INDUSTRIE BITOSSI S.p.A.


Via Pietramarina, 53 · 50053 SOVIGLIANA, Vinci (Firenze) Italia
(Società soggetta alla direzione e coordinamento di Colorobbia Holding S.p.A. – Vinci – R.I. Firenze e P.IVA IT-01847510482)

INTERMITTENT WET GRINDING


QUESTIONNAIRE

Customer’s name :
PT. Kedawung Setia Industri Tbk.
Address :
Jl. Mastrip 862 Warugunung Surabaya 60221 - Indonesia

INFORMATION REQUIRED FOR THE MILL-LINING CALCULATIONS

1) Mill diameter inside the metal cylinder :


1. 1140 mm (Dia x Lenght)
2. 1370 mm (Dia x Lenght)

2) Mill length inside the two metal sides :


1. 980 mm
2. 1350 mm

3) Opening’s number and size :


Ø 450 x 300 mm (Length x Width)

4) Ventilation opening diameter :


1. 182 mm
2. 250 mm

Important notice: in case the mill is not a straight side walls mill, pls.send a sketch.

INTERMITTENT WET GRINDING :

1) Mill diameter inside its lining :


1. Ø 1000 mm
2. Ø 1230 mm

2) Mill length inside its lining :


1. 840 mm
2. 1210 mm

3) Type and thickness of present mill-lining :


Stetite Mill Linning Thickness 70 mm

4) Mill rotation speed :


25 rpm and 19 rpm

5) Motor power installed :


3.75 KW and 11 KW

M43/01 Ed. 01 del 24/11/04 Intermittent wet grinding Questionnaire pag. 1/3
6) Present motor’s absorption :
1.5 KW and 2.75 KW

7) Type of product to be ground : frits Pengobes O white single firing O granite O other
O
Enamel Ground Coat

8) Body’s raw material ( kaolin, quartz, clay, feldspar


etc.) : ............................................................
…………………………………………………………
............................................................................................................................................

9) Initial lump or particle size of raw HARD materials :


mm/micron ...............................................
……………………………………………………………………
............................................................................................................................................

10) Initial lump or particle size of raw PLASTIC materials :


mm/micron .......................................
……………………………………………………………………….
............................................................................................................................................

11) Hard material of body % ..............................plastic material of body %........................

12) Average humidity of hard material % .........average humidity of plastic material % ......

13) Average specific weight of dry material :


gr/cm3 ..........................................................................

14) Weight of material charged at the present including humidity :


kg ...............................................

15) Quantity of water in the mill : Lt


50 Lt (untuk Molen 100 Kg), 200 Lt (untuk Molen 400 Kg), 400 Lt (untuk Molen
800 Kg)

16) Weight and type of


fluidifying : .....................................................................................................

17) Specific weight of slurry : gr/cm3............................................or


Kg/Lt ........................................

18) Viscosity of slurry : cpoise ........................ or minute according to Ford cup n.4..........

19) % of final particle size  …………………………………………………………

O10.000 mesh/cm2................................................................................

O 16.000 mesh/cm2...............................................................................

or .................................................................................................................

20) Type of grinding media used at the present :

P high density alumina balls


O high density alumina cylinders
O porcelain
M43/01 Ed. 01 del 24/11/04 Intermittent wet grinding Questionnaire pag. 2/3
O silica pebbles

21) The beginning ball charge was composed by :

Kg 270 size in mm 40

Kg 360 size in mm 50

Kg 270 size in mm 63

Kg ...............................size in mm ...............................................

Kg ...............................size in mm ...............................................

Kg ...............................size in mm ...............................................

22) Total of beginning ball charge :


900 Kg

23) Size of grinding media used to restore the level ball charge :
63

24) Consumption of grinding media used at the present: for each grinding Kg
…..........................................................or for each ton of ground material.........................

25) Present grinding time :


4 Hours

M43/01 Ed. 01 del 24/11/04 Intermittent wet grinding Questionnaire pag. 3/3