ABC & CONSTRUCTION SDN BHD

JOB SAFETY ANALYSIS REPORT Excavation Works

Project Name : Location : Contractor / Company Name :

Tools &/or Equipment:

Job Location & Details: Work Activity order by : No. of workers involved : Tool Box by :

JSA Participants :

JSA No.

Responsible Supervisor :

Date Prepared:

JSA Reviewed by: Name : Designation : Signature :

JSA Accepted by:

Page 1 of 3

ABC & CONSTRUCTION SDN BHD


JOB SAFETY ANALYSIS REPORT Excavation Works

Job/Task Mobilization of backhoe or excavators to jobsite.

Potential Hazard Found Collision with public vehicles or construction vehicles.

Recommendation Traffic controllers or signalman to be deployed during loading unloading activities. All services to be identify and marked clearly for easy identification. A safe working distance to be established from the excavation pit. Work area to be barricaded and relevant signages to be posted. Keep un authorize person away from the excavation area. Excavation more than 2 meters in depth to be properly shored and need to design by P.E.

Frequency

Action By Site supervisor

Statutory Reference Arahan Teknik (jalan) 2C/85 for JKRs specification.

Service detection to be carry out prior to commencement of excavation works. Positioning of the excavator or backhoe for the excavation works. Excavation being carry out adjacent to public area or over lapping with other site operation. Excavation wall collapse in the event of blending or concrete works in progress.

Damage to the public services which could cause injury to general public or site workers. Excavation machine fall into the excavation pit.

Site supervisor

Site supervisor and operator

Members of public drop into the excavation pit especially works adjacent to public area.

Site supervisor and operator

Workers working inside the excavation pit get berried or machine parked adjacent to the excavated hole fall into the hole.

Site supervisors and Design Manager

Factories and Machinery regulation, 1986-BOWECReg.116 Excavation more then 4 meters in depth to be shored.

Page 2 of 3

ABC & CONSTRUCTION SDN BHD


JOB SAFETY ANALYSIS REPORT Excavation Works

Job/Task Placement of the excavated material at jobsite

Potential Hazard Found Wall collapse due to excavation material placed adjacent to excavation edges.

Recommendation All excavated material should be placed 2 meters away from the edges. If possible all waste material to be dispose immediately off site. Proper planning for the excavation works to be implemented. Removal of the excavated material to be scheduled during off pick hours. If necessary dust suppression program to be introduce.

Frequency

Action By Site supervisor

Statutory Reference Factories and machinery regulation. 1986-BOWECReg. 113(5) All excavated material to be placed 610mm from than edges.

Transportation of excavated material off site.

Dust pollution due to frequent movement of construction vehicles.

Site supervisor and subcontractor

To be reviewed as and when necessary

Page 3 of 3