Concrete Leveling Sheet:y Before Laying Bottom After pour concrete have to take reading in Dimension and Grade

Sheet (CMS-830-17FM-00004). It is noted in the Dimension and Grade Sheet as before laying bottom. Note: - The concrete included with embed plates y After Laying Bottom Before install 1st plate have to take reading in Dimension and Grade Sheet (CMS-830-17FM-00004). It is noted in the Dimension and Grade Sheet as after laying bottom. Note: - The concrete included with embed plate y After 1st Ring Fit/Weld After install 1st plate have to take reading in Dimension and Grade Sheet (CMS-830-17FM-00004). It is noted in the Dimension and Grade Sheet as after 1st ring Fit/Weld. In normal CBI practice the reading has to take up to 4 shells to avoid misalignment or to check the strength of base concrete. Normal measuring method:The dimension should start from 0deg to clockwise. Every center and the vertical edge joint of shell should measure for levelness test. The dimensions should take from where the shell fits. Note: - The Place Where the plate load acting, have to measure for levelness. For Propylene Storage Tank the base concrete or bottom concrete should measure for levelness, with that take reading for the upper concrete or inside shell concrete also (See below Fig.).

Shell Plates Measuring Points

14 13 12

1 2 3

11 10 9 8 7 6 5

Total 28 Measuring Points

Shell Arrangement For Reference

Upper Concrete or inside shell concrete Bottom or Base Concrete.

Embed Plate:Before pure concrete need to check the elevation of the embed plate vertical and radial. Make and submit the Dimension and Grade Sheet (CMS-830-17-FM-00004) for that.
Measurement Starts From Clockwise

0
Shell Plates Measuring Points
27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 28 1 2 3 4 5 6 7 8 9

Total 56 Measuring Points

Embed Plate Arrangement For Reference

Plumbness Dimension and Tolerance Check:Plumbness check shall take place as per the document no. 5578-E4-1041-WP-MF-316.The dimensions shall note in the form No: - CMS-830-15-FM-48024. From the Procedure, y The maximum out of plumbness of the top of the shell relative to the bottom of the shell shall not exceed 1/200 of the tank height. y Radius measured at 1 ft (0.3m) above the corner weld shall not exceed the following As per the document the plumbness check only required for inner shell, not for outer shell. Annular Space and bottom plate Test:Vacuum box test required to find out leak in annular space and bottom plate joint. The Doc. No 5578-E4-1041-WP-MF-313 describing about this vacuum test. The Form No CMS-830-15-FM48018 used to fill the datas.