REDWOOD CONSULTING, LLC

TABLE 1: P&ID CHECKLIST


1. Title Block
a. b. c. d. e. f. a. b. c. d. Drawing number, Project number, sequence and revision numbers Project title Plant Reference Engineer of Record name and account number Approved drawing border Authorization initials/dates in accordance with Project Execution Plan Equipment laid out to process flow Equipment is shown in relative sizes Equipment is shown in relative elevation Package limits are delineated

2. P&ID Layout

3. Vessel/Tank Information
a. Equipment block i. Equipment number ii. Equipment title iii. Working Volume iv. Internal Diameter, Height (Tan-Tan) v. Design Pressure (negative and positive) vessel, jacket vi. Design Temperature (show low temp. limitation) vessel, jacket vii. Material of Construction vessel viii. Material of Construction jacket b. Vessel Outline i. Equipment number ii. Legs or Lugs iii. Type of jacket, number of jacket zones iv. Platform (if applicable) v. Nozzle identifiers vi. Nozzle sizes vii. Insulation of jacket, bottom dish, top dish (if required) viii. Vessel slope (if required) c. Specific Details i. Are internal spray devices shown? Are they shown in correct number and associated with correct nozzle? ii. Are the baffles shown (when required)? iii. Is the vortex breaker shown (when required)? iv. Are there dip tubes for sub-surface addition, how many? v. Are there angle J-tube nozzles, how many? vi. Are there other internals (e.g. sparger rings, internal cooling coils, or separation baffles) vii. Is correct agitator and configuration shown? o Impeller type and number

o o o o

Top, side, or bottom mounted Center mounted or angled Is appropriate nozzle used Is it VFD or constant/dual speed

viii. Are following connections to the vessel are shown? o Liquid inlets (products, solvents, water, wastes, utility fluids, etc.) o Outlets (products, wastes, solutions, utility fluids, etc.) o Solids/powder charging (if applicable) o Vessel Vent, jacket vents/drains o Vapor line and reflux line (if applicable) o Process Air or nitrogen pad or pressure control lines (when applicable) o Cleaning lines o Clean steam and trapped condensate lines (when applicable) o Gas addition lines (when applicable) o Pressure relief discharge ix. Are the following vessel devices shown? o Sampling device (if required) o pH probe (if required) o DO probe (if required) o Conductivity or Capacitance probe (if required) o Interface detection device (if required) o Level device and type, or load cell o Independent High level switch (recommended) o Vessel Temperature RTD o Jacket side RTD on HTF inlet and outlet (optional) o Pressure transmitter, pressure gauge o Safety devices (PSE, PSV, or PSE/PSV combo) and rupture indicator (if required) for vessels o Safety device for vessel jacket x. Are the following control loops shown? o Pressure control (if required) controlling vent, Process Air or N2 supply, vacuum o Vessel and/or jacket temperature control o Level control (if required) by constant level or high/low switches o Gas in-flow control (e.g. DO, or specific weight of gas, or pH, or other parameter) o Liquid addition control (if required) o Powder addition control (if required) o L-L interface control (if required)

4. Column Information
a. Equipment Block i. Equipment number ii. Equipment title iii. Internal diameter and height iv. Height of packing section (if required) v. Tray type /Packing type (random or structured) vi. Design Pressure vii. Design Temperature viii. Material of Construction Column ix. Material of Construction Internals

b. Column Outline i. Equipment Number ii. Platforms (if applicable) iii. Nozzle identifiers iv. Nozzle sizes v. Insulation vi. Packed section or sections (if applicable) vii. Number of actual trays (if applicable) viii. Mist eliminator ix. Distributor c. Specific Details i. Indicate if the stripping column section larger diameter than rectifying ii. Ensure that the side draw-off (if any) is shown from the correct tray iii. Ensure that feed is shown at the feed tray iv. Indicate if the column is self-standing or supported off the tank nozzle (e.g. scrubber solution tank, batch still) v. Indicate any internal baffles or weirs vi. Are the following connections are shown for the column: o Vapor Line o Reflux/Re-circulation line o Re-boiler return (if required) o Side Draw-off (if required) o Feed Line o Nitrogen Pad or Pressure Control lines o Pressure relief discharge o Vacuum Line (if required) o Bottoms section drain o Column flush line (if required) vii. Are the following column devices shown? o Column top pressure transmitter o Column temperature RTD(s) temperature profile o Column bottom level o Feed flow transmitter o Feed RTD o Relief devices for the column o Reflux flow transmitter o Bottoms flow transmitter viii. Are the following control loops shown? o Column temperature profile control o Column pressure control o Feed rate control o Reflux ratio control o Column bottom level control o Side draw-off flow control (if required) 5. 6. 7. 8. 9. HEAT EXCHANGERS PUMPS VACUUM PUMPS CHROMATOGRAPHY UFDF

10. 11. 12. 13. 14. 15.

CENTRIFUGES DRYERS SOLIDS HANDLING CONTAINMENT MILLING EQUIPMENT PACKAGED SYSTEMS