You are on page 1of 4

Bd - O : OIL PAINTING

Sr. No. & Item Code


1 Bd-O 1

Unit DESCRIPTION OF ITEMS

Rate for 2010-2011 ( In Rs.) Completed Labour


40.00 9.00

Providing and applying two coats of lead/zinc base oil paint / bituminous paint of approved colour and shade to new wood work and fiber boards including preparing the surface, knotting, scaffolding if necessary, excluding primer coat complete. Spec.No.:Bd.O. 1 Page No. 403 Providing and applying one coat of lead/zinc base oil paint / bituminous paint of approved colour and shade to old wood work previously painted and fiber boards including if necessary scaffolding preparing the surface, excluding primer coat complete. Spec.No.:Bd.O. 2 Page No. 404 Providing and applying two coats of lead/zinc base oil paint/bituminious paint of approved colour and shade to old wood work and fiber boards previously painted including if necessary scaffolding preparing the surface, excluding priming coat complete. Spec.No.: Bd.O. 2 Page No. 404 Providing & applying two coats of lead/zinc base oil paint/bituminious paint of approved colour to new structural steel work and iron work in buildings including scaffolding if necessary, cleaning and preparing the surface (excluding primer coat) Spec. No.: Bd.O. 3 Page No. 404 Providing and applying one coat of alluminium paint of approved make to new structural steel work in building and workshop includng scaffolding if necssary, cleaning and preparing surface ( excluding primer coat) complete. Spec.No.: Bd.O.4 Page No. 405 Providing and applying 2 coats of alluminium paint of approved make to new structural steel work in buildings and workshops including scaffolding if necessary, cleaning and preparing the surface ( excluding primer coat ) complete. Spec.No.: Bd.O. 4. Page No. 405

Sq.M

2 Bd-O 2

Sq.M

21.00

5.00

3 Bd-O 2A

Sq.M

31.00

9.50

4 Bd-O 3

Sq.M

39.30

9.50

5 Bd-O 4

Sq.M

33.15

7.35

6 Bd-O 4A

Sq.M

45.95

12.95

63

Sr. No. & Item Code


7 Bd-O 5

Unit DESCRIPTION OF ITEMS

Rate for 2010-2011 ( In Rs.) Completed Labour


39.90 12.90

Providing and applying two coats of synthetic enamel paint of approved colour to new / old structural steel work and wood work in building, including scaffolding if necessary, cleaning and preparing the surface ( excluding primer coat) complete. Spec. No.: Bd.O. 5 Page No. 405 Providing and applying one coat of flat oil paint of approved colour to the old structural steel work and iron work previously painted in building including scaffolding, if necessary, cleaning and preparing surface ( excluding primer coat) complete. Spec. No.: Bd.O. 6 Page No. 406 Providing and applying 2 coats of flat oil paint of approved colour to the old structural steel work and iron work previously painted in building including scaffolding, if necessary, cleaning the preparing the surface ( excluding primer coat.) complete. Spec. No.: Bd.O. 6 Page No. 406

Sq.M

8 Bd-O 6

Sq.M

24.20

7.50

9 Bd-O 6A

Sq.M

34.00

12.90

10 Bd-O 7

Providing and applying one coat of flat oil paint of approved colour and shade to internal / external plastered surfaces including scaffolding if necessary, cleaning and preparing the surface ( excluding primer coat) complete. Spec.No.: Bd.O. 7. Page No. 406 Providing and applying 2 coats of flat oil paint of approved colour and shade to internal/external plastered surfaces including scaffolding if necessary, cleaning and preparing the surfae ( excluding primer coat) complete. Spec. No.: Bd.O. 7 Page No. 406 Providing and applying two coats of water proof cement paint of approved manufacture and of approved colour to the plastered surfaces including scaffolding if necessary cleaning and preparing the surfaces, watering for two days complete. Spec.No.: Bd.O. 8 Page No. 406

Sq.M

23.10

7.50

11 Bd-O 7A

Sq.M

36.30

12.90

12 Bd-O 8

Sq.M

29.00

13.45

64

Sr. No. & Item Code


13 Bd-O 8B2

Unit DESCRIPTION OF ITEMS

Rate for 2010-2011 ( In Rs.) Completed Labour


5.30 3.55

Removing old paint from steel and other metal surface and making the surfaces even with hand scrapping, scaffolding etc. complete. Spec. No.: As directed by Engineer in charge Providing and applying priming coat over new wood and wood based surfaces, including preparing the surface by thoroughly cleaning oil, grease, dirt and other foreign matter, sand papering and knotting, scaffolding etc. complete. Spec.No.: As directed by Engineer in charge. Providing and applying priming coat over new/old steel and other metal surfaces including preparing the surface by throughly cleaning oil, grease, dirt and other foreign matter and scoured with wire brushes, fine steel wool, scrappers and sand paper, scaffolding etc. complete. Spec. No.: As directed by Engineer in charge. Providing and applying priming coat concrete/ masonary/Asbestos Cement plasterd surfaces including scaffolding if necessary, preparing the surface by throughly cleaning oil, grease, dirt and other foreign matter and sand papering as required. Spec. No.: As directed by Engineer in charge. Providing and applying one coat of seal cement primer of approved manufacture and shed including scaffolding preparing the surface by cleaning dirt and other foregin matters, scrapping if necessary including scaffolding etc. complete. Spec. No.: As directed by Engineer in charge.

Sq.M

14 Bd-O 8C

Sq.M

12.70

4.00

15 Bd-O 8D

Sq.M

11.70

4.00

16 Bd-O 8E

Sq.M

11.70

4.00

17 Bd-O 8F

Sq.M

7.00

4.00

65

Sr. No. & Item Code

Unit DESCRIPTION OF ITEMS


NEW ITEMS

Rate for 2010-2011 ( In Rs.) Completed Labour

18 Bd-O

Providing and applying pearl/luster finish paint of approved colour and shade to the existing plastered surface including scaffolding, preparing the surface, applying primer and the acrylic wall putti etc. complete. Spec. No. : As directed by Engineer in charge. Providing and applying two coats of textured synthetic paint of approved shade and quality and one coat of primer before applying textured paint including scaffolding if neccessary preparing surface by thoroughly cleaning oil, grease, dirt and other materials as required, etc. complete Spec. No.: As directed by engineer in charge. Note: Prior approval of Superintending Engineer will be necessary for Item Nos. 18 & 19.

Sq.M

150.00

64.00

19 Bd-O

Sq.M

90.00

15.00

66

You might also like