QUOTATION FOR ANDHERI RESIDENCE

Sr No Description
A) DEMOLITION WORK
1 Dismantling of Gypsum ceiling and carting away the debris from site.
2 Trucks for debris
3 Removing of existing furniture and carting away the debris from site.

B) CIVIL WORK
1 Polishing of existing white marble and also covering it with plastic.

C) CARPENTRY WORK

1 Providing and fixing of main door outside plywood panelling finish with approved laminate with
necessary hardware finish.

3 Removing of existing door laminate and fixing of new approved laminate from both side with
necessary hardware changes. ( 4 nos of door and outside shoe rack )

4 Providing and fixing of 25mm thk toilet door with both side approved laminate finish and
necessary hardware fittings. ( New Door )

5 Providing and fixing of T V Unit back panelling with plwood framing of 19mm thk and 12mm thk
ply fixed on it with approved laminate finish as per approved design.
6 Providing and fixing of T V Unit made up of approved laminate as per design approved.

9 Providing and supplying approved fabric 3 seater sofa with 4 nos of puffy as per complete
satisfaction.
10 Supplying of centre table with side tables
11 Making of approved design book shelf
12 Providing and fixing of pelmet for window as per drawings

13 Removing of existing kitchen shutters and replacing it with new approved korean laminate with
necessary hardware fittings.
14 Supply of stainless steel trolleys of 304 grade .

16 Removing of existing laminate of bed and fixing it with new approved laminate with necessary
hardware finish and french polish from inside. ( 2 nos of Bed )

17 Providing and fixing of full hieght wardrobe finish with approved laminate and necessary
hardware fittings.
18 Loft
Removing of existing wardrobe laminate and fixing it with new approved laminate with necessary
hardware changes.
19 Dressing table in bedroom
20 Approved design shoerack for dad , pooja table and writing table.

D) POP WORK
1 Providing and fixing of 12m thk GYPROC board gypsum ceiling with approved design and all joints
to be sealed with jointing tape complete as per satisfaction.

F) AIRCONDITIONING WORK

1 AC copper piping fixing for 1 nos of Ac with M S stand and fixing of AC with one year
maintainence free of AC from our side as per complete satisfaction.

G) PAINTING WORK
1 Providing and applying royalle paint for wall and ceiling of asian paint or ici delux make.

H) ELECTRICAL WORK

1 Removing of existing wiring and making it temporary arrangement for site work progress and
fixing of new poly cab wiring with GM brand switches as per approved drawings.

F) FURNISHING WORK
1 Approved fabric track curtains as per complete satisfaction.

TOTAL AMOUNT
ENCE
Unit Rate Quantity Amount

Sqft 25 350 8750 18750


Nos 6500 1 6500
L.S. 3500 1 3500
18750 Done

Sqft 50 825 41250


41250 Done

Sqft 375 35 13125 Done

Sqft 435 105 45675 Done

Sqft 855 30 25650 Done

Sqft 465 105 48825 Done


L.S. 16500 1 16500 Done

L.S. 57500 1 57500 Done


Nos 14500 1 14500 Done
L.S. 9500 1 9500 Done
Sqft 275 60 16500 Done

Sqft 415 95 39425 Done


Kgs 375 85 31875 Done

Sqft 535 72 38520 Done

Sqft 1250 84 105000 Done


Sqft 1150 16 18400 done

Sqft 625 110 68750 done


Nos 9500 1 9500 done
L.S. 24500 1 24500 done
583745
Sqft 75 150 11250 done

L.S. 9500 1 9500 Done

Sqft 35 2950 103250


103250

Sqft 150 650 97500 done

Sqft 375 165 61875 done


61875

927120