Intermediate survey

Valparaiso, Chile - Anchorage Date: 26-27 July 2010 1. 2. Class intermediate Sewage system Manual / Capacity: 50 persons. / Type approval certificate. Class annuals CSM as per RDRM list.

3. Tail shaft monitoring- TMON file / alarm test record for sensors (carry out again at Quintero) , high level, high temperature, lube oil high low alarm , sealing air low pressure alarm etc / oil in water test record (with c/e file)/

4. Exhaust Boiler Survey in open condition / cleaning of water side, smoke side as necessary / full function test including popping of safety valve to be carried out at sea Prior survey and to be recorded in the log book. Manhole door gasket will be connected at Fujairah. Exhaust gas boiler safety checkedPort side v/v opening pr: 7.8 bar reseating pr: 7.0bar Stbd side v/v opening pr: 7.4 bar reseating pr: 6.4bar

5. Auxiliary Boiler - Survey in open condition / cleaning and overhauling of mountings / cleaning water side , smoke side as necessary / operation test / test of alarms and cutouts in presence of surveyor / popping test of safety valves / record of burner routines / status of major spares / Safety valve settings:/.. Aft side v/v opening pr: 8.0 bar reseating pr: 7.4bar Fwd side v/v opening pr: 8.2 bar reseating pr: 7.5bar Capacity: boiler: 3000kg/hr. / burner: 70/210 kg/hr Working pressure: 6bar

6. Clean annual BDN / covering letter for bunker / From CHPBKR stating vessel is allowed to take bunker even if the sulphur content is more than 3.0 %. From mail. 7. E0 annual EO file to complete / record of test carried out during last 12 months / all test points must be covered. 8. Load line annual Water tight arrangement / sealing / vents / mushroom / doors / etc / Water tight below load line / weather tight above load line / Engine room ship side valves / Sea chest / Sea chest valve closing remote closing mechanism / General condition of ship side / Paint work, dent, corrosion etc. 9. 10. 11. note. Safety construction intermediate Safety Construction annual Safety Equipment periodical 3/O to assist prepare service requisition. C/O to prepare landing A) DCP- Local service service requisition to raise B) Life boat Local service service requisition to raise C) Rescue boat / davits Local service service requisition to raise

D) Portable fire extinguishers Service by ..- service requisition to raise - landing report to make E) ELSA - Service by ..- service requisition to raise - landing report to make F) BA set Servicing by- service requisition to raise - landing report to make G) Air quality check By .. H) Fixed CO2 Service by Chief Engineer Record of Level check / annual blow thro / alarm check / general inspection / house keeping / lighting / exhaust fan / integrity of pipes, tubes and cables / etc I) Life jackets Service by .. J) Fire detectors Test equipment /procedure / spare status K) Fire doors closing arrangement / sealing L) Quick closing valve operations to verify / record

12.

Safety Equipment annual

13. Safety radio - periodical: Service by Radio Holland 2/O to do the need full- Master to send service request to radio Holland thro email. Service confirmed by Radio Holland 14. IGC intermediate -

15. IGC annual IGG full function test / alarms/ trips date .07.2010 (work done report) / none return valve check, last record .. (date of last inspection G/E) / O2 analyzer / spare O2 bottles / O2 bottle with certificates / type approval certificate /

16.

IOPP intermediate

17. IOPP annual OWS record of last filter renewal , cleaning, inspection - date..(word done attached) ,etc / status of spare filter - ordered / record of last operation date / requisition number../ record of last 15 ppm calibration by vessel date . / ROB of calibrating solution / record of last zero ppm check weekly / house keeping. BDN Updated with c/e ORB filled up and signed by all 2/e (get it signed on Sunday before you leave ship) Capacity - 2.5 m3/hr 15 ppm certificate:.. To check Type approval:GL To check 18. IAPP intermediate

19. IAPP annual NOX file to update with correct IMO number components for auxiliary engines. Incinerator record of routines / status of spares / last furnace cleaning record / record of last safety check , high temp, flame failure date. ( work done report stating all above) / Garbage segregation / record of plastic ash landing (vessel dose not incinerate plastic) / record of normal ash landing (c/o) 2/E pl confirm entries. Annex VI log book - present bunker (upcoming bunker at Valparaisi anchorage) to update in annex VI log book (c/e) / BDN / Record of bunker sample / location (4/e) / Type approval certificate:..With Chief engineer Incinerator type approval by (Bureau Veritas) present in Manual IAPP certificate includes our incinerator 20. CSM - completed items to be offered for credit / new items to be offered time permitting.