Identification of Environmental
Aspects and Impacts
Initial step in formulating a planto fulfill the
organization’s environmental policy.
Organization’s policy, objectives and targets
should be based on knowledge of environmental
aspects and significant environmental impacts.
*Determinesthe past, current, and potential
impact (positive or negative) of an
organization’s activities on the environment.

1 NNBNAEOS m
Identification of Environmental
Aspects

Identify the environmentalaspects of


activities, products or services that the
company cancontrol and that have
significant environmentalimpact.

NNBNA EOS

Definition: Environmental Aspect

Element of an organization’s activities,


products or services which can
interact with the environment.

Examples: Spills, Chemical release, air


emission, water usage
n

NNBNA EOS
I

Definition: Environmental Impact

Any change to the environment, whether


positive or negative, wholly or
partially resulting from an
organization’s activities, products or
services.

Examples: Stormwater contamination,


air pollution, recycling

NNBNA EOS

Identification of Environmental
Aspects
. Step One

+ Select an activity, product or service


The selected activity should be
large enough for meaningful
examination and small enoughto
be understood.

NNBNA EOS
Identification of Environmental
Aspects
Step Two

+ Identify as many environmentalaspects


as possible associated withthe selected
activity, product or service.

NNBNA EOS m I

Consider in your Analysis

Raw material Finished


product
Exhaust
Ill
Electricity
Waste Water Ill

NNBNA EOS
I
Identification of Environmental
Aspects
Step Three

+ Identify environmental impacts


Identify as many actual andpotential,
positive and negative, environmental
impacts as possible with each
identified aspect.

NNBNA EOS

Example Aspect & Impact Matrix

materials groundwater
kquipment Spills Groundwater
maintenance CFC release Air quality
Construction Topsoil Soil quality
conservation Surface water

NNBNA EOS
I

L
nwmw .-

...............

..................

...................

t
=!.?!?E!? ...........

Environmental Aspects
*Accidental Spillage AS
*AirEmissions AE
*SolidWaste sw
*Energy Consumption EC
*EnvironmentalNoise EN
*Ground Water GW
*Hazardous Waste HW
*OdorEmissions OE
*Process Waste Water Discharge PWW
*Dischargeto Spent Biomass SBM
*OtherProcess Waste OPW
*Water Consumption wc
*Raw Material Consumption RMC
*Stormwater Discharge SD
*Other Environmental Aspect OEA
NNBNA EOS
m
I

Environmental Impacts
*AirQuality - Particulates AQ-P
*Air Quality - Toxic Vapor AQ-TV
*Air Quality - Ozone Depletion AQ-OZ
*Air Quality - Greenhouse Gases AQ-GG
*Excess Noise XN
*Ground Water Quality GWQ
*Soil Quality SQ
*Surface Water Quality SWQ
*Depletion of Landfill Space DLS
*Depletion of Nonrenewable Resources DNR
*Depletion of Renewable Resources DRR
*OtherEnvironmental Impact OEI

I NNBNAEOS d
1

Ratings
Environmental impact during normal or

+
abnormal operation.
Possible control improvements, or there
is a potentialsignificant impact

+ Current controls are acceptable, or


there is nopotential significant
impact

NNBNA EOS
Identification of Environmental
Aspects
Step Four

+ Evaluate significance of environmental


impacts
The significance of each of the
identified impacts can bedifferent for
each organization, considering
environmental & business concerns.

NNBNA EOS

Impact Summary (by Department)


Aspects and Impacts Analysis Grouped by Environmental Impact

.L-r
=?E&.TodC"W

* I-.-
"a"
(De i ""
-*
"c
**-
=--
h
u w

u
0-L.
**""
I
3

NNBNA EOS m
I TI I
Impact Summary (by Impact)

Aspect and Impact Identification


Other Considerations
-
- Who is involved in the process more levels
of organization means morecomprehensive
analysis!
- All new projects, equipment, or process
changes which require an investment
application, equipment change, or
engineering work request
n

NNBNA EOS m
To Summarize

Involve as many levels of organization as


possible
i
Identification of aspects & impacts is
certainly a very time-consuming process!
The data generated from the process is
very valuable.