Work dairy for the month of JUN06

Day Work Details

15 MSC WLL Indoor work and co-ordinating with ZTE staff


16 MSC WLL Indoor work and co-ordinating with ZTE staff
17 MSC WLL Indoor work and co-ordinating with ZTE staff
18 Sunday
19 Kailasgiri HFCL BTS was restored by replacing GPS antenna from BSC and RMS
from Velampeta was used for booting up.
20 Anadhapuram BTS was UP by replacing CDSU card. RMS of Kailasgiri HFCL BTS
was tested in Velampeta xge. Found faulty, to be sent to repair.
Applied account in canara bank
21 Disconnections of the MSC WLL based subscribers, learnt to take loop and break in
the switch. Coordinated with ITI staff for Ravikamatam BTS
22 Tested streams with OFC CXL for MSC WLL, couldn’t get the streams. Fan card
replacement in BSC WLL. Coordination with HFCL staff for card repair.
23 MSC WLL maintainance and kailasagiri BTS restoring
24 Went to kailasagiri for attending fault in power plant and attending GPS antenna fault.
Replaced GPS antenna with CRR BTS antenna and restored the BTS.
25 Sunday: coordinated with SDE for restoring the kailasagiri BTS which was down
again due to media fault
26 Power plant modules testing and GPS antenna cable repair.
27 Power plant modules repair in kailasagiri BTS site. 1 module is set OK.
28 MSC WLL Indoor work & RF cabling of GPS antenna & gathering details of
Working nos in Dot Soft , OCB and BSM for comparison. The details obtained will
be modified in Dot Soft
29 Replacement of RF cable of GPS antenna. Restoration GPS alarm in CRR BTS site
Dot Soft interaction meeting
30 Submission of ESN details to Dot Soft for modification. Rectification of fault in E1s
of Kailasagiri BTS.

Work dairy for the month of JUL06


Day Work Details
1 MSC WLL Indoor work
2 Sunday
3 MSC WLL Indoor work Downloading of data for GSM demo
4 MSC WLL Indoor work. Coordinating with OFC staff for monitoring of gajuwaka
BTS
5 MSC WLL Indoor work and co-ordinating with ZTE staff
6 MSC WLL Indoor work
7 AT of Ravikamatam BTS
8 Clearing of A/Notes and N/W monitoring
9 Sunday
10 Clearing of A/Notes of akkayapalem nos. TCM card given to ITI person
11 Received GPS antenna from HFCL. EMS ID EE882650832IN. Back up of data in
BSC WLL and for restoration of GPS alarm. Demo on BCCS in GSM Subsystems in
training centre
12 Demo of internet using FWT in GMs chamber, Clearing of A/Notes and N/W
monitoring
13 Programming of mobiles of Dabagardens exchange under CRRMMW level. ED of
BSC WLL taken.
14 STM 1s E1s verified up to mindi exge.
15 BSC wll Interface 0 down. Rectification of interface.
16 Sunday
17 Demo on future trends of GSM. Received TCM card from MSC Hyd. Coordination
for streams with SDE TAX minidi for streams.
18 Clearing of A/Notes and N/W monitoring
19 Clearing of A/Notes and N/W monitoring, checking of dels in dotsoft and switch
20 Clearing of A/Notes and N/W monitoring
21 Clearing of A/Notes and N/W monitoring
22 Clearing of A/Notes and N/W monitoring
23 Sunday
24 Clearing of A/Notes and N/W monitoring
25 Clearing of A/Notes and N/W monitoring
26 Disconnection of numbers, reconnections.
27 CALL FROM MSCWLL SWITCH IS PROCESSED
28 Clearing of A/Notes and N/W monitoring
29 Clearing of A/Notes and N/W monitoring
30 Sunday
31 Trg at httc

Work dairy for the month of AUG 06


Work Details
1 Trg at HTTC
2 Trg at HTTC
3 Trg at HTTC
4 Kailasagiri for insertion of RMS card for booting
5 Kailasagiri for rectification of battery fault. Set one battery set all right. Second, set
having prior faulty cells.
6 SUNDAY
7 Kailasagiri for attending the Alpha sector problem. Interchanged the Alpha-0 and
Alpha-1 .Alpha sector emitting radiation but the cell radius was reduced due to
antenna fault.
Coordination with ZTE staff at Vijayawada for internet availability.

8 Clearing of A/Notes and N/W monitoring. Demo about MSC WLL by ZTE engineer.
9 Attending fault on Alpha sector of kailasagiri BTS
10 Rectification of Kailasagiri HFCL Make Antenna by fixing new antenna fixture and
painting the antenna
11 Clearing of A/Notes and N/W monitoring. Demo about MSC WLL by ZTE engineer.
12 Getting details of working levels from vijayawada msc wll switch and rectifying
alarms in gajuwaka HPA in alpha, beta, gamma, sector and alarm in interface 0.
13 SUNDAY
14
15 Holiday
16 HOLIDAY
17 Clearing of A/Notes and N/W monitoring. Demo about MSC WLL by ZTE engineer.
18 RECEIVED AGILENT TECHNOLOGY
19 Pest control in store room in MSCWLL( E10B building). And shifting of stores.
20 SUNDAY
21 Clearing of A/Notes and N/W monitoring
22 Clearing of A/Notes and N/W monitoring. BTS tester send for repair to anglient
limited.
23 Laying of clock cable from ADM 16 to ZTE switch.
24 Clearing of A/Notes and N/W monitoring
25 Clearing of A/Notes and N/W monitoring
26 Clearing of A/Notes and N/W monitoring
27 SUNDAY
28 Clearing of A/Notes and N/W monitoring
29 Clearing of A/Notes and N/W monitoring
30 Clearing of A/Notes and N/W monitoring
31 Clearing of A/Notes and N/W monitoring

Work dairy for the month of SEP 06


Work Details
1 Clearing of A/Notes and N/W monitoring.
2 Clearing of A/Notes and N/W monitoring.
3 SUNDAY
4 Clearing of A/Notes and N/W monitoring. Demo about MSC WLL by ZTE engineer.
5 Strickering of names for modules
6 Clearing of A/Notes and N/W monitoring.
7 Clearing of A/Notes and N/W monitoring. Demo about MSC WLL by ZTE engineer.
8 Preparation for AT. Strickering of names for modules
9 Preparation for AT.
10 SUNDAY
11 Hardware AT of MSC WLL SWITCH started.
12 Hardware AT of MSC WLL SWITCH continuing.
13 Hardware AT of MSC WLL SWITCH continuing.
14 Hardware AT of MSC WLL SWITCH continuing. checking of power plant, battery,
UPS for the switch. Cabling also checked.
15 Hardware AT of MSC WLL SWITCH continuing.
16 Hardware AT of MSC WLL SWITCH continuing.
17 SUNDAY
18 Clearing of A/Notes and N/W monitoring.
19 Card diagnostics in MSC WLL switch.
20 AT of MSC WLL Switch and submission of pending points
21 Clearing of A/Notes and N/W monitoring.
22 Clearing of A/Notes and N/W monitoring.
23 Clearing of A/Notes and N/W monitoring.
24 SUNDAY
25 Clearing of A/Notes and N/W monitoring.
26 Clearing of A/Notes and N/W monitoring.
27 Clearing of A/Notes and N/W monitoring.
28 Shifting of BTS material from Gajuwaka exchange premises to Balacheruvu premisis
29 Working level statement preparations.
30 Meter reading sending for AO billing

For the month of OCT2006.

Date Work details

1 SUNDAY
2 EH for Gandhi Jayanthi, Monitoring of WLL BTS sites in VM SSA for CGM’s
Visit.
3 Went to Balacheruvu Monitoring of installation works in Balacheruvu Exchange.
Work still pending due to planning of RF cable runway.
4 Monitoring of installation works in Balacheruvu Exchange. CGM meeting in
Dasapalla.
5 Monitoring of BTS, clearing of advice notes in MSC. Went to Balacheruvu
exchange for monitoring and completion of WLL BTS installation works. Power
termination completed. E1’s also terminated and tested with Mindi OFC. getting
of data of Subs for conversion of nos for level change.
6 Conversions of database from MSCWLL switch for modification of levels.
7 Clearing of A/N and network monitoring in the switch. Went to Balacheruvu for
checking out the Installation works of wll BTS in the site, visited Malkapuram
exchange for BTS checking and Azimutal angle clarification.
8 SUNDAY
9 Clearing of A/N and network monitoring in the switch.
10 Tested fax software for office us, received RMS Card from HFCL to be tested in
Kailasagiri BTS site
11 Testing of RMS card in Kailasagiri BTS site (M.Subba Rao), replaced repaired
RMS in Kailasagiri BTS and replaced the one from Kailasagiri in Velempeta
BTS.
12 Meeting in GMTD office for number changing and SID changes in V5.2 BTS of
HFCL, ZTE. Disconnection of 31 nos for disconnections,
13 Clearing of A/N and network monitoring in the switch. And checking of fax in
huwai phone
14 Network monitoring in the switch.
15 SUNDAY
16 Clearing of A/N and network monitoring in the switch.
17 Creation of batch files for level changes in AKDR exge.
18 Conversion of AKDR levels from 260xxx to 200xxx. Creation of batch files
for level changes in PUY,APPM,CRR,KOMM exges.
19 Conversion level changes in PUY,APPM,CRR,KOMM exges.
20 Clearing of A/Notes and N/W monitoring.
21 Clearing of A/Notes and N/W monitoring.
22 SUNDAY
23 Clearing of A/Notes and N/W monitoring.
24 Changing of levels and SID in V5.2 HFCL WLL system
25 Clearing of A/Notes and N/W monitoring. Clearing of faulty nos after conversion
26 Clearing of A/Notes and N/W monitoring. Clearing of faulty nos after conversion
27 Clearing of A/Notes and N/W monitoring. Clearing of faulty nos after conversion
28 Monitoring of work in Balacheruvu exchange.
29 SUNDAY
30 Clearing of A/Notes and N/W monitoring. Clearing of faulty nos after
conversion.NPC’s,SFT’s&RC’s
31

For the month of NOV2006

Date Work details


1 Clearing of A/Notes and N/W monitoring
2Date Clearing of A/NotesWork Details
and N/W for the month of DEC2006
monitoring
3 Clearing of A/Notes and N/W monitoring
4 01 Monitoring
Clearing of N/W
of A/Notes and and
N/Wclearing of A/Notes. Preparation of working line
monitoring
5 SUNDAY statement and breakdown’s statement.
6 02 Clearing of A/Notes Monitoring of N/W and clearing of A/Notes.
and N/W monitoring
7 03 Clearing of A/Notes and N/W monitoring SUNDAY
8 04 Monitoring
Visited Balacheruvuof N/Wsiteand clearing
for Pre AT ofofsite.
A/Notes. Went to Kailasagiri BTS for
9 attending fault in BTTY sets, rectified
Received 20KVA/6 KVA ups/invertors. Clearing the problem, found one
of A/Notes andBTTYN/W set is faulty
monitoring
10 Clearing of A/Notes and N/W monitoring and was isolated.
1105 DCDB (for invertors) Fabrication
Clearing of A/Notes and N/W monitoring works and Monitoring of N/W and clearing of
12 SUNDAY A/Notes.
1306 Went to Kailasagiri
AT of Balacheruvu BTS. BTS site for rectification of BTTY sets fault and made a
14 Clearing of A/Notes single
andSET
N/W bymonitoring.
interchanging good &
Servers and bad cells.racks were
switching
07 Monitoring of N/W and clearing of A/Notes.
switched ON after tripping of power supply, which happened Assisted works with SDE
earlier.
Installation for Laying
No abnormalities found in the switch.of DC Cables for DCDB and its termination
1508 Clearing of A/Notes Monitoring of N/W and clearing of A/Notes
and N/W monitoring
1609 Monitoring
Clearing of A/Notes and N/W monitoringof N/W and clearing of A/Notes
1710 Installtion works along with ITI people SUNDAY
& Clearing of A/Notes and N/W
11 monitoring Monitoring of N/W and clearing of A/Notes
1812 Monitoring
Installation works along with ITIof N/W
peopleand& clearing
ClearingofofA/Notes
A/Notes and N/W
13 monitoring Monitoring of N/W and clearing of A/Notes
1914 SUNDAY Monitoring of N/W and clearing of A/Notes
2015 Monitoring of N/W
Installation works along andwith
clearing of A/Notes
ITI people &Termination
& Clearing of invertor
of A/Notes and N/Wcables to
monitoring DCDB
2116 Monitoringworks
Installation of N/W andwith
along clearing of A/Notes
ITI people &Termination
& Clearing of invertor
of A/Notes and N/Wcables to
monitoring DCDB
2217 Instillation works along with ITI people SUNDAY& Clearing of A/Notes and N/W
18 Monitoring
monitoring of N/W and clearing of A/Notes &Termination of invertor cables to
nd
23 DCDB
Installation works and with
along ACDB ITIfabrication works forof2A/Notes
people & Clearing 6KVA andset. N/W
19 MonitoringInvertors
monitoring. of N/W and clearing
wiring of A/Notes
complete &Termination
@ invertors end. DCDB of invertor
is to be cables
providedto
nd
DCDBwing.
by Dist. Installation and ACDB fabrication works for 2 6KVA set.
2420 Planning with SDE ( Inst ) for DCDB in Invertors room and Clearing of A/Notes
21 and N/W monitoring
2522 Clearing of A/Notes and N/W monitoring
2623 SUNDAY
2724 Monitoring of N/W and clearing of A/Notes. SUNDAY
2825 Monitoring of N/W and clearing of A/Notes.
2926 Monitoring of N/W and clearing of A/Notes.
3027 Monitoring of N/W and clearing of A/Notes. Meter readings were sent.
28
29
30
31 SUNDAY
Date Work Details for the month of JAN 2007

1
2
3
4 Received HPUS of KG BTS after repair from SOLAN factory
5
6 Installation of HPUS unit in velampeta for testing
7 SUNDAY
8 Went to Mindi for BSC expansion work installation planning along with ITI
staff
9 Installation of new 32 amps AC fuses in a/c plant room for inverters
10
11
12
13
14 SUNDAY
15
16
17
18
19
20
21 SUNDAY
22
23
24
25 Alpha sector of Gajuwaka BTS not radiating , HPA card of alpha sector
replaced with spare one ( 2nd FA presently spare) the problem rectified
26
27
28 SUNDAY
29
30
31