You are on page 1of 1

" Petrokimia Sahabat Petani " | | Search by Google

Support Facility & Infrastructure


Search Location Company Profile History Our Values Production Main Product Chemical Product Facility Infrastructure Environmental Subsidiary Companies Joint Venture Management Share Holder Commissioners Directors Finansial GCG Tanya Jawab GCG SCI Annual Report Sustainability Report PP Bisnis Human Resources Employee Facility Sport Recreation & Health Marketing Product Information Urea ZA SP-36 Phonska DAP Kaptan ZK Pupuk Spesific komoditi dan lokasi Pupuk rock phosphate Pupuk Petroganik dan Petronik Pupuk petro kalimas Pupuk Petro Biofertil Pupuk KCL petroseed Dekomposer Petro Gladiator Distribution List Distributors Sales Supervisors In orderto support and facilitate the procurement of raw material, production process and marketing/distribution, PT PETROKIMIA GRESIK has at its disposal all sorts of support facilities and infrastructure, as follows : I. Pier & Its Ancillaries The pier for loading and unloading is 625 meters long and 36 meters wide. The pier is designed to enable 40,000 60,000 DWT ships to berth along its sea-bound side and other three of under 10,000 DWT ships along its land-bound side concurrently at any one time. This pier is also equipped with a variety of loading/unloading facilities such as:
l

News Index
01 February 2012 07:51:59

Perluas Dermaga, PG Inves Rp 463 Miliar


31 January 2012 08:51:22

Pusri Patok Produksi Pupuk 11,95 Juta Ton Link URL APPI IFA Indonesia Kementerian BUMN

Continuous ship unloader, capable of unloading material in bulk, at a capacity of 1,000 tons per hour. Multiple loading crane, capable of loading various kinds of end products in bulk at a capacity of 120 tons per hour as well as in 50kg sacks at a capacity of 120 tons per hour. 2 Kangaroo cranes, each capable of unloading bulk material at a capacity of 350 tons per hour. Belt Conveyor; the Corporation has a system of belt conveyor, made up of 3 units with a total length of some 22 kilometers. These three belt conveyor units are, one for filling product into sacks at a capacity of 120 tons per hour and the other two for unloading raw material in bulk at a capacity of 1,000 tons per hour each.

II. Power Station In order to ensure the supply of electrical power required for its production process and all other activities within its industrial compound, PT PETROKIMIA GRESIK has 2 units of power station at its disposal :
l

Gas turbine generator, located at the nitrogen fertilizer production unit and capable of generating power 33 MW. Steam turbine generator, located at the phosphoric acid production unit and capable of generating power 20 MW. In addition to these two units of power station, the Corporation also receives power supply from the State-owned electricity company PLN, amounting to 15 MW, for some of its joint venture companies, lighting for the employees housing complex, hospital and other facilities.

III. Water Treatment Facility The first unit to supply clean water required by the Corporation was located at Gunungsari Surabaya, taking in its raw water from the river Brantas. The clean water was subsequently pumped through a 14-inch diameter pipeline to Gresik at a distance of 22 Kilometers away. The treatment and subsequent pumping capacity of this Gunungsari plant stood at 720 cubic meters per hour. The second water treatment unit could be found in Babat Lamongan, processing raw water from the river Bengawan Solo. The processed water is then pumped through a 28-inch pipeline to Gresik some 60 kilometers away. The treatment capacity of this Babat plant is 1500 cubic meters per hour.Yet,itscapacitycouldbeincreasedupto2500cubicmetershourly.

Distribution Distribution System 290909 Sistem Distribusi Pupuk Gudang Gresik Sistem Distribusi Pupuk Gudang Penyangga Teknis Pengambilan Barang Pelayanan Penjualan Pupuk Coverage Area Supply Point Community Development Small Business & Partnership Public Responsibility

PT Petrokimia Gresik
2002 PT Petrokimia Gresik

You might also like