You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13

A A

N
B B

C C

W 390288
N: 163975
CL ELEV:40790

D D

[1]
E E

F F
]
[2

G G
REFERENCIAS REVISIONES

FECHA DESCRIPCION
1.- 2016-957-P-P100-001 - PLOT PLAN GENERAL ARRANGEMENT
2.- 2016-957-P-P200-001 - KEY PLAN AREAS DIVISIONS A 26-12-2016 FOR CLIENT REVIEW YPV FSV
3.- 2016-957-P-P300-XXX - PIPING LAYOUT AREA XXX
4.- 100-12-T-PI-2XX - P&ID XXX
5.- 100-12-X-XX-XXX - LINE LIST
6.- UOP 9-11-I - EXTERNAL THERMAL INSULATION
7.- 2016-957-P-P600-001 - STANDARD PIPING SUPPORT

DISEÑADO POR
CLIENTE
H H

EP
PETROECUADOR

NOTAS
I

PROYECTO
MANTENIMIENTO Y REPARACION DE TUBERIAS, EQUIPOS Y PLANTAS DE
1.- ALL THE DIMENSIONS AND ELEVATIONS ARE IN MILIMETERS
[TODAS LAS DIMENSIONES ESTAN EN MILIMETROS] DE PROCESO

2.- ALL THE DIMENSIONS MUST BE VERIFIED BEFORE THE FIELD FABRICATION
[TODAS LAS DIMENSIONES DEBEN SER VERIFICADAS EN CAMPO ANTES DE

DESCRIPCION
LA FABRICACION] ISOMETRIC DRAWING (PLANTA PARSON)

3.- SPOOL INDICATED ON HOLD NOT TO BE PREFABRICATED LINE: 16-CR-201-A-IH ST: ST-221
I
[SPOOL INDIACDO EN HOLD NO DEBE SER PREFABRICADO] SPEC: H1A3
4.- FOR THERMAL & PERSONNEL PROTECTION SEE STANDARD SPECIFICATION DIBUJO No. HOJA ESCALA TAMAÑO
UOP 9-11-I 2016-957-P-P400-CR-201 5 DE 5 NA A3 A
[PARA PROTECCION TERMICA Y OERSONAL VER ESPECIFICACION STANDARD
UOP 9-11-I] EMITIDO PARA ESTE PLANO, ASI COMO CUALQUIER DETALLE
PATENTADO O PATENTABLE, CONTENIDO EN EL
REVISIÓN DEBE CONSIDERARSE COMO PROPIEDAD DE EP
PETROECUADOR Y SU UTILIZACION ESTA
APROBADO POR: CONDICIONADA A LA ACEPTACION DEL USUARIO
DE NO REPRODUCIRLO TOTAL O PARCIALMENTE,
FIRMA: NI UTILIZARLO PARA CUALQUIER OTRO FIN QUE
NO SEA ESPECIFICAMENTE AUTORIZADO POR
FECHA: ESCRITO POR EP PETROECUADOR

1 2 3 4 5 6 7 8 9 10 11 12 13

You might also like