APPAREL EXPORTS PVT. LTD.

, INTERNSHIPGURGAON
COMPANYCOMPANY
PROJECT I PROJECT II SWOT ANALYSIS

RICHA GLOBAL

Presented By:

Shivangi Srivastava
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

COMPANY PROFILE
Richa Group of Companies were COMPANYCOMPANY
PROJECT I PROJECT II SWOT ANALYSIS incorporated in 1977. Richa Group has over 22 fully integrated

manufacturing units in Delhi, Gurgaon,


Noida and Bangalore. Richa Global is one of the new facility

which was set up in Oct 2006 at Gurgaon.

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

COMPANY P PROFILE
COMPANYCOMPANY
PROJECT I PROJECT II SWOT ANALYSIS

roduct ange: All Types Of Knitted Garments

The product range covers T-Shirts Collar-Shirts Night Wear Skirts Overcoats Jerkins Jackets Sports wear

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

COMPANY E PROFILE
COMPANYCOMPANY
PROJECT I PROJECT II SWOT ANALYSIS

STEEMED

CUSTOMERS

GAP Tommy Hilfiger

WAL-MART
DKNY Calvin Klein Liz Claiborne

American Eagle
Armani Exchange IZOD NAUTICA

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

COMPANY PROFILE
COMPANYCOMPANY
PROJECT I PROJECT II SWOT ANALYSIS

Monthly Production: 2,60,000 Pcs. Workers Capacity: 1400 workers Factory Floor Space: 97,715 Sq. Feet In Five Floors Including Basement Total Production Area: 45,074 Sq.Feet (Cutting, Sewing, Washing & Finishing

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

ORGANISATIONAL STRUCTURE
DIRECTOR FACTORY MANAGER Mr.NAYAN WAGHELA

SENIOR MERCHANT Ms.VINNY

SENIOR MERCHANT Mr.VIPIN

SENIOR MERCHANT Ms.RIDHIMA

SENIOR MERCHANT Ms.MANPREET

SENIOR MERCHANT Ms.PHALGUNI

FINISHING MANAGER Mr RAJU

QUALITY MANAGER Mr.AMIT

PURCHASE MANAGER Mr.AJEET

ACCOUNTS MANAGER Mr.ASHOK GUPTA

WASHING & DYEING MANAGER Mr.RAKESH

MANAGER HR & COMPLIANCES

TECHNICAL MANAGER

Jr.Merchants -Ms.SAUMYA -Ms.DIVYA

Jr.Merchants -Mr.ASHISH Ms.ANUBHUTI

Jr.Merchants -Mr.TARANDEEP -Ms.POONAM -Ms.NEHA

Jr.Merchants -Mr.PANKAJ -Ms.SONIA Mr.DINESH

Jr.Merchants --Ms.SONIA -MrYASH

PRODUCTION CO-ORDINATOR Mr.DILIP SHARMA EXECUTIVE Mr.SUNEET CUTTING INCHARGE Mr.RAM BILAS

ASST. INDUSTRIAL ENGINEER Mr.ABHISHEK GOEL

FLOOR INCHARGE

PACKING INCHARGE Mr.KAMAL

SAMPLING MASTERS

MACHINE MAINTAINENCE INCHARGE Mr.SUNIL

LINE SUPERVISORS

ELECTRICAL TECHNICIAN

PROJECT 1
COMPANY PROJECT I PROJECT I PROJECT II SWOT ANALYSIS

WASTAGE: ESTIMATION AND


CONTROL MEASURES

Time allotted for project 2 weeks(30th June- 12th July)

WASTAGE CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 1
OBJECTIVES
COMPANY PROJECT I PROJECT I PROJECT II SWOT ANALYSIS

To define wastage and outline the challenges to control it To calculate wastage of each department through study of styles To identify the stages of wastage To find waste percentage and the cost lost in wastage through the costing sheet

WASTAGE CONTROL

To develop formats on wastage for each department and the costing sheet
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 1
DEFINITION
COMPANY PROJECT I PROJECT I PROJECT II SWOT ANALYSIS

WHAT IS WASTAGE?

Waste is purchased raw material that is subsequently not sold as product.

Waste costs money. Reducing the

amount of waste the company


produces will increase profits and

WASTAGE CONTROL

help the company to remain

competitive.

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 1
STYLES
COMPANY PROJECT I PROJECT I PROJECT II SWOT ANALYSIS

To evaluate the amount of


wastage happening at various stages and its reasons, study was conducted on 3 styles.

BUYER: DKNY STYLE NO. KP-28 GARMENT: HOODIE JACKET

BUYER: NAUTICA STYLE NO. 7K3502 GARMENT: POLO

WASTAGE CONTROL

BUYER: NAUTICA STYLE NO. 7K3501 GARMENT: POLO


APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

FINDINGS

STYLES

STYLE KP28.

STYLE 7K3502.

STYLE 7K3501.

STAGES FABRIC

WASTAGE

WST % 6.40%

WASTAGE

WST % 3.20%

WASTAGE

WST % 8.50%

160KG

50KG

161KG

CUTTING
BUNDLING

1
28

0%
1.20%

0
0

0%
0%

37
77

0.83%
1.73%

WASHING / DYIENG
SEWING WASHING / DYEING PRINTING FINISHING TOTAL TOTAL LOSS IN WASTAGE 10 160 0.40% 6.40% 14.92% RS. 99,960. 13 0.52% 187 17 21 33 5.12% 0.49% 0.61% 0.96% 10.38% RS. 52,296. *Still in progress *Still in progress 14.26% RS. 76,041. 140 3.21%

WASTE PERCENTAGE AT VARIOUS STAGES

FINISHING

0.96% 6.40%

STYLE 7K3501 STYLE 7K3502 STYLE KP28

PRINTING 0 WASHING / DYEING


ST AGES

0.61% 0.40% 0.49% 3.21%

SEWING 0.52% 1.73% BUNDLING 0% 1.20% 0.83% CUTTING 0% 0%

5.12%

8.50% FABRIC 3.20% 6.40% 0.00% 1.00% 2.00% 3.00% 4.00% 5.00% 6.00% 7.00% 8.00% 9.00%

WASTE PERCENTAGE

WASTAGE STAGES
FABRIC SOURCED FROM OUTSIDE FABRIC ISSUED TO CUTTING PCS.CUT CUT PCS. ISSUED TO BUNDLING PCS. ISSUED TO PRINTING PCS. REC. FROM PRINTING PCS. ISSUED FROM BUNDLING TO SEWING PCS. FROM PROD. TO FINISHING PCS. ISSUED FROM FINISHINGTO WASHING/DYEING

PCS. REC. FROM WASHING/DYEING


PCS. ISSUED TO PRINTING PCS. REC. FROM PRINTING

PCS. ISSUED TO FINISHING


PCS. ISSUED TO PACKING

PROJECT 1
REASONS
COMPANY PROJECT I PROJECT I PROJECT II SWOT ANALYSIS

Fabric store
Inspection of the incoming fabric is very important. The fabric which is sourced from outside into the fabric store should be inspected for the defects.

WASTAGE CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 1
REASONS
COMPANY PROJECT I PROJECT I PROJECT II SWOT ANALYSIS

Wastes in the Cutting Room


Wastes in the cutting room can come from several sources including marker utilization, cutting waste and roll

remnants.

WASTAGE CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 1
Bundling Room
REASONS
The inspection is not 100%, some
COMPANY PROJECT I PROJECT I PROJECT II SWOT ANALYSIS

defective pieces go undetected and reach the stage of production

WASTAGE CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 1
Production floor
REASONS
The loaders load the lines with the
COMPANY PROJECT I PROJECT I PROJECT II SWOT ANALYSIS

bundles which pass on in the line


according to the operation. The operator may find the piece defective at any stage and dispose it off there and then only.

WASTAGE CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 1
REASONS
COMPANY PROJECT I PROJECT I PROJECT II SWOT ANALYSIS

Dyeing and Washing:


The wastage happens when either the pieces are lost or misplaced during the transportation.

WASTAGE CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 1
Printing / Embroidery:
REASONS
The printing on the garment
COMPANY PROJECT I PROJECT I PROJECT II SWOT ANALYSIS

does not match the standard


while in case of embroidery, it may not be on the correct place

on the garment or the number of


threads used are less and

WASTAGE CONTROL

desired effect is not obtained.

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 1
REASONS
COMPANY PROJECT I PROJECT I PROJECT II SWOT ANALYSIS

Finishing
Measurement / Fit defect Trims defect Pressing

WASTAGE CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 1 M
CAUSES
COMPANY PROJECT I PROJECT I PROJECT II SWOT ANALYSIS

AIN CAUSES OF WASTAGE IDENTIFIED ARE 1.Motion

2.Delay or waiting
3.Conveyance (moving things around) 4.Correction(defects) 5.Overprocessing 6.Inventory

WASTAGE CONTROL

7.Overproduction 8. Knowledge disconnection underutilization of resources

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

INFERENCES FROM QUESTIONNAIRE_

High

10 9 8 7 6 5 4 3 2 1

Delay or waiting Correction (defects) Knowledge disconnection or underutilization of resources Incorrect method of working Inventory Overprocessing Overproduction Poor quality check Human errors

Moderate

Low

PROJECT 1
WASTE REDUCTION METHODS
METHODS
Wastes in the Cutting Room
COMPANY PROJECT I PROJECT I PROJECT II SWOT ANALYSIS

Care in movement of work-inprogress Quality Control

WASTAGE CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 1
RECOMMENDATION 1
COMPANY PROJECT I PROJECT I PROJECT II SWOT ANALYSIS

WASTE STREAM REDUCTION


PRACTICES FOR APPAREL MANUFACTURERS TO DEVELOP A COMPREHENSIVE WASTE MANAGEMENT SYSTEM

WASTAGE CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 1
RECOMMENDATION 2
COMPANY PROJECT I PROJECT I PROJECT II SWOT ANALYSIS

WASTE STREAM REDUCTION


PRACTICES FOR APPAREL MANUFACTURERS

TECHNIQUES TO REDUCE INDUSTRY SPECIFIC WASTE

WASTAGE CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 1
RECOMMENDATION 3
COMPANY PROJECT I PROJECT I PROJECT II SWOT ANALYSIS

WASTE STREAM REDUCTION


PRACTICES FOR APPAREL

MANUFACTURERS
TO HANDLE SPECIFIC

OPERATIONAL WASTES

WASTAGE CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 1
MEASURES
COMPANY PROJECT I PROJECT I PROJECT II SWOT ANALYSIS

TO CONTROL COST LOST IN


WASTAGE Finish In Time Minimum Changes in Original Design Least Make Break/ Rework

WASTAGE CONTROL

Keep Check on Labour and


Material Costs

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 1
MEASURES
COMPANY PROJECT I PROJECT I PROJECT II SWOT ANALYSIS

Avoid Rework due To bad Quality


Optimise Usage of Material Enhance Labour Productivity through Skills Training Efficient Management Information Systems for Timely Decision

WASTAGE CONTROL

Making

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

INFERENCES FROM QUESTIONNAIRE


10 Finish in time Least make break/rework Keep check on labour and material costs Avoid rework due to bad quality Enhance Labour Productivity through Skills Training Efficient Management Information Systems for Timely Decision Making 9 8 7 6 Optimise Usage of Material Moderate 5 Avoid Lumpsum Contracts Minimum Changes in Original Design 4 3 2 Low 1 High

PROJECT 2
COMPANY PROJECT I PROJECT II PROJECTII SWOT ANALYSIS

To

Identify the critical quality checkpoints in the industry in


Fabric Store Accessory Store Spreading and Cutting Department Sewing Department Finishing Department

QUALITY CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 2
OBJECTIVE

To analyze the existing quality systems,


trends available in the system and study its utilization for corrective action.

COMPANY PROJECT I PROJECT II PROJECTII SWOT ANALYSIS

Propose

measures to improvise the quality system. study the existing quality control norms and procedure in various departments o make the quality monitoring process more efficient and reliable

To

QUALITY T CONTROL

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 2
Time allotted for project
METHODOLOGY
COMPANY PROJECT I PROJECT II PROJECTII SWOT ANALYSIS

2 weeks(30th June- 12th July)

Step 1 Study of the system Step 2 Review of existing quality system Step 3 - Analysis of quality checkpoints
followed by Buying House

Step 4 Analysis of checkpoints in the


industry (through flowcharts)

QUALITY CONTROL

Step 5 Identifying the problem areas Step 6 Suggesting ways to improve


production

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 2
INFERENCES

FROM QUESTIONNAIRE_:
COMPANY PROJECT I PROJECT II PROJECTII SWOT ANALYSIS

Most

of the rejections are followed by their own QC personnel and QC Head followed by inspection agencies and buying houses.

The

QUALITY CONTROL

approximate amount of money spent as a result of poor quality ranged from 5%-7% of sales.

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 2
INFERENCES
COMPANY

REASONS FOR REJECTS IN PERCENTAGE


Fab ric shad e variat io ns and o t her f ab ric d ef ect s

10% 10%

Wo rkmanship

Pro cessing

10%

50%
Po o r rub b ing Qualit y

20%

PROJECT I PROJECT II PROJECTII SWOT ANALYSIS

Cut t ing d ef ect s, d amag es d uring manuf act uring ( w ro ng b ut t o ning , et c)

CAUSES OF "BULK OF HARM"

Wrong Pat t ern 10% 20% Sewing Defect s

QUALITY CONTROL

30%

Fabric problems Improper washing and dy eing

40%

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

Fabric arrives from textile industry

IN-HOUSE QUALITY
INSPECTION
COMPANY
Fabric issued for embroidery

Inspection for Fabric Defects by checkers

Fabric issued to cutting department

Spreading Under constant supervision by Quality Controllers Cutting Under constant supervision by Quality Controllers Bundling

PROJECT I
Bundles issued for printing

Cutting Audit Bundles issued to sewing department

PROJECT II PROJECTII
Bundles issued to sewing lines

SWOT ANALYSIS

In-line inspection at critical pts(100% or according to criticality of style

QUALITY CONTROL

End-Line Inspection NOTE: QUALITY CHECKERS

Washing

B/A, B/H, B/T

QCs X

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

IN-HOUSE QUALITY
INSPECTION
COMPANY PROJECT I PROJECT II PROJECTII SWOT ANALYSIS

Finishing

Thread Cutting

General Checking

Measurement Checking On Iron tables

Thread Cutting

General Checking

Final Checking

Re-Final Checking

Measurement Checking

Balancing

QUALITY CONTROL

Needle Checking (needle detection)

Packing (Buying House inspection) NOTE: QUALITY CHECKERS Dispatch to Buyer

QCs

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 2
INFERENCES
COMPANY PROJECT I
50%

STAGES AT WHICH QUALITY PROBLEMS ARE FACED


50%

PROJECT II PROJECTII SWOT ANALYSIS

35% 40% 30% 20% 10% 8% 7%

QUALITY CONTROL

0%
M A N UF A C T UR IN G F IN ISH IN G A N D P A C KA GIN G C UT T IN G F A B R IC IN C OM IN G A N D ST OR A GE

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 2 R
INFERENCES
COMPANY
NO. OF GARMENTS WITH MARKINGS TO BE REMOVED BY SPOTTING
100 90 80 70 60 50 40 30 20 10
79 67 82

easons for which the quality is not given stress are:

Lack of presence of good markers in the cutting department


NO. OF GARM ENTS OUT OF 100
95 89 72 64 89 83 67

PROJECT I PROJECT II PROJECTII SWOT ANALYSIS

NO. OF GARM ENTS WI TH M ARKI NGS TO BE REM OVED BY SPOTTI NG

7/ 1/ 20 07

7/ 2/ 20 07

7/ 3/ 20 07

7/ 4/ 20 07

7/ 5/ 20 07

7/ 6/ 20 07

7/ 7/ 20 07

7/ 8/ 20 07

6/ 30 / 20 07

7/ 9/ 20 07

7/ 10 / 20 07

7/ 11 / 20 07

QUALITY CONTROL

DAT E

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

7/ 12 / 20 07

PROJECT 2
INFERENCES
Lack of proper formats for tracking the defects in accessory and fabric department Improper fabric inspection Improper ply alignment and varying ply tension COMPANY PROJECT I PROJECT II PROJECTII SWOT ANALYSIS

QUALITY CONTROL

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 2
INFERENCES
Shorter lead time and large orders COMPANY PROJECT I PROJECT II PROJECTII SWOT ANALYSIS

The number of alterations in the pieces is high.


LINE NO. 1 2 3 4 5 AVG :1st week 30THJUNE-5THJULY 13.22% 10.85% 16.26% 10.46% 8.19% 11.26% 14.40% 24.81% 7.43% AVG :2nd week 6TH JULY-12THJULY 10.71% 9.17% 9.72% 9.14% 7.37% 7.88% 17.89% 14.75% 21.99% TOTAL AVG 11.97% 10.01% 12.99% 9.80% 7.78% 9.57% 16.15% 19.78% 14.71%

QUALITY CONTROL

6 7 8 9

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 2
INFERENCES
COMPANY PROJECT I PROJECT II PROJECTII SWOT ANALYSIS

There is no proper system for repair control. A lot of time is spent in material handling Piling up of huge WIP in the lines
WIP AS ON 5TH JULY, 2007

8000 7000 6000 5000 4000 3000 2000 1000 0


452 809 1111 616 2400 2502 2500

7680

WIP AS ON 5TH JULY, 2007

7K3000

7K3000

7K3000

7K3000

7K3000
9

QUALITY CONTROL

CK#007(39000)

MG37U07

10

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

7K3000

PROJECT 2
INFERENCES
Lack of proper thread cutting machines
THREAD CUTTING OBSERVATION STYLE NO 7590

COMPANY PROJECT I PROJECT II PROJECTII SWOT ANALYSIS


400 350 300 250 200 150 100 50 0
356

NO. OF THREADS

326

212 139 105 56 5 21 67 19 63 18 28 29

bot t om neck underarm sleeve hem placket side seam label

upt o 3mm

3mm t o 1cm SIZE OF THREAD

above 1cm

QUALITY CONTROL

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 2
RECOMMENDATION I

Proper Training

COMPANY PROJECT I PROJECT II PROJECTII SWOT ANALYSIS

Supervisors Operators Quality checkers

QUALITY CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 2
RECOMMENDATION II
COMPANY PROJECT I PROJECT II PROJECTII SWOT ANALYSIS

To keep a check on repairs


Designate a special person (helper) as a repair person and a special rack at each examination point (in-line and final examination)
Examiner must mark the faults

Put the complete faulty bundle in the repair rack

Collection of the faulty bundles in the repair rack and record them on the repair list

Give the bundle to the appropriate operator

QUALITY CONTROL

Bundle should be returned back to the QC within 1 hour of its collection by the repair person

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 2
RECOMMENDATION III
COMPANY PROJECT I PROJECT II PROJECTII SWOT ANALYSIS

Random inspection by
Use of Random Number Table

Roaming QC

Use of Red and Yellow Card System Use of Uncleared Operators Recording

format_

QUALITY CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

PROJECT 2
RECOMMENDATION IV

Use of formats
Use of formats for tracking of defects in accessory (accessory audit report) and washing department(after and before wash report) for proper tracking of defects

COMPANY PROJECT I PROJECT II PROJECTII SWOT ANALYSIS

QUALITY CONTROL
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

STRENGTHS
COMPANY PROJECT I PROJECT II SWOT SWOT ANALYSIS ANALYSIS In-House Facility Good Working Relationship Capacity expansion

SWOT ANALYSIS
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

WEAKNESSES
Due to shorter lead times, the quality is not upto the mark. COMPANY PROJECT I PROJECT II SWOT SWOT ANALYSIS ANALYSIS Competition from other domestic knit industries.

No T&A charts
Data is stored in files instead of computers in many departments

SWOT ANALYSIS

Absence of production Planning Department

APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

OPPORTUNITIES
COMPANY PROJECT I PROJECT II SWOT SWOT ANALYSIS ANALYSIS

Export income from garments made from knit fabrics increased by 64%
Quotas are gone now for 31 months, and India has the opportunity to derive the maximum gains as a garment exporter. Consolidation of global retail industry.

SWOT ANALYSIS
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

THREATS
COMPANY PROJECT I PROJECT II SWOT SWOT ANALYSIS ANALYSIS

Richa Global Exports Pvt. Ltd. will have to gear up to global standards and expectations of quality, delivery schedules and still remains sharply cost competitive.
Indian Export house faces competition from Bangladesh, Indonesia, etc. as they are the lowest cost supplier in almost all categories

SWOT ANALYSIS
APPAREL INTERNSHIP AT RICHA GLOBAL EXPORTS PVT.LTD.,GURGAON

Thank You