SCOPE OF WORK

Fabricated and Replacement Bull Nose ,Roof & Casing Cooler


NR.473-GQ1

Pada cooler NAR1 sisi bullnose dan roof cooler mengalami kerusakan, steel structure yang di tutup castable
sudah mengalami deformasi dan aus. Pada saat OH NAR1 Me 2011, kita berencana untuk mengganti steel
structure bull nose dan roof (see drawing)

Holcim supply: Supervision & Quality Control & Drawing


Material untuk fabrication dan installation bull nose :
1. Hot Face Castable Lining : SHIRACRETE 80TSR 9750/8550 kgs
2. Back Up Insulating Castable Lining : SHIRALITE 125XW or SHIRALITE 140MW 1400/700 kgs
3. Stainless Steel Fibers : 2.5% Mn, Grade 446 280/240 kgs
MELT EXTRACT FIBRES 446/25 NET 10 kg Ref 1099
4. Main Metallic Anchor : Double Y, Double Stem metallic Anchor 124 pcs
12 mm dia, 400 mm length , Grade 310 124 pcs
5. Back Up Metallic Anchor : V Type, Grade 310 100 pcs
6. Welding Rod Grade (for Anchor) : Grade 309 (SUS309)
7. I BEAM : 300 x 150 x 10 x 12 x 4.700 2 eah
Disupply dalam bentuk casting dengan panjang 940 mm
Plate buat rib : 60 x 280 x 10 t dari casting dipotong2 80 eah
8. Channel : 350 , 100 x 10 x 12 x 4.700 2 eah
9. H BEAM : 100 x 100 x 6 x 8 x 480 mm 19 eah
100 x 100 x 6 x 8 x 420 mm 19 eah
100 x 100 x 6 x 8 x 390 mm 19 eah
100 x 100 x 6 x 8 x 320 mm 10 eah
10. PLATE : 4’ x 8’ x 3 t A36 8 sheet
11. PLATE : 600 x 600 x 10 t (casting) 8 sheet
12. Blower V = 3 m/s : 2 eah
Plate 4’ x 8’ x 3,2 t untuk pembuatan ducting 10 eah
13. Wall seat 450 (drawing menyusul) 28 eah
14. Ceramic paper 3x1000x30000mm 1 sh
15. Ceramic Blanket 25x600x7200mm 1 sh
16. Water Glass 4 kg
17. Plate 3mmx4’x8ft 8 eah
18. Multyplex 9 mm 10 eah
19. Compressor/Plant air

Material untuk installation casing Selatan Cooler


1. Plate 4’ x 8’ x 10 t A36 untuk casing coler sebelah Selatan 6 sheet
2. H Beam 150 x 150 SS41 untuk struktur casing cooler sebelah Selatan 5 Eah
3. Anchor 450 Eah
Material untuk fabrication dan installation manhole
1. 1 Lot

Material untuk secondary air duct


1. Plate 4’ x 8’ x t 10 (casting) 5 sheet
Disupply dalam bentuk casting 600 x 600 x 10t (38 eah)
2. Plate 4’ x 8’ x t 10 A36 3 sheet
3. Anchor 600 Eah

Material untuk installation roof


1.I BEAM/WF 300 x 150 x 10 x 12 x 4700 13 Eah 166.15 kg x 12 = 1993.8 kg
Disupply dalam bentuk casting panjang 940
Sebanyask 65 Eah
2.H Beam 100 x 100 x 300 22 Eah 5 kg x 22 = 110 kg
100 x 100 x 320 34 Eah 5,5 kg x 34 = 242 kg
100 x 100 x 390 3 Eah 6,5 kg x 3 = 143 kg
100 x 100 x 420 3 Eah 7 kg x 3 = 154 kg
100 x 100 x 480 17 Eah 8 kg x 17 = 288 kg
3.Plate 10 x 600 x 600 38 Eah 15 kg x 38 = 720 kg
4.Angle 100 x 100 x 940 3 Eah kg x3 =
Disupply dalam bentuk casting panjang 940
Sebanyak 15 eah
5.Anchor 450 Eah

Contractor supply : Man power & supervision


Consumable parts (Oxygen acetylene)
Tools untuk fabrication Dismantle dan installation spt cutting plasma ,
Welding, cutting, lever block chain block dll
Bolt stainless untuk joint 52 Eah
Schafolding
Electrode NSN 310 & 7018 & 309
Job Safety analysis
Safety equipment
Time Schedule
Transportation
Scope Of Work :

1. Satukan I BEAM 300 x 150 x 940 length, CHANNEL 350 x 100 x 940 dari 6 pcs dilas di beri gusset dan
di bor dan di beri bolt stainless (4eah) di setiap joint
I Beam jumlahnya 65 batang dijadikan 13 batang ( 2 buah dari 13 dikasih stiffener dengan jarak 250mm)
CHANNEL 350 x 199 x 940 lenght jumlahnya 6 batang dijadikan 1 batang dikasih stiffener dgn jarak 250
mm
2. Fabrication man hole
3. Bongkar Castable di Bullnose, dinding selatan dan strukturnya, roof, secondary air duct take off (HOLCIM)
4. Dismantling dan instlaation bullnose sbb :

4.1. Pasang I beam no 5 dan Channel no 4 yang sudah di pasangi stiffener no7

4.2. Pasang H beam 100x100 item no 6


4.3. Pasang anchor AN 17 YD2X dan AN 10 YDX no 2 dan pasang wall seat no1
4.4. Pasang V anchor AN 01 no3
4.5. Pasang Begisting di daerah L diantara Wall seat, cor castable

4.6. Spray castable setebal 100 mm dengan castable SHIRALITE 125 XW or 140MW
Pasang Begisting di atas L, cor castable setebal 350 mm
5. Dismantling dan installation Casing Selatan Cooler, terlebih dahulu dismantling manhole, 2 sock
blower berikut
Accesoriesnya, 2 man hole kecil, 2 pock hole untuk bracket sock blower bila ingin di pindah posisi
nya.
6. Dismantling dan installation dinding tertiary air duct dengan menggunakan :
1. Plate 600 x 600 x t 10 (casting) 38 Eah
2. Plate 4’ x 8’ x t 10 A36 Eah
7. Dismantle dan installation roof