You are on page 1of 1

RSSA Drive Test Pricebook ver 0.

Service
Elements

General Description

Performance
Data Collection To carry out drive tests (routine and
comprehensive troubleshooting drive
tests measuring the Circuit Switch and
Packet Switch Network in terms of key
performance indicators: Coverage,
Quality, Accessibility, Retainability,
Mobility, Throughput, as defin

Activities

Provision of Resources and


Infrastructure

$9,000.00

$180.00

$162.00

$144.00

$135.00

$126.00

$108.00

$90.00

$72.00

$40.50

$33.75

$27.00

$20.25

$12.60

Data Collection

$4,213.00

$84.26

$75.83

$67.41

$63.20

$58.98

$50.56

$42.13

$33.70

$18.96

$15.80

$12.64

$9.48

$5.90

Complete Event Report And


Drive Test Form

$787.00

$15.74

$14.17

$12.59

$11.81

$11.02

$9.44

$7.87

$6.30

$3.54

$2.95

$2.36

$1.77

$1.10

Extract KPI Information

$500.00

$10.00

$9.00

$8.00

$7.50

$7.00

$6.00

$5.00

$4.00

$2.25

$1.88

$1.50

$1.13

$0.70

Prepare KPI Report for


performance analysis

$500.00

$10.00

$9.00

$8.00

$7.50

$7.00

$6.00

$5.00

$4.00

$5.25

$1.88

$1.50

$1.13

$0.70

$15,000.00

$300.00

$270.00

$240.00

$225.00

$210.00

$180.00

$150.00

$120.00

$70.50

$56.25

$45.00

$33.75

$21.00

Evaluation of the radio


environment and passive
elements on-site

$1,400.00

$28.00

$25.20

$22.40

$21.00

$19.60

$16.80

$14.00

$11.20

$6.30

$5.25

$4.20

$3.15

$1.96

Collected Data Analysis


(On/Off Site)

$1,000.00

$20.00

$18.00

$16.00

$15.00

$14.00

$12.00

$10.00

$8.00

$4.50

$3.75

$3.00

$2.25

$1.40

Problem Investigation &


Diagnosis

$1,300.00

$26.00

$23.40

$20.80

$19.50

$18.20

$15.60

$13.00

$10.40

$5.85

$4.88

$3.90

$2.93

$1.82

Report and
Recommendations from
Data Analysis

$1,050.00

$21.00

$18.90

$16.80

$15.75

$14.70

$12.60

$10.50

$8.40

$4.73

$3.94

$3.15

$2.36

$1.47

Configuration Database
Update

$350.00

$7.00

$6.30

$5.60

$5.25

$4.90

$4.20

$3.50

$2.80

$1.58

$1.31

$1.05

$0.79

$0.49

SUB TOTAL

$5,100.00

$102.00

$91.80

$81.60

$76.50

$71.40

$61.20

$51.00

$40.80

$22.95

$19.13

$15.30

$11.48

$7.14

Physical Site Audits

$7,500.00

$150.00

$135.00

$120.00

$112.50

$105.00

$90.00

$75.00

$60.00

$33.75

$28.13

$22.50

$16.88

$10.50

Antenna height changes,


tilts and reorientation

$3,700.00

$74.00

$66.60

$59.20

$55.50

$51.80

$44.40

$37.00

$29.60

$16.65

$13.88

$11.10

$8.33

$5.18

Carry out emergency


Antenna swap outs

$8,200.00

$164.00

$147.60

$131.20

$123.00

$114.80

$98.40

$82.00

$65.60

$36.90

$30.75

$24.60

$18.45

$11.48

Radio cable sweep testing


(where and when necessary
for 3 sectors)

$6,000.00

$120.00

$108.00

$96.00

$90.00

$84.00

$72.00

$60.00

$48.00

$27.00

$22.50

$18.00

$13.50

$8.40

Re-engineering of cables
and connecting accessories
as required

$6,000.00

$120.00

$108.00

$96.00

$90.00

$84.00

$72.00

$60.00

$48.00

$27.00

$22.50

$18.00

$13.50

$8.40

$31,400.00

$628.00

$565.20

$502.40

$471.00

$439.60

$376.80

$314.00

$251.20

$141.30

$117.75

$94.20

$70.65

$43.96

$51,500.00

$1,030.00

$927.00

$824.00

$772.50

$721.00

$618.00

$515.00

$412.00

$234.75

$193.13

$154.50

$115.88

$72.10

SUB TOTAL

Performance
Analysis

Perform analysis of the performance


on Access network in response to a
detected performance deviation,
identifies problems within the radio
environment/infrastructure and
recommends/deploys necessary
corrective measures to ultimately
improve quality of se

Field Service
Corrections
Dispatch field technicians in the event
of an identified or suspected onsite
fault, assist with the fault identification
and correction, record actions in
logbooks kept at all sites, report on
problems and escalate problems as
required.

SUB TOTAL
Grand Total

Full
FullManaged
Managed
Full
Full
Full
Full
Full
Full
Full
Option
FullManaged FullManaged
FullManaged
Option
FullManaged FullManaged
Managed
Managed
Managed Managed Managed
Managed
Managed
(Vendor
Option201to Option301to
Option801to
(Vendor
Option501to Option601to
Option901
Option25 Option51 Option101 Option151
Option701
Option401
Supplies
300sites
900sites
700sites
Supplies
600sites
400sites
to1000sites
to50sites to100sites to150sites to200sites
to800sites
to500sites
Materials.)50
Materials.)
Sites
PerSite

You might also like