PILE CAPACITY CALCULATION

DECODE BD

Sl No of Bore
Dia of Pile= 20 in 1
Hole:
F.S. = 3

Total
Allowable End
Corrected Surface Allowable Skin Allowable Cum Skin
Cum S.P.T. Average Bearing
Depth S.P.T. Value, Area in Friction, Qa = Skin Friction,
Depth Value S.P.T. Capacity, Qa =
N-(N-15)/2 Pile (sft) 0.02N/F.S. (Tsf) Friction, (Ton)
4N/F.S.
(Ton)
0 0 0 0 0 0 0.000 0.00 0.00 0.00
5 5 2 2 1 26.18 0.007 0.17 0.17 5.82
5 10 5 5 3.5 26.18 0.023 0.61 0.79 14.54
5 15 9 9 7 26.18 0.047 1.22 2.01 26.18
5 20 11 11 10 26.18 0.067 1.75 3.75 32.00
5 25 15 15 13 26.18 0.087 2.27 6.02 43.63
5 30 9 9 12 26.18 0.080 2.09 8.12 26.18
5 35 6 6 7.5 26.18 0.050 1.31 9.42 17.45
5 40 7 7 6.5 26.18 0.043 1.13 10.56 20.36
5 45 10 10 8.5 26.18 0.057 1.48 12.04 29.09
5 50 10 10 10 26.18 0.067 1.75 13.79 29.09
5 55 26 20.5 15.25 26.18 0.102 2.66 16.45 59.63
5 60 30 22.5 21.5 26.18 0.143 3.75 20.20 65.45
5 65 28 21.5 22 26.18 0.147 3.84 24.04 62.54
5 70 16 15.5 18.5 26.18 0.123 3.23 27.27 45.09
5 75 18 16.5 16 26.18 0.107 2.79 30.06 48.00
5 80 22 18.5 17.5 26.18 0.117 3.05 33.12 53.81
5 85 26 20.5 19.5 26.18 0.130 3.40 36.52 59.63
5 90 20 17.5 19 26.18 0.127 3.32 39.84 50.91
5 95 20 17.5 17.5 26.18 0.117 3.05 42.89 50.91
5 100 24 19.5 18.5 26.18 0.123 3.23 46.12 56.72
Sl No of Bore
Dia of Pile= 20 in 2
Hole:
F.S. = 3

Total
Allowable End
Corrected Surface Allowable Skin Allowable Cum Skin
Cum S.P.T. Average Bearing
Depth S.P.T. Value, Area in Friction, Qa = Skin Friction,
Depth Value S.P.T. Capacity, Qa =
N-(N-15)/2 Pile (sft) 0.02N/F.S. (Tsf) Friction, (Ton)
4N/F.S.
(Ton)

0 0 0 0 0 0 0.000 0.00 0.00 0.00


5 5 2 2 1 26.18 0.007 0.17 0.17 5.82
5 10 3 3 2.5 26.18 0.017 0.44 0.61 8.73
5 15 8 8 5.5 26.18 0.037 0.96 1.57 23.27
5 20 13 13 10.5 26.18 0.070 1.83 3.40 37.82
5 25 14 14 13.5 26.18 0.090 2.36 5.76 40.72
5 30 17 16 15 26.18 0.100 2.62 8.38 46.54
5 35 7 7 11.5 26.18 0.077 2.01 10.38 20.36
5 40 9 9 8 26.18 0.053 1.40 11.78 26.18
5 45 8 8 8.5 26.18 0.057 1.48 13.26 23.27
5 50 30 22.5 15.25 26.18 0.102 2.66 15.93 65.45
5 55 32 23.5 23 26.18 0.153 4.01 19.94 68.36
5 60 35 25 24.25 26.18 0.162 4.23 24.17 72.72
5 65 11 11 18 26.18 0.120 3.14 27.31 32.00
5 70 18 16.5 13.75 26.18 0.092 2.40 29.71 48.00
5 75 20 17.5 17 26.18 0.113 2.97 32.68 50.91
5 80 27 21 19.25 26.18 0.128 3.36 36.04 61.09
5 85 25 20 20.5 26.18 0.137 3.58 39.62 58.18
5 90 15 15 17.5 26.18 0.117 3.05 42.67 43.63
5 95 18 16.5 15.75 26.18 0.105 2.75 45.42 48.00
5 100 25 20 18.25 26.18 0.122 3.19 48.61 58.18
Sl No of Bore
Dia of Pile= 20 in 3
Hole:
F.S. = 3

Total
Allowable End
Corrected Surface Allowable Skin Allowable Cum Skin
Cum S.P.T. Average Bearing
Depth S.P.T. Value, Area in Friction, Qa = Skin Friction,
Depth Value S.P.T. Capacity, Qa =
N-(N-15)/2 Pile (sft) 0.02N/F.S. (Tsf) Friction, (Ton)
4N/F.S.
(Ton)

0 0 0 0 0 0 0.000 0.00 0.00 0.00


5 5 2 2 1 26.18 0.007 0.17 0.17 5.82
5 10 3 3 2.5 26.18 0.017 0.44 0.61 8.73
5 15 10 10 6.5 26.18 0.043 1.13 1.75 29.09
5 20 12 12 11 26.18 0.073 1.92 3.67 34.91
5 25 13 13 12.5 26.18 0.083 2.18 5.85 37.82
5 30 10 10 11.5 26.18 0.077 2.01 7.85 29.09
5 35 7 7 8.5 26.18 0.057 1.48 9.34 20.36
5 40 6 6 6.5 26.18 0.043 1.13 10.47 17.45
5 45 14 14 10 26.18 0.067 1.75 12.22 40.72
5 50 17 16 15 26.18 0.100 2.62 14.84 46.54
5 55 24 19.5 17.75 26.18 0.118 3.10 17.93 56.72
5 60 24 19.5 19.5 26.18 0.130 3.40 21.34 56.72
5 65 18 16.5 18 26.18 0.120 3.14 24.48 48.00
5 70 27 21 18.75 26.18 0.125 3.27 27.75 61.09
5 75 27 21 21 26.18 0.140 3.67 31.42 61.09
5 80 47 31 26 26.18 0.173 4.54 35.95 90.18
5 85 27 21 26 26.18 0.173 4.54 40.49 61.09
5 90 15 15 18 26.18 0.120 3.14 43.63 43.63
5 95 20 17.5 16.25 26.18 0.108 2.84 46.47 50.91
5 100 29 22 19.75 26.18 0.132 3.45 49.92 64.00
PACITY CALCULATION
DECODE BD

Allowable
working
Load (Ton)

0
4
11
21
27
37
26
20
23
31
32
57
64
65
54
59
65
72
68
70
77
Allowable
working
Load (Ton)

0
4
7
19
31
35
41
23
28
27
61
66
73
44
58
63
73
73
65
70
80
Allowable
working
Load (Ton)

0
4
7
23
29
33
28
22
21
40
46
56
59
54
67
69
95
76
65
73
85