/8" 3 4Ø 5/8" 12 Ø 5/8"
PISO COORDINADOR DE EVALUACIÓN:
3 Ø 3/8" 1@.05, 6@.10, 2@.15 c/extremo Rto. @ .25
2 Ø 3/8" 1@.05, 6@.10, 2@.15 2 Ø 3/8" 1@.05, 6@.10, 2@.15 2 Ø 3/8" 1@.05, 6@.10, 2@.15 2 Ø 1/2" : 1@.05, c/extremo Rto. @ .15 2 Ø 3/8" 1@.05, 6@.10, 2@.15
c/extremo Rto. @ .25 c/extremo Rto. @ .25 c/extremo Rto. @ .25 3 Ø 3/8" 1@.05, c/extremo Rto. @ .20 c/extremo Rto. @ .25

CUADRO DE COLUMNAS BLOQUE 05 EVALUADOR:

TIPO
CORTE NIVEL C-16 C-16 C-18 PL-14 PL-14
SC: 1/25 ejes EJE O/ EJE 7, EJE O/ EJE 10 EJE N/ EJE 4 EJE N/ EJE 7 EJE O/ EJE 4 EJE N/ EJE 10

bxt C-16 (0.25x0.40) C-16( 0.25x0.40) C-18 (0.25x0.70) PL-14 (0.25x0.50X0.50) PL-14 ( 0.25x0.50x0.50)
PRIMER
Ø 6 Ø 5/8" 6 Ø 5/8" 10 Ø 5/8" 12 Ø 5/8" 12 Ø 5/8"
PISO
1 Ø 3/8" 1@.05,6@.10, 2@.15 1 Ø 3/8" 1@.05,7@.10, 2@.15
1 Ø 3/8" 1@.05, 6@.10, 2@.15 1 Ø 3/8" 1@.05, 7@.10, 2@.15 1 Ø 3/8" 1@.05, 7@.10, 2@.15
c/extremo Rto. @ .25 c/extremo Rto. @ .25 ESPECIALIDAD:
c/extremo Rto. @ .25 c/extremo Rto. @ .25 c/extremo Rto. @ .25
4 Ø 3/8" : 1@.05, c/extremo Rto. @ .20 4 Ø 3/8" : 1@.05, c/extremo Rto. @ .20

ESTRUCTURA
CORTE
SC: 1/25

NOMBRE DEL PLANO:

bxt C-02 C-02 C-02 PL - 10 C-15


SEGUNDO
Ø C-02(0.25x0.50) C-02(0.25x0.50) C-02(0.25x0.50)
PL-10(0.25X0.50X1.50)
34Ø 5/8"
C-15 (0.25x0.50X50) CIMENTACION
PISO 12 Ø 5/8"
8 Ø 5/8" 8 Ø 5/8" 8 Ø 5/8" 3 Ø 3/8" 1@.05, 6@.10, 2@.15 c/extremo Rto. @ .25
2 Ø 3/8" 1@.05, 5@.10, 2@.15 2 Ø 3/8" 1@.05, 6@.10, 2@.15 2 Ø 3/8" 1@.05, 5@.10, 2@.15 2 Ø 3/8" 1@.05, 5@.10, 2@.15
2 Ø 1/2" : 1@.05, c/extremo Rto. @ .15 c/extremo Rto. @ .25
c/extremo Rto. @ .25 c/extremo Rto. @ .25 c/extremo Rto. @ .25 3 Ø 3/8" 1@.05, c/extremo Rto. @ .20 CARACTERÍSTICA (S):

CUADRO DE COLUMNAS Y
PLACAS
CORTE
SC: 1/25 LÁMINA:

16005-CIM-3-003

REVISIÓN FECHA ESCALA:


REV 0
REV B 1/25
REV A
ESPECIFICACIONES TECNICAS
PL-14 C-16 C-16
LOSA DE CIMENTACION e = 0.40 m - Concreto : DIRECCIÓN GENERAL
Solados de 4" : f'c = 100 kg/cm2
Falso piso de 4" : f´c = 140 kg/cm2 - Tipo de Cimentación : Losa de cimentacion
- FACTOR DE ZONA (ZONA2): Z=0.45
DE INFRAESTRUCTURA
Cimniento Corridos : C° 1:10 + 30 % PG - Profundidad mínima de Cimentación : 1.00 mts - 150 mts
Sobrecimientos reforzados : f'c = 175 kg/cm2 - FACTOR DE USO E IMPORTANCIA U = 1.5
- Estrato de Apoyo de la Cimentación : SM ( arena limoso) DIRECTOR GENERAL DE INFRAESTRUCTURA:
BLOQUE 05 Losas de cimentacion : f'c = 210 kg/cm2 - FACTOR DE SUELO (TIPO S3): S=1.1 Tp(s)=1.0 s.
Cisterna y tanque elevado : f'c = 280 kg/cm2 - Capacidad portante del Terreno : 0.61 kg/cm2 - COEFICIENTE DE AMPLIFICACION SISMICA: C = 2.5
Columnas, Placas y vigas : f'c = 210 kg/cm2 - Factor de seguridad por corte :3 Ing. Juan Carlos Sánchez Lazo
Losa aligerada, maciza y escalera : f'c = 210 kg/cm2 - FACTOR DE REDUCCION EN EJE "X" : R = 7
Columentas y vigas de amarre : f'c = 175 kg/cm2 - Agresividad del Suelo : Leve - FACTOR DE REDUCCION EN EJE "Y" : R = 7
- Los pisos y veredas de concreto sobre la subrasante
DIRECTOR DE ESTUDIOS:
- Acero grado 60 - fy = 4200 kg/cm2
- Cemento = Usar cemento Tipo I cimentacion compactada se colocará una capa de Afirmado Granular
- Cemento = Usar cemento Tipo I otros elementos compactado al 98% de la MDS del ensayo del Proctor Arq. Gabriel Enrique Calderón Ponce
estructurales Modificado en un espesor TIPO A2 (Edificación Esencial: Comisaria)
C-16 C-18 PL-14
Cimientos : 7.5 cms
PL-14 NPT= +0.45m PL-14 Sentido X: SISTEMA DUAL
NFC= -1.68m Columnas : 4 cms EXPEDE
I NTETÉCNC
I ODELPP
I VA
I BLE
LOSA DE CIMENTACION e = 0.40 m Columnas de amarre : 2.5 cms Sentido Y: SISTEMA DUAL
Placas : 2.5 cms “EXPEDIENTE TÉCNICO "MEJORAMIENTO DE LOS
Losas de cimentacion : 7.5 cms - Techos con inclinacion mayor al 13° = 50 kg/m2
SERVICIOS POLICIALES DE LA COMISARIA PNP CATACAOS
Vigas principales : 4 cms
PARAMETROS PARA DESPLAZAMIENTO LATERAL DISTRITO DE CATACAOS - PROVINCIA DE CATACAOS -
Losas, vigas chatas, escaleras : 2.5 cms
DEPARTAMENTO DE CATACAOS"
DE ENTRE PISOS: DI/hei < 0.007
Norma E-010 "Madera"
Columnas y vigas de cimentación: 24 horas Norma E-020 "Cargas" CÓDG
I OSNP
I: 350209
BLOQUE 04 Sobrecimientos : 24 horas Norma E-030 "Diseño Sismo-Resistente"
Placas : 24 horas Piso 1 0.0067 0.0052 Región: PIURA - Provincia: PIURA - Distrito: CATACAOS
Fondo de Vigas principales : 21 dias Norma E.050 "Suelos y Cimentaciones"
C-16 Laterales de Vigas principales : 24 horas Norma E-060 "Concreto Armado" Piso 2 0.0064 0.0066
Aligerados : 21 dias
Norma E.070 "Albañilería"
REGLAMENTO NACIONAL DE EDIFICACIONES (RNE-2012) PLANO LLAVE
C-16 Se tendra especial cuidado con el curado de los
elementos estructurales recomendandose usar
Curador Quimico Menbranil Tipo A + agua
LOSA DE CIMENTACION e = 0.40 m

PROLONG
C-16
C-16

. AV. CAYET
ANO HERE
PL-10 C-15
C-14

DIA
B-G
- FACTOR DE ZONA (ZONA2): Z=0.45 - FACTOR DE ZONA (ZONA2): Z=0.45 - FACTOR DE ZONA (ZONA2): Z=0.45
- FACTOR DE USO E IMPORTANCIA U = 1.5 - FACTOR DE USO E IMPORTANCIA U = 1.5 - FACTOR DE USO E IMPORTANCIA U = 1.5
- FACTOR DE SUELO (TIPO S3): S=1.1 Tp(s)=1.0 s. - FACTOR DE SUELO (TIPO S3): S=1.1 Tp(s)=1.0 s. - FACTOR DE SUELO (TIPO S3): S=1.1 Tp(s)=1.0 s.
NPT= +0.45m - COEFICIENTE DE AMPLIFICACION SISMICA: C = 2.5 - COEFICIENTE DE AMPLIFICACION SISMICA: C = 2.5 - COEFICIENTE DE AMPLIFICACION SISMICA: C = 2.5
NFC= -1.68m - FACTOR DE REDUCCION EN EJE "X" : R = 7 - FACTOR DE REDUCCION EN EJE "X" : R = 7 - FACTOR DE REDUCCION EN EJE "X" : R = 7
DROP e =0.65 m - FACTOR DE REDUCCION EN EJE "Y" : R = 7 - FACTOR DE REDUCCION EN EJE "Y" : R = 7 - FACTOR DE REDUCCION EN EJE "Y" : R = 7 RESPONSABLES DEL PROYECTO:
COORDINADOR DEL PROYECTO:
C-02 NPT= +0.45m C-02 TIPO A2 (Edificación Esencial: Comisaria) Arqº YULINA VENEGAS LOPEZ CAP 9595
NFC= -1.68m
TIPO A2 (Edificación Esencial: Comisaria) TIPO A2 (Edificación Esencial: Comisaria) RESPONSABLE DEL DISEÑO ARQUITECTONICO:
C-02 Arqº JOSE TURPO RAMOS CAP 9381
Sentido X: SISTEMA DUAL
RESPONSABLE DEL DISEÑO ESTRUCTURAL:
Sentido Y: SISTEMA DUAL Sentido X: SISTEMA DUAL Sentido X: SISTEMA DUAL Ingº JAIME FLORES QUINCHO CIP 111819
Sentido Y: SISTEMA DUAL Sentido Y: SISTEMA DUAL
RESPONSABLE DE INSTALACIONES SANITARIAS
PARAMETROS PARA DESPLAZAMIENTO LATERAL Ingº LUIS A. DE LA CRUZ MARTINEZ CIP 137691
DROP e =0.65 m

C-02 C-02 C-02


DE ENTRE PISOS: DI/hei < 0.007
PARAMETROS PARA DESPLAZAMIENTO LATERAL PARAMETROS PARA DESPLAZAMIENTO LATERAL
RESPONSABLE DE INSTALACIONES ELECTRICAS
Ingº MARCO NIETO HUAYCUCH CIP 117905
DE ENTRE PISOS: DI/hei < 0.007 DE ENTRE PISOS: DI/hei < 0.007 RESPONSABLE DE EQUIPAMIENTO
BLOQUE 2 - 1
Piso 1 0.0046 0.0060 Arqº LILIANA ROSPLIGIOSI ALVAREZ CAP 16756
Piso 2 0.0007 0.0015 RESPONSABLE DE SISTEMA DE GAS
Piso 1 0.0033 0.0063 Piso 1 0.0012 0.0033 Ing° MIGUEL ANGEL SERRANO COSIO CIP 158997
BLOQUE 2 - 2 Piso 2 0.0025 0.0014
BLOQUE 03 NPT= +0.45m
0.0048 RESPONSABLE DE SEGURIDAD Y SEÑALIZACION
NFC= -1.68m Piso 1 0.0030
Piso 3 0.0022 0.0013
Arqº VERONICA PANDURO RUIZ CAP 16549

EQUIPO TECNICO
Bach. ARQ° ELIZABETH PEREZ ALVAREZ
DROP e =0.65 m Bach. ING° MILCA PALACIN GRIJALVA
DROP e =0.65 m Bach. Ing. Sanit. JAIME ALEXANDER ROJAS LAZO
CADISTA MARIA SORIANO VILLACORTA
C-19 C-13 C-02
LOSA DE CIMENTACION e = 0.40 m
C-04 C-05 C-05 PL-03 NPT= +0.45m
NFC= -1.68m
COORDINADOR DEL PROYECTO:
- FACTOR DE ZONA (ZONA2): Z=0.45
- FACTOR DE USO E IMPORTANCIA U = 1.5
LOSA DE CIMENTACION e = 0.40 m - FACTOR DE SUELO (TIPO S3): S=1.1 Tp(s)=1.0 s. NPT + 0.45
- COEFICIENTE DE AMPLIFICACION SISMICA: C = 2.5 NFP + 0.40 NFP + 0.40 NPT + 0.45
- FACTOR DE REDUCCION EN EJE "X" : R = 7
- FACTOR DE REDUCCION EN EJE "Y" : R = 7 AFIRMADO AFIRMADO

RELLENO CON MATERAIL DE PRESTAMO COMPACTADO NTN RELLENO CON MATERAIL DE PRESTAMO COMPACTADO NTN
DROP e =0.65 m DROP e =0.65 m
DROP e =0.65 m
AL 95% DE MDS DEL ENSAYO DE PROCTOR MODIFICADO
ESPECIALISTA:
AL 95% DE MDS DEL ENSAYO DE PROCTOR MODIFICADO
BLOQUE 01 C-01
TIPO A2 (Edificación Esencial: Comisaria)
CORTE DE TERRENO Y RELLENO CON MATERIAL DE PRESTAMO CORTE DE TERRENO Y RELLENO CON MATERIAL DE PRESTAMO
NPT= +0.45m COMPACTADO AL 95% DE MDS DEL ENSAYO DE PROCTOR MODIFICADO COMPACTADO AL 95% DE MDS DEL ENSAYO DE PROCTOR MODIFICADO
NFC= -1.68m C-13 C-13 PL-12 PL-9 C-02
PL-11 Sentido X: SISTEMA DUAL Ø 5/8"@0.25 Ø 5/8"@0.125
DROP e =0.65 m
Sentido Y: SISTEMA DUAL

NFLC - 1.68 NFLC - 1.68


NPT= +0.45m COORDINADOR DE EVALUACIÓN:
NFC= -1.68m NPT= +0.45m PARAMETROS PARA DESPLAZAMIENTO LATERAL
Ø 5/8"@0.25
NFC= -1.68m DE ENTRE PISOS: DI/hei < 0.007 CORTE DE TERRENO Y RELLENO CON MATERIAL DE PRESTAMO CORTE DE TERRENO Y RELLENO CON MATERAIL DE PRESTAMO
COMPACTADO AL 98% DE MDS DEL ENSAYO DE PROCTOR MODIFICADO COMPACTADO AL 98% DE MDS DEL ENSAYO DE PROCTOR MODIFICADO

LOSA DE CIMENTACION E=0.40M LOSA DE CIMENTACION (REFORZADO)


Piso 1 0.0009 0.002 SUP/INF SUP/INF

DROP e =0.65 m
LOSA DE CIMENTACION e = 0.40 m
DROP e =0.65 m EVALUADOR:
DROP e =0.65 m
PL-02 PL-07 C-02 PL-08
PL-01 PL-15
C-03 C-03 NPT= +0.45m C-08 PL-04
NFC= -1.68m C-02
LOSA DE CIMENTACION e = 0.40 m

ESPECIALIDAD:

BLOQUE 02 NPT + 0.45

AFIRMADO
sobrecimiento f'c 175 kg/cm2

NPT + 0.45
sobrecimiento
f'c 175 kg/cm2
Ø 3/8"@0.20
ESTRUCTURA
NTN
RELLENO CON MATERAIL DE PRESTAMO COMPACTADO
NPT + 0.15
AL 95% DE MDS DEL ENSAYO DE PROCTOR MODIFICADO Afirmado

CORTE DE TERRENO Y RELLENO CON MATERIAL DE PRESTAMO NOMBRE DEL PLANO:


DROP e =0.65 m COMPACTADO AL 95% DE MDS DEL ENSAYO DE PROCTOR MODIFICADO Ø 3/8"@0.20
Afirmado
DROP e =0.65 m
NPT= +0.45m PL-16
NFC= -1.68m PL-04 Ø 5/8"@0.125 Ø 3/8"@0.20 Afirmado
Ø 5/8"@0.25

PL-05 C-02 C-02


Ø 5/8"@0.25
CIMENTACION
C-02 PL-06 NFLC - 1.68 NFLC - 1.68 Ø 5/8"@0.25
NFLC - 1.68 Ø 5/8"@0.125
NFC -1.93
Ø 5/8"@0.25 Ø 5/8"@0.25
CORTE DE TERRENO Y RELLENO CON MATERIAL DE PRESTAMO CARACTERÍSTICA (S):
COMPACTADO AL 98% DE MDS DEL ENSAYO DE PROCTOR MODIFICADO
Ø 5/8"@0.25M

CORTE DE TERRENO Y RELLENO CON MATERIAL DE PRESTAMO


CAMBIO DE ALTURA DE LOSA DE CIMENTACION E= 0.65 M
COMPACTADO AL 98% DE MDS DEL ENSAYO DE PROCTOR MODIFICADO
PLANTA Y DETALLES
DROP E= 0.65 M DETALLE TIPICO
SOBRECIMIENTO DE 0.15 M Y 0.25 M
C-02
LOSA DE CIMENTACION e = 0.40 m
LÁMINA:
NPT= +0.45m
PL-13 C-02 NFC= -1.68m
16005-CIM-3-001

REVISIÓN FECHA ESCALA:


REV 0
REV B INDICADA
REV A