Professional Documents
Culture Documents
Any achievement big or small should have a catalyst and a costant encouragement and
advice of valuable and noble minds for our efforts to bring out this seminar work .
The satisfaction that accompanies the successful culmination of any task would be
incomplete without mentioning those who made it possible because success is the
epitome of hard work determination concentration and dedication.
In our society guru is the most important person who educates us about the various facts
of life. Hence we would like to express our deep sense gratitude to our beloved and
respected principal Dr. KUPPAGAL VEERESH who is the source of information for
all the students and who has encouraged us in whatever way that he can do best.
We are greatly indebted to our seminar guide Asst.prof.ADANA GOUDA and co-
ordinator Asst.Prof. PUSHPA LATHA for the help understanding the concept of the
seminar and their effort for all round growth and development of an individual.
SHIVAKUMAR
3vc15CV100
ABSTRACT
This report is aimed on the technical seminar on “Construction features of BTPS, Power
generation and total quantity of fly ash generated and their uses in BALLARI . “A
generating station which converts heat generated from the coal combustion into electrical
energy with the help of turbines is known a thermal power station”. Ballari power plant is
a coal based power plant, the power is generated in three units of capacity two of 500 mw
and one of 700 mw. Ballari power plant is owned by KPCL government of Karnataka,
BTPS is is constructed in 1850 acres having 550 employs. the coal is supplied from
western mines located in Nagpur and Chhattisgarh by a private companies. The water is
supplied to BTPS from Maralihalli, Dhanapur village, Gangavati taluk , koppal dist.
Length of pipe line is 43km Diameter of the pipe is 1.5mt, the raw water pond having a
capacity of 0.5 tmc. To generate 500 mw of power it consumes 320 tones of coal per
hour, it consumes 7680 tones of coal per day. The ash produced from coal burning is
handled in two ways wet and fly ash. The ash is generally used for manufacturing of
cement and brick in ballari. Currently only two units of 500 mw are generating the
power, the third unit was stopped due to lack of coal.
CONTENTS
SL NO CHAPTER PAGE NO
1 Introduction 1
1.1 Definition 2
2 Introductory Overview 3
2.1 Components 4
3 Features 5
4 Construction Details 7
8 Conclusion 23
LIST OF TABLES
SERIAL PAGE
DESCRIPTION NO.
NO.
Date of commencing 1
1.
LIST OF PLATES
SERIAL PAGE
DESCRIPTION NO.
NO.
BTPS Ballari
1. 7
1. Block Diagram
2
3. Ash Handling 18
CO305.1 Identify and explain about power generation and Remembering &
construction details of BTPS BALLARI. Understanding
(L1,L2)
CO305.2 Describe and explain about the working nature of power Remembering &
generation. Understanding
(L1,L2)
CO305.3 Investigate and Explain about generation of the Fly ash Remembering,
in BTPS and their uses. analyze &
Understanding
(L1,L2,L4)
CO305.4 Justify and validate a presentable report. Analyse,
Evaluate, create
(L4,L5,L6)