Professional Documents
Culture Documents
ASME Sec-V&VIII&
MOCK-UP TEST & Test requirements and actual
3 100% TEMA-R & Approved ASME Sec VIII Div 1 Procedure P R for existing
NDT parameters
Dwg. H for new
Approved drawing
Fabrication and Machining: Approved drawing
4 shape and dimension 100% TEMA-R Insp. Report P W
baffles, Flange & support
plate
Measurement Approved drawing Approved drawing
Machining and drilling of tube
5 Visual 100% TEMA-R TEMA-R Insp. Report P W
sheet
Measurement
Approved drawing
Visual Approved drawing
6 Final inspection of tube sheet 100% TEMA-R Insp. Report P W
Champher
Ligament check
Approved drawing
Approved drawing
7 Inspection of baffles Hole dia. And layout 100% TEMA-R Insp. Report P R
Page 1 of 2
Projection of tube Approved drawing Approved drawing
9 Set-up of tube to tube sheet 100% Insp. Report P H
joint
Expansion: Tube with tube ASME Sec II & Sec VIII Approved drawing
10 As per drawing 3-5 % Insp. Report P W
sheet & welding Approved Dwg.
Dimension
Approved drawing Approved drawing
11 Final dimension/ Visual Surface defects 100% Insp. Report P H
Visual
ASME Sec II A/B/Sec
VIII Approved Approved drawing Insp. Report & SR
12 Tube to Tube sheet joint PWHT after welding & visual 100% P H
drawing Chart
PR/Approved drawing
Pneumatic Test of tube to Approved drawing
13 Leak check 100% TEMA-R ASME SEC Insp. Report P H
Tube sheet joint
VIII
Test guage(02 min),
Test pressure/ temp Approved drawing Approved drawing
14 Hydro test shell side & 100% Insp. Report P/W H
Leakage holding time & ASME Sec VIII Div 1 ASME Sec VIII Div 1
Tube Side
deformation
17 Painting on cooling water side As per P.O 100% Purchased order PO & Approved Drg. Insp. Report P W
Application of corrosion
18 resistant coating Visual 100% PO & Approved Dwg. PO & Approved Drg. Insp. Report P H
(Vapour corrosion inhibitor)
Page 2 of 2