A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L
(PERSIAPAN )
(PEKERJAAN TANAH )
(PONDASI )
(PEKERJAAN BETON )
(PEKERJAAN ATAP DAN PLAFOND )
(PEKERJAAN LANTAI dan DINDING )
(PEKERJAAN KUSEN )
(PENGECATAN )
(MEKANIKAL ELEKTRIKAL )
(SANITASI dan DRAINASE )
(SEPTICTANK dan RESAPAN (1m x 0,6m x 0,65m) )
(LAIN-LAIN )
JUMLAH
PPN 10 %
JUMLAH + PPN 10 %
DIBULATKAN
Terbilang
Jumlah Harga
(Rp)
63,674,129.75
1,834,986.60
35,824,325.22
468,285,380.49
76,252,857.17
114,461,446.90
21,000,000.00
19,157,985.29
19,157,985.29
6,508,336.43
4,281,830.00
21,513,206.73
851,952,469.86
85,195,246.99
937,147,716.85
937,147,000.00
###
###
REKAPITULASI
RENCANA ANGGARAN BIAYA
Pekerjaan
Lokasi
No.
A.
B.
C.
D.
E.
F.
Uraian Pekerjaan
(PERSIAPAN
(PEKERJAAN
(PONDASI )
(PEKERJAAN
(PEKERJAAN
(PEKERJAAN
)
TANAH )
BETON )
LANTAI dan DINDING )
KUSEN )
JUMLAH
DIBULATKAN
Terbilang
Jumlah Harga
(Rp)
6,074,129.75
1,834,986.60
35,824,325.22
257,756,924.89
68,535,201.07
4,800,000.00
374,825,567.52
374,825,000.00
###
###
(PERSIAPAN )
(Pembongkaran Bangunan Lama ) Ls
(Pembersihan Lokasi )
Ls
(Pembuatan Direksi Keet )
m2
12.000
(Pengukuran dan Pemasangan Bowplank
m' ) 65.000
###
187,429.40
###
93,448.15
(JUMLAH TOTAL A )
B.
1
2
3
(PEKERJAAN TANAH )
(Galian Tanah (dalam 0.5 m) )
(Pasir urug bawah pondasi )
(Urugan Tanah kembali )
C. (PONDASI )
1 Strouss 30, t = 3m
- Beton K225
- Bor Strous
2 (Poer )
- Beton K225
- Bekisting 2x pakai
- Besi Ulir
D. (PEKERJAAN BETON )
1 (Plat atap t= 8cm )
- Beton K225
- Bekisting 2x pakai
- Besi Polos - 8
2 (Plat lantai t= 12 cm )
- Beton K225
- Bekisting 2x pakai
- Besi Polos - 10
3 (Sloof 20/40 )
- Beton K225
- Bekisting 2x pakai
- Besi Polos -12
- Besi Polos - 8
4 (Kolom 30/30 )
- Beton K225
- Bekisting 2x pakai
- Besi Ulir - 12
- Besi Polos - 8
5 (Kolom20/30 )
- Beton K225
- Bekisting 2x pakai
- Besi Ulir - 10
- Besi Polos
6 (Kolom 20/20 )
m3
m3
m3
41.760
25,137.50
4.176
123,350.00
41.760
6,468.75
(JUMLAH TOTAL B )
810,603.40
17,533.00
9,371,470.00
187,429.40
57,600,000.00
6,074,129.75
63,674,129.75
1,049,742.00
515,109.60
270,135.00
1,834,986.60
m3
m'
20.400
145.000
16,536,309.33
2,542,285.00
m3
m3
kg
0.432
810,603.40
350,180.67
45.380
114,981.07
5,217,841.02
757.400
14,758.00
11,177,709.20
(JUMLAH TOTAL C ) 35,824,325.22
m3
m3
kg
143.200
93.600
707.000
810,603.40
196,755.32
14,548.00
116,078,406.64
18,416,298.09
10,285,436.00
m3
m3
kg
161.100
93.600
1,080.000
810,603.40
196,755.32
14,548.00
130,588,207.47
18,416,298.09
15,711,840.00
m3
m3
kg
kg
7.920
55.350
913.752
150.965
810,603.40
72,056.70
14,548.00
14,548.00
6,419,978.91
3,988,338.15
13,293,264.10
2,196,238.82
m3
m3
kg
kg
8.613
91.000
1,019.770
131.100
810,603.40
144,655.32
14,758.00
14,548.00
6,981,727.07
13,163,634.25
15,049,765.66
1,907,242.80
m3
m3
kg
kg
5.742
102.000
472.370
85.680
810,603.40
144,655.32
14,758.00
14,548.00
4,654,484.71
14,754,842.79
6,971,236.46
1,246,472.64
F.
1
2
4
5
6
7
###
1
2
3
4
5
G.
1
2
3
(PEKERJAAN KUSEN )
PJ1
Jkaca
J hias
bh
bh
bh
195.160
62,968.25
12,288,883.67
163.300
163.300
69,265.08
69,265.08
11,310,986.75
11,310,986.75
170.760
50,000.00
8,538,000.00
210.360
150,000.00
31,554,000.00
62.500
20,000.00
1,250,000.00
(JUMLAH TOTAL E ) 76,252,857.17
164.000
13.800
79.200
158.400
158.400
369.000
322,804.25
128,746.25
73,107.49
29,025.41
17,303.50
6,684.80
79.200
355,084.68
79.200
80,418.24
158.400
31,927.95
158.400
19,033.85
215.600
7,353.28
(JUMLAH TOTAL F )
52,939,897.00
1,776,698.25
5,790,113.21
4,597,625.26
2,740,874.40
2,466,691.20
28,122,706.26
6,369,124.53
5,057,387.79
3,014,961.84
1,585,367.17
###
2.000
###
4,800,000.00
6.000
950,000.00
5,700,000.00
4.000
### 10,500,000.00
(JUMLAH TOTAL G ) 21,000,000.00
H. (PENGECATAN )
Lantai 1
1 Pengecatan Dinding
2 Pengecatan Plafond
m2
m2
167.013
167.013
Lantai 2
1 Pengecatan Dinding
2 Pengecatan Plafond
m2
m2
164.140
30,905.77
5,072,872.27
163.300
29,805.77
4,867,281.42
(JUMLAH TOTAL H ) 19,157,985.29
I.
1
2
3
4
5
(MEKANIKAL ELEKTRIKAL )
Pasang Panel Box dan MCB
Pek. Instalasi Titik Lampu
Pek. Instalasi Stop Kontak
Pas. Saklar tunggal
Pas. Saklar ganda
unit
m'
titik
titik
titik
1.000
45.650
8.000
8.000
4.000
28,096.15
27,096.15
###
156,550.00
65,682.50
15,575.00
20,975.00
4,692,422.30
4,525,409.30
1,624,125.00
7,146,507.50
525,460.00
124,600.00
83,900.00
9.46
23,229.75
3.84
113,544.75
2
21,825.00
1
460,859.25
1
13,125.00
2
46,725.00
1
563,147.25
1
321,357.25
82.4
52,876.00
(JUMLAH TOTAL J )
219,753.44
436,011.84
43,650.00
460,859.25
13,125.00
93,450.00
563,147.25
321,357.25
4,356,982.40
6,508,336.43
K.
(LAIN-LAIN )
1 Railling Tangga
2 Beton Canopy
- Beton K225
- Bekisting 2x pakai
- Besi Polos
3 Tandon Air
Kolom 20/20
- Beton K225
- Bekisting 2x pakai
- Besi Ulir
- Besi Polos
4 Balok 15/20
- Beton K225
- Bekisting 2x pakai
- Besi Ulir
- Besi Polos
- Pelat
m3
m3
m2
m2
0.390
0.060
4.535
9.070
25,137.50
123,350.00
29,025.41
32,061.72
9,803.63
7,401.00
131,630.24
290,799.78
m3
m3
kg
kg
0.563
5.630
73.657
53.372
810,603.40
150,908.67
14,758.00
14,548.00
456,369.71
849,615.82
1,087,034.29
776,461.68
m3
m3
kg
m'
0.048
0.480
4.320
0.5
810,603.40
196,755.32
14,548.00
23,229.75
38,908.96
94,442.55
62,847.36
11,614.88
m3
m3
m2
1.000
0.200
4.000
25,137.50
218,916.00
29,025.41
25,137.50
43,783.20
116,101.65
m3
m3
kg
m1
m3
m2
0.800
72,056.70
0.480
14,548.00
4.320
14,548.00
2.000
52,876.00
0.150
187,000.00
1.000
18,600.00
(JUMLAH TOTAL K )
57,645.36
6,983.04
62,847.36
105,752.00
28,050.00
18,600.00
4,281,830.00
m2
8.100
140,000.00
1,134,000.00
m3
m2
kg
1.800
5.270
59.551
810,603.40
150,908.67
14,548.00
1,459,086.12
795,288.70
866,347.95
m3
m2
kg
kg
1.240
30.720
136.390
12.230
810,603.40
150,908.67
14,758.00
14,548.00
m3
m2
kg
kg
m2
0.360
30.720
136.390
12.230
1.800
810,603.40
150,908.67
14,548.00
23,229.75
810,603.40
1,005,148.21
4,635,914.39
2,012,843.62
177,922.04
291,817.22
4,635,914.39
1,984,201.72
284,099.84
1,459,086.12
21,513,206.73
B.
1
2
3
(PERSIAPAN )
(Pembongkaran Bangunan Lama ) Ls
(Pembersihan Lokasi )
Ls
(Pengukuran dan Pemasangan Bowplank
m' ) 65.000
(PEKERJAAN TANAH )
(Galian Tanah (dalam 0.5 m) )
(Pasir urug bawah pondasi )
(Urugan Tanah kembali )
C. (PONDASI )
1 Strouss 30, t = 3m
- Beton K225
- Bor Strous
2 (Poer )
- Beton K225
- Bekisting 2x pakai
- Besi Ulir
D. (PEKERJAAN BETON )
2 (Plat lantai t= 12 cm )
- Beton K225
- Bekisting 2x pakai
- Besi Polos - 10
3 (Sloof 20/40 )
- Beton K225
- Bekisting 2x pakai
- Besi Polos -12
- Besi Polos - 8
4 (Kolom 30/30 )
- Beton K225
- Bekisting 2x pakai
- Besi Ulir - 12
- Besi Polos - 8
6 (Balok 20/30 )
- Beton K225
- Bekisting 2x pakai
- Besi Ulir
- Besi Polos
m3
m3
m3
###
187,429.40
93,448.15
9,371,470.00
187,429.40
6,074,129.75
(JUMLAH TOTAL A )
6,074,129.75
41.760
25,137.50
4.176
123,350.00
41.760
6,468.75
(JUMLAH TOTAL B )
1,049,742.00
515,109.60
270,135.00
1,834,986.60
m3
m'
20.400
145.000
810,603.40
17,533.00
16,536,309.33
2,542,285.00
m3
m3
kg
0.432
810,603.40
350,180.67
45.380
114,981.07
5,217,841.02
757.400
14,758.00
11,177,709.20
(JUMLAH TOTAL C ) 35,824,325.22
m3
m3
kg
161.100
93.600
1,080.000
810,603.40
196,755.32
14,548.00
130,588,207.47
18,416,298.09
15,711,840.00
m3
m3
kg
kg
7.920
55.350
913.752
150.965
810,603.40
72,056.70
14,548.00
14,548.00
6,419,978.91
3,988,338.15
13,293,264.10
2,196,238.82
m3
m3
kg
kg
8.613
91.000
1,019.770
131.100
810,603.40
144,655.32
14,758.00
14,548.00
6,981,727.07
13,163,634.25
15,049,765.66
1,907,242.80
m3
m3
kg
kg
5.978
810,603.40
59.780
150,908.67
932.360
14,758.00
165.900
14,548.00
(JUMLAH TOTAL D )
4,845,787.12
9,021,320.38
13,759,768.88
2,413,513.20
###
164.000
79.200
52,939,897.00
5,790,113.21
E.
322,804.25
73,107.49
bh
2.000
###
(JUMLAH TOTAL G )
4,800,000.00
4,800,000.00
URAIAN KEGIATAN
Masjid
:)
DUKUH KUPANG
:
(HARGA SATUAN )
KOEF. SATUAN
(HARGA (Rp.) )
((Rp.) )
m1
Mandor
0.005
O.H
60,000.00
300.00
0.010
O.H
50,000.00
500.00
Tukang Kayu
0.100
O.H
50,000.00
5,000.00
0.100
O.H
32,500.00
3,250.00
0.007
m3
4,478,450.00
31,349.15
0.012
m3
4,392,000.00
52,704.00
0.020
kg
17,250.00
345.00
Bahan :
(Nilai HSPK : )
93,448.15
m3
Mandor
0.024
O.H
60,000.00
1,440.00
0.720
O.H
32,500.00
23,400.00
0.050
Buah
5,950.00
297.50
Peralatan:
Keranjang
3
(Nilai HSPK : )
25,137.50
m3
Mandor
0.006
O.H
60,000.00
375.00
0.188
O.H
32,500.00
6,093.75
(Nilai HSPK : )
4 Pengurugan Pasir (PADAT)
6,468.75
m3
Tenaga:
Mandor
0.025
O.H
60,000.00
1,500.00
Pekerja Terampil
0.250
O.H
35,000.00
8,750.00
1.200
m3
94,250.00
113,100.00
Bahan :
Pasir Urug
5
(Nilai HSPK : )
123,350.00
m3
Tenaga:
Mandor
0.075
O.H
60,000.00
4,500.00
0.075
O.H
50,000.00
3,750.00
Tukang Batu
0.750
O.H
50,000.00
37,500.00
1.500
O.H
32,500.00
48,750.00
2.720
Zak
65,900.00
179,248.00
Pasir Pasang
0.544
m3
126,650.00
68,897.60
1.200
m3
Bahan :
107,550.00
(Nilai HSPK : )
129,060.00
471,705.60
URAIAN KEGIATAN
Masjid
:)
DUKUH KUPANG
:
(HARGA SATUAN )
KOEF. SATUAN
(HARGA (Rp.) )
((Rp.) )
m3
Tenaga:
Mandor
0.039
O.H
60,000.00
2,340.00
0.039
O.H
50,000.00
1,950.00
Tukang Batu
0.390
O.H
50,000.00
19,500.00
0.780
O.H
32,500.00
25,350.00
1.200
m3
107,550.00
129,060.00
Pasir urug
0.432
m3
Bahan :
94,250.00
(Nilai HSPK : )
40,716.00
218,916.00
m1
Tenaga:
Mandor
0.020
O.H
60,000.00
1,200.00
0.400
O.H
32,500.00
13,000.00
0.333
jam
10,000.00
3,333.00
Peralatan:
Sewa alat bantu strouss pile
8
(Nilai HSPK : )
17,533.00
m2
Tenaga:
Mandor
0.015
O.H
60,000.00
900.00
0.010
O.H
50,000.00
500.00
Tukang Batu
0.100
O.H
50,000.00
5,000.00
0.300
O.H
32,500.00
9,750.00
0.287
Zak
65,900.00
18,939.66
Pasir Pasang
0.043
m3
126,650.00
5,445.95
70.000
Buah
550.00
38,500.00
Bahan :
(Nilai HSPK : )
79,035.61
m2
Tenaga:
Mandor
0.015
O.H
60,000.00
900.00
0.010
O.H
50,000.00
500.00
Tukang Batu
0.100
O.H
50,000.00
5,000.00
0.300
O.H
32,500.00
9,750.00
0.194
Zak
65,900.00
12,758.24
Pasir Pasang
0.045
m3
126,650.00
5,699.25
70.000
Buah
550.00
38,500.00
Bahan :
(Nilai HSPK : )
73,107.49
10
URAIAN KEGIATAN
Masjid
:)
DUKUH KUPANG
:
(HARGA SATUAN )
KOEF. SATUAN
(HARGA (Rp.) )
((Rp.) )
m2
Tenaga:
Mandor
0.015
O.H
60,000.00
900.00
0.010
O.H
50,000.00
500.00
Tukang Batu
0.100
O.H
50,000.00
5,000.00
0.300
O.H
32,500.00
9,750.00
0.230
Zak
65,900.00
15,157.00
Pasir Pasang
0.040
m3
126,650.00
5,066.00
70.000
Buah
Bahan :
550.00
(Nilai HSPK : )
Plesteran 1 Pc : 3 Ps tebal 15
mm
Tenaga:
38,500.00
74,873.00
m2
Mandor
0.015
O.H
60,000.00
900.00
0.015
O.H
50,000.00
750.00
Tukang Batu
0.150
O.H
50,000.00
7,500.00
0.300
O.H
32,500.00
9,750.00
0.156
Zak
65,900.00
10,248.77
Pasir Pasang
0.023
m3
126,650.00
2,912.95
Bahan :
(Nilai HSPK : )
Plesteran 1 Pc : 4 Ps tebal 15
12
mm
Tenaga:
32,061.72
m2
Mandor
0.015
O.H
60,000.00
900.00
0.015
O.H
50,000.00
750.00
Tukang Batu
0.150
O.H
50,000.00
7,500.00
0.300
O.H
32,500.00
9,750.00
0.125
Zak
65,900.00
8,224.32
Pasir Pasang
0.024
m3
126,650.00
3,039.60
Bahan :
13
(Nilai HSPK : )
Plesteran 1 Pc : 5 Ps tebal 15
mm
Tenaga:
30,163.92
m2
Mandor
0.015
O.H
60,000.00
900.00
0.015
O.H
50,000.00
750.00
Tukang Batu
0.150
O.H
50,000.00
7,500.00
0.300
O.H
32,500.00
9,750.00
0.104
Zak
65,900.00
6,832.51
Pasir Pasang
0.026
m3
126,650.00
3,292.90
Bahan :
(Nilai HSPK : )
29,025.41
14
URAIAN KEGIATAN
Masjid
:)
DUKUH KUPANG
:
(HARGA SATUAN )
KOEF. SATUAN
(HARGA (Rp.) )
((Rp.) )
m1
Mandor
0.002
O.H
60,000.00
120.00
0.038
O.H
50,000.00
1,900.00
Tukang Batu
0.038
O.H
50,000.00
1,900.00
0.057
O.H
32,500.00
1,852.50
0.010
Zak
65,900.00
659.00
Pasir Pasang
0.002
m3
Bahan :
126,650.00
(Nilai HSPK : )
15 Acian
253.30
6,684.80
m2
Tenaga:
Mandor
0.017
O.H
60,000.00
1,020.00
0.010
O.H
50,000.00
500.00
Tukang Batu
0.100
O.H
50,000.00
5,000.00
0.200
O.H
32,500.00
6,500.00
0.065
Zak
Bahan :
Semen portland (50kg)
65,900.00
(Nilai HSPK : )
4,283.50
17,303.50
m2
Mandor
0.019
O.H
60,000.00
1,114.29
0.019
O.H
50,000.00
928.57
Tukang Kayu
0.186
O.H
50,000.00
9,285.71
Pekerja Terampil
0.371
O.H
35,000.00
13,000.00
0.020
m3
4,392,000.00
87,840.00
0.150
Kg
17,250.00
2,587.50
0.050
Ltr
4,500.00
225.00
Bahan :
(Nilai HSPK : )
17 Pembesian dengan besi polos
114,981.07
Kg
Tenaga:
Mandor
0.000
O.H
60,000.00
24.00
Tukang Besi
0.007
O.H
40,000.00
280.00
0.001
O.H
50,000.00
35.00
0.007
O.H
32,500.00
227.50
1.050
Kg
13,100.00
13,755.00
Kawat Beton
0.015
Kg
15,100.00
226.50
Bahan :
(Nilai HSPK : )
14,548.00
URAIAN KEGIATAN
Masjid
:)
DUKUH KUPANG
:
(HARGA SATUAN )
KOEF. SATUAN
(HARGA (Rp.) )
((Rp.) )
Kg
Tenaga:
Mandor
0.000
O.H
60,000.00
24.00
Tukang Besi
0.007
O.H
40,000.00
280.00
0.001
O.H
50,000.00
35.00
0.007
O.H
32,500.00
227.50
1.050
Kg
13,300.00
13,965.00
Kawat Beton
0.015
Kg
15,100.00
226.50
Bahan :
(Nilai HSPK : )
19 Pekerjaan Beton Rabat K-100
14,758.00
m3
Tenaga:
Mandor
0.083
O.H
60,000.00
4,980.00
0.028
O.H
50,000.00
1,400.00
Tukang Batu
0.275
O.H
50,000.00
13,750.00
1.650
(O.H )
32,500.00
53,625.00
4.940
Zak
65,900.00
325,546.00
Pasir Beton
0.543
m3
130,650.00
70,942.95
Bahan :
0.500
m3
169,350.00
84,675.00
215.0000
Ltr
100.00
21,500.00
0.350
Jam
75,000.00
26,250.00
Peralatan:
Sewa Alat Bantu
(Nilai HSPK : )
602,668.95
m3
Mandor
0.080
O.H
60,000.00
4,819.00
0.024
O.H
50,000.00
1,200.00
Tukang Batu
0.243
O.H
50,000.00
12,131.67
1.205
O.H
32,500.00
39,156.54
6.825
Zak
65,900.00
449,767.50
Pasir Beton
0.499
m3
130,650.00
65,233.55
Bahan :
1.060
m3
169,350.00
179,460.20
215.000
Ltr
100.00
21,500.00
0.482
Jam
40,000.00
19,276.00
Water Tanker
0.049
Jam
52,500.00
2,567.25
Concrete Vibrator
0.482
Jam
18,000.00
8,674.20
0.091
Jam
75,000.00
6,817.50
Air
Peralatan:
(Nilai HSPK : )
810,603.40
URAIAN KEGIATAN
Masjid
:)
DUKUH KUPANG
:
(HARGA SATUAN )
KOEF. SATUAN
(HARGA (Rp.) )
((Rp.) )
m2
Mandor
0.0186
O.H
60,000.00
1,114.29
0.0186
O.H
50,000.00
928.57
Tukang Kayu
0.1857
O.H
50,000.00
9,285.71
Pekerja Terampil
0.3714
O.H
35,000.00
13,000.00
0.0200
m3
1,996,250.00
39,925.00
0.1500
Kg
17,250.00
2,587.50
0.0500
Ltr
4,500.00
225.00
Bahan :
(Nilai HSPK : )
67,066.07
URAIAN KEGIATAN
Masjid
:)
DUKUH KUPANG
:
(HARGA SATUAN )
KOEF. SATUAN
(HARGA (Rp.) )
((Rp.) )
m2
Mandor
0.0186
O.H
60,000.00
1,114.29
0.0186
O.H
50,000.00
928.57
Tukang Kayu
0.1857
O.H
50,000.00
9,285.71
Pekerja Terampil
0.3714
O.H
35,000.00
13,000.00
0.0225
m3
1,996,250.00
44,915.63
0.1500
Kg
17,250.00
2,587.50
0.0500
Ltr
4,500.00
225.00
Bahan :
(Nilai HSPK : )
23
72,056.70
m2
Tenaga:
Mandor
0.0236
O.H
60,000.00
1,414.29
0.0236
O.H
50,000.00
1,178.57
Tukang Kayu
0.2357
O.H
50,000.00
11,785.71
Pekerja Terampil
0.4714
O.H
35,000.00
16,500.00
0.0200
m3
1,996,250.00
39,925.00
0.2000
Kg
17,250.00
3,450.00
0.1000
Ltr
4,500.00
450.00
0.0075
m3
4,168,900.00
31,266.75
Taekwood/multipleks tebal 9 mm
0.1750 Lembar
72,200.00
12,635.00
1.0000 Batang
26,050.00
26,050.00
Bahan :
(Nilai HSPK : )
144,655.32
m2
Mandor
0.0236
O.H
60,000.00
1,414.29
0.0236
O.H
50,000.00
1,178.57
Tukang Kayu
0.2357
O.H
50,000.00
11,785.71
Pekerja Terampil
0.4714
O.H
35,000.00
16,500.00
0.0200
m3
1,996,250.00
39,925.00
0.2000
Kg
17,250.00
3,450.00
0.1000
Ltr
4,500.00
450.00
0.0090
m3
4,168,900.00
37,520.10
Taekwood/multipleks tebal 9 mm
0.1750 Lembar
72,200.00
12,635.00
1.0000 Batang
26,050.00
26,050.00
Bahan :
(Nilai HSPK : )
150,908.67
URAIAN KEGIATAN
25
Masjid
:)
DUKUH KUPANG
:
(HARGA SATUAN )
KOEF. SATUAN
(HARGA (Rp.) )
((Rp.) )
m2
Mandor
0.0236
O.H
60,000.00
1,414.29
0.0236
O.H
50,000.00
1,178.57
Tukang Kayu
0.2357
O.H
50,000.00
11,785.71
Pekerja Terampil
0.4714
O.H
35,000.00
16,500.00
0.0200
m3
1,996,250.00
39,925.00
0.2000
Kg
17,250.00
3,450.00
0.1000
Ltr
4,500.00
450.00
0.0075
m3
4,168,900.00
31,266.75
Taekwood/multipleks tebal 9 mm
0.1750 Lembar
72,200.00
12,635.00
3.0000 Batang
26,050.00
78,150.00
Bahan :
26
(Nilai HSPK : )
196,755.32
m2
Mandor
0.0236
O.H
60,000.00
1,414.29
0.0236
O.H
50,000.00
1,178.57
Tukang Kayu
0.2357
O.H
50,000.00
11,785.71
Pekerja Terampil
0.4714
O.H
35,000.00
16,500.00
0.0150
m3
1,996,250.00
29,943.75
0.2000
Kg
17,250.00
3,450.00
0.0750
Ltr
4,500.00
337.50
0.0075
m3
4,168,900.00
31,266.75
Taekwood/multipleks tebal 9 mm
0.1750 Lembar
72,200.00
12,635.00
1.0000 Batang
26,050.00
26,050.00
Bahan :
(Nilai HSPK : )
134,561.57
0.540
ljr
31,925.00
17,239.50
hollow 4.4
0.275
ljr
41,500.00
11,412.50
kawat BWG
0.250
kg
26,750.00
6,687.50
Suspention root
0.150
m'
17,325.00
2,598.75
18.000
bh
200.00
3,600.00
Mandor
0.076
O.H
60,000.00
4,560.00
0.032
hari
50,000.00
1,600.00
Tukang besi
0.320
hari
40,000.00
12,800.00
0.076
O.H
fasting nails
Tenaga:
32,500.00
(Nilai HSPK : )
2,470.00
62,968.25
URAIAN KEGIATAN
Masjid
:)
DUKUH KUPANG
:
(HARGA SATUAN )
KOEF. SATUAN
(HARGA (Rp.) )
((Rp.) )
m2
tebal 9 mm
Bahan :
Kalsiboardboard(120x240x0.6)mm
0.347
lbr
124,750.00
43,288.25
0.110
kg
27,550.00
3,030.50
Tenaga:
Mandor
0.005
O.H
60,000.00
300.00
0.005
hari
50,000.00
250.00
Tukang Kayu
0.050
hari
50,000.00
2,500.00
0.100
O.H
32,500.00
3,250.00
(Nilai HSPK : )
29 Pasang list plafond Gypsum
52,618.75
m1
Bahan :
List gipsum motif uk.10x10
1.050
m'
10,400.00
10,920.00
Mandor
0.001
O.H
60,000.00
60.00
0.002
O.H
50,000.00
100.00
Tukang Kayu
0.021
O.H
50,000.00
1,050.00
0.021
O.H
Tenaga:
30
32,500.00
(Nilai HSPK : )
682.50
12,812.50
m2
Mandor
0.035
O.H
60,000.00
2,100.00
0.035
O.H
50,000.00
1,750.00
Tukang Batu
0.350
O.H
50,000.00
17,500.00
0.700
O.H
32,500.00
22,750.00
Bahan :
Semen portland (50kg)
0.200
Zak
65,900.00
13,180.00
Semen Warna
1.300
(Kg )
7,750.00
10,075.00
Pasir Pasang
0.045
(m3 )
126,650.00
5,699.25
1.110
m2
225,000.00
249,750.00
(Nilai HSPK : )
322,804.25
m2
Mandor
0.035
O.H
60,000.00
2,100.00
0.035
O.H
50,000.00
1,750.00
Tukang Batu
0.350
O.H
50,000.00
17,500.00
0.700
O.H
32,500.00
22,750.00
Bahan :
Semen portland (50kg)
0.200
Zak
65,900.00
13,180.00
Semen Warna
1.300
(Kg )
7,750.00
10,075.00
Pasir Pasang
0.045
(m3 )
126,650.00
5,699.25
1.120
m2
415,600.00
465,472.00
URAIAN KEGIATAN
Masjid
:)
DUKUH KUPANG
:
(HARGA SATUAN )
KOEF. SATUAN
(HARGA (Rp.) )
((Rp.) )
(Nilai HSPK : )
538,526.25
URAIAN KEGIATAN
Masjid
:)
DUKUH KUPANG
:
(HARGA SATUAN )
KOEF. SATUAN
(HARGA (Rp.) )
((Rp.) )
32 Pasang Marmer
m2
Tenaga:
Mandor
0.035
O.H
60,000.00
2,100.00
0.035
O.H
50,000.00
1,750.00
Tukang Batu
0.350
O.H
50,000.00
17,500.00
0.700
O.H
32,500.00
22,750.00
0.200
Zak
65,900.00
13,180.00
Semen Warna
1.300
(Kg )
7,750.00
10,075.00
Pasir Pasang
0.045
(m3 )
126,650.00
5,699.25
Batu Marmer
1.120
m2
194,350.00
217,672.00
Bahan :
33
(Nilai HSPK : )
290,726.25
m2
Mandor
0.035
O.H
60,000.00
2,100.00
0.035
O.H
50,000.00
1,750.00
Tukang Batu
0.350
O.H
50,000.00
17,500.00
0.700
O.H
32,500.00
22,750.00
0.200
Zak
65,900.00
13,180.00
Semen Warna
1.620
Kg
7,750.00
12,555.00
Pasir Pasang
0.045
m3
126,650.00
5,699.25
1.060
m2
Bahan :
50,200.00
(Nilai HSPK : )
53,212.00
128,746.25
0.045
O.H
60,000.00
2,700.00
0.045
O.H
50,000.00
2,250.00
Tukang Batu
0.450
O.H
50,000.00
22,500.00
0.900
O.H
32,500.00
29,250.00
0.186
Zak
65,900.00
12,257.40
Semen Warna
1.940
Kg
7,750.00
15,035.00
Pasir Pasang
0.045
m3
126,650.00
5,699.25
1.060
m2
Bahan :
35
45,000.00
(Nilai HSPK : )
47,700.00
137,391.65
m2
Mandor
0.003
O.H
60,000.00
0.006
O.H
50,000.00
300.00
Tukang cat
0.060
O.H
45,000.00
2,700.00
Pekerja terampil
0.060
O.H
32,500.00
1,950.00
Bahan :
180.00
URAIAN KEGIATAN
Masjid
:)
DUKUH KUPANG
:
(HARGA SATUAN )
KOEF. SATUAN
(HARGA (Rp.) )
((Rp.) )
Plamir
0.100
Kg
13,300.00
1,330.00
Kapi
0.050
Buah
3,500.00
175.00
Kertas gosok
0.500
Lembar
3,800.00
1,900.00
0.470
Kg
41,145.00
19,338.15
Roll
0.010
Buah
22,300.00
(Nilai HSPK : )
223.00
28,096.15
URAIAN KEGIATAN
Masjid
:)
DUKUH KUPANG
:
(HARGA SATUAN )
KOEF. SATUAN
(HARGA (Rp.) )
((Rp.) )
36 Pengecatan Plafond
m2
Tenaga:
Mandor
0.003
O.H
60,000.00
180.00
0.004
O.H
50,000.00
200.00
Tukang cat
0.040
O.H
45,000.00
1,800.00
Pekerja terampil
0.060
O.H
32,500.00
1,950.00
Kapi
0.050
Buah
3,500.00
175.00
Plamir
0.100
Kg
13,300.00
1,330.00
0.470
Kg
41,145.00
19,338.15
Kertas Gosok
0.500
lembar
3,800.00
1,900.00
Roll
0.010
Buah
Bahan :
22,300.00
(Nilai HSPK : )
223.00
27,096.15
Set
Tenaga:
Kepala Tukang Listrik
0.020
O.H
50,000.00
1,000.00
Tukang Listrik
0.300
O.H
50,000.00
15,000.00
Pekerja terampil
0.250
O.H
32,500.00
8,125.00
MCCB 25 A
6.000
Buah
125,000.00
750,000.00
MCCB 30 A
2.000
Buah
200,000.00
400,000.00
1.000
Buah
450,000.00
450,000.00
Bahan :
38
Titik
0.050
O.H
50,000.00
2,500.00
Tukang Listrik
0.200
O.H
50,000.00
10,000.00
Pekerja Terampil
0.001
O.H
32,500.00
32.50
Bahan :
Stop Kontak (broco)
1.000
Buah
18,150.00
18,150.00
10.000
m1
2,450.00
24,500.00
1.000
Batang
8,500.00
8,500.00
T Doos Pvc
1.000
Buah
2,000.00
(Nilai HSPK : )
2,000.00
65,682.50
39
URAIAN KEGIATAN
Masjid
:)
DUKUH KUPANG
:
(HARGA SATUAN )
KOEF. SATUAN
(HARGA (Rp.) )
((Rp.) )
Titik
0.050
O.H
50,000.00
2,500.00
Tukang Listrik
0.500
O.H
50,000.00
25,000.00
Pekerja Terampil
0.300
O.H
32,500.00
9,750.00
4.000
Roll
7,650.00
30,600.00
30.000
m1
2,450.00
73,500.00
1.000
Batang
8,500.00
8,500.00
T Doos Pvc
1.000
Buah
2,000.00
2,000.00
Fiting Plafon
1.000
Buah
Bahan :
Isolator
Kabel NYA 500 VOLT 2 X 2,5 mm2
4,700.00
(Nilai HSPK : )
4,700.00
156,550.00
Titik
Tenaga:
Kepala Tukang Listrik
0.005
O.H
50,000.00
250.00
Tukang Listrik
0.020
O.H
50,000.00
1,000.00
Pekerja Terampil
0.010
O.H
32,500.00
325.00
1.000
Buah
14,000.00
14,000.00
Bahan :
Saklar Tunggal Broco
(Nilai HSPK : )
41 Pemasangan Saklar Ganda
15,575.00
Titik
Tenaga:
Kepala Tukang Listrik
0.005
O.H
50,000.00
250.00
Tukang Listrik
0.020
O.H
50,000.00
1,000.00
Pekerja Terampil
0.010
O.H
32,500.00
325.00
1.000
Buah
Bahan :
Saklar Ganda Broco
19,400.00
(Nilai HSPK : )
19,400.00
20,975.00
Buah
Tenaga:
Kepala Tukang Listrik
0.020
O.H
50,000.00
1,000.00
Tukang Listrik
0.100
O.H
50,000.00
5,000.00
Pekerja Terampil
0.150
O.H
32,500.00
4,875.00
Lampu SL 14 Watt
1.000
Buah
30,000.00
30,000.00
Fitting/rumah Lampu
1.000
Buah
100,000.00
100,000.00
Bahan :
(Nilai HSPK : )
140,875.00
URAIAN KEGIATAN
Masjid
:)
DUKUH KUPANG
:
(HARGA SATUAN )
KOEF. SATUAN
(HARGA (Rp.) )
((Rp.) )
Buah
Tenaga:
Kepala Tukang Listrik
0.020
O.H
50,000.00
1,000.00
Tukang Listrik
0.100
O.H
50,000.00
5,000.00
Pekerja Terampil
0.150
O.H
32,500.00
4,875.00
1.000
(bh )
50,000.00
50,000.00
Fitting/rumah Lampu
1.000
(bh )
100,000.00
100,000.00
Bahan :
(Nilai HSPK : )
160,875.00
m1
Mandor
0.004
O.H
60,000.00
246.00
0.014
O.H
50,000.00
675.00
Tukang Pipa
0.135
O.H
40,000.00
5,400.00
0.081
O.H
32,500.00
2,632.50
Bahan :
45
1.200
m1
8,812.50
10,575.00
Perlengkapan
0.350
Harga
10,575.00
3,701.25
(Nilai HSPK : )
23,229.75
m1
Mandor
0.004
O.H
60,000.00
246.00
0.014
O.H
50,000.00
675.00
Tukang Pipa
0.135
O.H
40,000.00
5,400.00
0.081
O.H
32,500.00
2,632.50
1.200
m1
64,562.50
77,475.00
Perlengkapan
0.350
Harga
Bahan :
46
77,475.00
(Nilai HSPK : )
27,116.25
113,544.75
Buah
Mandor
0.005
O.H
60,000.00
300.00
0.010
O.H
50,000.00
500.00
Tukang Pipa
0.100
O.H
40,000.00
4,000.00
0.010
O.H
32,500.00
325.00
Kran Air
1.000
Buah
14,850.00
14,850.00
Seal Tape
1.000
roll
Bahan :
1,850.00
(Nilai HSPK : )
1,850.00
21,825.00
URAIAN KEGIATAN
Masjid
:)
DUKUH KUPANG
:
(HARGA SATUAN )
KOEF. SATUAN
(HARGA (Rp.) )
((Rp.) )
Buah
Tenaga:
Mandor
0.005
O.H
60,000.00
300.00
0.010
O.H
50,000.00
500.00
Tukang Batu
0.100
O.H
40,000.00
4,000.00
0.010
O.H
32,500.00
325.00
1.000
Buah
8,000.00
8,000.00
Bahan :
Avour Bak Mandi
48
(Nilai HSPK : )
13,125.00
Buah
Mandor
0.160
O.H
60,000.00
9,600.00
1.500
O.H
50,000.00
75,000.00
Tukang Batu
1.500
O.H
40,000.00
60,000.00
1.000
O.H
32,500.00
32,500.00
1.000
Buah
130,650.00
130,650.00
0.120
Zak
65,900.00
7,908.00
Pasir Pasang
0.045
m3
Bahan :
126,650.00
(Nilai HSPK : )
5,699.25
321,357.25
Buah
Tenaga:
Mandor
0.005
O.H
60,000.00
300.00
0.010
O.H
50,000.00
500.00
Tukang Batu
0.100
O.H
40,000.00
4,000.00
0.010
O.H
32,500.00
325.00
1.000
Buah
Bahan :
Floor drain
41,600.00
(Nilai HSPK : )
41,600.00
46,725.00
m1
Tenaga:
0.125
O.H
1.010
1.000
m1
Buah
32,500.00
4,062.50
Bahan :
46,350.00
46,813.50
2,000.00
2,000.00
(Nilai HSPK : ) 52,876.00
m1
Tenaga:
0.125
O.H
32,500.00
4,062.50
1.010
m1
46,350.00
46,813.50
Bahan :
Masjid
:)
DUKUH KUPANG
:
(HARGA SATUAN )
KOEF. SATUAN
(HARGA (Rp.) )
((Rp.) )
URAIAN KEGIATAN
Klem PVC
1.000
Buah
2,000.00
2,000.00
(Nilai HSPK : ) 52,876.00
Buah
Tenaga:
Mandor
0.020
0.200
2.000
3.000
Tukang Batu
Pekerja Tak Terampil
O.H
O.H
O.H
O.H
60,000.00
1,200.00
50,000.00
10,000.00
40,000.00
32,500.00
80,000.00
97,500.00
550.00
99,000.00
65,900.00
158,160.00
126,650.00
5,699.25
Bahan :
Bata Merah uk.5 x 11 x 22
Semen portland (50kg)
180.000 Buah
Zak
2.400
Pasir Pasang
0.045
m3
Semen Warna
1.200
kg
7,750.00
9,300.00
(Nilai HSPK : ) 460,859.25
Buah
Tenaga:
Mandor
0.100
O.H
60,000.00
6,000.00
0.150
O.H
50,000.00
7,500.00
Tukang Pipa
Pekerja / Buruh Tak Terampil
1.450
1.200
O.H
O.H
40,000.00
32,500.00
58,000.00
39,000.00
set
392,000.00
392,000.00
1.000
0.120
Zak
65,900.00
7,908.00
Pasir Pasang
0.045
m3
126,650.00
5,699.25
Peralatan:
0.120
set
Bahan :
392,000.00
47,040.00
(Nilai HSPK : ) 563,147.25
NO
URAIAN KEGIATAN
: Masjid
: TULUNGAGUNG
(HARGA SATUAN )
KOEF.SATUAN
(HARGA (Rp.) )
((Rp.) )
m1
Tenaga:
Mandor
0.002
O.H
60,000.00
126.00
0.004
O.H
50,000.00
215.00
Tukang besi
0.043
O.H
40,000.00
1,720.00
Pekerja Terampil
0.043
O.H
35,000.00
1,505.00
1.100
m1
83,150.00
91,465.00
Skrup/Ripet
2.000
Buah
200.00
400.00
Sealent
0.060
Botol
37,500.00
2,250.00
Bahan:
(Nilai HSPK : )
2 Pemasangan Slimar Aluminium
Profil 4" Warna Coklat
97,681.00
m1
Tenaga:
Mandor
0.002
O.H
60,000.00
126.00
0.004
O.H
50,000.00
215.00
Tukang besi
0.043
O.H
40,000.00
1,720.00
Pekerja Terampil
0.043
O.H
35,000.00
1,505.00
Bahan:
Profil Slimar 4"
1.100
m1
73,150.00
80,465.00
Skrup/Ripet
2.000
Buah
200.00
400.00
Sealent
0.060
Botol
37,500.00
2,250.00
(Nilai HSPK : )
3 Pemasangan Rangka Pintu
Aluminium Profil 4"
86,681.00
m1
Tenaga:
Mandor
0.002
O.H
60,000.00
126.00
0.004
O.H
50,000.00
215.00
Tukang besi
0.043
O.H
40,000.00
1,720.00
Pekerja Terampil
0.043
O.H
35,000.00
1,505.00
Bahan:
Profil 4" coklat
1.100
m1
83,150.00
91,465.00
Skrup/Ripet
2.000
Buah
200.00
400.00
Sealent
0.060
Botol
37,500.00
(Nilai HSPK : )
2,250.00
97,681.00
NO
URAIAN KEGIATAN
: Masjid
: TULUNGAGUNG
(HARGA SATUAN )
KOEF.SATUAN
(HARGA (Rp.) )
((Rp.) )
m2
Mandor
0.008
O.H
60,000.00
480.00
0.016
O.H
50,000.00
800.00
Tukang Kayu
0.160
O.H
40,000.00
6,400.00
Pekerja Terampil
0.160
O.H
35,000.00
5,600.00
1.100
m2
79,450.00
87,395.00
Bahan:
Kaca bening Tebal 5 mm
(Nilai HSPK : )
5 Pemasangan Engsel Pintu Muller
Kuning 3" untuk Pintu Aluminium
100,675.00
Buah
Tenaga:
Kepala Tukang Kayu
0.013
O.H
50,000.00
650.00
Tukang Kayu
0.125
O.H
40,000.00
5,000.00
1.000
Buah
50,000.00
50,000.00
Bahan:
Engsel Pintu Muller Kuning 3"
6
(Nilai HSPK : )
55,650.00
Buah
0.010
O.H
50,000.00
500.00
Tukang Kayu
0.100
O.H
40,000.00
4,000.00
Bahan:
Engsel Jendela kupu-kupu Kuningan
2.5"
1.000
buah
12,400.00
12,400.00
(Nilai HSPK : )
16,900.00
Buah
Tenaga:
Kepala Tukang Kayu
0.010
O.H
50,000.00
500.00
Tukang Kayu
0.100
O.H
40,000.00
4,000.00
1.000
buah
7,400.00
7,400.00
Bahan:
Engsel Jendela Salon HK 20
(Nilai HSPK : )
11,900.00
0.013
O.H
50,000.00
650.00
Tukang Kayu
0.125
O.H
40,000.00
5,000.00
1.000
Pasang
150,000.00
150,000.00
Bahan:
Handle Pintu Stainless Steel
(Nilai HSPK : )
155,650.00
NO
: Masjid
: TULUNGAGUNG
URAIAN KEGIATAN
(HARGA SATUAN )
KOEF.SATUAN
(HARGA (Rp.) )
((Rp.) )
Buah
Tenaga:
Kepala Tukang Kayu
0.010
O.H
50,000.00
500.00
Tukang Kayu
0.100
O.H
40,000.00
4,000.00
1.000
buah
28,000.00
28,000.00
Bahan:
Hak Angin Lurus Kuningan (Bisa
disetel maju mundur)
(Nilai HSPK : )
10 Pemasangan Grendel Biasa (Besar)
32,500.00
Buah
Tenaga:
Kepala Tukang Kayu
0.010
O.H
50,000.00
500.00
Tukang Kayu
0.100
O.H
40,000.00
4,000.00
1.000
buah
11,150.00
11,150.00
Bahan:
Grendel Biasa (Besar)
(Nilai HSPK : )
11 Pemasangan Grendel Biasa (Kecil)
15,650.00
Buah
Tenaga:
Kepala Tukang Kayu
0.010
O.H
50,000.00
500.00
Tukang Kayu
0.100
O.H
40,000.00
4,000.00
1.000
buah
4,450.00
4,450.00
Bahan:
Grendel Biasa (Kecil)
(Nilai HSPK : )
12 Pemasangan Grendel Tanam
8,950.00
Buah
Tenaga:
Kepala Tukang Kayu
0.010
O.H
50,000.00
500.00
Tukang Kayu
0.100
O.H
40,000.00
4,000.00
1.000
buah
100,000.00
100,000.00
Bahan:
Grendel Tanam
(Nilai HSPK : )
104,500.00
0.050
O.H
50,000.00
2,500.00
Tukang Kayu
0.500
O.H
40,000.00
20,000.00
1.000
Buah
350,000.00
350,000.00
Bahan:
Kunci Tanam Aluminium
(Nilai HSPK : )
14 Pemasangan Pintu Jendela (PJ1)
Kusen Aluminium warna 4"
372,500.00
Unit
26.410
m1
97,681.00
2,579,755.21
Kaca Polos 5 mm
7.052
m2
100,675.00
709,960.10
7.923
m1
86,681.00
686,773.56
3.000
bh
55,650.00
166,950.00
Handle Pintu
2.000
Pasang
155,650.00
311,300.00
180,000.00
180,000.00
bh
NO
URAIAN KEGIATAN
: Masjid
: TULUNGAGUNG
(HARGA SATUAN )
KOEF.SATUAN
(HARGA (Rp.) )
((Rp.) )
Unit
7.890
m1
97,681.00
770,703.09
Kaca Polos 5 mm
1.940
m2
100,675.00
195,309.50
3.000
bh
16,900.00
50,700.00
3.660
m2
48,794.01
178,586.07
Grendel Tanam
2.000
bh
104,500.00
209,000.00
Handle Pintu
2.000
Pasang
155,650.00
311,300.00
bh
180,000.00
180,000.00
Unit
7.300
m1
97,681.00
713,071.30
Kaca Polos 5 mm
1.200
m2
100,675.00
120,810.00
3.000
bh
16,900.00
50,700.00
2.700
m2
48,794.01
131,743.82
2.000
bh
15,650.00
31,300.00
Handle Pintu
1.000
Pasang
155,650.00
155,650.00
180,000.00
180,000.00
bh
Unit
6.800
m1
97,681.00
664,230.80
Kaca Polos 5 mm
0.750
m2
100,675.00
75,506.25
3.000
bh
4,000.00
6,600.00
1.650
m2
48,794.01
97,588.01
2.000
bh
15,650.00
31,300.00
Handle Pintu
1.000
Pasang
155,650.00
155,650.00
180,000.00
180,000.00
bh
Unit
9.500
m1
97,681.00
927,969.50
Kaca Polos 5 mm
4.950
m2
100,675.00
498,341.25
Unit
47.300
m1
97,681.00
4,620,311.30
Kaca Polos 5 mm
1.049
m2
100,675.00
105,587.94
14.190
m1
86,681.00
1,230,003.39
bh
16,900.00
135,200.00
bh
8,950.00
107,400.00
12.000
NO
URAIAN KEGIATAN
: Masjid
: TULUNGAGUNG
(HARGA SATUAN )
KOEF.SATUAN
(HARGA (Rp.) )
((Rp.) )
Unit
41.575
m1
97,681.00
Kaca Polos 5 mm
1.620
m2
100,675.00
163,093.50
12.473
m1
86,681.00
1,081,128.77
6.000
bh
11,900.00
71,400.00
4.000
bh
32,500.00
130,000.00
12.000
bh
8,950.00
107,400.00
4,061,087.58
Unit
43.300
m1
97,681.00
4,229,587.30
Kaca Polos 5 mm
3.780
m2
100,675.00
380,551.50
12.990
m1
86,681.00
1,125,986.19
6.000
bh
11,900.00
71,400.00
4.000
bh
32,500.00
130,000.00
12.000
bh
8,950.00
107,400.00
Unit
24.100
m1
100,675.00
2,426,267.50
Kaca Polos 5 mm
1.620
m2
86,681.00
140,423.22
7.230
m1
11,900.00
86,037.00
6.000
bh
11,900.00
71,400.00
4.000
bh
32,500.00
130,000.00
12.000
bh
8,950.00
107,400.00
NO
1
2
3
1
1
2
3
4
5
1
2
3
4
1
1
2
3
1
2
1
2
1
2
3
4
1
2
3
4
NAMA BARANG
Semen
Semen
Semen
Kapur
Kaca
Kaca
Pasir
Pasir
Pasir
Pasir
Pasir
Pasir
Batu
Batu
Batu
Batu
Batu
Cat
Cat
Besi
Besi
Besi
Besi
Air dan Minyak
Air
Minyak
Genteng
Genteng
Genteng
Aluminium
Aluminum
Aluminum
Aluminum
Aluminum
Hollow
Hollow
Hollow
Hollow
Hollow
Keramik
: Masjid
: TULUNGAGUNG
(MERK / UKURAN )
SATUAN
(HARGA
SATUAN )
(Gresik 50 Kg )
(Semen warna/nat )
(Pasang )
zak
Kg
m3
65,900
7,750
186,750
m2
79,450
(Beton )
(Pasang )
(Sirtu )
(Tanah Urug /Padas/Tanah Liat )
(Urug )
m3
m3
m3
m3
m3
130,650
126,650
96,500
77,200
94,250
(Bata Merah )
(Pecah 15/20 )
(Pecah mesin 2/3 )
(Pecah mesin 1/2 )
Biji
m3
m3
m3
550
107,550
169,350
187,000
Galon
822,900
Kg
Kg
m1
13,100
13,300
41,500
(Bekesting (solar) )
Ltr
Ltr
100
4,500
(Bubungan ex Trenggalek )
(Kodok ex Trenggalek )
Biji
Biji
3,100
1,600
m
m1
m1
m2
3,500
83,150
46,800
73,150
ljr
ljr
m'
bh
31,925
41,500
17,325
200
NO
1
2
3
4
5
6
1
1
1
2
3
1
2
3
4
5
NAMA BARANG
Keramik
Keramik
Keramik
Keramik
Keramik
Granite Tile
Kuas
Kuas Roll
Marmer
Marmer
Paku
Paku
Paku
Paku
Pintu & Pagar
Pagar
Pagar
Pintu
Sekrup
Pagar
Gypsum
: Masjid
: TULUNGAGUNG
(MERK / UKURAN )
(Batu Granit, 30 x 60 )
(Motif 20 x 20 )
(Motif 20 x 25 )
(Polos 20 x 25 )
(Kasar warna coral bell 20 x 20 )
(Iviory Uk. 60 x 60 )
(Super Imundex Uk.5" )
(Ex. Tulung agung 30x60 cm )
(Paku Beton )
(Paku Biasa/ keling/ Usuk/ Triplek/
Eternit/
Reng )isolasi, dll )
(Paku skrup,
(Besi Motif Biasa )
(Besi Motif Variasi )
(Besi Lipat )
(Ripet )
(Besi Steinles )
SATUAN
m2
m2
m2
m2
m2
m2
Buah
(HARGA
SATUAN )
415,600
50,200
50,500
45,000
115,000
225,000
22,300
m2
194,350
Kg
Kg
Kg
29,700
17,250
27,550
m2
m2
m2
Buah
m2
374,000
472,750
265,250
200
826,500
NO
1
2
1
2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
NAMA BARANG
: Masjid
: TULUNGAGUNG
(MERK / UKURAN )
Gypsum board
(Tebal 9 mm )
Gypsum board
(List Uk. 1 X 10 Cm )
Kawat
Kawat
(Kawat Beton )
Kawat
(kawat BWG )
Kayu dan Bambu
Kayu
(Plywood 122x244x8 mm )
Kayu
(Kalsiboardboard(120x240x0.6)mm )
Kayu
(Lapis Multipleks (0,9 x 122 x 244)cm )
Kayu
(Taekwood 90.210.4 mm )
Kayu
(Bekesting (meranti) )
Kayu
(Bengkirai Balok )
Kayu
(Bengkirai Papan )
Kayu
(Bengkirai Usuk )
Kayu
(Meranti Balok 6 x 12 x 400Cm )
Kayu
(Meranti Kaso 5 x 7 x 400Cm )
Kayu
(Meranti Papan 2 x 20 x 400Cm )
Kayu
(Meranti Reng 2 x 3 x 400Cm )
Kayu
(Perancah )
Kayu
(Triplek 1,22 x 2,44 x 4 mm )
Kayu
(Triplek 1,22 x 2,44 x 6 mm )
Kayu
(Triplek 1,22 x 2,44 x 6 mm Lapis
Aluminium
)
Kayu
(Dolken JatiJeruk
dia 10cm
- 300cm )
SATUAN
(HARGA
SATUAN )
Lembar
m
57,600
10,400
Kg
Kg
15,100
26,750
Lembar
Lembar
Lembar
Lembar
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
Btg
111,100
124,750
145,250
72,200
1,996,250
7,420,650
8,251,750
7,094,150
4,168,900
4,392,000
4,478,450
3,904,000
2,794,650
50,000
75,000
90,000
26,050
NO
NAMA BARANG
: Masjid
: TULUNGAGUNG
(MERK / UKURAN )
PIPA PVC/UPVC
Pipa PVC
1 Pipa PVC
(Maspion AW 1/2" X 4 m )
2 Pipa PVC
(Maspion AW 3/4" X 4 m )
3 Pipa PVC
(Maspion AW 1" X 4 m )
4 Pipa PVC
(Maspion AW 4" X 4 m )
5 Pipa PVC
(Maspion D 2" X 4 m )
6 Pipa PVC
(Maspion D 4" X 4 m )
7 Pipa PVC
(Pralon 5/8' )
8 Reducer PVC dia 12"-6"
9 Klem PVC
10 T Doos PVC
Bahan Konstruksi Lain
1 Ijuk
2 Floor Drain
3 Kran Air
(1/2" )
4 Seal tape
5 Sealent
6 Wastafel
(ex. INA )
7 Closet Jongkok
8 Avour Bak Mandi
Alat-Alat Perlengkapan Rumah
Engsel
1 Engsel
(muller kuning 3" (Pintu Alm.) )
2 Engsel
(salon HK 20 )
3 Engsel
(jendela kuningan )
4 Hak Angin
(Lurus Kuningan )
5 Handel Pintu
(Stainless Steel )
Grendel
1 Grendel
(Grendel Kuningan )
2 Grendel
(Grendel Biasa (Besar) )
3 Grendel
(Grendel Biasa (Kecil) )
4 Grendel
(Grendel Tanam )
Kran
1 Kran
(Plastik 1/2" )
2 Kran
(air goldeno /yuri 1/2" )
3 Kran
(Putar Untuk Tanaman 3/4" )
4 Kran
(Bebek (Swingin Sink Tap) 10 JC )
SATUAN
(HARGA
SATUAN )
Batang
Batang
Batang
Batang
Batang
Batang
Batang
Buah
Buah
Buah
19,500
26,550
35,250
258,250
46,350
139,550
8,500
615,100
2,000
2,000
m2
Buah
Buah
roll
Botol
Buah
Buah
Buah
18,600
41,600
14,850
1,850
37,500
392,000
130,650
8,000
Kotak
buah
buah
Buah
Pasang
600,000
7,400
12,400
28,000
150,000
Buah
Buah
Buah
Buah
26,500
11,150
4,450
100,000
Buah
Buah
Buah
Buah
9,350
14,850
45,000
52,000
NO
1
2
3
1
1
2
3
4
1
2
1
2
3
4
5
6
1
2
3
4
NAMA BARANG
: Masjid
: TULUNGAGUNG
(MERK / UKURAN )
Kunci
Kunci
(Kunci Tanam Biasa )
Kunci
(Kunci Tanam Aluminium )
Kunci + Rumah Kunci(Stainless Steel )
ALAT LISTRIK
Kabel
Kabel NYA
Kabel NYA
(NYA, 2.5 mm; Supreme Cable )
MCB
MCB
(MCB )
MCB
(MCB )
MCCB
(Metal Box MCCB )
Isolator
Lampu SL
Lampu SL
(Lampu SL 14 Watt Downlight )
(Lampu Baret )
(25 watt )
Saklar
Saklar
(Broco, Ganda )
Saklar
(Broco, Tunggal )
Fitting
(Plafon Biasa )
Fitting
(Lampu SL Down Light )
Fitting
(Lampu Spotlight )
Stop Kontak
(Broco )
ALAT BANTU
Keranjang
Kapi
Kertas gosok
Plamir
SATUAN
Buah
Buah
Buah
(HARGA
SATUAN )
44,400
350,000
180,000
2,450
Buah
Buah
Buah
Roll
125,000
200,000
450,000
7,650
Buah
Buah
30,000
50,000
Buah
Buah
Buah
Buah
Buah
Buah
19,400
14,000
4,700
100,000
190,000
18,150
Buah
Buah
Lembar
Kg
5,950
3,500
3,800
13,300
NO
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
9
: Masjid
: DUKUH KUPANG
NAMA UPAH
(Kepala Tukang )
(Kepala Tukang )
(Kepala Tukang )
(Kepala Tukang )
(Kepala Tukang )
(Kepala Tukang )
(Kepala Tukang )
(Kepala Tukang )
(Kepala Tukang )
(Tukang )
(Tukang )
(Tukang )
(Tukang )
(Tukang )
(Tukang )
(Tukang )
(Tukang )
(Tukang )
(Tukang )
URAIAN
SATUAN
(HARGA
SATUAN )
Batu
Besi
Cat
Gali Tanah
Kayu
Listrik
Pipa
Mandor
OH
OH
OH
OH
OH
OH
OH
OH
50,000
50,000
50,000
50,000
50,000
50,000
50,000
60,000
Batu
Besi
Cat
Gali Tanah
Kayu
Listrik
Pipa
Pekerja trampil
Pekerja tak trampil
OH
OH
OH
OH
OH
OH
OH
OH
OH
40,000
40,000
45,000
35,000
50,000
50,000
40,000
35,000
32,500
NO
: Masjid
: DUKUH KUPANG
NAMA BARANG
1
2
1
2
3
4
URAIAN
SATUAN
(HARGA
SATUAN )
Jam
Unit/Hari
75,000
21,000
Jam
Jam
Jam
Jam
10,000
40,000
18,000
52,500
NO
1
4
5
3
4
1
2
3
NAMA BARANG
MERK / UKURAN
SATUAN
20
3
4
BARANG PERSEDIAAN DAN BARANG PAKAI HABIS
20.01
20.01.01
20.01.01.01.
Aspal
20.01.01.01.04
20.01.01.01.05
Aspal
Aspal
20.01.01.02.
20.01.01.02.03
20.01.01.02.04
20.01.01.08.
20.01.01.08.01
20.01.01.08.02
20.01.01.08.03
20.01.01.12.
Semen
Semen
Semen
Baja
Baja
Baja
Baja
Besi
(HARGA )
(SATUAN )
(6 )
Aspal Curah
Aspal Bitumen
Kg
Kg
7,700
8,100
Gresik 40 Kg
Gresik 50 Kg
zak
zak
48,300
59,000
Plat Siku
Baja WF/ Profil/ INP/ H.Beam
Plat Strip
Kg
Kg
Kg
14,750
15,900
15,200
16 20.01.01.12.16
17 20.01.01.12.17
20.01.05.
20.01.05.01.
2 20.01.05.01.02
3 20.01.05.01.03
20.01.05.02
1 20.01.05.02.01
2 20.01.05.02.02
3 20.01.05.02.03
16 20.01.05.02.16
17 20.01.05.02.17
18 20.01.05.02.18
19 20.01.05.02.19
Besi
Besi
BAHAN BAKU
Kawat
Kawat
Kawat
Kayu
Kayu
Kayu
Kayu
Kayu
Kayu
Kayu
Kayu
Beton, polos
Beton, Ulir
Kg
Kg
12,900
13,200
Kawat Berduri
Kawat Beton
m'
Kg
3,500
12,700
Bengkirai Balok
Bengkirai Papan
Bengkirai Usuk
Kamper Papan 2 x 20 x
400cm
Kamper Reng 2 x 3 x 400cm
m3
m3
m3
m3
m3
m3
m3
6,254,000
6,077,000
5,723,000
6,555,500
5,900,000
6,268,750
5,654,100
20 20.01.05.02.20
Kayu
m3
6,145,800
21 20.01.05.02.21
Kayu
m3
5,689,200
22 20.01.05.02.22
Kayu
m3
6,047,500
23 20.01.05.02.23
Kayu
m3
5,408,300
24 20.01.05.02.24
Kayu
4,302,000
Kayu
Meranti Balok 6 x 12 x
400Cm
Meranti Kaso 5 x 7 x 400Cm
m3
25 20.01.05.02.25
m3
3,540,000
26 20.01.05.02.26
Kayu
4,056,250
27 20.01.05.02.27
Kayu
Meranti Papan 2 x 20 x
400Cm
Meranti Reng 2 x 3 x 400Cm
m3
m3
3,441,600
20.05.06
20.05.06.01
85 20.05.06.01.85
PIPA PVC/UPVC
Pipa PVC
Pipa PVC
Kamper Balok 6 x 12 x
400cm
Kamper Kaso 5 x 7 x 400cm
Batang
115,700
20.05.06.02
20.05.06.02.01
Batang
165,200
20.05.06.02.02
Pipa Galvanis
dia 3/4" @ 6m
Batang
247,800
20.05.06.02.03
Pipa Galvanis
dia 1" @ 6m
Batang
324,500
20.05.06.02.04
Pipa Galvanis
dia 1 1/2" @ 6m
Batang
385,800
20.05.06.02.05
Pipa Galvanis
dia 2" @ 6m
Batang
678,500
20.05.06.02.06
Pipa Galvanis
dia 2 1/2" @ 6m
Batang
890,900
20.05.06.02.07
Pipa Galvanis
dia 3" @ 6m
Batang
1,091,500
20.05.06.02.08
Pipa Galvanis
dia 4" @ 6m
Batang
1,476,100
(HARGA )
(SATUAN )
KODE
BARANG
20.05.06.02.09
Pipa Galvanis
dia 6" @ 6m
Batang
2,100,400
10 20.05.06.02.10
Pipa Galvanis
dia 8" @ 6m
Batang
2,478,000
NO
9
NAMA BARANG
MERK / UKURAN
SATUAN
20.01.04.
1
2
20.01.04.01.
20.01.04.01.01
20.01.04.01.02
Pompa Turbin &
Unit
133,731,000
Pompa Submersible
Brand Southern Franklin
02.02.03.05.01.51Kap. 15 Ltr/Dt Head 50 Type SJ60-6 (Complit dg
m
Acessoris dan Perlengkapan)
Unit
118,440,000
Pompa Submersible
Brand Southern Franklin
02.02.03.05.01.01Kap. 20 Ltr/Dt Head 50 Type SJ60-6 (Complit dg
m
Acessoris dan Perlengkapan)
Unit
137,820,000
Unit
126,000,000
Unit
157,800,000
ltr
ltr
6,000
5,500
NO
26.08.01.01
Pembangunan Gedung
JENIS PEKERJAAN
Koeff
SAT.
HARGA
SATUAN (Rp) JUMLAH (Rp)
M2
I
PEK. PENDAHULUAN
20.01.01.64.01.05 Pek. Persiapan
25.01.01.02
Pembuatan bouwplank/uietzet
0.01 Ls
0.46 M
500,000.00
35,520.14
JUMLAH
3,278.69
16,420.79
19,699.47
II
25.01.02.07
25.02.01.23
25.01.02.13
25.01.02.16
25.01.02.16
PEK. TANAH
Galian pondasi batu kali + poer plat
Galian tanah lubang strouss pile d = 20 cm, h = 3 m
Urugan tanah kembali
Urugan pasir bawah pondasi batu kali t = 10 cm
Pek. urugan pasir bawah keramik t = 5 cm
0.17
0.2
0.04
0.03
0.05
M
Ttk
M
M
M
20,250.00
45,600.00
5,062.50
117,741.25
117,741.25
JUMLAH
3,537.44
8,970.49
221.09
3,582.42
5,983.57
22,295.02
III
25.03.01.24
25.03.01.16
25.03.01.16
25.03.01.28
25.03.01.33
25.03.01.28
25.03.01.28
25.03.01.28
25.03.01.33
25.03.01.28
0.04
0.02
0
0.03
0.07
0
0.03
0.04
0.0116
0.0073
M
M
M
M
M
M
M
M
M
M
3,457,113.56
1,880,541.98
1,880,541.98
2,777,913.59
419,259.66
2,777,913.59
2,777,913.59
2,777,913.59
419,259.66
2,777,913.59
JUMLAH
153,019.78
42,295.55
7,102.90
73,774.10
27,525.43
10,656.26
87,435.97
115,930.73
4,845.54
20,401.73
542,987.98
IV
25.04.01.12
25.04.01.30
25.04.01.38
25.02.01.12
25.02.01.20
PEK. PASANGAN
Pas. batu merah
Pek. Plesteran halus
Pek. benangan
Pek. pondasi batu kali
Pas. aanstamping t = 20 cm
2.6859
5.3718
1.9148
0.0813
0.0494
M
M
M
M
M
50,100.92
18,901.15
5,865.60
427,332.94
179,720.00
JUMLAH
134,566.15
101,533.26
11,231.18
34,740.07
8,885.83
290,956.48
V
25.05.01.11
25.05.01.07
25.05.01.01
25.05.01.07
25.05.01.10
PEK. LANTAI
Pas. Lantai marmer
Pas. keramik dinding KM/WC 20 x 25 cm ( Motif )
Pas. keramik lantai KM/WC 20 x 20 cm ( Motif )
Pas. keramik dinding keliling 20 x 25 cm ( Motif )
Pas. list keramik 7.5 x 20 cm ( Motif )
0.9820
0.1364
0.0344
1.1646
0.0689
M
M
M
M
M
449,184.00
106,978.74
76,305.40
106,978.74
22,569.25
JUMLAH
441,083.96
14,591.20
2,626.91
124,586.39
1,553.95
584,442.40
VI
25.07.01.04
25.07.01.04
25.07.01.47
25.07.01.11
0.0771
0.0204
0.1034
0.0585
M
M
M
M
284,491.72
284,491.72
307,273.40
332,624.50
21,938.51
5,798.03
31,773.08
19,451.44
0.0150
6,617,060.00
JUMLAH
99,362.64
178,323.71
1.6458
0.0128
0.0075
0.0132
1.6458
0.2426
0.4508
0.0656
M
M
M
M
M
M
M
M
65,130.00
12,914,000.00
62,276.80
62,276.80
104,435.80
49,958.25
152,017.90
118,263.44
107,191.17
165,841.16
469.27
824.26
171,880.78
12,121.02
68,532.66
7,754.98
25.07.01.02
VII
25.06.02.03
25.06.01.01
25.06.01.07
25.06.01.07
25.06.01.06
25.06.02.12
25.06.02.32
25.06.02.18
PEK. ATAP
Pas. genteng Kr. pilang/wisma
Pas. kuda - kuda Ky. kamper 8/12
Pas. pengapit kuda - kuda + jurai 6/12
Pas. gording kamper 8/12
Pas. reng jati Usuk ky. Kamper
Pas. bumbungan kr pilang/wisma
Pas Listplank Kayu Jati 3 / 30 cm
Pek. talang jurai
VIII
25.06.03.17
25.06.03.06
PEK. PLAFOND
Pas. Plafond Kalsiboard Rangka Aluminium
Pas. list plafond
1.5984
1.6295
IX
25.04.02.18
25.04.02.22
25.04.02.21
PEK. PENGECATAN
Pek. pengecatan kayu ( kusen + lisplank + list plafond )
Pek. pengecatan dinding
Pek. pengecatan plafond
Pek. plitur daun pintu + pintu kaca
Pek. koltir rangka atap
Pek. meni rangka plafond
1.0309
5.3718
1.5984
0.1950
1.6458
1.5984
25.04.02.15
25.04.02.16
25.04.02.12
JUMLAH
534,615.30
M
M
122,735.00
4,683.00
JUMLAH
196,174.80
7,630.99
203,805.78
M
M
M
M
M
M
88,190.90
19,986.00
21,821.40
39,277.80
6,287.50
5,287.20
JUMLAH
90,913.36
107,360.86
34,878.47
7,658.78
10,347.99
8,450.85
259,610.31
X
25.07.01.19
25.07.01.22
25.07.01.21
25.07.01.32
25.07.01.24
PEK. PENGANTUNG
Pas. kunci tanam 2 x putar
Pas. engsel kuningan untuk pintu
Pas. engsel kuningan untuk jendela
Pas. hak angin lurus
Pas. grendel kecil biasa
0.0721 Unit
0.1082 Stel
0.0787 Stel
0.0393 Bh
0.1508 Bh
97,650.00
42,800.00
34,700.00
26,200.00
9,600.00
JUMLAH
7,043.61
4,630.82
2,730.49
1,030.82
1,447.87
16,883.61
195,150.00
51,700.00
7,450.00
227,500.00
29,205.30
26,755.30
29,205.30
JUMLAH
24,313.77
5,424.26
146.56
1,491.80
2,298.12
2,105.34
383.02
36,162.87
20,250.00
117,741.25
50,100.92
1,784,684.36
18,901.15
135,517.96
Jumlah
824.89
159.87
5,660.11
5,815.98
2,135.34
1,332.96
15,929.17
20,250.00
13,753.60
76,305.40
117,741.25
418,649.94
2,777,913.59
Jumlah
473.25
356.24
4,723.43
203.83
362.37
17,195.74
23,314.86
0.1246
0.1049
0.0197
0.0066
0.0787
0.0787
0.0131
Ttk
Bh
Bh
Bh
Ttk
Bh
Bh
XII
25.01.02.07
25.01.02.16
25.04.01.12
25.07.03.08
25.04.01.30
25.07.05.08
0.0407
0.0014
0.1130
0.0033
0.1130
0.0098
Unit
M
M
M
M
M
M
XIII
25.01.02.07
25.03.02.03
25.05.01.01
25.01.02.16
25.03.01.36
0.0234
0.0259
0.0619
0.0017
0.0009
0.0062
Unit
M
kg
M
M
M
M
XIV
25.07.03.23
B.08.03.05.07.02
25.07.03.19
0.0393 Unit
0.0066 Unit
0.0525 Bh
0.3279 M
0.1639 M
0.0131 Bh
0.0131 Bh
0.0131 Bh
0.0131 Bh
459,150.00
450,000.00
58,250.00
69,000.00
77,937.50
281,900.00
19,060.00
19,060.00
185,120.00
JUMLAH
18,064.92
2,950.82
3,055.74
22,622.95
12,776.64
3,697.05
249.97
249.97
2,427.80
66,095.85
0.0066 Ls
0.0066 Ls
300000
500,000.00
JUMLAH
Nilai ASB
1,967.21
3,278.69
5,245.90
2,800,368.71
XI
25.07.02.02
25.07.03.30
25.07.03.31
25.07.03.22
25.07.03.24
25.07.03.24
25.07.01.46
XII
PEK. LAIN-LAIN
22.04.03.01.02.08 Air kerja
20.01.01.64.02.06 Pembersihan akhir
26.08.01.02
M2
I
PEK. PENDAHULUAN
20.01.01.64.01.05 Pek. Persiapan
25.01.01.02
Pembuatan bouwplank/uietzet
0.0066 Ls
0.4623 M
500,000.00
35,520.14
JUMLAH
3,278.69
16,420.79
19,699.47
II
25.01.02.07
25.02.01.23
25.01.02.13
25.01.02.16
25.01.02.16
PEK. TANAH
Galian pondasi batu kali + poer plat
Galian tanah lubang strouss pile d = 20 cm, h = 3 m
Urugan tanah kembali
Urugan pasir bawah pondasi batu kali t = 10 cm
Pek. urugan pasir bawah keramik t = 5 cm
0.1747 M
0.1967 Ttk
0.0437 M
0.0304 M
0.0508 M
20,250.00
45,600.00
5,062.50
117,741.25
117,741.25
JUMLAH
3,537.44
8,970.49
221.09
3,582.42
5,983.57
22,295.02
III
25.03.01.24
25.03.01.16
25.03.01.16
25.03.01.28
25.03.01.33
25.03.01.28
25.03.01.28
25.03.01.28
25.03.01.33
25.03.01.28
0.0443 M
0.0225 M
0.0038 M
0.0266 M
0.0657 M
0.0038 M
0.0315 M
0.0417 M
0.0116 M
0.0073 M
3,457,113.56
1,880,541.98
1,880,541.98
2,777,913.59
419,259.66
2,777,913.59
2,777,913.59
2,777,913.59
419,259.66
2,777,913.59
JUMLAH
153,019.78
42,295.55
7,102.90
73,774.10
27,525.43
10,656.26
87,435.97
115,930.73
4,845.54
20,401.73
542,987.98
IV
25.04.01.12
25.04.01.30
25.04.01.38
25.02.01.12
25.02.01.20
PEK. PASANGAN
Pas. batu merah
Pek. Plesteran halus
Pek. benangan
Pek. pondasi batu kali
Pas. aanstamping t = 20 cm
2.6859 M
5.3718 M
1.9148 M
0.0813 M
0.0494 M
50,100.92
18,901.15
5,865.60
427,332.94
179,720.00
JUMLAH
134,566.15
101,533.26
11,231.18
34,740.07
8,885.83
290,956.48
V
25.05.01.04
25.05.01.07
25.05.01.01
25.05.01.07
25.05.01.10
PEK. LANTAI
Pas. keramik lantai 30 x 30 cm ( Motif )
Pas. keramik dinding KM/WC 20 x 25 cm ( Motif )
Pas. keramik lantai KM/WC 20 x 20 cm ( Motif )
Pas. keramik dinding keliling 20 x 25 cm ( Motif )
Pas. list keramik 7.5 x 20 cm ( Motif )
0.9820 M
0.1364 M
0.0344 M
1.1646 M
0.0689 M
69,654.00
106,978.74
76,305.40
106,978.74
22,569.25
JUMLAH
68,397.94
14,591.20
2,626.91
124,586.39
1,553.95
211,756.39
VI
25.07.01.04
25.07.01.04
25.07.01.13
25.07.01.11
0.0771 M
0.0204 M
0.1034 M
0.0585 M
284,491.72
284,491.72
55,973.40
332,624.50
21,938.51
5,798.03
5,787.83
19,451.44
25.07.01.02
0.0150 M
6,617,060.00
JUMLAH
99,362.64
152,338.46
VII
25.06.02.03
25.06.01.02
25.06.01.07
25.06.01.07
25.06.01.04
25.06.02.12
25.06.02.33
25.06.02.18
PEK. ATAP
Pas. genteng Kr. pilang/wisma
Pas. kuda - kuda Ky. kamper 8/12
Pas. pengapit kuda - kuda + jurai 6/12
Pas. gording kamper 8/12
Pas. reng kamper Usuk ky. kamper
Pas. bumbungan kr pilang/wisma
Pas. listplank ky papan 3 x 30 cm
Pek. talang jurai
1.6458 M
0.0128 M
0.0075 M
0.0132 M
1.6458 M
0.2426 M
0.4508 M
0.0656 M
65,130.00
5,273,760.00
62,276.80
62,276.80
81,248.35
49,958.25
69,049.16
118,263.44
JUMLAH
107,191.17
67,725.45
469.27
824.26
133,718.80
12,121.02
31,128.72
7,754.98
360,933.67
VIII
25.06.03.07
25.06.03.06
PEK. PLAFOND
Pas. plafond eternit rangka ky kamper
Pas. list plafond
1.5984 M
1.6295 M
113,412.72
4,683.00
JUMLAH
181,274.43
7,630.99
188,905.42
IX
25.04.02.21
25.04.02.10
25.04.02.21
25.04.02.15
25.04.02.16
25.04.02.12
PEK. PENGECATAN
Pek. pengecatan kayu ( kusen + lisplank + list plafond )
Pek. pengecatan dinding
Pek. pengecatan plafond
Pek. plitur daun pintu + pintu kaca
Pek. koltir rangka atap
Pek. meni rangka plafond
1.0309 M
5.3718 M
1.5984 M
0.1950 M
1.6458 M
1.5984 M
21,821.40
11,820.00
21,821.40
39,277.80
6,287.50
5,287.20
22,495.03
63,494.71
34,878.47
7,658.78
10,347.99
8,450.85
X
25.07.01.19
25.07.01.22
25.07.01.21
25.07.01.32
25.07.01.24
PEK. PENGANTUNG
Pas. kunci tanam 2 x putar
Pas. engsel kuningan untuk pintu
Pas. engsel kuningan untuk jendela
Pas. hak angin lurus
Pas. grendel kecil biasa
XI
PEK. INSTALASI LISTRIK
25.07.02.02
Pas. titik lampu
25.07.02.02
Pas. lampu TL 20 watt
B.20.03.06.02.26.07Pas. lampu pijar 10 watt
B.24.01.02.05.023 Pas. MCB
25.07.02.01
Pas. stop kontak
25.07.02.03
Pas. saklar tunggal
25.07.02.04
Pas. saklar ganda
JUMLAH
147,325.83
0.0721 Unit
0.1082 Stel
0.0787 Stel
0.0393 Bh
0.1508 Bh
97,650.00
42,800.00
34,700.00
26,200.00
9,600.00
JUMLAH
7,043.61
4,630.82
2,730.49
1,030.82
1,447.87
16,883.61
0.1246 Ttk
0.1049 Bh
0.0197 Bh
0.0066 Bh
0.0787 Ttk
0.0787 Bh
0.0131 Bh
195,150.00
51,700.00
7,450.00
227,500.00
29,205.30
26,755.30
29,205.30
JUMLAH
24,313.77
5,424.26
146.56
1,491.80
2,298.12
2,105.34
383.02
36,162.87
XII
25.01.02.07
25.01.02.16
25.04.01.12
25.07.03.08
25.04.01.30
25.07.05.08
Unit
0.0407 M
0.0014 M
0.1130 M
0.0033 M
0.1130 M
0.0098 M
XIII
25.01.02.07
25.03.02.03
25.05.01.01
25.01.02.16
25.03.01.36
Unit
0.0234 M
0.0259 kg
0.0619 M
0.0017 M
0.0009 M
0.0062 M
XIV
25.07.03.23
B.08.03.05.07.02
25.07.03.19
25.07.03.30
25.07.03.31
25.07.03.22
25.07.03.24
25.07.03.24
25.07.01.46
0.0393 Unit
0.0066 Unit
0.0525 Bh
0.3279 M
0.1639 M
0.0131 Bh
0.0131 Bh
0.0131 Bh
0.0131 Bh
XII
PEK. LAIN-LAIN
22.04.03.01.02.08 Air kerja
20.01.01.64.02.06 Pembersihan akhir
0.0066 Ls
0.0066 Ls
20,250.00
117,741.25
50,100.92
1,784,684.36
18,901.15
135,517.96
Jumlah
824.89
159.87
5,660.11
5,815.98
2,135.34
1,332.96
15,929.17
20,250.00
13,753.60
76,305.40
117,741.25
418,649.94
2,777,913.59
Jumlah
473.25
356.24
4,723.43
203.83
362.37
17,195.74
23,314.86
459,150.00
450,000.00
58,250.00
69,000.00
77,937.50
281,900.00
19,060.00
19060
185120
JUMLAH
18,064.92
2,950.82
3,055.74
22,622.95
12,776.64
3,697.05
249.97
249.97
2,427.80
66,095.85
300000
500000
JUMLAH
Nilai ASB
1,967.21
3,278.69
5,245.90
2,100,830.98
26.08.01.03
I
20.01.01.64.01.05
25.01.01.02
M2
0.01 Ls
0.46 M
500000
35520.14
JUMLAH
3,278.69
16,420.79
19,699.47
II
25.01.02.07
25.02.01.23
25.01.02.13
25.01.02.16
25.01.02.16
PEK. TANAH
Galian pondasi batu kali + poer plat
Galian tanah lubang strouss pile d = 20 cm, h = 3 m
Urugan tanah kembali
Urugan pasir bawah pondasi batu kali t = 10 cm
Pek. urugan pasir bawah keramik t = 5 cm
0.17 M
0.2 Ttk
0.04 M
0.03 M
0.05 M
20250
3600
45600
117741.25
117741.25
JUMLAH
3,537.44
708.20
1,991.45
3,582.42
5,983.57
15,803.08
III
25.03.01.24
25.03.01.16
25.03.01.16
25.03.01.28
25.03.01.33
25.03.01.28
25.03.01.28
25.03.01.28
25.03.01.33
25.03.01.28
0.04 M
0.02 M
0 M
0.03 M
0.07 M
0 M
0.03 M
0.04 M
0.01 M
0.01 M
3457113.56
1880541.98
1880541.98
2777913.59
419259.66
2777913.59
2777913.59
2777913.59
419259.66
2777913.59
JUMLAH
153,019.78
42,295.55
7,102.90
73,774.10
27,525.43
10,656.26
87,435.97
115,930.73
4,845.54
20,401.73
542,987.98
IV
25.04.01.12
25.04.01.30
25.04.01.38
25.02.01.12
25.02.01.20
PEK. PASANGAN
Pas. batu merah
Pek. Plesteran halus
Pek. benangan
Pek. pondasi batu kali
Pas. aanstamping t = 20 cm
2.69 M
5.37 M
1.91 M
0.08 M
0.05 M
50100.92
18901.15
5865.6
427332.94
179720
JUMLAH
134,566.15
101,533.26
11,231.18
34,740.07
8,885.83
290,956.48
V
25.05.01.03
25.05.01.07
25.05.01.01
25.05.01.07
PEK. LANTAI
Pas. keramik lantai 30 x 30 cm ( Motif )
Pas. keramik dinding KM/WC 20 x 25 cm ( Motif )
Pas. keramik lantai KM/WC 20 x 20 cm ( Motif )
Pas. keramik dinding keliling 20 x 25 cm ( Motif )
0.98 M
0.14 M
0.03 M
1.16 M
67924
106978.74
76305.4
106978.74
66,699.14
14,591.20
2,626.91
124,586.39
25.05.01.10
0.07 M
22569.25
JUMLAH
1,553.95
210,057.58
VI
25.07.01.05
25.07.01.05
25.07.01.13
25.07.01.11
0.08 M
0.02 M
0.1 M
0.06 M
0
0.02 M
281731.72
281731.72
55973.4
332624.5
21,725.67
5,741.78
5,787.83
19,451.44
25.07.01.02
4635300
JUMLAH
69,604.27
122,311.01
VII
25.06.02.01
25.06.01.02
25.06.01.07
25.06.01.07
25.06.01.05
25.06.02.11
25.06.02.33
25.06.02.18
PEK. ATAP
Pas. genteng jawa
Pas. kuda - kuda Ky. meranti 8/12
Pas. pengapit kuda - kuda + jurai 6/12
Pas. gording kamper 8/12
Pas. reng kamper Usuk ky. kamper
Pas. Wuwungan genteng jawa
Pas. listplank ky papan 3 x 30 cm
Pek. talang jurai
1.65 M
0.01 M
0.01 M
0.01 M
1.65 M
0.24 M
0.45 M
0.07 M
22630
4768720
62276.8
62276.8
70547.71
42312.9
69049.16
118263.44
JUMLAH
37,244.53
61,239.75
469.27
824.26
116,107.65
10,266.08
31,128.72
7,754.98
265,035.23
VIII
25.06.03.04
25.06.03.06
PEK. PLAFOND
Pas. plafond eternit rangka ky kamper
Pas. list plafond
1.6 M
1.63 M
77374.84
4683
JUMLAH
123,672.90
7,630.99
131,303.89
IX
25.04.02.21
25.04.02.10
25.04.02.21
25.04.02.15
25.04.02.16
25.04.02.12
PEK. PENGECATAN
Pek. pengecatan kayu ( kusen + lisplank + list plafond )
Pek. pengecatan dinding
Pek. pengecatan plafond
Pek. plitur daun pintu + pintu kaca
Pek. koltir rangka atap
Pek. meni rangka plafond
1.03 M
5.37 M
1.6 M
0.19 M
1.65 M
1.6 M
21821.4
11820
21821.4
39277.8
6287.5
5287.2
JUMLAH
22,495.03
63,494.71
34,878.47
7,658.78
10,347.99
8,450.85
147,325.83
X
25.07.01.19
25.07.01.22
25.07.01.21
25.07.01.32
25.07.01.24
PEK. PENGANTUNG
Pas. kunci tanam 2 x putar
Pas. engsel kuningan untuk pintu
Pas. engsel kuningan untuk jendela
Pas. hak angin lurus
Pas. grendel kecil biasa
0.07 Unit
0.11 Stel
0.08 Stel
0.04 Bh
0.15 Bh
97650
42800
34700
26200
9600
JUMLAH
7,043.61
4,630.82
2,730.49
1,030.82
1,447.87
16,883.61
XI
PEK. INSTALASI LISTRIK
25.07.02.02
Pas. titik lampu
25.07.02.02
Pas. lampu TL 20 watt
B.20.03.06.02.26.07Pas. lampu pijar 10 watt
B.24.01.02.05.023 Pas. MCB
25.07.02.01
Pas. stop kontak
25.07.02.03
Pas. saklar tunggal
25.07.02.04
Pas. saklar ganda
0.12 Ttk
0.1 Bh
0.02 Bh
0.01 Bh
0.08 Ttk
0.08 Bh
0.01 Bh
94500
1650
7800
227,500.00
29,205.30
26,755.30
29,205.30
JUMLAH
11,773.77
173.11
153.44
1,491.80
2,298.12
2,105.34
383.02
18,378.61
XII
25.01.02.07
25.01.02.16
25.04.01.12
25.07.03.08
25.04.01.30
25.07.05.08
0.04 M
0 M
0.11 M
0 M
0.11 M
0.01 M
20250
117741.25
50100.92
1784684.36
18901.15
135517.96
Jumlah
XIII
25.01.02.07
25.03.02.03
25.05.01.01
25.01.02.16
25.03.01.36
Unit
0.02 M
0.03 kg
0.06 M
0 M
0 M
0.01 M
208732.5
13753.6
76305.4
117741.25
418649.94
2777913.59
Jumlah
824.89
159.87
5,660.11
5,815.98
2,135.34
1,332.96
15,929.17
0.00
4,878.18
356.24
4,723.43
203.83
362.37
17,195.74
27,719.79
XIV
25.07.03.23
B.08.03.05.07.02
25.07.03.19
25.07.03.30
25.07.03.31
25.07.03.22
0.04 Unit
0.01 Unit
0.05 Bh
0.33 M
0.16 M
0.01 Bh
459150
450000
58250
69000
77937.5
281900
18,064.92
2,950.82
3,055.74
22,622.95
12,776.64
3,697.05
25.07.03.24
25.07.03.24
25.07.01.46
Pas. avour
Pas. floor drain
Pas. pintu PVC KM/WC
0.01 Bh
0.01 Bh
0.01 Bh
19060
19060
185120
JUMLAH
249.97
249.97
2,427.80
66,095.85
XII
PEK. LAIN-LAIN
22.04.03.01.02.08 Air kerja
20.01.01.64.02.06 Pembersihan akhir
26.08.02
NO
0.01 Ls
0.01 Ls
300000
500000
JUMLAH
Nilai ASB
1,967.21
3,278.69
5,245.90
1,889,455.21
Pembangunan Pendopo
JENIS PEKERJAAN
Koeff
SAT.
HARGA
SATUAN (Rp) JUMLAH (Rp)
26.08.02.01
I
20.01.01.64.01.05
25.01.01.01
Pembangunan Pendopo
PEK. PERSIAPAN
Pek. Persiapan
Pembuatan bouwplank/uietzet
0.01 Ls
0.08 Ttk
350000
43115.8
Jumlah
3,500.00
3,449.26
6,949.26
II
25.02.01.24
25.01.02.07
25.01.02.13
25.01.02.16
25.01.02.17
PEK. TANAH
Pembuatan Lubang Strous Pile diameter 30 cm
Galian Tanah
Urugan Tanah Kembali
Pengurugan Pasir (PADAT)
Pengurugan Sirtu (PADAT)
0.04 Ttk
0.47 M
0.23 M
0.15 M
0.4 M
43115.8
20250
5062.5
106956.25
87501.25
Jumlah
1,724.63
9,477.00
1,143.92
16,492.65
34,886.75
63,724.96
III
25.02.01.11
25.04.01.30
25.04.01.38
PEK. PASANGAN
Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 3 Ps)
Plesteran Halus 1 Pc : 4 Ps tebal 1,5 cm
Pasang Benangan
0.22 M
1.14 M
2.98 M
406973.71
5000
5680.8
Jumlah
87,515.63
5,682.50
16,928.78
110,126.91
III
25.03.01.23
25.04.01.30
0.08 M
0.04 M
404051.65
18606.5
30,410.54
753.56
0.14 M
0
0.01 M
3241888.4
439,081.37
2907758
Jumlah
32,899.20
503,144.68
25.03.01.19
25.03.01.17
M2
IV
25.05.01.06
PEK. LANTAI
Pas. keramik lantai 40 x 40 cm ( Motif )
1.43 M
80364
Jumlah
115,209.83
115,209.83
IV
25.03.02.05
25.03.02.03
B.20.01.01.44.06
B.20.01.01.62.02
PEK. PEMBESIAN
Pekerjaan Besi WF 150x100x7x10
Pekerjaan Besi Plat Tebal 2 mm
Baut 22 mm
Angker
6.98 Kg
1.17 Kg
3.6 Bh
0.8 Bh
13093.6
13753.6
3000
2200
Jumlah
91,396.50
16,146.77
10,800.00
1,760.00
118,343.27
V
25.06.01.04
25.06.02.03
25.06.02.12
25.06.02.33
25.06.01.07
25.06.03.02
25.06.03.06
2.12 M2
2.12 M2
0.43 M
0.5 M
0.03 M
2.14 M2
2.88 M
58904.52
64380
49958.25
46133.18
62276.8
67775.76
2988.25
Jumlah
124,583.06
136,163.70
21,482.05
22,974.32
1,771.81
145,175.68
8,606.16
460,756.78
VI
25.04.02.12
25.04.02.16
25.04.02.21
25.04.02.21
25.04.02.10
2.49 M
2.12 M
0.35 M
2.14 M
1.14 M
5287.2
6287.5
21821.4
21821.4
11820
Jumlah
13,186.70
13,298.06
7,682.88
46,741.44
13,433.43
94,342.51
VII
PEK. INSTALASI LISTRIK
25.07.02.02
Pas. titik lampu
20.03.06.02.21.65 Pas. lampu TL 20 watt
Pas Lampu Gantung
25.07.02.01
Pas. stop kontak
25.07.02.04
Pas. saklar ganda
0.05 Ttk
0.04 Bh
0.01 Ls
0.02 Ttk
0.02 Bh
195150
51700
1500000
29205.3
29205.3
Jumlah
9,757.50
2,068.00
15,000.00
584.11
584.11
27,993.71
VIII
PEK. LAIN-LAIN
22.04.03.01.02.08 Air kerja
0.01 Ls
300000
3,000.00
0.01 Ls
350000
Jumlah
Nilai ASB
3,500.00
6,500.00
1,507,091.91
26.08.03
NO
JENIS PEKERJAAN
Koeff
26.08.03.01
25.01.02.07
25.02.01.23
25.01.02.13
25.01.02.16
25.01.02.16
PEK. TANAH
Galian pondasi batu kali + poer plat
Galian tanah lubang strouss pile d = 20 cm, h = 3 m
Urugan tanah kembali
Urugan pasir bawah pondasi batu kali t = 10 cm
Pek. urugan pasir bawah keramik t = 5 cm
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
0.1747
0.1967
0.0437
0.0304
0.0508
20,250.00
45,600.00
5,062.50
117,741.25
117,741.25
JUMLAH
Nilai ASB
3,537.44
8,970.49
221.09
3,582.42
5,983.57
22,295.02
25,573.71
500,000.00
JUMLAH
3,278.69
3,278.69
3,457,113.56
1,880,541.98
1,880,541.98
2,777,913.59
419,259.66
2,777,913.59
2,777,913.59
2,777,913.59
419,259.66
2,777,913.59
JUMLAH
Nilai ASB
153,019.78
42,295.55
7,102.90
73,774.10
27,525.43
10,656.26
87,435.97
115,930.73
4,845.54
20,401.73
542,987.98
546,266.66
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
PEK. PASANGAN
Pas. batu merah
Pek. Plesteran halus
Pek. benangan
Pek. pondasi batu kali
Pas. aanstamping t = 20 cm
2.6859
5.3718
1.9148
0.0813
0.0494
50,100.92
18,901.15
5,865.60
427,332.94
179,720.00
JUMLAH
Nilai ASB
134,566.15
101,533.26
11,231.18
34,740.07
8,885.83
290,956.48
294,235.17
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
0.9820
0.1364
0.0344
1.1646
0.0689
449,184.00
106,978.74
76,305.40
106,978.74
22,569.25
JUMLAH
Nilai ASB
441,083.96
14,591.20
2,626.91
124,586.39
1,553.95
584,442.40
587,721.09
500,000.00
JUMLAH
3,278.69
3,278.69
M
M
M
M
284,491.72
284,491.72
307,273.40
332,624.50
21,938.51
5,798.03
31,773.08
19,451.44
6,617,060.00
99,362.64
0.0066 Ls
0.0443
0.0225
0.0038
0.0266
0.0657
0.0038
0.0315
0.0417
0.0116
0.0073
PEK. LANTAI
Pas. Lantai marmer
Pas. keramik dinding KM/WC 20 x 25 cm ( Motif )
Pas. keramik lantai KM/WC 20 x 20 cm ( Motif )
Pas. keramik dinding keliling 20 x 25 cm ( Motif )
Pas. list keramik 7.5 x 20 cm ( Motif )
M
M
M
M
M
M
M
M
M
M
M2
26.08.03.04
25.05.01.11
25.05.01.07
25.05.01.01
25.05.01.07
25.05.01.10
M
Ttk
M
M
M
M2
26.08.03.03
25.04.01.12
25.04.01.30
25.04.01.38
25.02.01.12
25.02.01.20
HARGA
SATUAN (Rp) JUMLAH (Rp)
M2
26.08.03.02
25.03.01.24
25.03.01.16
25.03.01.16
25.03.01.28
25.03.01.33
25.03.01.28
25.03.01.28
25.03.01.28
25.03.01.33
25.03.01.28
SAT.
M
M
M
M
M
M2
M
M
M
M
M
26.08.03.05
25.07.01.04
25.07.01.04
25.07.01.47
25.07.01.11
25.07.01.02
0.0771
0.0204
0.1034
0.0585
0.0000
0.0150
JUMLAH
Nilai ASB
178,323.71
181,602.39
26.08.03.06
25.06.02.03
25.06.01.01
25.06.01.07
25.06.01.07
25.06.01.06
25.06.02.12
25.06.02.32
25.06.02.18
PEK. ATAP
Pas. genteng Kr. pilang/wisma
Pas. kuda - kuda Ky. kamper 8/12
Pas. pengapit kuda - kuda + jurai 6/12
Pas. gording kamper 8/12
Pas. reng jati Usuk ky. Kamper
Pas. bumbungan kr pilang/wisma
Pas Listplank Kayu Jati 3 / 30 cm
Pek. talang jurai
M2
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
65,130.00
12,914,000.00
62,276.80
62,276.80
104,435.80
49,958.25
152,017.90
118,263.44
JUMLAH
Nilai ASB
107,191.17
165,841.16
469.27
824.26
171,880.78
12,121.02
68,532.66
7,754.98
534,615.30
537,893.99
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
1.5984
1.6295
122,735.00
4,683.00
JUMLAH
Nilai ASB
196,174.80
7,630.99
203,805.78
207,084.47
500,000.00
JUMLAH
3,278.69
3,278.69
88,190.90
19,986.00
21,821.40
39,277.80
6,287.50
5,287.20
JUMLAH
Nilai ASB
90,913.36
107,360.86
34,878.47
7,658.78
10,347.99
8,450.85
259,610.31
262,889.00
500,000.00
JUMLAH
3,278.69
3,278.69
97,650.00
42,800.00
34,700.00
26,200.00
9,600.00
JUMLAH
Nilai ASB
7,043.61
4,630.82
2,730.49
1,030.82
1,447.87
16,883.61
20,162.30
1.6458
0.0128
0.0075
0.0132
1.6458
0.2426
0.4508
0.0656
26.08.03.07
25.06.03.17
25.06.03.06
PEK. PLAFOND
Pas. Plafond Kalsiboard Rangka Aluminium
Pas. list plafond
M2
26.08.03.08
25.04.02.18
25.04.02.22
25.04.02.21
25.04.02.15
25.04.02.16
25.04.02.12
PEK. PENGECATAN
Pek. pengecatan kayu ( kusen + lisplank + list plafond )
Pek. pengecatan dinding
Pek. pengecatan plafond
Pek. plitur daun pintu + pintu kaca
Pek. koltir rangka atap
Pek. meni rangka plafond
25.07.01.21
25.07.01.32
25.07.01.24
PEK. PENGANTUNG
Pas. kunci tanam 2 x putar
Pas. engsel kuningan untuk pintu
Pas. engsel kuningan untuk jendela
Pas. hak angin lurus
Pas. grendel kecil biasa
M
M
M2
0.0066 Ls
1.0309
5.3718
1.5984
0.1950
1.6458
1.5984
26.08.03.09
25.07.01.19
25.07.01.22
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M2
0.0066 Ls
0.0721 Unit
0.1082 Stel
0.0787 Stel
0.0393 Bh
0.1508 Bh
26.08.03.10
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
0.1246
0.1049
0.0197
0.0066
0.0787
0.0787
0.0131
195,150.00
51,700.00
7,450.00
227,500.00
29,205.30
26,755.30
29,205.30
JUMLAH
Nilai ASB
24,313.77
5,424.26
146.56
1,491.80
2,298.12
2,105.34
383.02
36,162.87
39,441.56
500,000.00
JUMLAH
3,278.69
3,278.69
25.07.02.02
26.08.03.11
M2
Ttk
Bh
Bh
Bh
Ttk
Bh
Bh
M2
0.0066 Ls
Unit
25.01.02.07
25.01.02.16
25.04.01.12
25.07.03.08
25.04.01.30
25.07.05.08
0.0407
0.0014
0.1130
0.0033
0.1130
0.0098
M
M
M
M
M
M
20,250.00
117,741.25
50,100.92
1,784,684.36
18,901.15
135,517.96
Jumlah
Nilai ASB
824.89
159.87
5,660.11
5,815.98
2,135.34
1,332.96
15,929.17
19,207.86
26.08.03.12
25.01.02.07
25.03.02.03
25.05.01.01
25.01.02.16
25.03.01.36
25.03.01.16
M2
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
20,250.00
13,753.60
76,305.40
117,741.25
418,649.94
2,777,913.59
Jumlah
Nilai ASB
473.25
356.24
4,723.43
203.83
362.37
17,195.74
23,314.86
26,593.55
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
0.0393 Unit
0.0066 Unit
0.0525 Bh
0.3279 M
0.1639 M
0.0131 Bh
0.0131 Bh
0.0131 Bh
0.0131 Bh
459,150.00
450,000.00
58,250.00
69,000.00
77,937.50
281,900.00
19,060.00
19,060.00
185,120.00
JUMLAH
Nilai ASB
18,064.92
2,950.82
3,055.74
22,622.95
12,776.64
3,697.05
249.97
249.97
2,427.80
66,095.85
69,374.54
0.0234
0.0259
0.0619
0.0017
0.0009
0.0062
26.08.03.12
25.07.03.31
25.07.03.22
25.07.03.24
25.07.03.24
25.07.01.46
26.08.04
25.07.03.23
B.08.03.05.07.02
25.07.03.19
25.07.03.30
NO
JENIS PEKERJAAN
M2
Koeff
26.08.04.01
25.01.02.07
25.02.01.23
25.01.02.13
25.01.02.16
25.01.02.16
PEK. TANAH
Galian pondasi batu kali + poer plat
Galian tanah lubang strouss pile d = 20 cm, h = 3 m
Urugan tanah kembali
Urugan pasir bawah pondasi batu kali t = 10 cm
Pek. urugan pasir bawah keramik t = 5 cm
HARGA
SATUAN (Rp) JUMLAH (Rp)
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
0.1747
0.1967
0.0437
0.0304
0.0508
20,250.00
45,600.00
5,062.50
117,741.25
117,741.25
JUMLAH
Nilai ASB
3,537.44
8,970.49
221.09
3,582.42
5,983.57
22,295.02
25,573.71
500,000.00
JUMLAH
3,278.69
3,278.69
3,457,113.56
1,880,541.98
1,880,541.98
2,777,913.59
419,259.66
2,777,913.59
2,777,913.59
2,777,913.59
419,259.66
2,777,913.59
JUMLAH
Nilai ASB
153,019.78
42,295.55
7,102.90
73,774.10
27,525.43
10,656.26
87,435.97
115,930.73
4,845.54
20,401.73
542,987.98
546,266.66
500,000.00
JUMLAH
3,278.69
3,278.69
50,100.92
134,566.15
M
Ttk
M
M
M
M2
0.0066 Ls
0.0443
0.0225
0.0038
0.0266
0.0657
0.0038
0.0315
0.0417
0.0116
0.0073
26.08.04.03
25.04.01.12
SAT.
M2
26.08.04.02
25.03.01.24
25.03.01.16
25.03.01.16
25.03.01.28
25.03.01.33
25.03.01.28
25.03.01.28
25.03.01.28
25.03.01.33
25.03.01.28
Unit
M
kg
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M2
0.0066 Ls
2.6859
25.04.01.30
25.04.01.38
25.02.01.12
25.02.01.20
5.3718
1.9148
0.0813
0.0494
M
M
M
M
18,901.15
5,865.60
427,332.94
179,720.00
JUMLAH
Nilai ASB
101,533.26
11,231.18
34,740.07
8,885.83
290,956.48
294,235.17
26.08.04.04
25.05.01.04
25.05.01.07
25.05.01.01
25.05.01.07
25.05.01.10
PEK. LANTAI
Pas. keramik lantai 30 x 30 cm ( Motif )
Pas. keramik dinding KM/WC 20 x 25 cm ( Motif )
Pas. keramik lantai KM/WC 20 x 20 cm ( Motif )
Pas. keramik dinding keliling 20 x 25 cm ( Motif )
Pas. list keramik 7.5 x 20 cm ( Motif )
M2
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
0.9820 M
0.1364 M
0.0344 M
1.1646 M
0.0689 M
69,654.00
106,978.74
76,305.40
106,978.74
22,569.25
JUMLAH
Nilai ASB
68,397.94
14,591.20
2,626.91
124,586.39
1,553.95
211,756.39
215,035.08
500,000.00
JUMLAH
3,278.69
3,278.69
0.0771 M
0.0204 M
0.1034 M
0.0585 M
284,491.72
284,491.72
55,973.40
332,624.50
21,938.51
5,798.03
5,787.83
33,524.38
0.0150 M
6,617,060.00
JUMLAH
Nilai ASB
99,362.64
166,411.39
169,690.08
26.08.04.05
25.07.01.04
25.07.01.04
25.07.01.13
25.07.01.11
25.07.01.02
26.08.04.06
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
PEK. ATAP
Pas. genteng Kr. pilang/wisma
Pas. kuda - kuda Ky. kamper 8/12
Pas. pengapit kuda - kuda + jurai 6/12
Pas. gording kamper 8/12
Pas. reng kamper Usuk ky. kamper
Pas. bumbungan kr pilang/wisma
Pas. listplank ky papan 3 x 30 cm
Pek. talang jurai
1.6458 M
0.0128 M
0.0075 M
0.0132 M
1.6458 M
0.2426 M
0.4508 M
0.0656 M
65,130.00
5,273,760.00
62,276.80
62,276.80
81,248.35
49,958.25
69,049.16
118,263.44
JUMLAH
Nilai ASB
107,191.17
67,725.45
469.27
824.26
133,718.80
12,121.02
31,128.72
7,754.98
360,933.67
364,212.36
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
1.5984 M
1.6295 M
113,412.72
4,683.00
JUMLAH
Nilai ASB
181,274.43
7,630.99
188,905.42
192,184.10
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
1.0309 M
5.3718 M
1.5984 M
0.1950 M
1.6458 M
1.5984 M
21,821.40
11,820.00
21,821.40
39,277.80
6,287.50
5,287.20
JUMLAH
Nilai ASB
22,495.03
63,494.71
34,878.47
7,658.78
10,347.99
8,450.85
147,325.83
150,604.52
500,000.00
JUMLAH
3,278.69
3,278.69
97,650.00
7,043.61
25.06.02.03
25.06.01.02
25.06.01.07
25.06.01.07
25.06.01.04
25.06.02.12
25.06.02.33
25.06.02.18
26.08.04.07
25.06.03.07
25.06.03.06
PEK. PLAFOND
Pas. plafond eternit rangka ky kamper
Pas. list plafond
26.08.04.08
25.04.02.21
25.04.02.10
25.04.02.21
25.04.02.15
25.04.02.16
25.04.02.12
PEK. PENGECATAN
Pek. pengecatan kayu ( kusen + lisplank + list plafond )
Pek. pengecatan dinding
Pek. pengecatan plafond
Pek. plitur daun pintu + pintu kaca
Pek. koltir rangka atap
Pek. meni rangka plafond
26.08.04.09
25.07.01.19
PEK. PENGANTUNG
Pas. kunci tanam 2 x putar
M2
M2
M2
M2
0.0066 Ls
0.0721 Unit
25.07.01.22
25.07.01.21
25.07.01.32
25.07.01.24
0.1082 Stel
0.0787 Stel
0.0393 Bh
0.1508 Bh
42,800.00
34,700.00
26,200.00
9,600.00
JUMLAH
Nilai ASB
4,630.82
2,730.49
1,030.82
1,447.87
16,883.61
20,162.30
26.08.04.10
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
0.1246 Ttk
0.1049 Bh
0.0197 Bh
0.0066 Bh
0.0787 Ttk
0.0787 Bh
0.0131 Bh
195,150.00
51,700.00
7,450.00
227,500.00
29,205.30
26,755.30
29,205.30
JUMLAH
Nilai ASB
24,313.77
5,424.26
146.56
1,491.80
2,298.12
2,105.34
383.02
36,162.87
39,441.56
500,000.00
JUMLAH
3,278.69
3,278.69
20,250.00
117,741.25
50,100.92
1,784,684.36
18,901.15
135,517.96
Jumlah
Nilai ASB
824.89
159.87
5,660.11
5,815.98
2,135.34
1,332.96
15,929.17
19,207.86
500,000.00
JUMLAH
3,278.69
3,278.69
20,250.00
13,753.60
76,305.40
117,741.25
418,649.94
2,777,913.59
Jumlah
Nilai ASB
473.25
356.24
4,723.43
203.83
362.37
17,195.74
23,314.86
26,593.55
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
0.0393 Unit
0.0066 Unit
0.0525 Bh
0.3279 M
0.1639 M
0.0131 Bh
0.0131 Bh
0.0131 Bh
0.0131 Bh
459,150.00
450,000.00
58,250.00
69,000.00
77,937.50
281,900.00
19,060.00
19,060.00
185,120.00
JUMLAH
Nilai ASB
18,064.92
2,950.82
3,055.74
22,622.95
12,776.64
3,697.05
249.97
249.97
2,427.80
66,095.85
69,374.54
M2
26.08.04.11
25.01.02.07
25.01.02.16
25.04.01.12
25.07.03.08
25.04.01.30
25.07.05.08
M2
0.0066 Ls
0.0407
0.0014
0.1130
0.0033
0.1130
0.0098
26.08.04.12
25.01.02.07
25.03.02.03
25.05.01.01
25.01.02.16
25.03.01.36
25.03.01.16
M2
0.0066 Ls
0.0234
0.0259
0.0619
0.0017
0.0009
0.0062
26.08.04.13
25.07.03.31
25.07.03.22
25.07.03.24
25.07.03.24
25.07.01.46
26.08.05
25.07.03.23
B.08.03.05.07.02
25.07.03.19
25.07.03.30
NO
JENIS PEKERJAAN
Unit
M
kg
M
M
M
M
M2
Koeff
26.08.05.01
25.01.02.07
25.02.01.23
25.01.02.13
Unit
M
M
M
M
M
M
SAT.
HARGA
SATUAN (Rp) JUMLAH (Rp)
M2
0.0066 Ls
0.1747
0.1967
0.0437
M
Ttk
M
500,000.00
JUMLAH
3,278.69
3,278.69
20,250.00
45,600.00
5,062.50
3,537.44
8,970.49
221.09
25.01.02.16
25.01.02.16
0.0304
0.0508
M
M
117,741.25
117,741.25
JUMLAH
Nilai ASB
3,582.42
5,983.57
22,295.02
25,573.71
26.08.05.02
25.03.01.24
25.03.01.16
25.03.01.16
25.03.01.28
25.03.01.33
25.03.01.28
25.03.01.28
25.03.01.28
25.03.01.33
25.03.01.28
M2
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
3,457,113.56
1,880,541.98
1,880,541.98
2,777,913.59
419,259.66
2,777,913.59
2,777,913.59
2,777,913.59
419,259.66
2,777,913.59
JUMLAH
Nilai ASB
153,019.78
42,295.55
7,102.90
73,774.10
27,525.43
10,656.26
87,435.97
115,930.73
4,845.54
20,401.73
542,987.98
546,266.66
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
2.6859
5.3718
1.9148
0.0813
0.0494
50,100.92
18,901.15
5,865.60
427,332.94
179,720.00
JUMLAH
Nilai ASB
134,566.15
101,533.26
11,231.18
34,740.07
8,885.83
290,956.48
294,235.17
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
0.9820 M
0.1364 M
0.0344 M
1.1646 M
0.0689 M
67,924.00
106,978.74
76,305.40
106,978.74
22,569.25
JUMLAH
Nilai ASB
66,699.14
14,591.20
2,626.91
124,586.39
1,553.95
210,057.58
213,336.27
500,000.00
JUMLAH
3,278.69
3,278.69
281,731.72
281,731.72
55,973.40
332,624.50
21,725.67
5,741.78
5,787.83
19,451.44
4,635,300.00
JUMLAH
Nilai ASB
69,604.27
122,311.01
125,589.70
0.0443
0.0225
0.0038
0.0266
0.0657
0.0038
0.0315
0.0417
0.0116
0.0073
26.08.05.03
25.04.01.12
25.04.01.30
25.04.01.38
25.02.01.12
25.02.01.20
PEK. PASANGAN
Pas. batu merah
Pek. Plesteran halus
Pek. benangan
Pek. pondasi batu kali
Pas. aanstamping t = 20 cm
26.08.05.04
25.05.01.03
25.05.01.07
25.05.01.01
25.05.01.07
25.05.01.10
PEK. LANTAI
Pas. keramik lantai 30 x 30 cm ( Motif )
Pas. keramik dinding KM/WC 20 x 25 cm ( Motif )
Pas. keramik lantai KM/WC 20 x 20 cm ( Motif )
Pas. keramik dinding keliling 20 x 25 cm ( Motif )
Pas. list keramik 7.5 x 20 cm ( Motif )
M
M
M
M
M
M
M
M
M
M
M2
M
M
M
M
M
M2
26.08.05.05
25.07.01.05
25.07.01.05
25.07.01.13
25.07.01.11
25.07.01.02
26.08.05.06
0.0771 M
0.0204 M
0.1034 M
0.0585 M
0.0000
0.0150 M
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
PEK. ATAP
Pas. genteng jawa
Pas. kuda - kuda Ky. meranti 8/12
Pas. pengapit kuda - kuda + jurai 6/12
Pas. gording kamper 8/12
Pas. reng kamper Usuk ky. kamper
Pas. Wuwungan genteng jawa
Pas. listplank ky papan 3 x 30 cm
Pek. talang jurai
1.6458 M
0.0128 M
0.0075 M
0.0132 M
1.6458 M
0.2426 M
0.4508 M
0.0656 M
22,630.00
4,768,720.00
62,276.80
62,276.80
70,547.71
42,312.90
69,049.16
118,263.44
JUMLAH
37,244.53
61,239.75
469.27
824.26
116,107.65
10,266.08
31,128.72
7,754.98
265,035.23
25.06.02.01
25.06.01.02
25.06.01.07
25.06.01.07
25.06.01.05
25.06.02.11
25.06.02.33
25.06.02.18
M2
26.08.05.07
25.06.03.04
25.06.03.06
PEK. PLAFOND
Pas. plafond eternit rangka ky kamper
Pas. list plafond
Nilai ASB
268,313.92
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
1.5984 M
1.6295 M
77,374.84
4,683.00
JUMLAH
Nilai ASB
123,672.90
7,630.99
131,303.89
134,582.58
M2
26.08.05.08
25.04.02.21
25.04.02.10
25.04.02.21
25.04.02.15
25.04.02.16
25.04.02.12
PEK. PENGECATAN
Pek. pengecatan kayu ( kusen + lisplank + list plafond )
Pek. pengecatan dinding
Pek. pengecatan plafond
Pek. plitur daun pintu + pintu kaca
Pek. koltir rangka atap
Pek. meni rangka plafond
M2
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
1.0309 M
5.3718 M
1.5984 M
0.1950 M
1.6458 M
1.5984 M
21,821.40
11,820.00
21,821.40
39,277.80
6,287.50
5,287.20
JUMLAH
Nilai ASB
22,495.03
63,494.71
34,878.47
7,658.78
10,347.99
8,450.85
147,325.83
150,604.52
500,000.00
JUMLAH
3,278.69
3,278.69
97,650.00
42,800.00
34,700.00
26,200.00
9,600.00
JUMLAH
Nilai ASB
7,043.61
4,630.82
2,730.49
1,030.82
1,447.87
16,883.61
20,162.30
26.08.05.09
25.07.01.19
25.07.01.22
25.07.01.21
25.07.01.32
25.07.01.24
PEK. PENGANTUNG
Pas. kunci tanam 2 x putar
Pas. engsel kuningan untuk pintu
Pas. engsel kuningan untuk jendela
Pas. hak angin lurus
Pas. grendel kecil biasa
M2
0.0066 Ls
0.0721 Unit
0.1082 Stel
0.0787 Stel
0.0393 Bh
0.1508 Bh
26.08.05.10
0.0066 Ls
500,000.00
JUMLAH
3,278.69
3,278.69
0.1246 Ttk
0.1049 Bh
0.0197 Bh
0.0066 Bh
0.0787 Ttk
0.0787 Bh
0.0131 Bh
195,150.00
51,700.00
7,450.00
227,500.00
29,205.30
26,755.30
29,205.30
JUMLAH
Nilai ASB
24,313.77
5,424.26
146.56
1,491.80
2,298.12
2,105.34
383.02
36,162.87
39,441.56
500,000.00
JUMLAH
3,278.69
3,278.69
20,250.00
117,741.25
50,100.92
1,784,684.36
18,901.15
135,517.96
Jumlah
Nilai ASB
824.89
159.87
5,660.11
5,815.98
2,135.34
1,332.96
15,929.17
19,207.86
500,000.00
JUMLAH
3,278.69
3,278.69
20,250.00
13,753.60
76,305.40
117,741.25
418,649.94
2,777,913.59
Jumlah
Nilai ASB
473.25
356.24
4,723.43
203.83
362.37
17,195.74
23,314.86
26,593.55
500,000.00
3,278.69
M2
26.08.04.11
25.01.02.07
25.01.02.16
25.04.01.12
25.07.03.08
25.04.01.30
25.07.05.08
M2
0.0066 Ls
0.0407
0.0014
0.1130
0.0033
0.1130
0.0098
26.08.05.12
25.01.02.07
25.03.02.03
25.05.01.01
25.01.02.16
25.03.01.36
25.03.01.16
26.08.05.13
Unit
M
M
M
M
M
M
M2
0.0066 Ls
0.0234
0.0259
0.0619
0.0017
0.0009
0.0062
Unit
M
kg
M
M
M
M
M2
0.0066 Ls
25.07.03.23
B.08.03.05.07.02
25.07.03.19
25.07.03.30
25.07.03.31
25.07.03.22
25.07.03.24
25.07.03.24
25.07.01.46
0.0393 Unit
0.0066 Unit
0.0525 Bh
0.3279 M
0.1639 M
0.0131 Bh
0.0131 Bh
0.0131 Bh
0.0131 Bh
JUMLAH
3,278.69
459,150.00
450,000.00
58,250.00
69,000.00
77,937.50
281,900.00
19,060.00
19,060.00
185,120.00
JUMLAH
Nilai ASB
18,064.92
2,950.82
3,055.74
22,622.95
12,776.64
3,697.05
249.97
249.97
2,427.80
66,095.85
69,374.54
26.08.06
NO
Rehabilitasi Pendopo
JENIS PEKERJAAN
26.08.06.01
25.02.01.24
25.01.02.07
25.01.02.13
25.01.02.16
25.01.02.17
PEK. TANAH
Pembuatan Lubang Strous Pile diameter 30 cm
Galian Tanah
Urugan Tanah Kembali
Pengurugan Pasir (PADAT)
Pengurugan Sirtu (PADAT)
26.08.06.02
25.02.01.11
25.04.01.30
25.04.01.38
PEK. PASANGAN
Pemasangan Batu Kali Belah 15/20 cm (1 Pc : 3 Ps)
Plesteran Halus 1 Pc : 4 Ps tebal 1,5 cm
Pasang Benangan
26.08.06.03
25.03.01.23
25.04.01.30
25.03.01.19
25.03.01.17
26.08.06.04
25.05.01.06
PEK. LANTAI
Pas. keramik lantai 40 x 40 cm ( Motif )
26.08.06.05
25.03.02.05
25.03.02.03
B.20.01.01.44.06
B.20.01.01.62.02
PEK. PEMBESIAN
Pekerjaan Besi WF 150x100x7x10
Pekerjaan Besi Plat Tebal 2 mm
Baut 22 mm
Angker
26.08.06.07
25.06.01.04
25.06.02.03
25.06.02.12
25.06.02.33
25.06.01.07
Koeff
SAT.
HARGA
SATUAN (Rp) JUMLAH (Rp)
M2
0.0100 Ls
350,000.00
Jumlah
3,500.00
3,500.00
0.0400 Ttk
0.4680 M
0.2260 M
0.1542 M
0.3987 M
43,115.80
20,250.00
5,062.50
106,956.25
87,501.25
Jumlah
Nilai ASB
1,724.63
9,477.00
1,143.92
16,492.65
34,886.75
63,724.96
67,224.96
0.0100 Ls
350,000.00
Jumlah
3,500.00
3,500.00
0.2150 M
1.1365 M
2.9800 M
406,973.71
5,000.00
5,680.80
Jumlah
Nilai ASB
87,515.63
5,682.50
16,928.78
110,126.91
113,626.91
0.0100 Ls
350,000.00
Jumlah
3,500.00
3,500.00
0.0753 M
0.0405 M
404,051.65
18,606.50
30,410.54
753.56
0.1354 M
0.0000
0.0113 M
3,241,888.40
439,081.37
2,907,758.00
Jumlah
Nilai ASB
32,899.20
503,144.68
506,644.68
0.0100 Ls
350,000.00
Jumlah
3,500.00
3,500.00
1.4336 M
80,364.00
Jumlah
Nilai ASB
115,209.83
115,209.83
118,709.83
0.0100 Ls
350,000.00
Jumlah
3,500.00
3,500.00
6.9802 Kg
1.1740 Kg
3.6000 Bh
0.8000 Bh
13,093.60
13,753.60
3,000.00
2,200.00
Jumlah
Nilai ASB
91,396.50
16,146.77
10,800.00
1,760.00
118,343.27
121,843.27
0.0100 Ls
350,000.00
Jumlah
3,500.00
3,500.00
2.1150 M2
2.1150 M2
0.4300 M
0.4980 M
0.0285 M
58,904.52
64,380.00
49,958.25
46,133.18
62,276.80
124,583.06
136,163.70
21,482.05
22,974.32
1,771.81
M2
M2
M2
M2
M2
25.06.03.02
25.06.03.06
26.08.06.08
2.1420 M2
2.8800 M
67,775.76
2,988.25
Jumlah
Nilai ASB
145,175.68
8,606.16
460,756.78
464,256.78
350,000.00
Jumlah
3,500.00
3,500.00
M2
0.0100 Ls
25.04.02.12
25.04.02.16
25.04.02.21
25.04.02.21
25.04.02.10
26.08.06.09
2.4941 M
2.1150 M
0.3521 M
2.1420 M
1.1365 M
0.0100 Ls
0.0500 Ttk
0.0400 Bh
0.0100 Ls
0.0200 Ttk
0.0200 Bh
5,287.20
6,287.50
21,821.40
21,821.40
11,820.00
Jumlah
Nilai ASB
13,186.70
13,298.06
7,682.88
46,741.44
13,433.43
94,342.51
97,842.51
350,000.00
Jumlah
3,500.00
3,500.00
195,150.00
51,700.00
1,500,000.00
29,205.30
29,205.30
Jumlah
Nilai ASB
9,757.50
2,068.00
15,000.00
584.11
584.11
27,993.71
31,493.71
M2